travel management manual

22
1 Standard Operating Procedure on Travel

Upload: yashraj1510

Post on 22-Sep-2015

31 views

Category:

Documents


4 download

DESCRIPTION

Travel Management Manual

TRANSCRIPT

  • 1

    Standard

    Operating

    Procedure

    on Travel

  • 2

    Management

    Module

    The tour dairy is to be approved by concern authority after

    performing the journey by an employee on monthly basis. TA claim is to be claimed by an employee after approval of the tour dairy. TA claims

    along with approved tour diary is to be sent to accounts wing for processing of the TA claim as per legacy system same procedure is being mapped with

  • 3

    SAP-ERP system through ESS Portal with certain modifications. The

    employee can apply tour dairy and TA bill through ESS portal at a time. Further dearness allowance will be calculated by the system as per existing

    TA Rules and further it can also provide print out of Tour Dairy and TA bill. This is integration process of verifying the tour dairy and TA claim along

    with the payment.

    TOUR DIARY CREATION BY AN EMPLOYEE:

    Employee in the APGENCO/TSGENCO who are having ESS (Employee Self

    Service) portal should apply their TA Bill Claim through ESS only. The

    following procedure is being applied for procedure for applying Tour Diary

    and TA bill through ESS is as follows. For example if an Asst. Engineer (AE)

    performing the tour from KTPP plant to HYDERABAD the creation of Tour

    Diary is as follows. After performing the tour by an employee has to first

    create tour diary through ESS portal.

    Employee has to first open internet browser and copy the under given URL

    address for entry into ESS portal.

    Step1:

    The URL for Production Server: http://ess.apgenco.gov.in:/irj/portal

    Step:2

  • 4

    Step:3

  • 5

    step:4

    STEP:05

    1. Click on

    General Data

    4. Select HYD from drop box

    5.enter destination

    6. Select

    relevant field

    from the drop

    box

    7. Enter additional

    certificates if any

    8. Select

    review

  • 6

    Step6:

    Step: 7

  • 7

    TA BILL Creation

    Step: 08

    Step:09

  • 8

    Step:10

    Enter travel fare only. No need to enter DA amount in TA bill system will

    be calculated automatically as per the TA rules.

    step:11

  • 9

    Step:12

    Step:13

  • 10

    Step:14

    To verify the status of the tour diary: The following procedure is to be

    followed for verifying the status of tour diary.

    STEP: 15 In Employee Self-Service select travel work centre

  • 11

    Step:16

    APPROVAL PROCESS OF TOUR DIARY:

    Step:17

    Controlling officer (here ADE) has to log on to ESS Portal same as

    above.

    1. Select

    Tasks &

    Notifiation

    s

    2. Select refresh

    button

    3. Select the relevant tour diary

    document number

  • 12

    Step:18

    The same steps to be followed by all Officer upto final approval authroty

    (SE/CE as the case may be).

    After final approval the screen will be displayed to the concerned

    employee like this in all my travel requests in ESS portal

    Step:19

    1. Reasons may be recorded

    2. Forwarded or Reject

    the tour diary

    Request Approved

  • 13

    Whatever the procedure is followed for approval of tour diary, the same

    procedure to be followed for approval of TA bill by the immediate concerned

    controlling officer only in ESS Portal.

    ACCOUNTS DEPARTMENT APPROVAL PROCESS (Integration of HR

    module with FI

    After approval of Tour Dairy and Travel Expenses request by the immediate

    controlling officer, the same along with Tour Diary will be forwarded to the

    Accounts Department usually PRS(Pay Rolls) sections. The procedure for

    scrutiny and approval at PRS Sections is as follows.

    Step20: The JAO of PRS section is opened his inbox in R/3 System.

    Step:21

    Click on sap business work

    place

    1.Click on

    work flow 2.click on

    work item

  • 14

    Step:22

    If the JAO wants to rectify anything he can make changes in the T code

    TRIP. If he enters TRIP Tcode the following screen appears

    Step:23

    Forward, reject or keep

    work item

    Enter the

    employee number

  • 15

    Step:24

    Step:25

    Message displayed .Your trip was saved in status 'Trip Completed' 'To Be

    Settled'

    Click on

    change

    travel

    expense

    report

    1. Click on the any relevant

    item and make changes

    2. click

    on save

  • 16

    For making approval the same steps will be followed by the AAO/AO. After

    final approval the JAO of the PRA Section will see the report of approved

    TA bills list by the T code PRAP. The following report will be displayed.

    Step:26

    Step:27

  • 17

    Step:28

    Step:29

  • 18

    Settlement:

    Based on the above list concerned AAO/AO will settle trip through T code

    PR05

    Step:30

    Step:31

    1. Enter employee ID

    and press enter

    1.Select

    the trip

    2. click on

    settle

  • 19

    Step:32

    Simulation:

    After settlement AAO/AO will make simulation run. Tcode is PRFI. The

    following screen will be displayed.

    Step:33

    Click on

    this

    1.Enter

    payroll area

    2.Enter single or

    Multiple numbers

    Tick in

    the box

    Click on

    this

  • 20

    Step:34

    Posting to Accounts: This is the final step by the PRS section. Tcode is PRRW

    Step:35

    1. Enter the run numbers in

    the previous step

    2.click

    on this

  • 21

    Step:36

    Step:37

    1.Select

    it 2.click on this

  • 22

    REPORT

    After FI posting JAO/PRS will down load the passed travel bills report using

    Tcode: Z_HR_TRAVEL_DL same will be forwarded to cash section for

    applying LOC and make the payment to employees.

    Step:38

    Step:39

    THE END

    Tick the

    box

    2. Enter 1000 3. Enter

    payroll area