Newcastle Under Lyme, UK the complete construc tion company Travelodge Hotels Ltd The design and construction of an 82 bedroom Travelodge Hotel complete with a bar cafe with a Lidl Supermarket under and adjacent. The project is set on the site of a recently demolished paper mill near the centre of Newcastle under Lyme.TRANSCRIPT
![Page 1: Travelodge-NewcastleUnderLyme](https://reader034.vdocuments.net/reader034/viewer/2022042823/568bd9ee1a28ab2034a8e56c/html5/thumbnails/1.jpg)
Travelodge Hotels LtdNewcastle Under Lyme, UK
the complete construc tion company
![Page 2: Travelodge-NewcastleUnderLyme](https://reader034.vdocuments.net/reader034/viewer/2022042823/568bd9ee1a28ab2034a8e56c/html5/thumbnails/2.jpg)
![Page 3: Travelodge-NewcastleUnderLyme](https://reader034.vdocuments.net/reader034/viewer/2022042823/568bd9ee1a28ab2034a8e56c/html5/thumbnails/3.jpg)
The design and construction of an 82
bedroom Travelodge Hotel complete
with a bar cafe with a Lidl Supermarket
under and adjacent. The project is set
on the site of a recently demolished
paper mill near the centre of Newcastle
under Lyme.
Travelodge Hotels Ltd
![Page 4: Travelodge-NewcastleUnderLyme](https://reader034.vdocuments.net/reader034/viewer/2022042823/568bd9ee1a28ab2034a8e56c/html5/thumbnails/4.jpg)
Key Features
Japanese Knotweed was present on the
site, this was treated and removed.
The site was of Archaeological interest,
having been a medieval settment.
Archaeological monitoring was carried
out during the substructure works.
The ground had been contaminated
by previous use, so a site remediation
scheme was developed, approved and
implemented before the main works.
The site, being a paper mill in the past,
was set over a culverted stream. The
design of the foundations and external
works allowed the culvert to remain in
tact and undisturbed.
A sustainable drainage system was
designed to the approval of the EA.
Highways works were designed and
installed to both allow access into the
site from the main A34 and to improve
one of the adjacent junctions to ease
traffic flow. These were installed with
single lane closures only avoiding the
need to diver traffic.
![Page 5: Travelodge-NewcastleUnderLyme](https://reader034.vdocuments.net/reader034/viewer/2022042823/568bd9ee1a28ab2034a8e56c/html5/thumbnails/5.jpg)
Start Date | September 2009
Duration | 38 Weeks
Completion Date | May 2010
Project Value | £3.9m
Client Details | Urbanwaterside
Details
![Page 6: Travelodge-NewcastleUnderLyme](https://reader034.vdocuments.net/reader034/viewer/2022042823/568bd9ee1a28ab2034a8e56c/html5/thumbnails/6.jpg)
the complete construc tion company
Anglo Holt Construction Ltd.
0121 525 6717
www.angloholt.co.uk