trellis design at court 05. · 2013. 5. 7. · trellis design at court. ... trellis at level 5: -...

7
400 6th Street, SW Washington DC | December 04, 2012 05. Trellis Design at Court

Upload: others

Post on 30-Mar-2021

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Trellis Design at Court 05. · 2013. 5. 7. · Trellis Design at Court. ... Trellis at Level 5: - No Facade setbacks required at upper levels. - Trellis must run the entire south

400 6th Street, SW Washington DC | December 04, 2012

05.Trellis Design at Court

Page 2: Trellis Design at Court 05. · 2013. 5. 7. · Trellis Design at Court. ... Trellis at Level 5: - No Facade setbacks required at upper levels. - Trellis must run the entire south

400 6th Street, SW Washington DC | December 04, 2012

Ground Floor

South Court

Extent of Court above at Loading Roof Level

Page 3: Trellis Design at Court 05. · 2013. 5. 7. · Trellis Design at Court. ... Trellis at Level 5: - No Facade setbacks required at upper levels. - Trellis must run the entire south

400 6th Street, SW Washington DC | December 04, 2012

Second Floor

South Court

22’-2” Setback from face-of-building to Property LIne

Extent of Court from Loading Roof Level to Main Roof

Page 4: Trellis Design at Court 05. · 2013. 5. 7. · Trellis Design at Court. ... Trellis at Level 5: - No Facade setbacks required at upper levels. - Trellis must run the entire south

400 6th Street, SW Washington DC | December 04, 2012

Section - Option 01

Level 0120' - 11"

Level 0233' - 3"

Level 0343' - 11"

Level 0454' - 7"

Level 0565' - 3"

Level 0675' - 11"

Level 0786' - 7"

Level 0897' - 3"

Level 09107' - 11"

Level 10118' - 7"

Level 11129' - 3"

Level 12139' - 11"

ROOF LEVEL151' - 8"

123567 4

Level P19' - 11"

Level P20' - 11"

Level P3-8' - 1"

8

11' -

9"10

' - 8"

10' -

8"10

' - 8"

10' -

8"10

' - 8"

10' -

8"10

' - 8"

10' -

8"10

' - 8"

10' -

8"9'

- 0"

9' - 0

"12

' - 4"

8' - 4

"

(CEILING HEIGHT)10

' - 3"

LEVEL P3

LEVEL P2

LEVEL P1

LOADING DOCK

2 STORY LOBBY

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE8' - 4

" (CEILING HEIGHT)

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

PENTHOUSE

22' - 0" 20' - 0" 30' - 0" 20' - 0" 20' - 0" 30' - 0" 20' - 0"

11' -

0"

South Court

Trellis at Level 5:

- No Facade setbacks required at upper levels.- Trellis must run the entire south facade from face of building to property line.- Requires no change to building footprint. FAR surplus from SD will be handled by tightening up the north facade.

Page 5: Trellis Design at Court 05. · 2013. 5. 7. · Trellis Design at Court. ... Trellis at Level 5: - No Facade setbacks required at upper levels. - Trellis must run the entire south

400 6th Street, SW Washington DC | December 04, 2012

Court Trellis (per Zoning requirement)

SW 3D View

Page 6: Trellis Design at Court 05. · 2013. 5. 7. · Trellis Design at Court. ... Trellis at Level 5: - No Facade setbacks required at upper levels. - Trellis must run the entire south

400 6th Street, SW Washington DC | December 04, 2012

Court Trellis (per Zoning requirement)

Level 05 Floor Plan

DN

DN

UP

UP

A B C D E F H J

1

2

3

5

6

7

4

8

GF3E7

Page 7: Trellis Design at Court 05. · 2013. 5. 7. · Trellis Design at Court. ... Trellis at Level 5: - No Facade setbacks required at upper levels. - Trellis must run the entire south

400 6th Street, SW Washington DC | December 04, 2012

Court Trellis (per Zoning requirement)

Trellis Axon View