trimble total station
TRANSCRIPT
April 13, 2023 1
OPERATION of Total Station
BYG.NAGESH KUMAR
SENIOR ASSISTANT PROF.G.P.R.E.C, KURNOOL
April 13, 2023 2
Eye Piece
Touch Screen
Alpha Numeric Keyboard
Tribratch
Horizontal Movement
Vertical Movement
Focus Adjustment
Nomenclature
April 13, 2023 3
Battery
Projected Handle
TelescopeLine of Collimation
Nomenclature
April 13, 2023 4
Track Lights
Physical Bubble
Telescope
Bull Sight eye
Nomenclature
April 13, 2023 5
Laser PlummetBattery
Data Transfer
PC Connection
Pen Drive Slot
Nomenclature
April 13, 2023 6
OPERATION
April 13, 2023 7
Open TRIMBLE ACCESS. Select ‘General Survey’
April 13, 2023 8
April 13, 2023 9
Adjust the Electronic Level Within a limit of + 10”
(both in Turnnion and Sighting)
April 13, 2023 10
Go to ‘Jobs’ and select ‘New Job’.
April 13, 2023 11
Give a name to the new job Enter Accept.
April 13, 2023 12
STATION SETUP [One known co-ordinate and one angle]
Go
April 13, 2023 13
Station Set-up
April 13, 2023 14
Station Set-up/ Measure topo
April 13, 2023 15
Measure topo
April 13, 2023 16
Measure topo/ Map
April 13, 2023 17
Point Manager
April 13, 2023 18
STATION SETUP [Two Known Co-ordinates] Go
April 13, 2023 19
Station Set-up
April 13, 2023 20
Station Set-up
April 13, 2023 21
AREA & PERIMETER Calculation
April 13, 2023 22
Sub-divide Area
April 13, 2023 23
STAKE OUT (Points)
April 13, 2023 24
STAKE OUT (Points)
April 13, 2023
STAKE OUT (Points)
25
April 13, 2023 26
STAKE OUT (Points)
April 13, 2023 27
STAKE OUT (Points)
April 13, 2023 28
DATA Export to Excel (.CSV) format
April 13, 2023 29
DATA Export to Excel (.CSV) format
April 13, 2023 30
Export to AutoCAD format(.DXF) Go
April 13, 2023 31
BACKGROUND MAP
April 13, 2023 32
Active Map
April 13, 2023 33
THANK YOU….