trinamount

23
Introducing the fastest, easiest and least expensive way to mount PV modules

Upload: trina-solar-ltd

Post on 12-Jul-2015

4.999 views

Category:

Business


0 download

TRANSCRIPT

Page 1: Trinamount

Introducing

the fastest, easiest and least expensive way to mount PV modules

Page 2: Trinamount

Introduction to

Benefits

Additional Information

Page 3: Trinamount

Conventional Solar Installations Require Railing

Rails are expensive, time-consuming and challenging

It’s time-consuming to manage the many SKUs and to load parts onto

trucks.

Additionally, rails must be:• Stored in costly warehouse space• Cut to meet the requirements of the individual job• Carried or crane-hoisted onto the roof•Affixed to the roof with an array of small parts

Page 4: Trinamount

The Challenges of Grounding Conventional Systems

Grounding is difficult and time consuming

• Must ground each module and rail

• Each event takes 5+ minutes

• Often entails grounding “jumpers”

between rails.

• Ground lugs are susceptible to

corrosion, premature failure

• Systems often become improperly

grounded over time

Page 5: Trinamount

Innovative Solar Mounting Solution

Trinamount makes solar cost-effective, fast and easy

• Installs quickly

• Few parts simplify

logistics

• Self-grounding

• Installs portrait or

landscape

Trinamount III installation in New Jersey – 500kWp

Page 6: Trinamount

How works

• Groove in module frame simplifies system: no rails

• Self-contained grounding

• Innovative component mating: snaps and ¼-turns

• Fewer parts

Innovative design sets Trinamount apart

Page 7: Trinamount

3 Series cover a range of conditions

TILECOMPOSITION

SHINGLE

STANDING SEAM

TRAPEZOIDAL METAL

CORRUGATED METAL

FLAT ROOFS

I II IIc III

Page 8: Trinamount

Introduction to Trinamount

Benefits

Additional Information

Page 9: Trinamount

Trinamount isfast and easy

quick installationself-contained grounding

fewer parts, simplified logisticsrapid system design

Page 10: Trinamount

installation

grounding

logistics

design

Quick Installation

Installs 4.5 times faster

• No rails: no measuring or cutting• One tool, fewer parts• Integrated wire-management• Self-grounded• Drop and snap installations• 2 kW of mounting hardware fits in a tool belt

fast/easy

WATCH VIDEO

Page 11: Trinamount

installation

grounding

logistics

design

World-Class Grounding Solution

One ground lug per 72 modules

fast/easy

• Integrated, optimized auto-grounding hardware

• A single ground lug grounds multiple modules

• UL 1703 listed

Page 12: Trinamount

Competitor X Trinamount III 12 240" Rails 32 Leveling Feet

6 60" Rails 28 Interlocks

12 Rail Splices 1 Ground Lug

48 Standoffs 32 Flashings

96 S.S. Lag Bolts 93 Total

48 L-feet

96 S.S. Bolts

96 S.S. Nuts

48 Galvanized flashings

54 Grounding lugs

42 Mid Clamps

12 End Clamps

140' Bare #8AWG Wire

54 S.S. Ground Bolts

54 S.S. Ground Nuts

54 Star washers

732 Total

fast/easy

installation

grounding

logistics

design

Fewer Parts Simplifies Logistics

66% fewer SKUs

80% fewer parts

System Configuration• 24 Trina 230W PA05 Modules• 3 rows of 8 modules• Landscape Configuration• 5.52kW DC STC

pitched roof example

Fewer parts to ship, store and track

Source: Internal calculations

Page 13: Trinamount

fast/easy

installation

grounding

logistics

design

Trinamount Design Tool

order the right parts the first time

• layout designs• attachment point spans• cantilever allowances• bills of materials

For Trinamount III projects:

Email [email protected] with specifications and pictures of the project site for assistance

• Fast system design and engineering • Best-in-class web-based software• Order the right parts the first time

For Trinamount I, II projects

Log in to generate

www.trinamount-design.com

Page 14: Trinamount

Trinamountsaves money

theft-resistantlandscape installation

lower labor and parts costs

Page 15: Trinamount

15

savings

secure

landscape

labor/parts

Theft-Resistant

A secure investment

Module removal requires system-specific knowledge and tool

Channel-locks cannot fit around nut between modules

Page 16: Trinamount

16

savings

secure

landscape

labor/parts

Landscape-Installation Options

Without rails, you can install in landscape or portrait modes

Landscape installations deliver more kWh

Landscape

Max. 3.2 kW

Portrait

Max. 4.0 kW

Source: Internal calculations

25% more kW in landscape

Page 17: Trinamount

savings Savings Add Up

Installation savings make a real difference in the bottom line

secure

landscape

labor/parts

2009 2010 2011 Trinamount

Installed Cost per Watt for US Residential PV Systems ($/Wp)

BOS

Inverters

Modules

$ 7.26

$ 5.98

$ 5.26$ 4.76

Sources: GTM Research, Internal estimates

- 10%

Page 18: Trinamount

:

savings Savings Case Study: Introduction

secure

landscape

labor/parts

ASSUMPTIONS

system size 1 MWp

module count 4,256 modules

module wattage 235 Wp

hourly rooftop labor rate $ 120.00

copper wire cost/foot $ 0.62

modules/row 24

average row length (ft) 140

row count 177

Source: Internal calculations

Page 19: Trinamount

Competitor XX Trinamount III Savings %

Rooftop Labor Expenses

Crew Size (headcount) 3 3 -

Max Module/day/crew 180 480 300 167%

Max Module/man-day Rate 60 160 100

Days to complete 24 9 15

(A) Subtotal: Rooftop Labor Expense (in $) $68,096 $25,536 $42,560

Subtotal: Install Labor Exp (in $/Wp) $0.068/Wp $0.026/Wp $0.043/Wp

Grounding

Incremental Intra-row Copper Wire (ft) 24,826.7 24,826.7

Incremental Intra-row Copper Wire ($) $15,393 $15,393

Module Grounding Events 4,256.0 4,256.0

Minutes/Event 1.0 -

Module Grounding Man-hours 70.9 70.9

Module Grounding: Increm. Labor Exp. $8,512 $8,512

(B) Subtotal, Incremental Module Grounding ($) $23,905 $0 $23,905

Subtotal, Incremental Module Grounding/W $0.024/Wp $0.000/Wp $0.024/Wp

TOTAL SAVINGS in $ (A+B) $92,001 $25,536 $66,465

in $/Wp $0.092/Wp $0.026/Wp $0.066/Wp

63%

72%

Rooftop installation - 1MWp system

savings Savings Case Study: Cost Comparison

72% total savingsSystem completed in 9 days (vs. 24 days)

secure

landscape

labor/parts

Source: Internal calculations and Competitor Y’s data sheets

Trinamount requires no additional grounding

Page 20: Trinamount

Trinamount

Faster and Easier Installs up to 5 times faster

Fewer PartsOne tool, few parts

Accommodates any RoofSystems for for flat, tiled and

pitched roofs

Theft ResistantMore difficult to steal from

roofs

Improves EfficiencyInstall modules landscape or

portrait for more kWh

Aesthetic SolutionArray skirts keep your array

looking clean

Page 21: Trinamount

Introduction to Trinamount

Benefits

Additional Information

Page 22: Trinamount

add’l info

website

Please visit our website for more details

www.trinasolar.com/trinamount

you can find at our website:

• Videos• Installation Manuals

• Trinamount Design Tool• Datasheets

Page 23: Trinamount

www.trinasolar.com

CHINA

JAPAN

KOREA

U.S.A.

SWITZERLAND

GERMANY

ITALY

SPAIN

AUSTRALIA

CONTACT US

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]