Timberwork Case StudiesMSc. Building Conservation
22 February 2013
![Page 3: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/3.jpg)
Paul Price
Woodwrights
Oak frame carpentry and timber conservatio
n
![Page 4: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/4.jpg)
Topics:1.Recognising historic carpentry
2.Repairs: surveys and methods
3.Case histories
An overview of historic carpentry and timber
repair
![Page 5: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/5.jpg)
Historic timberworkPart of our built heritage – in Ireland: especially
roofs.A valuable record of historic craftwork - timber
conversion and scribe carpentry.
Christchurch Cathedral,
Dublin. 17th C. oakwork
![Page 6: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/6.jpg)
Ilustrations from:McCracken, E. (1971) The Irish Woods Since Tudor Times
![Page 7: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/7.jpg)
Holy Trinity Church, Fethard, Co.
TipperaryMedieval oak roof
frame, discovered 2010
![Page 8: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/8.jpg)
![Page 9: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/9.jpg)
![Page 10: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/10.jpg)
See-sawing (swivel or trestle sawn)
![Page 11: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/11.jpg)
Timber Conservation Aims
Conserve the overall aesthetic form of the structural
frame while repairing the structure.Preserve original timber as much as possible.
Timber surfaces, which preserve marks recording the original timber conversion and framing methods.
Dunsoghley Castle, Co. Dublin.
High quality scribe carpentry;Double collar; Arch-braces with locking tenons; Scribe numbers visible.
![Page 12: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/12.jpg)
Timber Conservation ProcessSurvey: historical value, condition, and
structure.Repairs: minimal, unobtrusive, reversible.
Outlook: maintenance check-listNorway - Loft repair.Timber replacement: New timber selected, cleft and hand hewn to match original decayed element.
![Page 13: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/13.jpg)
Recognising historic carpentry
Conversion: logs into timber
Carpentry: scribing, jointing and raising frames
![Page 14: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/14.jpg)
Oak - tough and durable. Baltic pine –
imported.
Two forms of historic timberwork:
Treewrightingaxe-hewn, boxed
heart,often smaller ‘stuff’,
cottage roofs;
Frame carpentryhewn plus rip-sawn,mortice and tenon,
large range of scantlings,
use of grown “bends”,larger, more durable
buildings.
![Page 15: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/15.jpg)
Hewing: Turning logs into timber.Marking and notching
![Page 16: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/16.jpg)
Hewing
Notching
Juggling
Finishing with broadaxe
![Page 17: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/17.jpg)
Hewing: Finishing- A broadaxe was used to give a flat finish
![Page 18: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/18.jpg)
Close up of hewn
surface
Stop mark
Axe nick marks
Note mutual angle of marks
![Page 19: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/19.jpg)
Pit-sawn surface with
framers’ level mark
![Page 20: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/20.jpg)
Scribing: Timber placed over full scale layout so thatjoints can be scribed to allow accurate fit of irregular timbers
![Page 21: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/21.jpg)
Plumb bob
Referenceline
![Page 22: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/22.jpg)
Scribed shoulder
![Page 23: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/23.jpg)
Scribe carpentry workshop
![Page 24: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/24.jpg)
Numbering: Usually Roman - chiselled or
race-knifed
![Page 25: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/25.jpg)
![Page 26: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/26.jpg)
Recognising historic timberwork
Hewn or pit-sawn surfaces
Carpenters layout marks - scribe lines and references
Mortice and tenon joints
Chiselled numbers at joints
Scribed joints - shoulders scribed to match irregularities
![Page 27: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/27.jpg)
Repairs: surveys and
methods
![Page 28: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/28.jpg)
Surveys
Record DrawingsBasic survey - Schematic timber drawings and
photographs.Full Survey: Archeological level recording.
EstimatingAnnotate basic survey schematics with current
condition and possible repairs
![Page 29: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/29.jpg)
Bishops Palace, Salisbury, Wiltshire, EnglandRoof by Francis Price 1726 Our repairs 1998
![Page 30: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/30.jpg)
Cathedral Church, Cashel
Nave roof 1780Large span 46ft
=14mTransition carpentry
Diagnosing a structural problem.
– Is it really a problem?
![Page 31: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/31.jpg)
Cashel Cathedral Church Roof:
• Queen post roof with king strut
• Ceiling load has deformed roof
![Page 32: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/32.jpg)
Joint separation 100mm+
![Page 33: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/33.jpg)
Cashel: Structural schematic
Original
Current
Movement appears locked but should be monitored
![Page 34: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/34.jpg)
Repair Methods
![Page 35: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/35.jpg)
Repair Methods for Historic Timberwork
•Steelwork: straps, flitch plates, cables, brackets, bolts, screws to secure joints and framing.
•Carpentry: replacement timbers, patch and end repairs.
•Resin: consolidation, packing, patch and end repairs.
Beware the “honest” repair
Making repairs look distinctive from original workis often an excuse for unsightly repairs.
![Page 36: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/36.jpg)
METAL REPAIRS:•Often cheapest and best if hidden or subtle- no disassembly needed.•Reversible and easier. Unsightly if visible and poorly designed.•Use galvanised or stainless steel for repairs.
![Page 37: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/37.jpg)
CARPENTRY REPAIRS•Potentially damaging disassembly required for replacement or end repairs.•Requires high quality repair carpentry for good results.•Decide whether to match conversion methods.•Use oak with oak etc.
![Page 38: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/38.jpg)
End repairs•require careful fitting and assembly•use dry timber where possible.•may have to use green -allow for shrinkage and later tightening
![Page 39: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/39.jpg)
New tenon repair - only possible if frame elements disassembled
![Page 40: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/40.jpg)
Multiple scarf repairs to softwood wall
![Page 41: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/41.jpg)
Rafter notch joint reformed in resin
RESIN REPAIRS:•Good for consolidating valuable decayed timber and for packing out steel repairs.•Bad for large end repairs. Can be very ugly.•Always use resin designed specifically for structural timber work.
![Page 42: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/42.jpg)
Exposed to weather for 600 years
Timber durability:Excellent if kept dry.Good if sheltered.Bad if continually damp.
Leaking weathervane - king post decayed
![Page 43: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/43.jpg)
Case Histories
![Page 44: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/44.jpg)
Barn, Co. Wicklow18th Century
An exceptional and unusual barn frame
![Page 45: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/45.jpg)
Barn in WicklowShipping marks on Baltic Pine on hewn surfaces.Race knifed symbols denoting timber baulk quality and quantity.
![Page 46: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/46.jpg)
Unusual framed cantilevered roof overhang
![Page 47: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/47.jpg)
Bridled scarf with sallied abutments in a 10 cm by 6.5 cm timber !!
![Page 48: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/48.jpg)
Dragon tie hip assembly: Note numbering
![Page 49: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/49.jpg)
Purlins scribed over hip bevel
![Page 50: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/50.jpg)
Curved EndNew tie and reassembly numbers
![Page 51: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/51.jpg)
![Page 52: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/52.jpg)
Historic pine: Left side has been sandblasted.Note serious loss of fragile but intact surface.
![Page 53: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/53.jpg)
Winchester Cathedral, South TransceptDendro date 1313Difficult working conditionsLaminated in-situ repairs
![Page 54: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/54.jpg)
Disassembly: can see inside joints•Soulace brace with locking tenon•Axed tenon faces•Drawbored tenon•Centre lines
![Page 55: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/55.jpg)
Southwick Barn. Hampshire, England
Collapsing barn- uprighted, mostly in-situ steel repairs
![Page 56: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/56.jpg)
Gusset bracket and flitch repairs
![Page 57: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/57.jpg)
Wooton Bassett,Wiltshire, England
Decay of 19th century oak repairs due to impermeable black paint
![Page 58: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/58.jpg)
Repaired frame prior to stripping impermeable paint
Frame and replastered panels then limewashed
![Page 59: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/59.jpg)
House at Laxfield, Suffolkworking with Traditional Oak Carpentry Co
![Page 60: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/60.jpg)
![Page 61: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/61.jpg)
Structural frame repairs - support carefully!
![Page 62: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/62.jpg)
Cill plate decay - due to constant wetting, impermable paint, and cement mortar/render.
![Page 63: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/63.jpg)
Exterior new timber conserving interior -Coach screwed together with resin packing
![Page 64: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/64.jpg)
Installing new cill with new and repaired timber
![Page 65: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/65.jpg)
Frame reassembled with new plinth built up.Exterior frame aesthetic conserved.
![Page 66: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/66.jpg)
Decay treatment
![Page 67: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/67.jpg)
Interior timber entirely saved.
Poor quality of framing timber -hedgerow stuff
![Page 68: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/68.jpg)
Charlton Court Barn, West Sussex, England
Major repairs•Roof stone removed, frame realigned, joints reassembled•Very costly - steel building over, detailed repairs throughout. Use for special buildings.
Dendro-dated to 1404
![Page 69: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/69.jpg)
Patch repair: coach screwed and plugged
End repairs:Tabled stop splay scarf
![Page 70: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/70.jpg)
New aisle sway brace
New timbers where missing•Re-make in new timber on pattern of existing.•Better than unsightly exposed steel. •Can make decision to match existing conversion to similar pieces.
![Page 71: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/71.jpg)
Purlin span decreased using in-line steel angles - no plywood
![Page 72: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/72.jpg)
Completed frame repair •Aesthetic conserved •Structure repaired
![Page 73: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/73.jpg)
![Page 74: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/74.jpg)
![Page 75: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/75.jpg)
![Page 76: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/76.jpg)
Topics:•Recognising historic carpentry
•Repair surveys and methods
•Case histories
An overview of historic carpentry and timber
repair
![Page 77: Trinity Timber Case Studies slideshare](https://reader034.vdocuments.net/reader034/viewer/2022050808/54852d2cb4af9f72678b469b/html5/thumbnails/77.jpg)
Thank-you
Paul Pricewoodwrights.ie