Page 1: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

EXTENSION TO HOTEL RIVIERA, MARFA

PROJECT DESCRIPTION STATEMENT

Version 1: September 2013

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 1 of 62 36a

Page 2: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

i

Report Reference:

Adi Associates Environmental Consultants Ltd, 2013. Extension to Hotel

Riviera, Marfa. Project Description Statement. San Gwann, September

2013; vi + 18pp.

THIS IS A DIGITAL COPY OF THE REPORT.

RESPECT THE ENVIRONMENT – KEEP IT DIGITAL

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 2 of 62 36a

Page 3: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 3 of 62 36a

Page 4: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

iii

This document has been prepared in accordance with the scope of Adi Associates’ appointment with its client and is subject to the terms of that appointment. It is addressed to and for the sole and

confidential use and reliance of Adi Associates’ client. Adi Associates accepts no liability for any use of this document other than by its client and only for the purposes for which it was

prepared and provided. Except as provided for by legislation, no person other than the client may copy (in whole or in part) use or rely on the contents of this document, without the prior written

permission of Adi Associates. Any advice, opinions, or recommendations within this document should be read and relied

upon only in the context of the document as a whole. The

contents of this document do not provide legal or tax advice or opinion.

© Adi Associates Environmental Consultants Ltd 2011

Kappara Business Centre 113 Triq Birkirkara

San Gwann SGN 4197

MALTA

Tel. / Fax: 21378172 - 77

Email: [email protected]

Web: www.adi-associates.com

Quality Assurance

To Extension to Hotel Riviera, Marfa

Project Description Statement September 2013

Report for: Perit Martin Farrugia

Revision Schedule

Rev Date Details Written by: Checked by: Approved by:

00 Sept 2013 Submission to Client Yury Zammit

Environmental Consultant

Rachel Xuereb Director

Adrian Mallia Director

File ref: F:\ADI\PDSs\Riviera Hotel\PDS\Riviera Hotel Extension PDS_FINAL.docx

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 4 of 62 36a

Page 5: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 5 of 62 36a

Page 6: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

v

CONTENTS

Introduction .............................................................................................. 1

Background ................................................................................................................................................... 1

Planning history ............................................................................................................................................ 1

Objectives of the Scheme ......................................................................................................................... 3

Benefits of the scheme ............................................................................................................................... 3

Description of Scheme ............................................................................ 4

Location ......................................................................................................................................................... 4

Characteristics of the Application Site ................................................................................................... 4

Description of the General Surroundings ............................................................................................. 7

Land uses ....................................................................................................................................................... 7

Scheduled areas ........................................................................................................................................... 7

Planning Policy ............................................................................................................................................ 11

North West Local Plan ............................................................................................................................ 11

The Scheme ................................................................................................................................................ 12

Alternatives Considered .......................................................................................................................... 13

Access & Parking ....................................................................................................................................... 13

Access .......................................................................................................................................................... 13

Parking ......................................................................................................................................................... 14

Resources ................................................................................................................................................... 14

Energy .......................................................................................................................................................... 14

Water .......................................................................................................................................................... 14

Raw Materials ............................................................................................................................................. 14

Sewage ......................................................................................................................................................... 14

Surface run-off ........................................................................................................................................... 14

Waste Management .................................................................................................................................. 15

Employment ................................................................................................................................................ 15

Construction .............................................................................................................................................. 15

Machinery .................................................................................................................................................... 15

Timing .......................................................................................................................................................... 16

Employment ................................................................................................................................................ 16

Environmental Impacts ......................................................................... 17

Waste management .................................................................................................................................. 17

Tourism product / accommodation ...................................................................................................... 17 Construction .............................................................................................................................................. 18

Landscape and visual amenity ................................................................................................................. 18

Mitigation Proposals ................................................................................................................................. 18

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 6 of 62 36a

Page 7: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

vi

FIGURES

Figure 1: 1960s postcard that shows the Solemar Hotel ................................................................... 1

Figure 2: 1968 Survey sheet ...................................................................................................................... 2

Figure 3: The informal car park ............................................................................................................... 4

Figure 4: Location of Scheme ................................................................................................................... 5

Figure 5: Surrounding land uses ............................................................................................................... 9

Figure 6: Scheduled sites ........................................................................................................................ 10

TABLES

Table 1: Food & Beverage outlets ........................................................................................................ 12

Table 2: Schedule of accommodation .................................................................................................. 12

APPENDIX

Appendix 1: Marfa Action Plan Maps

Appendix 2: Current Scheme

Appendix 3: Proposed Plans

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 7 of 62 36a

Page 8: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

1

INTRODUCTION

1. This Project Description Statement (PDS) describes a proposal to extend the current

Hotel Riviera, located at Ir-Ramla tal-Bir, Marfa. The applicant is Mr Beppe Bugeja on

behalf of FTI Hotel Management (Malta) Ltd. The project is hereafter referred to as

the “Scheme”.

2. Overall, the Scheme will increase the number of hotel rooms, extend food and

beverage facilities, relocate the hotel reception and un/loading bay, provide a splash

pool and sun deck on the roof, pedestrianise part of the road fronting the hotel, and

upgrade the adjacent car park.

BACKGROUND

3. FTI Hotel Management (Malta) Ltd (a company owned by German company Frosch

Touristik) acquired the hotel in 2011.

Planning history

4. The Riviera Hotel in Marfa has been extended several times in the past. The hotel

was previously known as the Solemar Hotel and was already in existence in the

1960s, as can be seen from Figures 1 and 2.

Figure 1: 1960s postcard that shows the Solemar Hotel

(Source: http://collezionismo.delcampe.it/page/item/id,0191040009,language,I.html, accessed 13 August

2013).

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 8 of 62 36a

Page 9: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

2

Figure 2: 1968 Survey sheet

(Source: MEPA MapServer http://www.mepa.org.mt/mepa-mapserver, accessed 13 August 2013).

5. Since the early 1990s, a number of applications were submitted to extend the hotel.

These applications include:

PA 01272/91 - Additions and alterations of hotel1;

PA 01589/97 - Renewal to construct a 4-star hotel2;

PA 04887/97 - Extensions and alterations to the approved drawings of a 4-Star Hotel,

and external landscaping3;

PA 07278/97 - Proposed extension of Solemar Hotel (Phase II) incorporating a receded

penthouse level, tennis court and amphitheatre4;

PA 06772/98 - Proposed extension of Solemar Hotel (Phase 2)5;

PA 00749/01 - To sanction amendments to phase 1 and proposed extension (phase 2) to existing Hotel inclusive of two basement levels, parking, conference hall, health centre,

multi-purpose hall, new indoor pool, proposed penthouse suites and dining

1 Permission granted on 16 December 1993. 2 Permission granted on 8 August 1997. 3 Permission granted on 23 April 1998. 4 Permission granted on 2 August 1999. 5 Permission refused.

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 9 of 62 36a

Page 10: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

3

centre/watersports club6;

PA 05943/02 - To sanction minor amendments to approved plans including structures

on roof, additional room (pool side) emergency exit stairs from pool deck7;

PA 05885/04 - To place solar panels on roof of hotel as part of grant scheme for

tourism enterprises programme being managed by the Malta Tourism Authority8;

PA 05886/04 - To carry out additions and alterations to existing 4 star hotel as per

attached plans9; and

PA 04416/10 - To apply for a second LPG storage tanks originally included in approved

drawing 5886/04/1K of MEPA permit PA5886/0410.

OBJECTIVES OF THE SCHEME

6. The Scheme’s objectives are to enhance the current facilities such that the hotel can

start to be offered as an all-inclusive resort.

BENEFITS OF THE SCHEME

7. The Scheme will provide a number of benefits and enhance the tourism product in

the area. The added rooms will provide additional capacity in the area, at a time

when tourist arrivals to the Maltese Islands are continuously on the increase. In

addition, a number of rooms will be modified to become compliant with Malta

Tourism Authority (MTA) standards.

8. The pedestrianisation of part of the road fronting the hotel and the relocation of the

un / loading bay will improve the surrounding amenity and provide a seamless link

between the foreshore and the hotel. This will also allow the extension of the

restaurant seating area outdoors during the summer.

9. In addition, the car park upgrade will replace a derelict area with haphazardly parked

cars with a surfaced, organised and landscaped car park, available for use by hotel

guests and the public.

6 Permission granted on 31 May 2001. 7 Permission granted on 18 October 2004. 8 Permission granted on 8 August 2005. 9 Permission granted on 6 October 2005. 10 Permission granted on 15 April 2011.

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 10 of 62 36a

Page 11: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

4

DESCRIPTION OF SCHEME

LOCATION

10. The Scheme is located at Ir-Ramla tal-Bir, Marfa within the locality of Mellieħa, see

Figure 4. It faces Il-Fliegu ta’ Malta, the channel that separates Malta from Comino.

CHARACTERISTICS OF THE APPLICATION SITE

11. The Application site measures circa 12,150m2. It comprises the Riviera Resort & Spa,

the road fronting the hotel (Triq ir-Ramla tal-Bir) and an informal parking area to the

southwest of the hotel.

12. The Riviera Resort & Spa is a four-star hotel with 242 rooms. Each room has its own

private facilities (including air-conditioning, central heating, satellite TV and en-suite bathroom) and benefits from sea and / or country views. The hotel features three

restaurants and four bars, conference facilities, a fully equipped PADI-certified diving

school centre, a gymnasium, a squash court, a thalasso therapy spa with an indoor

swimming pool, and two outdoor swimming pools.

13. Triq ir-Ramla tal-Bir is the main access road to the hotel that links to the arterial Triq

il-Marfa (part of the TEN-T network). The road continues around the eastern

boundary of the hotel (in a one-way direction) and merges with Triq Ta’ Msid, which

is a rural road that leads from Marfa to l-Aħrax.

14. The informal car park is located to the southwest of the site, see Figure 3.

15. Plans of the current hotel are provided in Appendix 2.

Figure 3: The informal car park

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 11 of 62 36a

Page 12: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

5

Figure 4: Location of Scheme

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 12 of 62 36a

Page 13: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 13 of 62 36a

Page 14: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

7

DESCRIPTION OF THE GENERAL SURROUNDINGS

Land uses

16. The Riviera Resort & Spa is located in a rural area along the northern coast of Malta.

It is situated adjacent to the sandy beach known as ir-Ramla tal-Bir and east of the

Cirkewwa Ferry Terminal.

17. Across the road from the entrance to the hotel is the foreshore that is mainly

utilised for recreational purposes and berthing of boats, particularly in the summer

months. The former Gozo ferry-boat jetty is also popular with anglers and is

regularly used by the operators of a nearby fish farm and as a departing point for boat

trips to Comino.

18. The Ramla Bay Resort, another four-star accommodation, is located to the northeast

of the Scheme site. The two hotels are separated by the pocket beach at Ir-Ramla

tal-Bir, which also houses a coastal redoubt and leisure facilities for bathers

(umbrellas, deckchairs, etc.).

19. The landward side of the surrounding area is predominantly used for agricultural

purposes, although there are pockets of derelict land. A small number of boathouses

/ beach rooms and a fish farm depot are present to the west of the site.

20. The surrounding land uses are described in Figure 5.

Scheduled areas

21. Although the Scheme site is not scheduled, there are a number of scheduled

locations in its vicinity. To the west of the Scheme are sites scheduled for their

architectural merits:

Il-Batterija ta' Wied Musa (Grade 1)11;

World War II beach defence light (Grade 2)12;

World War II beach post ruins (Grade 2)13; and

Wied Musa military buffer zone14.

22. To the east of the Scheme site, the following sites are scheduled:

Ir-Ramla tal-Bir redoubt (Grade 1)15;

11 GN 729/95. 12 GN 895/02. 13 Ditto. 14 Ditto. 15 GN 729/95.

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 14 of 62 36a

Page 15: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

8

Ramla ta-Bir military buffer zone16; and

Saline marshland at ir-Ramla tal-Bir (Area of Ecological Importance) 17.

23. The marine area is also protected. Il-Fliegu ta’ Malta forms part of a large marine

area in the northeast of Malta that is designated a Special Area of Conservation –

International Importance18.

24. These designated sites are shown in Figure 6.

16 GN 985/02. 17 GN 288/95. 18 GN 851/10.

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 15 of 62 36a

Page 16: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

9

Figure 5: Surrounding land uses

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 16 of 62 36a

Page 17: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

10

Figure 6: Scheduled sites

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 17 of 62 36a

Page 18: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

11

PLANNING POLICY

North West Local Plan

25. The Scheme site is located within the North West Local Plan (NWLP) area; the

approved Plan was published in June 2006.

26. The NWLP designates Marfa ridge as a Major Recreation Area (NLWP Policy NWRE

1). Through this policy, MEPA aims to encourage and support the creation of

opportunities for recreation in the area. For this purpose the Marfa Action Plan has

been prepared.

Marfa Action Plan

27. The Marfa Action Plan (MAP) is a separate document to the North West Local Plan.

It has been prepared to guide land use and the development process in the area. The

action plan was published in June 2002 for public consultation and is still awaiting

MEPA approval.

MTO 1 – Hotel

28. MEPA will not permit any extension to the Riviera Hotel beyond the site area shown

in Map 8.3 in Appendix 1. The aim of this policy is to protect existing access to the

coastal road, foreshore, quay, breakwater, and the proposed Small Boat Sailing

facilities. Furthermore, this will also help avoid further visual dominance of the hotel

on the character and landscape of the surrounding area.

MTO 2 – Heritage Trail 29. The MAP proposes the setting up of a heritage trail that links the various cultural

features in the area including the nearby Il-Batterija ta' Wied Musa and Ir-Ramla tal-

Bir redoubt, see Map 7 in Appendix 1.

MCZ 2 - Public Coastal Access Area 30. Part of the Scheme site (mainly the road fronting the hotel) lies within the designated

public coastal access area, see Map 8.3 in Appendix 1. In these areas, MEPA will

seek to secure public access to the coast / foreshore.

MRE 3 – Cycling 31. Cycle routes in the Action Plan area are proposed. These include a route that passes

through Triq ta’ Msid, the road that links the Scheme site with l-Aħrax (see Map 8.5

in Appendix 1).

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 18 of 62 36a

Page 19: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

12

THE SCHEME

32. The Scheme proposes increasing the number of hotel rooms, extending the

restaurants, relocating the reception area, un/loading bay and car park ramp,

rationalising the surface car park adjacent to the hotel, and improving traffic

management.

33. As a result of the Scheme, the hotel footprint will increase by 361m2 from 5,471m2 to

5,832m2. The additional footprint will be taken up by the extended restaurant and

the relocation of the lounge / reception, un/loading bay, and car park ramp. The

lounge / reception will be shifted from the ground floor to the semi-basement level

whereas the un/loading bay and car park ramp will be shifted to the eastern side of

the Scheme. A cocktail bar and wine bar will replace the reception and un / loading

bay, respectively. The kitchen will also be extended; it will take up 113m2 of the

indoor pool area. A breakdown of the floor areas of the food and beverage outlets is

provided in Table 1.

Table 1: Food & Beverage outlets

Outlet Floorspace (m2)

Bistro 376

Cocktail bar 338

Lounge bar 150

Pizzeria 376

Restaurant 1,234

Wine bar 189

34. The number of rooms will increase from the current 242 to 293, mainly as a result of

the increased footprint (rooms will be constructed above the extended restaurant)

and the construction of an additional floor. In terms of floor area, this translates to

an increase of 2,990 m2 to 13,970 m2. Furthermore, internal alterations will be

undertaken in some rooms to bring them in compliance with the MTA requirements.

A breakdown of the final room types per floor is provided in Table 2.

Table 2: Schedule of accommodation

Floor Single Twin Twin for

disabled

1-bed

apartment

2-bed

apartment

Family

room

Executive

suite

Total

Ground 43 4 47

1 3 73 3 79

2 3 70 3 76

3 2 45 2 6 1 1 57

4 20 2 2 10 34

Total 8 251 14 8 1 10 1 293

35. The new areas will be air-conditioned by air cooled VRF19 systems.

19 VRF (Variable refrigerant flow) is an HVAC (heating, ventilation, and air conditioning) technology.

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 19 of 62 36a

Page 20: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

13

36. On top of the new level, a 1.2m deep splash pool will be provided. The pool area

(678m2) will be surrounded by wood decking and will comprise showers, a pool bar,

toilets, sun beds and landscaping.

37. The informal car park area located southwest of the hotel will be surfaced,

landscaped and organised into a car park for 63 vehicles. A number of trees will be

used for landscaping, including:

Olive (Olea europaea);

Judas tree (Cercis siliquastrum);

Aleppo Pine (Pinus halepensis);

Date Palm (Phoenix Dactylifera);

Mediterranean Cypress (Cupressus Sempervirens); and

Bay laurel (Laurus Nobilis).

38. Part of the road fronting the hotel will be transformed into a pedestrian zone.

Pavements on both sides of the road will be widened and landscaped, whereas the

road surface will be changed to porfido hardstone paving. Bollards will be installed at

both ends of the pedestrian zone to block vehicular access. The embellished

pedestrian zone will allow for the placing of outdoor seating, thereby extending the

restaurant eating area outdoors.

39. A mini-roundabout will be introduced close to the new car park entrance in order to

improve turning movements in / out of the car park.

40. The proposed plans are presented in Appendix 3.

ALTERNATIVES CONSIDERED

41. No alternative designs to the proposal as presented in this Project Description

Statement were considered.

ACCESS & PARKING

Access

42. The Scheme proposes changes to the surrounding road configuration in order to

provide a shared space in front of the Hotel. Vehicles will no longer be allowed to

pass in front of the Hotel, except for emergency purposes. Nonetheless, the access

will still be mainly from the arterial Triq il-Marfa.

43. A turning circle will be provided in the space between the Scheme site and the

former Gozo Channel quay. This will give coaches enough space to turn around and

drive back to Triq il-Marfa.

44. Given that part of the road fronting the Scheme site will be turned into a shared

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 20 of 62 36a

Page 21: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

14

space, the road running along the eastern boundary of the hotel will be widened and

converted to a two-way road. This road will provide access to the hotel’s semi-

basement parking and the relocated loading / unloading bay.

Parking

45. The hotel has a semi-basement parking area that can accommodate up to 19 cars. A

separate area of the semi-basement garage is dedicated to staff parking. As a result

of the Scheme, access to the semi-basement garage will be shifted from the north to

the eastern side of the hotel.

46. An informal car park is located to the southwest of the hotel. It is the intention of

the Applicant to rationalise the parking area and embellish it through surfacing and

landscaping. The embellished car park will be able to accommodate 63 vehicles

(including four ‘accessible-for-all’ parking spaces and one ‘van-accessible’ space).

RESOURCES

Energy

47. The current power requirements of the Riviera Resort & Spa are provided by an

Enemalta substation located at basement level. Estimates suggest that the proposed

Scheme would require an additional 97kVA that can be supplied by the existing

substation.

Water

48. The Riviera Resort & Spa is currently supplied by mains water. This will remain.

Raw Materials

49. The main raw materials to be used during the construction of the Scheme are shown

in the following table.

Raw material Estimated quantities

Concrete 1,060m3

HCB 2,109m3

Steel 9,371kg

Torba 765m3

Tarmac 294m3

Planters 107m3

Sewage

50. The Riviera Resort & Spa wastewater system consists of a cesspit and two direct

connections with the mains sewer. The drainage system of the proposed extension

will be linked directly with the mains sewer.

Surface run-off

51. Rainwater falling on the roof and terraces will be collected in existing reservoirs and

used for irrigation purposes. The surface car park will be fitted with a gutter and a

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 21 of 62 36a

Page 22: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

15

silt / oil trap tank separator to prevent surface runoff from the car park ending in the

sea.

Waste Management

52. Waste generated during construction will consist mainly of demolition (2,473m3) and

scarifying waste (444m3).

53. With respect to hotel operations, the following waste management arrangements are

in place, and will be retained following the extension:

Organic waste is stored in a refrigerated room and collected on a daily basis;

Recyclable waste (paper, plastic, metal and glass) is stored separately and

collected four times a week;

Used cooking oil is collected on a weekly basis; and

Bulky refuse is collected according to demand.

54. All waste streams are collected by licensed waste contractors.

EMPLOYMENT

55. The Riviera Resort & Spa currently employs the equivalent of 160 full-time

employees. This comprises full-time, part-time and subcontracted workers. As a

result of the Scheme, the number of employees is expected to increase to 178 full-

time equivalents.

CONSTRUCTION

Machinery

56. The machinery that will be required to undertake the extension of the hotel includes:

A tower crane;

Two mobile cranes;

A front-loader;

Two excavators;

An air compressor;

Two tipper trucks;

Stone cutting machines; and

A Bobcat.

57. The Scheme will generate approximately 3,000m3 of waste. The estimated highest

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 22 of 62 36a

Page 23: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

16

peak flows / hour will occur during the demolition phase. A total of 16 HGV trips

per day are expected during this phase that will last three weeks.

58. During the construction phase, it is estimated that there will be three to four HGV

trips per day delivering bricks / other construction materials; the concreting phase

will generate between seven and eight trips per day. Other construction traffic, such

as passenger cars utilised by staff and professionals, is likely to be very limited.

Timing

59. The intention of the Applicant is to undertake the works during the low season in

order to cause the least disturbance to guests. Given that construction of the

Scheme is estimated to take five months (including finishes), the preferred period is

between November and March.

Employment

60. It is estimated that approximately 60 workers will be required during the

construction phase.

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 23 of 62 36a

Page 24: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

17

ENVIRONMENTAL IMPACTS

61. Environmental impacts can be both negative as well as positive and their assessment

is important so as to better define the effects that a proposal may have on its

receiving environment. In order for the environmental impacts of a project to be

properly defined and analysed, an EIA process will normally need to be undertaken,

complete with an identification of impacts, the determination of their significance, a

comparison with the baseline conditions, and consideration of alternatives. The need

for an EIA is however dependent on the screening of the likely impacts, which

screening is undertaken following the submission of this PDS.

62. A preliminary list of potential environmental impacts of the Scheme can be identified. The list identifies only those impacts that may be significant. The level of significance

would need to be assessed as part of an EIA if the screening exercise concludes that

one is required. The potential impacts of the Scheme are considered to be:

Impacts from waste generated (during construction and operation);

Improved tourism product / accommodation;

Impacts during construction (noise, vibration, dust, surface water management);

and

Visual and landscape impacts.

Waste management

63. The construction and operation of the Scheme will require the disposal of waste

material. During construction, the vast majority of the waste to be generated will be

demolition material. Other wastes would include general construction waste,

including brick and stone off cuts, wood, plastic off cuts, concrete wash water,

packaging waste, waste electronic parts (during installation of services and fittings),

and hazardous wastes (e.g. oily rags, paint, thinner, and solvent cans, etc). All wastes

will be separated into the various fractions and handled under a waste management

regime to be established as part of the Construction Management Plan (CMP) for the

project. During operation, the Scheme management will continue to use its current

waste management procedures20.

Tourism product / accommodation

64. The proposed Scheme will improve the tourism product by providing additional bed

capacity in the area, improving facilities, and converting a dilapidated car park into a

surfaced and landscaped car park. Moreover, the pedestrianisation of part of the

road in front of the hotel and the shifting of the un / loading bay will improve the

20 The Riviera Hotel is an Eco-certified hotel, and therefore subscribes to proper waste management and

disposal.

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 24 of 62 36a

Page 25: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

18

area’s amenity and provide a seamless link between the foreshore and the hotel.

Construction

65. Construction of the Scheme will temporarily degrade the noise environment and air

quality in the immediate vicinity of the Scheme. In addition, there is also a

neighbouring hotel that needs to be taken into consideration. Measures for

mitigating noise, vibration and air quality from the construction works on the

surrounding uses will be incorporated in the CMP and appropriate operational

monitoring regimes set up throughout the construction phase to ensure a reduction

in such impacts. Management of surface water during construction will also be

important to avoid overspill from the site and potential contamination of the sea.

Landscape and visual amenity

66. The Scheme will result in an increase in the mass and height of the existing hotel

through the addition of another floor and the increased footprint. The hotel hence

will become more visible, both from land and from sea.

67. The upgraded car park will be landscaped and the pedestrianisation / relocation of

the un / loading bay will improve the visual amenity of the hotel facade.

MITIGATION PROPOSALS

68. The mitigation measures during construction mainly focus on best practice during the

works and, if required, periodical monitoring to ensure that no pollution occurs as a

result of the construction works. A detailed CMP will be formulated and enforced by

the site project manager. The CMP will also address waste management during both

demolition and construction.

69. During construction, the location of disposal should be carefully considered given the

hotel’s close location to the sea.

70. A landscaping plan should be submitted that shows how the Scheme will blend with

the surroundings.

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 25 of 62 36a

Page 26: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

APPENDICES

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 26 of 62 36a

Page 27: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

Appendix 1:

Marfa Action Plan Maps

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 27 of 62 36a

Page 28: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 28 of 62 36a

Page 29: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 29 of 62 36a

Page 30: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 30 of 62 36a

Page 31: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

Appendix 2:

Current Scheme

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 31 of 62 36a

Page 32: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 32 of 62 36a

Page 33: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 33 of 62 36a

Page 34: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 34 of 62 36a

Page 35: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 35 of 62 36a

Page 36: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 36 of 62 36a

Page 37: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 37 of 62 36a

Page 38: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 38 of 62 36a

Page 39: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 39 of 62 36a

Page 40: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 40 of 62 36a

Page 41: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 41 of 62 36a

Page 42: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 42 of 62 36a

Page 43: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 43 of 62 36a

Page 44: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 44 of 62 36a

Page 45: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 45 of 62 36a

Page 46: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

Appendix 3:

Proposed Plans

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 46 of 62 36a

Page 47: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 47 of 62 36a

Page 48: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 48 of 62 36a

Page 49: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 49 of 62 36a

Page 50: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 50 of 62 36a

Page 51: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 51 of 62 36a

Page 52: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 52 of 62 36a

Page 53: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 53 of 62 36a

Page 54: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 54 of 62 36a

Page 55: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 55 of 62 36a

Page 56: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 56 of 62 36a

Page 57: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 57 of 62 36a

Page 58: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 58 of 62 36a

Page 59: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 59 of 62 36a

Page 60: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 60 of 62 36a

Page 61: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 61 of 62 36a

Page 62: TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel

TRK 151436 - Document - (36a) 581-PDS-01_Riviera Hotel Extension PDS_07-10-13 [] - DocumentID - 2401122 - Document Dated - - ncard - Page 62 of 62 36a