James Turso Assistant Director Radiation Science and Engineering Center Penn State Control System Upgrade TRTR 2017

Upload: others

Post on 27-Apr-2020

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

James TursoAssistant Director

Radiation Science and Engineering Center

Penn State Control System Upgrade

TRTR 2017

Page 2: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

• PSBR TRIGA Description

• Existing Console

• If it ain’t broke….Motivation

• New Control System

• AGARA

• Schneider Equipment Grant – Student Lab/Software Staging Area

• Preliminary Schedule

Overview

Page 3: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

PSU TRIGA

Good Old Days…

Page 4: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

PSU TRIGA

Page 5: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

PSU TRIGA SPECIFICATIONS

TRIGA

Purpose Research and Education use of radiation

Thermal Power 1 MWth

Fuel Design

Enrichment – U235 < 20%

Physical Size ~0.8 m

Fuel Matrix Uranium metal

Primary moderator Zr1 H 1.65

Cladding Stainless Steel

Page 6: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

2 Dry irradiation tubes1 wet irradiation tube1 source location

4 Control Rods2 inst. Elements

PSU TRIGA CORE MAP

Page 7: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

Figure 1 – The U2RR reactor Core.

Analog Safety System

Digital ControlSystem Digital Monitoring

System

Existing AECL System… Installed 1991

Rod Control Station

Page 8: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

Safety System: TRIGA Fuel

Page 9: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

PSU Control System Replacement• AECL Console: Outstanding Performance for 26 years

• Still Operating: OEM No Longer Supports/Software UpgradesCostly

• PSU Pursuing Obsolescence Upgrade (Replacement of Digital Components) ‐ $1M DOE Grant

• Keep Analog Safety System (Initially) 

• Replace Digital Control System (50.59)

• Phase‐In 1E Digital Safety System (License Amendment)

Page 10: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

Enclosure

ExistingAnalogRPS

New Control Console

Page 11: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

PSU Control System Replacement – Other Goals:

AGARA(As Generic As Reasonably Achievable)

Share Project Artifacts With TRTR Community:

• Regulatory Documents (50.59 Screening/Evaluations)• Design Documents/Schematics/BOM• Software• License Amendment Documents / SAR Upgrades

Page 12: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

Foxboro Control and Monitoring SystemPotential Replacement for PSU System

$300K Equipment Donation

Foxboro I/AWorkstation

Foxboro I/AControl/CommunicationSystem

TRICON 1ESafety System

LabView/NI cRIOTRIGA Simulator

Page 13: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

Familiarization Through Senior Design Projects

Page 14: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

Foxboro SystemTRICON I/O Connector BlockFoxboro Control 

Workstation

LabVIEW Reactor Simulator

TRICON System Chassis

Foxboro Control and Monitoring SystemPotential Replacement for PSU System

Page 15: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

LabView HIL cRIO-Based Simulator

∗ ∑

+

Fuel Temperature Dynamics

PKE – BasedNeutron Dynamics

Delayed Neutron Precursor Dynamics

Coolant Temperature Dynamics

Thermal PowerProduced in Fuel

Reactivity Feedback

Page 16: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

Existing AECL Console Programmed With PROTROL Configuration Software

Page 17: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

Foxboro System ProgrammingIntegrated Control Configurator

Page 18: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

Foxboro System ProgrammingIntegrated Control Configurator

Page 19: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

TRICON 1E Safety System

TRICON: Triple Redundant Architecture

TRICON Enclosure

Page 20: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

TRICON 1E Safety System Programming

Page 21: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

Figure 1 – The U2RR reactor Core.

Work With GSE Systems to Develop 3D RELAP‐Based Hardware‐In‐The‐Loop Test Bed for New Console

Page 22: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

Figure 1 – The U2RR reactor Core.

Operator Station Digital ControlSystem

Power, Temperature signals from Reactor

Velocity DMDTo CRDM

Work With GSE Systems to Develop 3D RELAP‐Based Hardware‐In‐The‐Loop Test Bed for New Console

3D RELAP‐BasedSimulator 

Page 23: TRTR PSU Control Sys Upgradetrtr.org/.../2017/10/S3_P3_TRTR_PSU_Control_Sys_Upgrade.pdfIntegrated Control Configurator Foxboro System Programming Integrated Control Configurator TRICON

October 2015: Received Equipment Grant from Schneider Electric (Foxboro I/A and TRICON systems)

Spring 2016/2017: 2 Student Senior Design Groups Implemented Existing Console’s Algorithms in Foxboro/TRICON Equipment

September 2017: Received DOE Grant for PSU Control System Modernization

December 2017: Develop Project Requirements/SOW

June 2018: Contract Award / Project Kick‐Off

September 2019: Factory Acceptance Tests, Foxboro MA

January 2020: Delivery of System to PSU/Beginning of Site Acceptance Tests

May 2020: Disassembly of Old Console / New Console Installation

July 2020: Testing/Commisioning of New Console

PSU Console Replacement Timeline