SANDWELL PETROGASTrust, Passion & Challenge!
E PC Scope R aw Materials ndustrial Equipments E quipmentsI
About SandWell PetroGas (SWPG)
SWPG has started its business as a raw material supplier to industries such as Oil & Gas, Petrochemical andPower plants mainly to Iran. Thanks to sustainable and reputable performance to its clients, SWPG hasextended its business successfully as an EPC contractor and coordinator. The strength of SWPG’s EPC scope is SWPG has solidified its position as a consortium leader in EPC by offeringmost experienced companies of engineering, manufacturing and construction mainly in Korea and also globally.Through this extensive consortium coordination capability, SWPG has integrated optimized capabilities in eachproject to meet satisfaction of clients’ requirements. SWPG is also specialized to supply special equipments ofbig group of Korea, EU and Japan which can not export directly to Iran due to its political situation with repre-sentative authorization.
Business Organization
Process
Instruments
Electrical
Civil
Mechanical
EngineeringBasic and Detail
Equipment Fabrication
CCPP&HRSG
Subsea Installation
Fired Heater
Storage Tank Farm
Construction for Plant
Korea
Iran
Dubai
Korea
China
Europe
Japan
Marketing ManagementAssistance
GlobalProcurement
ProjectManagement
CEO / President
ContentsE PC Scope
• Storage Tank Farms• Fabrication│Erection│Construction• CCPP• HRSG• Fired Heater│Reformer & Furnace
• Submarine_Installation & Maintenance│Fiber Optic Cable│Power & Composite Cable│Pipeline
R aw Materials• Pipes & Tubes│SMLS & OCTG
• Pipes & Tubes│SAW & ERW
• Plates│Hot Rolled Steel│Steel Plate│Wire Rod│Cold Rolled Steel│Electrical Steel│Stainless Steel
• Steel Structure│H-Beam• Valves• Pumps
I ndustrial Equipments• Reactor│Pressure Vessel│Drum│Tower• Heat Exchanger│Condenser│Evaporator│Deaerator│FW Heater
E quipments• Diesel│Gas Engine Generator• Gas│Air Compressor• Transformer
Storage Tank Farms
Cryogenic VesselL29,861Mat’l : SA516-70N +S5, 4Sets│Size : 583Ton/set, 46T~49T x I.D20,000
Cryogenic Storage Tank
Cryogenic VesselInner : A240-304, Outer : A283-C│Size : 1,140Ton x I.D25,000, O.D27,200
Cryogenic VesselInner : A537 CL1│Size : 2,324Ton x I.D58,000 x T.L29,861Mat’l
Name Of Project Client Location Type Capacity(m3) Q'ty Contract Date Remarks
200,000 KL LNGIn-Ground Tank Kogas/SHI Incheon Korea In-ground PC
Membrane 200,000 2 Jan. 01. 2002 Completed(E,S/V)
Phu-My FertilizerProject
Petro Vietman/Technip&SECL Phu-My Vietnam Double Wall Tank 35,000 1 Apr. 29. 2002 Completed(E,S/V)
Qatar QP LPG Tank QP/Samsung E&C Mesaieed Qatar Double Wall Tank 100,000 3 Jun. 29. 2002 Completed(E)
SFC NH3 TankFacilities Project SFC/SEI Ulsan Korea NH3 System 19,163 1 Aug. 26. 2004 Completed(E,P,C)
POSCO LO2 Tank POSCO KwangYang Korea Double Wall Tank 500 1 Sep. 02. 2004 Completed(E,P,C)
805,000 MTAEthylene No.1
YNCC/Hanhwa E&C Yeosu Korea Double Wall Tank 20,000 1 Oct. 04. 2005 Completed(E,P,C)
Ethylene Storage TankExpansion Project SKEC Ulsan Korea Double Wall Tank 6,000 1 Jun. 15. 2006 Completed(P,C)
Fujian Ethylene Project Sinopec Fujian China Double Wall Tank 35,18516,470
11 Mar. 21. 2007 Completed(E,P,S/V)
LOX Cryogenic TankProjec Korea Air Tech Ulsan Korea LOX System 3,000 1 Aug. 07. 2007 Completed(E,P,C)
DBS#1 Project Dongbu Steel/Air Liquide Dangjin Korea Double Wall Tank 2,572
3,26211 May. 08. 2008 Completed(E,P,C)
MTT Propane/Butane Tank Project
SCG/Daewoo Eng. Rayong Thailand Double Wall Tank 77,000 1 May. 15. 2008 Completed(E,P,C)
WW Project(NH3 Tank System) CJI Gresik Indonesia NH3 System 17,450 1 Oct. 01. 2008 Completed(E,P,C,C)
Daesan LPGTerminal Project E1 Corp./GS E&C Daesan Korea SingleWall Tank 62,800 1 May. 10. 2010 Completed(E,P,C)
Long An RefrigeratedLPG Terminal Project
Vinabenny Energy/Daewoo Eng. LongAn Vietnam Double Wall Tank 34,000 2 Jan. 05. 2011 Ongoing(E,P,C)
EPC Scope Raw Materials Industrial Equipments Equipments
04│05
EPC Scope Raw Materials Industrial Equipments Equipments
Fabrication│Erection│Construction
Project Name Client Contractor Scope Of Work Location Period Contract Amount
Green Disel Project(Mechanical Work for Area 1) Takreer GS E&C Co.,Ltd. Mech : 6,680ton Stl/Str :
2,236ton Piping : 272,066D/IRuwais in
U.A.E(abu Dhabi)Dec.2008~Mar.2011 40.0 Million USD
S-Oil Refinery Expansion(PX Unit) S-Oil Samsung
EngineeringMechanical Steel Structure
Piping(480,000 DI) Heaters InsulationOnsan-city,Korea)
Aug.2008~Jan.2011 75.0 Million USD
Jubail Export Refinery ProjectPackage-3 (Paraxlene Unit) ARAMCO Samsung Engi-
neering Co.,LtdMech : 10.060Ton Stl/Str :
1,927Ton Piping : 271,550 D/I Jubail in KSA Jun.2010~Dec.2012 45.20 Million USD
Jubail Export Refinery ProjectPackage-(Coker Unit) ARAMCO Chiyoda/Sam-
sung Eng.Co.,Ltd.Erection of FiredHeater(3Sets) Jubail in KSA Jul.2011~
Dec.2012 18.44 Million USD
Ruwais Refinery ExpansionPackage #3 Project Takreer Samsung Engi-
neering Co.,Ltd.Mechanical Steel Structure Piping
uwais in U.A.E(abu Dhabi)
Oct.2010~Mar.2013 63.68 Million USD
Pearl GTL Project (SMR&Furnace Erection Work and SMP Work for LDF Area)
Qatar SheelGTL Limited
Hyundai E&CCo.,Ltd.
Mech : 6,605Ton+126SetsStl/Str :3,014Ton Piping : 103,433D/I
Ras Laffan in Qatar
Jan.2008~Mar.2011 36.8 Million USD
Upgrade Acid Gad PipingShedgum Plant ARAMCO SAACO LSPB Work Stl/Str : 300Ton
Piping : 32,503D/I E&I and CivilShedgum inSaudi Arabia
Nov.2009~Mar.2011 5.0 Million USD
Manifa Gas Facilities Project ARAMCO GS E&C Co.,Ltd. Mech : 2,965Ton Stl/Str :1,760Ton Piping : 271,866D/I
Khursaniyah inSaudi Arabia
Nov.2009~Oct.2011 30.0 Million USD
Ruwais 4th NGL Train Project(West Area) GASCO J/V of GS E&C Petrofac Mechanical Steel
Structure Piping Ruwais in U.A.E Oct.2010~Dec.2012 74.32 Million USD
NCP South Plot Petrichemical Facilities PJT(Mech.for PKG C)
Saudi PolymerCompany
Daelim SaudiArabia Co.,Ltd.
Mech : 2,992Ton Stl/Str :2,995Ton Piping : 118,340D/I
Jubail in SaudiArabia
Aug.2008~Mar.2011 26.8 Million USD
Ras Laffan IWPP C Project (HRSG&AssosiatedEqip.Erec.) (220MW x 8Unit & 242 MW x 4Unit)
Qatar HeneralElect. & Water
Hyundai E&CCo.,Ltd.
Erection for HRSG & Aux Equipment Mech :10,241Ton Str/Stl : 10,751Ton Piping : 376,600D/I
Ras Laffan inQatar
Aug.2008~Mar.2011 33.6 Million USD
Shinwolsung Nuclear Power Proj-ect(1,000MW x 2 units)
Korea Hydro & Nu-clear power Co.,Ltd.
GS Engineering andConstruction Co.,Ltd.
Erection of Generator, Turbine, Condenser,aux.equipment and piping.
Gyeongju inKorea
Dec.2008~jan.2013 22.1 Million USD
Jubail Export Refinery Project Package-3 (Paraxylene Unit)
Ruwais 4th NGL Train Project(West Area) - Mechanical Steel Structure Piping
Ma’aden phosphate Project
Ras Laffan Ciwpp Project
EPC Scope Raw Materials Industrial Equipments Equipments
CCPP│Combined Cycle Power Plant
Combined Cycle Thermal Power Generation System Diagram
Project Name Configuration GT-Mfg & Type COD Scope of Service
Seoinchon CCPP 1900MW GT(155MW*8)+ST(183MW*8) GE 7F 30-Jun-92 Basic/Detail Engineering &Consulting Service
Sininchon CCPP 2000MW GT(159MW*8)+ST(183MW*4) GE 7FA 30-Jun-97 Basic/Detail Engineering &Consulting Service
Ulsan Ⅱ CCPP 1000MW GT(160MW*4)+ST(191MW*2) WH 501F 30-Jul-97 Basic/Detail Engineering &Consulting Service
Hallim Gas TBN PP 35MW GT(35MW*2)+ ST(35MW*1) GE MS6001B 30-Jun-95 Basic/Detail Engineering &Consulting Service
Pyongtaek CCPP 520MW GT(80MW*4)+ ST(200MW*1) GE 7001EA 30-Jun-94 Basic/Detail Engineering &Consulting Service
Illjan CCPP 1280MW GT(199MW*4)+ST(242MW*2) MHI M501G 30-Jun-02 Consulting Service including Document Review & Construction Supervision
LG Pugok Ⅰ 560MW GT(187MW*2)+ST(186MW*1) SIEMENS V84.3A 30-Mar-01 Basic/Detail Engineering &Consulting Service
Poryong CCPP GT(150MW*8)+ST(150MW*4) ABB 30-Dec-02 Basic Engineering & Prepa-ration of EPC RFP
Busan CCPP 1,800MW GT(150MW*8)+ST(190MW*4) GE 7FA 30-Jun-04 Basic/Detail Engineering &Consulting Service
Yulchon CCPP 550MW GT(187MW*2)+ST(186MW*1) SIEMENS W501FD2 30-Jun-05 Consulting Service including DocumentReview & Construction Supervision
Inchon CCPP 550MW GT(178MW*2)+ST(195MW*1) SIEMENS V84.3A 30-Jun-05 Basic/Detail Engineering &Consulting Service
06│07
EPC Scope Raw Materials Industrial Equipments Equipments
HRSG│Heat Recovery Steam Generator
Yulchon 550MW C/C Power Plant, Korea Tuban Aromatic, Indonesia
HRSGCapacity
Evaporation 190T/H, 46T/H, 40T/HSteam Pressure 33kg/cm2g, 28kg/cm2g, 4kg/cm2gSteam Temperature 568℃, 334℃, 226℃
HRSGCapacity
Evaporation 75T/HSteam Pressure 43kg/cm2gSteam Temperature 390℃
GasTurbine Siemens Westinghouse 501FD2 Gas
Turbine Gas Turbine NT MS-500
Rojana Ext. Phase-4, Thailand Kwangmyung Ces, Korea
HRSGCapacity
Evaporation 42T/H, 16T/HSteam Pressure 47kg/cm2g, 3kg/cm2gSteam Temperature 393℃, 115℃
HRSGCapacity
Evaporation 27T/H, 5T/HSteam Pressure 86kg/cm2g, 6kg/cm2gSteam Temperature 500℃, 181℃
GasTurbine GE LM 6000 Gas
Turbine Gas Turbine KHI GPB 180D
Heat Recovery Steam Generator
YULCHON CCPP PROJECT• Engineering - Basic&Detail• Manufacturing• Test&Commissioning
GTF PROJECT• Construction• Supervision• Training&Education
EPC Scope Raw Materials Industrial Equipments Equipments
Fired Heater│Reformer & Furnace
Project Name Application Scope Client Location Year of Supply
Module Type Supply
HPC New Furnace Project
Naphtha Furnace (2 sets)
Shop Detail Design / ProcurementFabrication / Construction
SECLYeocheon, Korea
2001ConvectionStack & Duct
Cadereyta ProjectHDS Reformer
(1 set)Construction SECL
Cadereyta,Mexico
2000 -
E-BA116 Naphtha Cracking Heater Project
Naphtha Furnace(1set)
Shop Detail Design / ProcurementFabrication / Construction
LG Chemical
Yeosu,Korea
2009ConvectionStack & Duct
Esfahan RefineryProject
Furnace(5 sets)
Shop Detail Design Procurement /Fabrication
JNKHeaters
Iran 2009ConvectionStack & Duct
Oman Salalah Methanol Reformer
Methanol Reformer(1 set)
Shop Detail Design Procurement /Fabrication
JNKHeaters
Salalah,Oman
2009 Stack & Duct
Motiva Crude Expansion Project
Stack,Platform &Ladder
Shop Detail Design Procurement /Fabrication
KTIKorea
Texas,USA
2008 Stack
Ambatovy Project, H2 Plant
LINDE HydrogenReformer (1 set)
Shop Detail Design Procurement Fabrication
SelasLinde
Madagascar 2008 Duct
BTX RevampingProject
Aromizing Furnace (1 set)
Shop Detail Design / ProcurementFabrication / Construction
JNKHeaters
Incheon,Korea
2008 Radiant
Naphtha Cracker LPCNew Furnace Project
Naphtha Furnace(2 sets)
Shop Detail Design / ProcurementFabrication / Construction
GS E&CDaesan, Korea
2007Radiant/Convec-tionConvection
Naphtha Cracker LGCNew Furnace Project
Naphtha Furnace(2 sets)
Shop Detail DesignProcurement
JNKHeaters
Daesan,Korea
2006ConvectionStack & Duct
APPC ProjectReactor ChargeHeater (1 set)
Construction SECLJubail,
Saudi Arabia2006 -
LGPC New Furnace Project
Naphtha Furnace(1 set)
Shop Detail DesignProcurement /Fabrication
LG Petro -chemical
Yeocheon,Korea
2004ConvectionStack & Duct
Fabrication of Heater S-OIL Refinery Expansion ProjectFabrication of Heater No.3 HOU Project
08│09
EPC Scope Raw Materials Industrial Equipments Equipments
Submarine
Project Customers Year Total Length (km)
TPE 3M PLIB Installation Project SBSS 2009/07 ~ 2009/10 30.879
AAG Project (Asian America Gateway) NEC 2008/03 ~ 2009/01 1,274
TPE Project (Trans Pacific Express) Tyco/SBSS 2007/10 ~ 2008/12 1,251
DSCN Project (Sri Lanka-Male) (Diaggu Submarine Cable Network) NEC 2006/10 ~ 2006/12 1,058
TISEC project RENETECH 2009.12 1.0
Jindo-Jeju HVDC#2 Power Cable(DC250kV) LSC 2009.11~2012.09 105X2
Yeonpyeongdo-Dangseon Power Cable(Ac22.9kV) KEPCO 2007.06~2007.12 1.022
Masan Dotseom Power Cable(AC22.9kV) Masan City 2006.12~2007.08 0.85
ENI Project(Drilling Assistant) Amarco Service 2009.03~2009.05 -
KOC Project(Cable Installation) HHI 2007.07~2008.01 56.6
• Submarine Fiber Optic Cable Installation & Maintenance
• Submarine Power & Composite Cable Installation & Maintenance
• Submarine Pipeline Installation & Maintenance
Pipes & Tubes│SMLS & OCTG
• Seamless Steel Pipe & Tube (Carbon & Alloy & Stainless & Special Steel)Carbon Steel│Stainless Steel│Alloy Steel│Copper & Copper Alloy│Titanium
• OCTG (Oil Country Tubular Goods)
OCTG according to API and ISO standards offers a broad range of special produsts. All products are abailable in API or
special grades in harsher environments, encountering higher well bore pressures and temperatures in addition to sweet
and sour gas, especially 13Cr OCTG. Casing and Tubing of API Specification are furnished with threads and coupling
conforming to API thread without coupling, and special end finish.
EPC Scope Raw Materials Industrial Equipments Equipments
10│11
EPC Scope Raw Materials Industrial Equipments Equipments
Pipes & Tubes│SAW & ERW
• SAW Pipe & Tube (Submerged Arc Welded) - Roll Bending Pipe
The SAW(Submerged Arc Welding) method is applied, in which welding is done by Arc,
Roll Bending MethodThe SAW(Submerged Arc Welding) method is applied, in which welding is done by Arc, Roll bending steel pipe settles different
pole in between the parent material and welding section, and it uses heat of arc resulting from the space in between for welding.
Large-scaled thick wall and quality pipe are capable for production and is used not only in line pipe for conveying petroleum
and natural gas, but also for common piping and structure.
Spiral MethodSpiral method makes possible to manufacture pipes with various outer diameters according to customer's demands since the
welding part is spiral, which is utilized to manufacture pipes for water supply, basement of civil work, and steel pipe for
construction principally.
• ERW Pipe & Tube (Electronic Resistance Welded)
Electric resistance welding provides extensive uses in Manufacturing.
- This method results outstanding welding properties, wide range of manufacturing capability, and high precision in size by
performing self-welding without particular filter metal.
- Quality stability and workability are excellent that it is easy to produce both thin and thick pipes and has a high productivity.
PlatesHot Rolled Steel│Steel Plate│Wire Rod│Cold Rolled Steel│Electrical Steel│Stainless Steel
METERIAL GRADE APPLICATION
Carbon Steel
A 516-60Pressure Vessel Plates, Carbon Steel,
for Moderate and LoweerTemperature Service
A 516-65
A516-70
A537-1 Pressure Vessel Plates, Heat-Treated,Carbon-Manganese-Silicon Steel
Pressure Vessel Plates, Alloy Steel, Nickel
A537-2
A203-E
HICA516-60, A516-65, A516-70
Pressure Vessel HIC PlatesA516-60N, A516-65N, A516-70N
Low AlloyA387 Gr2-1/2. A387Gr 12-1/2 Pressure Vessel Plates, Alloy Steel,
Chromium-MolybdenumA387 Gr11/2. A387Gr 22-1/2
Stainless Steel
A240 TP30 4/1Heat-Resisting Chromium and
Chromium-Nickel Stainless Steel Plate,Sheet, and Strip for Pressure Vessels
A240 TP 316/1
A240 Tp 430
EPC Scope Raw Materials Industrial Equipments Equipments
12│13
EPC Scope Raw Materials Industrial Equipments Equipments
Steel Structure│H-Beam
• Wide Flange Beams Wide flange beams support many types of structures, such as multi-storey buildings, mills, warehouses, airport hangars,
and sports complexes, as well as apartments, schools, shopping centers, and houses.
They are renowned for their excellent shock absorbency and high degree of weldability.
The need for them has been increasing rapidly, due to a worldwide increase in construction facilities.
They are also in demand for use in earthquake-resistant buildings.
• Structural steel is steel construction material, a profile, formedwith a specific shape or cross section and certain standards of chemical composition and mechanical properties.
Structural steel shape, size, composition, strength, storage, etc., is regulated in most industrialized countries.
EPC Scope Raw Materials Industrial Equipments Equipments
Valves
Range of Products• Control Valves Pneumatically Operated Control ValveElectrically Operated Control ValveHydraulically Operated Control ValveHydraulically and Electricall Operated Control Valves
• Regulating Valves Directly Operated Reducing Valve for High pressure and High TemperatureVarious types of Pressure Regulating Valves
• Remotely Operated Valves(Cylinder Valves)Electric Motor ValvePeneumatic Cylinder ValveHydraulic Oil Cylinder Valve
• Solenoid Operated ValvesDirecly Operated Solenoid ValvePilot Type Solenoid Valve3-Way, 4-Way, Change-over Solenoid ValvesEmergency Shut-off Solenoid ValveSpecial Valves are also avaitable
• Safety ValvesSafety-Relief Valves for Air, Gas and Vapor ServiceSafety Valve for Steam serviceRelief Valve for Liquid Service
• Butterfly ValvesManually Operated ValveRemotely Operated ValveValves for Cryogenic & High Temperature Service
VALVES AND CONTROL SYSTEMSWORLD BEST TECHNOLOGY SUPPORTS INDUSTRY• A variety of products designed and manufactored under the ISO 9001 quality system.• Products are used in a wide range of applications, including marine, land and niclear applications.
Control ValvesControl Valves
Level SwitchesRegulating Valves Cylinder ValvesSafety Valves
14│15
EPC Scope Raw Materials Industrial Equipments Equipments
Pumps
CHARACTERISTICS
• Radially split, vertical in-linecentrifugal pump
• Foot mounted• Single volute casing• Single suction, radial, closed impeller
• Thrust compensation by balance holes
• Side-Side in line nozzle arrangement
• Materials of construction per API 610, other materials on request
CHARACTERISTICS
• Axially split, horizontal multistagecentrifugal pump
• Near-centerline mounted• Diffuser casing• Single suction, radial, enclosed impeller• Thrust compensation by opposedimpeller groups
• Side-Side nozzle arrangement• Materials of construcion per API 610,other materials on request
➲
➲
➲
Vertical Pumps (NKP/NKT, WKP/WKT)
Horizontal Process Pump Multi Stage(JTN)
Vertical Pumps
Centrifugal Process Pumps Vertical Inline, Process Pump(SPI)
Multi-stage submersible pump type HZV-Cat.1
NKP/NKT, WKP/WKT
Non-clogging (NKP/NKT) and wear re-sistant (WKP/WKT) vertical cantilever pumps are used in applications with liquids containingsolids or abrasive slurries and when no support bearing inside the liquid isallowed. Cantilever pumps are abailable with closed, open or vortex impellers to meetthe require-ments of different applications.
Reactor│Pressure Vessel│Drum│Tower
EPC Scope Raw Materials Industrial Equipments Equipments
Toweer Toweer
Reactor Converter Vessel Drum
TOC Glycol Company Limited. (Thailand 2005)Mat’l : SA240-304 Size : 59ton, 15Tx3,200IDx38,920L
Ningbo Mitsubishi Chemical (China 2005)Mat’l : SA516-70+B265-1 Size : 26.9ton, (20+3)Tx4,500IDx4,700L
Tosoh Corporation (Japan 2004)Mat’l : JIS SPV490Q Size : 102.5ton, 39Tx3,400IDx5,500L
Samsung Petrochemicals Co., Ltd. (Korea 2004)Mat’l : SA516Gr.70N+SB265Gr.1 Size : 162ton, (46+3)Tx5,700IDx8,900L
16│17
EPC Scope Raw Materials Industrial Equipments Equipments
Heat Exchanger│Condenser│Evaporator│Deaerator│FW Heater
FW Heater Evaporator
Heat Exchanger Condenser Deaerator
Feicheng Acid Chemicals Co., Ltd. (China 2007)Mat’l : B551-R60702 Size : 25.4ton, 9.53Tx2,000IDx43,518L
Kureha Corporation 41.1TON (Japan 2006)Mat’l : SPV335+TP270 Size : 41.1ton, (34.5+2)Tx2,800IDx6,640L
Samsung Total Petrochemical (Korea 2007)Mat’l : SA240-304, SA516-70 Size : 570ton, (82/25/23/20)Tx4,318IDx41,300L
Qatar Liquefied Gas Company (Qatar 2006)Mat’l : SA203-E, D Size : 133ton, 58Tx5,000IDx16,300L
Diesel│Gas Engine Generator
Gas│Air Compressor
Economical and Ecological Engine with low fuel consumption, NOx emission, and smoke, etc., which is based on the below specific designs;- Optimized Supercharging with Miller Cycle
- High Fuel Injection Pressure
Reliable and Practical Engine with simple, smart and robust structure.
- Number of engine components are minimized with Pipe-Free design
- Most of the components are directly accessible for easier maintenance
- ‘Individual Part’ maintenance concept is provided
- Feed System is fully modularized with direct accessibility
LD Compressor• Model : SG-G4250/2• 2-stage, tandem type core construction• New concept cryogenic LD compressor
Expander• Moder : SG-ST2800• Cryogenic expander• 2 expanders of cold section and hot section
Fueal Gas Compressor• Model : SG-S3400/3• 3-stage coreconstruction • World’s 1st centrifugal type fuel gas compressor for LNG-FPSO
HD Compressor• Model : SG-G30000/1• Single stage core construction• Suction condition : -140dgree, 1.03barA
Engineered Air Compressor• Moder : SM8000• Centrifugal integrally geared type• America Petrileum Institute(API) standard
Expander• Model : SG-V5000• 3-stage core construction• Energy recovery in mechanical vapor recompression
EPC Scope Raw Materials Industrial Equipments Equipments
18│19
EPC Scope Raw Materials Industrial Equipments Equipments
Transformer
Using modern designs, state-of-the-art
manufacturing facilities and innovative
production technology. We manufacture
high-quality power and distribution transformers
with a rated voltage of up to 800kV
and a capacity of up to 1,500MVA
Prominent Features│Benefits :
• Suitable for various site conditions and sufficient
supply records proven by worldwide end-users
• Environmentally friendly with low loss, low
niose and compact design
• High reliablity and long service life
Production Range :
• Power Transformers up to 800 kV Class
• Distribution Transformers
• Cast Resin Transformers
• Special Purpose Transformers such as Dry
Type Transformers, Shunt Reactors, Gas
Insulated Transformers, etc.
Power Transformer up to 100kVA~50MVA
Power Transformer up to 420kV/200MVA
765 kV Power Transformer
Supervision of Transformer Traction Transformer
Power Transformer up to 420kV/200MVA
Power Transformer up to 800kV/1300MVA
Tap Changers
Reactor
SandWell PetroGas Co., Ltd. KOREA HeadquarterSandWell PetroGas B/D#626-11, Wu-Dong, Haeundae-Gu, Busan, KoreaTel. +82 (51) 891 0606Fax. +82 (51) 891 6116Email. [email protected]://www.sandwellpetrogas.co.kr