trw hw overview.ppt
TRANSCRIPT
-
8/10/2019 TRW HW Overview.ppt
1/8
Your IT Partner
CMC Ltd
CMC-TRW HW Services Overview
-
8/10/2019 TRW HW Overview.ppt
2/8
CONFIDENTIAL
Tier 1 Automotive ODCKey Domain Areas
Braking Systems
Vehicle Control Systems ABS, TC, YSC, Slip Control, Anti Rollover, etc
Sensors and Actuators
Steering
EPAS ( Electric Power Assisted Steering), Electro Hydraulic Power Assisted Steering
ACC- Adaptive Cruise Control
Occupant Safety Systems
Airbag Systems, Occupant Detection & Classification, TPM ( Tire Pressure Monitoring), RKE( Remote Keyless Entry), Lane Departure Warning System
Sensors, Diagnostic Modules
Body Controls
HVAC, Climate Control, Rain Sensor, Steering Modules Angle Sensors, Column Node
Others
Diesel Engine Control, Diesel Common Rail
-
8/10/2019 TRW HW Overview.ppt
3/8
CONFIDENTIAL
CMC TRW Hardware Design services- Foot Print
ShirleyDesign Analysis &
Simulation
Charateritization &
Other Testing
Design SupportBench Marking
Layout
Test Rig Build
Value Engineering
Regulatory Testing
ROHS / Obsolescence
PDM / DocumentationTest Coverage
Livonia
Farmington Hills
WinonaDesign Analysis & Simulation
Charateritization & Other
Testing
LayoutTest Rig Build
Sensor Support
Koblenz
RadolfzellDesign Analysis &
Simulation
Labcar automation
CMC Center INDIATRW ODC
ShanghaiDesign Analysis &
Simulation
Testing
Seamless support for last ten yearsCoverage Across the Product Development Life Cycle
Global Support US, UK, Germany, and China
Highlights
Direct connection to TRW network
Access to TRW product data and internal websites
Embedded Software and Hardware tools
Infrastructure
-
8/10/2019 TRW HW Overview.ppt
4/8
CONFIDENTIAL
Hardware service Overview for TRW
Design Analysis & Simulation ( WC, DFMEA, MTBF, Sneak )
Charateritization & Other Testing (FIT / Test and Validation)
Design Support (Circuit Design , ECAD, CAF, )
Bench Marking / Component Engineering / Global Mfg. Technology
Test Rig Build
Value Engineering
Regulatory Testing
ROHS / Obsolescence
PDM / Documentation
Sensor Support
-
8/10/2019 TRW HW Overview.ppt
5/8
CONFIDENTIAL
Global C40 Process is used for
developing customer specific
applications.
Consistent and common product development process
Links with several other TRW processes
Enables use of global resources efficiently
Why needed?
Start of every new application program
All application programs starting from Q2 of 2007
When needed? Braking Air Bags Seat Belts Steering Wheels Body Electronics
Where needed?
Project / Team Lead.
The process can be tailored by the leader, as
required, to satisfy the needs of each individualproject.
who leads?
TRW C40 Process Overview
-
8/10/2019 TRW HW Overview.ppt
6/8
CONFIDENTIAL
Architecture Phase
Beta Prototype Phase
Alpha Prototype Phase
Alpha Prototype Phase
Breadboard Phase
Beta Phase
Prototype
Board Bring-Up &
DVT
PCB Design &
Gerber File
Schematics
PCB Fabrication
& Assembly
Requirement Phase
Functional Testing
HW -Prototype
HW Design
HW, FW and Mech Requirement
Specs
Mechanical Design
Calculations, Analysis
Component Selection & DesignElectro-mechanical packaging
PCB blank data
H/W S/W
IntegrationMechanical Alpha Prototyping
Initial
Requirement
Document
Preliminary Shape/Size
Final Shape/Size &
Height Limitations
DXF Interface
Implementation for Breadboard
SW Design
Theoretical Analysis (Timings,
Memory, Throughput)
HW, FW, MechanicalDesign Doc
High level
Component and Tools
Selection
Identification of
Evaluation boards
Mechanical Design & Validation
for Alpha Prototype
Update Design document
Breadboard code testing
H/W Prototype
System Testing
H/W S/W Mech
Integration
Design Transition to Beta
H/W-S/W-Mech Integration
Environmental Testing AcceptanceTesting
Support for
Manufacturing
A
A
Prototype & Architecture
Implementation for Alpha
Release
Alpha code testing
Implementation forBeta Release
Beta Code Validation
Mechanical Design refinements
Mechanical Design & validation
for Beta Prototype
Moulds/Die for Beta production
Environmental /
Pre-Conformance Testing
Integration with Device
Driver/ Application
Integrated SW testing
ProductCertification
Dealer Trials
In-VehicleTe
sting
PPAP & SOP
Product Development Process
Case
Study
Details
6
-
8/10/2019 TRW HW Overview.ppt
7/8CONFIDENTIAL
CMC support in TRW Product Engineering process
Product Development (Aligned with C-40 Process) - CV, DV, PV Phases Planning and execution
Project
Planning
Define
RequirementsDesign
Prototype &
Test
Integrate &
Test
Product &
Process
Validation
Launch Assess &
Evolve
Document Control and Configuration Management
DFMEA, Worst case
Analysis
Circuit Lib. Updates,
Characterisation spec
Obsolescence mgmt
ECL update, MTBF
Bootloaders develop.
Basic SW modules
develop.
Application Porting
Tool development
Test Rig/SW. Dev.
SW Integration
Testing (QAC,
Polyspace,
Functionality prove-outs)
Test Plan updates,
Validation Tests
(EMI/EMC, & Environ.,
Functionality Proveouts)
Current Engagement provides excellent coverage over a significant portion of the product development life cycle
Characterization test
Building and testing of
Test Rigs
Gap Analysis
(Customer Vs
TRW Rqmnts)
PVCS/Track activities
77
-
8/10/2019 TRW HW Overview.ppt
8/8CONFIDENTIAL8
Automotive Engineering Hardware Activities for TRW
Legend: Full Involvement Partial Involvement No Involvement
Activity Component / Sub ActivityCoverage
SCD Power train Sensors BCS Steering Braking Air Bags DAS
Requirement Management
Requirement Analysis
Requirements Capture
Design
Hardware Detailed Design
Re- design /Design change implementation
HW Design reviewDesign Review Based On Failure Modes (DRBFM)
Component design review
Schematics Capture
ECL & BOM creation/updates
PCB layout & Gerber file generation
HW performance specification/Circuit Design document
Interface control Specification
Test requirements document
Design Analysis
Hazard Analysis and Risk Assessment
Design Failure Mode Effects Analysis (DFMEA)
Reliability AnalysisFailure Mode Effects and Diagnostics Analysis(FMEDA)
Sneak Circuit Analysis (SCA)
Hardware Fault Metrics Analysis
Common Mode Common Cause Analysis
Thermal simulation and analysis
De- rating analysis
Transient Analysis
Worst case circuit analysis & simulation
Testing
Validation test specification/plan
Characterization test specification
Characterization/Circuit library release testing and report generationFault Insertion/current testing and report generation
Environmental testing and report generation
EMI/EMC testing and report generation
Test Coverage Analysis
Tear down analysis
Functional testing and report generation
Test Data Analysis
Test Infrastructure /tools development
Value Engineering