    Safety Improvement

    Implementation Program atPertamina Refineries

    BY Taruli Sibuea

    HSSE REFINING

    J uni 2011

  • 7/30/2019 TS1 - Taruli Sibuea

    2/18

    PERTAMINA1

    Topic of Presentation

    Summary4

    Introduction1

    SIIP Program Design2

    Implementation3

  • 7/30/2019 TS1 - Taruli Sibuea

    3/18

    PERTAMINA

    PT PERTAMINA (Persero) REFINERIES1. Introduction

    RU II :

    - P. Brandan- Dumai- Sei. Pakning RU III Plaju

    RU IV Cilacap

    RU V :

    - Balikpapan- Methanol Bunyu- Kasim

    RU VI Balongan

    2

  • 7/30/2019 TS1 - Taruli Sibuea

    4/18PERTAMINA

    How We Accelerate Pertaminas Transformation

    Safety

    Culture

    Refining :

    Deliver safe, top quart ile operation, expend to meet national demand

    3

  • 7/30/2019 TS1 - Taruli Sibuea

    5/18PERTAMINA

    The case for change

    No Harm to People, Asset, Environment

    and Reputation Pertamina vision is to transform to a

    company w ith Excellent Safety

    Performance by 2015

    Many HSE Role models from linemanagement

    Compliance to HSE Golden Rules andown safety procedures

    Leadership commitment tolerance of unsafepractices.

    Standards of safety performance tolerance oflow standards for implementing cri tical tasks.

    Contractor safety contractors not following basic

    safety rules. Knowledge and competencies in HSE are low. Safety is driven by HSE Department.

    From (Result o f DuPont Safety Assessment 2006)

    To / Future State

    4

  • 7/30/2019 TS1 - Taruli Sibuea

    6/18PERTAMINA

    2. SIIP Program Design

    Al ignment WorkshopsFour workshop to manage thechanges and ensure succesfulimplementation.

    Strengthen Safety BasicsHazard Awareness and RAMSafe Walk and TalkSafety Supervision.

    Technical SafetyTechnical /Process SafetyPrimer

    2008

    2010

    2012

    2014

    Close the Gaps in SafetyCritical ProcessesReview safety critical process

    Gap closure Workshop (PtW,J SA)

    Technical SafetyHEMP AwarenessTraining

    Integrated HSEManagement SystemHSE MS TrainingHSE MS Review

    Enhancing HSE CultureHeart and Minds ToolsLaunch of Behavior Based

    SafetyTechnical Safety

    HEMP Implementation

    Sustain the ProcessReview the progress ofimplementation

    A Step wise Journey to Excel lence in Safety

    5

  • 7/30/2019 TS1 - Taruli Sibuea

    7/18PERTAMINA

    Deployment for Safety Improvement Implementation Program (SIIP)

    Program Design Implementation

    1. Preparation

    a. Establish task groupb. Establish unit to be evaluated

    2. Implementationa. Evaluate the present statusb. Identified Deviationsc. Do Correction

    PIC HSE Personal competencies

    Process Eng.ProductionME

    Metric

    Measurement

    0

    5

    10

    w1 w2 w3

    Audit (Health Check, MWT)

    % Compliance to definedoperating windows setting

    % Compliance to defined alarmsetting

    % Compliance to defined safeguarding setting

    Verify

    performance

    Leadership Commitment1 2

    3

    4

    6

  • 7/30/2019 TS1 - Taruli Sibuea

    8/18

    PERTAMINA

    Chairman

    (Refining Director)

    Steering

    Committee-2Steering

    Committee-3

    Executor

    Chairman

    (GM RU)

    Refine

    ryUnit

    Ce

    ntral

    SteeringCommittee

    Secretary (Man. HSE Ref.)

    Line Organization

    Secretary (Man. HSE RU)

    ExecutorSteering

    Committee

    Line Organization

    Standards,

    Procedures, Incident

    Investigation

    Steering

    Committee-2Steering

    Committee-3

    Manager

    SVP

    Organization & Responsibilit ies (Organization Of Safety Committee Meeting)

    SMOM

    Manager

    Standards,

    Procedures, Incident

    Investigation

    7

  • 7/30/2019 TS1 - Taruli Sibuea

    9/18

    PERTAMINA

    Lagging Indicator:

    Leading Indicator

    KPI

    HSE KPIs For Pertaminas Refineries

    1. Number of Safety Walk & Talk (SWAT)2. Number of Management Walk Through (MWT)3. % Follow up on Incident Investigation Recommendation4. % Compliance to Management of Change (MOC) Personal, Facility & Technical5. % Fire Protection Readiness6. % Compliance to Setting of Operating Windows, Alarm and Safeguarding.7. % Compliance to Schedule Testing of Alarm & Safeguarding8. % Overdue Inspection for Tank, Vessel, Piping, Pressure Safety Valve (PSV),

    Compressors, Pumps, Column, Boiler & Furnace

    1. Total Recordable Incident Rate (TRIR)2. Number of Incident

    3. Implementation

    8

  • 7/30/2019 TS1 - Taruli Sibuea

    10/18

    PERTAMINA

    IssuesEquipmentProcess

    People

    Safety

    Some Safeguard system are not working or by pass

    Some monitoring equipments are not working ( TI,FI )

    Some operating windows are exceeded

    Some Supervisors and Operators competencies needto upskill regarding Safe operations .

    Management consequences needs to be stronglyimplemented

    Need improvement to Permit To Work implementation.

    Risk Containment Acitivities (Accelarated Preventive Response, APR)

    APR to identify gap and mitigate in the area of critical process safety. Involvement more people / teamfor the program.

    Related to PSM Element :

    Process Safety Information Process Hazard Analysis Operating Procedure Training Mechanical Integrity Management of change Compliance Audit

    Key Learning from Balikpapan and Cilacap Furnace incident

    APR For : Boiler & Furnace Storage Tank Fire Protection Facility Pressure Vessel and Piping

    9

  • 7/30/2019 TS1 - Taruli Sibuea

    11/18

    PERTAMINA

    50

    60

    70

    80

    90

    100

    2008 2009 2010 2011

    50

    60

    70

    80

    90

    100

    2008 2009 2010 2011

    50

    60

    70

    8090

    100

    2008 2009 2010 2011

    PPE Contractor

    (% Safe)

    100%

    Week

    Scaffolding

    (% Safe)

    Gap Gap Closure Remark

    1. Unstandard Blind formaintenance work (workpermit).

    2. Unsafe Scaffolding use by small

    Contractor (no bracing, baseplate, stair, toe).

    1. Intervention

    2. Review to improve

    scaffolding standard.

    Week

    50

    60

    70

    8090

    100

    2008 2009 2010 2011

    Week

    100%

    90% Target

    85% - 90% Target

    < 85% Target

    Electrical Tools & Distribut ion

    (% Safe)

    Work Permit

    (% Safe)

    Week

    Sample Results of SIIP in Refinery

    100%100%

    Before After

    Before After

    10

  • 7/30/2019 TS1 - Taruli Sibuea

    12/18

    PERTAMINA

    Lock and tags System to manage Bypass

    Avai labil it y of Good Fire Fighting Equipment Avai labil it y of informat ion during emergency

    KPIs on display

    Sample Impact of Safety Leadership in Refinery

    11

  • 7/30/2019 TS1 - Taruli Sibuea

    13/18

    PERTAMINA

    Good House-keeping, Painting & Insulation

    Good Scaffolding Material Good Plant Housekeeping

    Good Chemical Handling

    12

  • 7/30/2019 TS1 - Taruli Sibuea

    14/18

    PERTAMINA

    Safety Golden Rules deal with Compliance issues on Key Safety Rules

    There has to be investigation and appropriatemaximum consequence for those breaking rules..

    If you choose to break the rules,

    You Choose not to work for Pertamina

    13

  • 7/30/2019 TS1 - Taruli Sibuea

    15/18

    PERTAMINA

    Overall Safety Effort : Reduce and Eliminate Hazard to Prevent Incident

    People risks

    Observable behaviour

    Man-Machine Risks

    Unseen behaviour

    Integrity Risks

    Understanding assets

    Reactive

    Catastrophic

    Incident

    Multiple fatality

    Near Miss

    Major Incident

    Loss Incident

    Fatality

    Serious Injury

    First-aid Incident

    Unsafe Acts and Conditions

    Process Safety

    Preventative

    Assess the effort

    to eliminate both

    behavioural and

    process safety

    hazards

    Behavior

    ? ?

    ??

    ?

    ?

    ??

    14

  • 7/30/2019 TS1 - Taruli Sibuea

    16/18

    PERTAMINA

    Key Learning For Continues Improment

    Maintain The Processes(Safety Committee Structure, Safety moment in every meeting, Safety board and leading

    indicators)

    Do More(Incident Investigation, Safety Observation and Intervention, Safety Action Plans)

    Change the Process(Involve Contractor in Safety Culture development, Improve operating discipline)

    Introduce the Process(Develop a matrix of knowledge and competency for capabil ity development, develop

    system to maintain the mechanical integrity safety critical equipment)

    15

  • 7/30/2019 TS1 - Taruli Sibuea

    17/18

    PERTAMINA

    4. Summary

    - We have got some improvements by implementing SIIP.

    - We learnt f rom incident in Pertamina and other refineries and conducted RiskContainment (Accelerated Preventive Response) for cri tical process safety.

    - We have to cont inuously identify the gap and follow up to achieve SafetyExcellent.

    Achieving Safety Excellence is a Long Journey