tsf-300a/300/120 center hung packages...9 70 45 25 door gap 3 12.5 12.5 135 25 90 12 12 holes for...

3
TSF-300A/300/120 CENTER HUNG PACKAGES INSTALLATION INSTRUCTIONS INSERT THE SPINDLE INTO THE FLOOR HINGE. 1 4 5 2 3 PUT THE WASHER FIRST AND FIT END SQUARED & ANGLED PART OF SPINDLE INTO HOLLOW AREA AND TIGHTEN IT BY USE OF SPINDLE SCREW READY ALREADY. TURN THE ADJUSTMENT SCREW IN A ANTICLOCKWISE AND RELEASE PIVOT PIN . INSTALL THE PIVOT INTO UPPER PART OF DOOR FRAME. AND COVER IT. INSERT PIVOT CHANNEL INTO TOP OF DOOR, INSTALL BEARING INSERT INTO PIVOT CHANNEL. TIGHTEN UP THE ADJUSTMENT SCREW ALMOST AND CONTROL THE CENTER POINT OF PIVOT. FIX THE BEARING TO THE VERY PROPER LOCATION. INSTALL IN THE CENTER OF THE FLOOR HINGE CEMENT BOX AND TIGHTEN THE FASTENING SCREWS. MAKE CEMENT BOX AND PUT THE FLOOR HINGE IN THE CEMENT BOX. THE UPPER PART OF THE CEMENT BOX SHOULD BE ON THE LEVEL WITH THE FLOOR SURFACE. THE CEMENT BOX SHOULD BE A LEVEL SURFACE. ADDITIONALLY THE CENTER OF SPINDLE HAS TO BE POSITED CORRECTLY. FULFILL GROUT AROUND CEMENT BOX. (LH Door) (RH Door) CAUTION - PUT THE WASHER FIRST. SPINDLE SCREW SPINDLE WASHER ADJUSTMENT SCREW PIVOT COVER PLATE FOR SINGLE ACTION OFFSET 3 ° . FOR DOUBLE ACTION STANDARD TYPE SPINDLE FLOOR FINISHED BEARING INSERT ADJUSTMENT SCREW POIVOT CHANNEL TOP PIVOT CAUTION: 1.Dimension indicated is not a real size. 2.Dimensions are in mm. 3.All reinforcement accessories for bottom arm should be prepared by user. 34 25 18 32 Min 34 7 5 25 5 100 169 126 13 70 147 9 70 45 25 DOOR GAP 3 12.5 12.5 135 25 90 12 12 Holes for pivot insert x 4 ea Use Ø5.1 drill for M6 X 1.0 mech. Screw. Holes x 5 ea Use Ø 4.3 drill for M5 x 0.8 mech. Screw. REAR view Door frame position Front view SIDE view PLANE VIEW R65 DOOR area. COVER PLATE C/L BOTTOM ARM CAUTION: 1,Dimension indicated is not a real size. 2,Dimensions are in mm. 3,All reinforcement accessories for bottom arm should be prepared by user. Holes x 5 ea Use Ø 4.3 drill for M5 x 0.8 mech. Screw. 20 24 70 36 DOOR GAP 3 Floor area finished 59 40 52 52 52 201 Front view Rear View R65 C/L FASTENING SCREWS

Upload: others

Post on 17-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TSF-300A/300/120 CENTER HUNG PACKAGES...9 70 45 25 DOOR GAP 3 12.5 12.5 135 25 90 12 12 Holes for pivot insert x 4 ea Use Ø 5.1 drill for M6 X 1.0 mech. Screw. Holes x 5 ea Use Ø

B A

TSF-300A/300/120CENTER HUNG PACKAGES

INSTALLATION INSTRUCTIONS

INSERT THE SPINDLE INTO THE FLOOR HINGE.

1 4

5

2

3

PUT THE WASHER FIRST AND FIT END SQUARED & ANGLED PART OF SPINDLE INTO HOLLOW AREA AND TIGHTEN IT BY USE OFSPINDLE SCREW READY ALREADY.

TURN THE ADJUSTMENT SCREW IN AANTICLOCKWISE AND RELEASE PIVOT PIN .INSTALL THE PIVOT INTO UPPER PART OF DOORFRAME. AND COVER IT.

INSERT PIVOT CHANNEL INTO TOP OF DOOR,INSTALL BEARING INSERT INTO PIVOT CHANNEL.TIGHTEN UP THE ADJUSTMENT SCREW ALMOSTAND CONTROL THE CENTER POINT OF PIVOT.FIX THE BEARING TO THE VERY PROPER LOCATION.

INSTALL IN THE CENTER OF THE FLOOR HINGECEMENT BOX AND TIGHTEN THE FASTENING SCREWS.

MAKE CEMENT BOX AND PUT THE FLOOR HINGEIN THE CEMENT BOX.

THE UPPER PART OF THE CEMENT BOX SHOULD BE ON THE LEVEL WITH THE FLOOR SURFACE. THE CEMENT BOX SHOULD BE A LEVEL SURFACE. ADDITIONALLY THE CENTER OF SPINDLE HAS TO BE POSITED CORRECTLY. FULFILL GROUT AROUND CEMENT BOX.

(LH Door) (RH Door)

CAUTION - PUT THE WASHER FIRST.

SPINDLE SCREW

SPINDLE

WASHER

ADJUSTMENT SCREW

PIVOT

COVER PLATE

FOR SINGLE ACTIONOFFSET 3 °.

FOR DOUBLE ACTION

STANDARD TYPE SPINDLE

FLOOR FINISHED

BEARING INSERT

ADJUSTMENTSCREW

POIVOT CHANNEL

TO

P P

IVO

T

CAU

TIO

N:

1.D

imensio

n in

dic

ate

d is

not a

real s

ize.

2.D

imensio

ns a

re in

mm

.3.A

ll rein

forc

em

ent a

ccessorie

s fo

r botto

m a

rm s

hould

be p

repare

d b

y user.

3425

18

32Min 347

5

25

5

100

169

126

13

70

1479

70

4525

DO

OR G

AP 3

12.5

12.5

135

25

90

12

12

Hole

s fo

r pivo

t insert x 4

ea

Use Ø

5.1

drill fo

r M6 X

1.0

mech. S

cre

w.

Holes x 5 ea

Use

Ø 4.3 drill for M

5 x 0.8 mech. Screw

.

REAR vie

w

Door fra

me p

ositio

n

Fro

nt vie

w

SID

E vie

w

PLAN

E V

IEWR

65

DO

OR a

rea.

CO

VER P

LATE

C/L

BO

TTO

M A

RM

CAU

TIO

N:

1,D

imensio

n in

dic

ate

d is

not a

real s

ize.

2,D

imensio

ns a

re in

mm

.3,A

ll rein

forc

em

ent a

ccessorie

s fo

r botto

m a

rm s

hould

be p

repare

d b

y user.

Holes x 5 ea

Use

Ø4.3 drill for M

5 x 0.8 mech. Screw

.

2024

70

36

DO

OR G

AP 3

Floor area �nished

5940

5252

52

201

Fro

nt vie

w

Rear V

iew

R65

C/L

FASTENING SCREWS

Page 2: TSF-300A/300/120 CENTER HUNG PACKAGES...9 70 45 25 DOOR GAP 3 12.5 12.5 135 25 90 12 12 Holes for pivot insert x 4 ea Use Ø 5.1 drill for M6 X 1.0 mech. Screw. Holes x 5 ea Use Ø

B A

TSF-300A/300/120OFFSET HUNG PACKAGES

INSTALLATION INSTRUCTIONS

INSERT THE SPINDLE INTO THE FLOOR HINGE.

1 4

5

2

3

PUT THE WASHER FIRST AND FIT END SQUARED & ANGLED PART OF SPINDLE INTO HOLLOW AREA AND TIGHTEN IT BY USE OFSPINDLE SCREW READY ALREADY.

INSTALL TOP PIVOT

REMOVE CAP, PIVOT PIN AND THEN INSTALL TOP PIVOT.

INSTALL BOTTOM ARM.

INSTALL IN THE CENTER OF THE FLOOR HINGECEMENT BOX AND TIGHTEN THE FASTENING SCREWS.

MAKE CEMENT BOX AND PUT THE FLOOR HINGEIN THE CEMENT BOX.

THE UPPER PART OF THE CEMENT BOX SHOULD BE ON THE LEVEL WITH THE FLOOR SURFACE. THE CEMENT BOX SHOULD BE A LEVEL SURFACE. ADDITIONALLY THE CENTER OF SPINDLE HAS TO BE POSITED CORRECTLY. FULFILL GROUT AROUND CEMENT BOX.

(LH Door) (RH Door)

CAUTION - PUT THE WASHER FIRST.

SPINDLE SCREW

SPINDLE

WASHERFOR SINGLE ACTIONOFFSET 3 °.

FOR DOUBLE ACTION

STANDARD TYPE SPINDLE

FLOOR FINISHED

CAU

TIO

N:

1,D

imensio

n in

dic

ate

d is

not a

real s

ize.

2,D

imensio

ns a

re in

mm

.3,A

ll rein

forc

em

ent a

ccessorie

s fo

r botto

m a

rm s

hould

be p

repare

d b

y user.

FASTENING SCREWS

BOTTOM OF DOOR

OFFSET ART

FRAME POSITION

DOOR POSITIONPIVOT PIN

CAP

TO

P P

IVO

TO

FFSET A

RM

FR

ON

T V

IEW

FR

ON

T V

IEW

BAC

K V

IEW

BAC

K V

IEW

CAU

TIO

N:

1.D

imensio

n in

dic

ate

d is

not a

real s

ize.

2.D

imensio

ns a

re in

mm

.3.A

ll rein

forc

em

ent a

ccessorie

s fo

r botto

m a

rm s

hould

be p

repare

d b

y user.

Page 3: TSF-300A/300/120 CENTER HUNG PACKAGES...9 70 45 25 DOOR GAP 3 12.5 12.5 135 25 90 12 12 Holes for pivot insert x 4 ea Use Ø 5.1 drill for M6 X 1.0 mech. Screw. Holes x 5 ea Use Ø

INSTALL DOOR ADJUSTMENT THE GAP BETWEEN DOORAND FLOOR.(IF NEEDED)

6 7

WITH DOOR PARALLEL TO FRAME, PLACE BOTTOMARM ONTO CLOSER SPINDLE. ALIGN DOOR ANDFRAME POSTION OF TOP PIVOT. INSTALL PIVOT PINAND CAP. INSTALL COVER OVER OFFSET ARM.

THE FLOOR HINGES HEIGHT CAN BE UP AB. 4MM INTO THE CEMENT BOX. RELEASE THE FASTENING SCREW “A” AND TURN THE HEIGHT ADJUSTMENT SCREW “B” IN A CLOCKWISE PROPERLY. THE FLOOR HINGES SHOULD BE LEVEL OFF AND TIGHTEN THE FASTENING SCREW ”A” AGAIN. IN CASE BIGGER GAP IS NEEDED,MODIFY THE SPINDLE SIZE PROPERLY.

INSTALLATION- COVER PLATE OR DOORSILL.

11

Cement Case

PUT THE COVER PLATE PROPERLY TO THE DOOR POST AS PIG. AND PUT THE TAB PROPERLY AS WELL.DON’T FIX THE FLOOR HINGES TO THE DOORSILL,IF THERE IS DOORSILL.THE FLOOR HINGE CAN BE ADJUSTED IN THECEMENT BOX.

CAUTION:1,Dimension indicated is not a real size.2,Dimensions are in mm.3,Upper of cement box should be on a level with the floor surface finished.4,Cement box should be a level surface and parallel with door frame.5,Cement box should be made after positing the floor hinge in the center.

QTY (4)

TAB

78

TSF-300A/300 (60)TSF-120 (50)

(70)

(54

B A

± 3)

TSF-300A/300 (341)

TSF-120 (285)

C/L

C/L SIDE view

Cement Case

CLOSING SPEED CONTROL.8

TSF-300AVALVE “D”-TO CONTROL DOOR CLOSING SPEED BETWEEN FULLY OPENED DOOR AND 80 °.VALVE “E”- TO CONTROL DOOR CLOSING SPEED BETWEEN 80 ° AND 0 °.DELAYING ACTION-TURN VALVE ‘D” IN A CLOCKWISE AS MUCH AS YOU WANT.HOLD OPEN-TURN VALVE ‘D” COMPLETELY IN A CLOCKWISE. DOOR CAN BE HOLD OPEN ALWAYS OVER 80 °. HOLD OPEN POSITION HAS TO BE SETTLED AT LESS 4 °.VALVE “C” -START POSITION OF HOLD OPEN OR DELAYING ACTION CAN BE CONTROLLED WITH THIS. INCREASE SPEED ,TURN IN A CLOCKWISE (MAX 105°.)DECREASE SPEED,TURN IN A ANTICLOCKWISE (MIN.75 °.)

TSF-300/120

VALVE “D”-TO CONTROL DOOR CLOSING SPEED BETWEEN FULLY OPENED DOOR AND 15 °.VALVE “E”- TO CONTROL DOOR CLOSING SPEED BETWEEN 15 ° AND 0 °DELAYING ACTION-TURN VALVE ‘D” IN A CLOCKWISE AS MUCH AS YOU WANT.

HOLD OPEN : 90° MECHANICAL HOLD OPEN.

-+

A B A B

TSF-300A

TSF-300

TSF-120

A B A BA

BA

B

A B

B A

TSF-120

TSF-300

TSF-300/120

E

C

D

E

DE

D

DE

D

E