Tsinghau LectureDesign for Safety

Ian Askew, General Manager Lambeth Associates

10 May 2012

Page 2: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Fatality statistics by region

Page 3: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

“Challenge traditional thinking in roles and responsibilities of project stakeholders…”

Page 4: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Page 5: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

‘Hazards leading to 60% of construction accidents could have been designed-out’

Designers….do not underestimate your input to safer construction

(ref. European Foundation for the Improvement in Living and Working Conditions)

Page 6: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Maximize open excavation

Page 7: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Maximize working space

Page 8: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

not like this….

Page 9: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

or this….

Page 10: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

or this….

Page 11: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Standardize…make it repetitive …keep it simple!

Page 12: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Engineer-out, as far as possible, need for workers to enter deep excavations

Page 13: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

The Challenge©

200

4 G

amm

on C

onst

ruct

ion

Lim

ited

. A

ll R

igh

ts R

eser

ved

Marina Bay in the 1950’s

Rock Armour up to 8T

Existing Seawall

Page 14: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Designing out risk….deep excavations Cofferdam

Dredge

N

Page 15: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Soil Conditions

Fill

Marine Clay

Old Alluvium (N value > 100)

Existing Ground Level+105

(m)

+100

+90

+80

+70

+60

Seawall

+50

Kallang Alluvial

Marine Clay

60 - 80m

40m

Page 16: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Typical Cofferdam Wall Arrangement

1.8m & 1.5m Dia. Steel Casing

+80mPD

2.1m

Top of Old Alluvium

Excavation Face

+84mPDExcavation level

Sheetpile & TAM Pipes

Page 17: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Removal Method – Stage 1

Page 18: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Removal Method – Stage 2

Page 19: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Removal Method – Stage 3

Page 20: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Removal Method – Stage 4

Page 21: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Excavation Method – Stage 5

Page 22: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Redundancy for the case of one strut failure

Moveable deflection panels to be provided during grab operation for added protection

Strutting designed for an impact force of 25kN

Protection barrier

Design-in robustness

Page 23: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Maximize offsite prefabrication of support elements…modularize

Fabrication of Megatruss Struts

Page 24: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Campaign feedback from frontline workers on buildability

Waling Detail (Improved for Demolition)

Waling Detail (Before)

Strut

Void former

Concrete waling Concrete fill Concrete fill

Concrete waling

Page 25: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Page 26: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Page 27: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Designing out risk….we need fresh thinking!!

Page 28: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Designing out risk….make it less labour intensive

Page 29: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Designing out risk….make it less labour intensive

Page 30: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Designing out risk….make it less labour intensive

Page 31: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Designing out risk….make it less labour intensive

Page 32: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Communicating design intent……

Page 33: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Isometric views

Page 34: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Isometric views

Page 35: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Harnessing technology….BIM

Hennessy Centre, Hong Kong

Page 36: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

and….Google Sketch-up….WIL 704

Hennessy Centre, Hong Kong

Page 37: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

and….Google Sketch-up…Austin Station

Hennessy Centre, Hong Kong

Page 38: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

….QR codes..design drawings to 3-D visualizations

Page 39: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

To avoid this….

Page 40: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

and this….

Page 41: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Work procedure drawings• pictorial and illustrative

in a language workers understand at a glance

Page 42: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Work procedure drawings• each sequential step

in the erection and dismantling process

• hold points where validation, testing, and/or certification of the erected structure to take up load or to undergo a change in loading is required

Page 43: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

…Pictorial method statements

Page 44: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

…Pictorial method statements

Page 45: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Identifying residual risks

Page 46: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Worker access and egress

Steel Post

Top Railing

Kick Board

TemporaryShoring

Diaphragm Wall

TemporaryStaircase

Steel Bracket

Waling

Struts

Concrete Packing

TemporaryWalkway

Page 47: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Managing field changes

Page 48: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Managing field changes

As-BuiltOriginal Design

Page 49: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Temporary works control

• enforcing temporary works procedures

• improving traceability and transparency

• encouraging communication between design and construction team

Page 50: Tsinghau Leacture 2012-IA

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

The objective …….