tt14-tanmitt14-tanmia mdr 2013dec13 for kamala mdr 2013dec13 for kamal

24
KHARIR CCU EXTENSION PROJECT WTU IF Master Document Register This document is the property of TOTAL EP YEMEN. It must not be stored, reproduced or disclosed to others without written authorization from COMPANY. CONTRACTOR SITE MDR Friday, December 13, 2013 MDR Revision No. TS Number CTR Project Number Country Field or area Zone or install or WP Originator Chrono Sheet Number Document Title Revision Status Discipline Document type Format System - Subsystem Date of issue Date sent to CPY Site DCC Week of Issue Return Code TT14-TAST-TTST-TN010 TT14-WPS-001 YE KHA 99 TAN 161150 A IFA QUA PRC A4 Y 21-Mar-11 3/24/2011 3 1 TT14-TAST-TTST-TN093 TT14-WPS-001 YE KHA 99 TAN 161150 INS MS Y 11-Jul-11 15-Jul-2011 3 1 TT14-TAST-TTST-TN034 TT14-WPS-002 YE KHA 99 TAN 161151 COMMISSIONING PROCEDURE QUA PRC Y 16-Apr-11 4/16/2011 3 1 TT14-TAST-TTST-TN093 TT14-WPS-002 YE KHA 99 TAN 161151 ULTRASONIC EXAMINATION PROCEDURE (COOPERHEAT) QUA PRC Y 11-Jul-11 15-Jul-2011 3 1 TT14-TAST-TTST-TN034 TT14-WPS-003 YE KHA 99 TAN 161152 PROCEDURE FOR CABLE INSTALLATION ELE PRC Y 16-Apr-11 4/16/2011 3 1 TT14-TAST-TTST-TN093 TT14-WPS-003 YE KHA 99 TAN 161152 CATHODIC PROTECTION INSTALLATION PROCEDURE ELE PRC Y 11-Jul-11 15-Jul-2011 3 1 TT14-TAST-TTST-TN035 TT14-WPS-004 YE KHA 99 TAN 161153 PVV MS Y 18-Apr-11 4/18/2011 3 1 TT14-TAST-TTST-TN093 TT14-WPS-004 YE KHA 99 TAN 161153 MEC MS Y 11-Jul-11 15-Jul-2011 3 1 TT14-TAST-TTST-TN036 TT14-WPS-005 YE KHA 99 TAN 161154 CIV MS Y 19-Apr-11 4/19/2011 3 1 TT14-TAST-TTST-TN093 TT14-WPS-005 YE KHA 99 TAN 161154 METHOD STATEMENT FOR THE INSTALLATION OF L.V. SWITCHBOARD ELE MS Y 11-Jul-11 15-Jul-2011 3 1 TT14-TAST-TTST-TN059 TT14-WPS-006 YE KHA 99 TAN 161155 METHOD STATEMENT FOR THE INTALLATION OF STREET LIGHTING ELE MS Y 30-May-11 5/30/2011 3 1 TT14-TAST-TTST-TN059 TT14-WPS-007 YE KHA 99 TAN 161156 METHOD STATEMENT FOR THE INSTALLATION OF CATHODIC PROTECTION ELE MS Y 30-May-11 5/30/2011 3 1 TT14-TAST-TTST-TN034 TT14-WPS-008 YE KHA 99 TAN 161157 ELE MS Y 16-Apr-11 4/16/2011 3 1 TT14-TAST-TTST-TN093 TT14-WPS-008 YE KHA 99 TAN 161157 METHOD STATEMENT FOR INSTALLATION OF CABLE TRAYS ELE MS Y 11-Jul-11 15-Jul-2011 3 1 TT14-TAST-TTST-TN034 TT14-WPS-009 YE KHA 99 TAN 161158 ELE MS Y 16-Apr-11 4/16/2011 3 1 TT14-TAST-TTST-TN093 TT14-WPS-009 YE KHA 99 TAN 161158 ELE MS Y 11-Jul-11 15-Jul-2011 3 1 TT14-TAST-TTST-TN059 TT14-WPS-010 YE KHA 99 TAN 161159 METHOD STATEMENT FOR LIGHTING TRANSFORMER INSTALLATION ELE MS Y 30-May-11 5/30/2011 3 1 TT14-TAST-TTST-TN059 TT14-WPS-011 YE KHA 99 TAN 161160 METHOD STATEMENT FOR CABLE PULLING IN CABLE TRENCH ELE MS Y 30-May-11 5/30/2011 3 1 TT14-TAST-TTST-TN0124 TT14-WPS-011 YE KHA 99 TAN 161160 INS MS Y 10-Sep-11 9/11/2011 1 1 TT14-TAST-TTST-TN059 TT14-WPS-012 YE KHA 99 TAN 161161 ELE PRC Y 30-May-11 5/30/2011 3 1 TT14-TAST-TTST-TN0124 TT14-WPS-012 YE KHA 99 TAN 161161 ELE PRC Y 10-Sep-11 11-Sept.-11 3 1 TT14-TAST-TTST-TN059 TT14-WPS-013 YE KHA 99 TAN 161162 PROCEDURE FOR THE INSTALLATION OF INTRUMENT CABLES INS PRC Y 30-May-11 5/30/2011 3 1 TT14-TAST-TTST-TN0124 TT14-WPS-013 YE KHA 99 TAN 161162 INSPECTION & TEST PLAN FOR PUMPS QUA PLN Y 10-Sep-11 11-Sept.-11 1 1 TT14-TAST-TTST-TN0132 TT14-WPS-013 YE KHA 99 TAN 161162 INSPECTION & TEST PLAN for POWER CABLES QUA PLN Y 21-Sep-11 22-Sept.-11 3 1 TT14-TAST-TTST-TN059 TT14-WPS-014 YE KHA 99 TAN 161163 INSPECTION & TEST PLAN FOR INBSTRUMENT CABLES QUA PLN Y 30-May-11 5/30/2011 3 1 TT14-TAST-TTST-TN0124 TT14-WPS-014 YE KHA 99 TAN 161163 INSPECTION & TEST PLAN for TRANSFORMER QUA PLN Y 10-Sep-11 11-Sept.-11 1 1 TT14-TAST-TTST-TN0132 TT14-WPS-014 YE KHA 99 TAN 161163 INSPECTION & TEST PLAN CABLE TRAYS /LADDER QUA PLN Y 21-Sep-11 22-Sept.-11 3 1 TT14-TAST-TTST-TN059 TT14-WPS-015 YE KHA 99 TAN 161164 INSPECTION & TEST PLAN for UNDERGROUND PIPING QUA PLN Y 30-May-11 5/30/2011 3 1 TT14-TAST-TTST-TN0124 TT14-WPS-015 YE KHA 99 TAN 161164 INSPECTION & TEST PLAN for UNDERGROUND CABLE /TRENCHED CABLE QUA PLN Y 10-Sep-11 11-Sept.-11 1 1 TT14-TAST-TTST-TN059 TT14-WPS-016 YE KHA 99 TAN 161165 INSPECTION & TEST PLAN FOR EARTHING SYSTEM QUA PLN Y 30-May-11 5/30/2011 3 1 Basic and/or Detailed Engineering To be approved by Company (Y/N) Addition, (A) Modification (M), Deletion(D) to Initial MDR WELDING PROCEDURE SPECIFICATIONS (Carbon Steel Piping - Class B01. B03, B10,D03) METHOD STATEMENT FOR INSTALLATION OF FIELD MOUNTED INSTRUMENTS. METHOD STATEMENT FOR THE PROTECTION OF FIBER GLASS DURING PIPE ERECTION AT CFU PIPE RACK METHOD STATEMENT FOR THE OFFLOADING OF CHEMICAL INCJECTION PACKAGE METHOD STATEMENT FOR THE SEQUENCING OF ROAD CROSSING FOR THE INSTALLATION OF FIRE MAIN METHOD STATEMENT FOR THE INSTALLATION OF INTERPOSSING RELAY PANEL and MARSHALLING CABINET FOR WATER INJECTION PUMP METHOD STATEMENT FOR INSTALLATION OF MARSHALLING AND SYSTEM CABINETS METHOD STATEMENT FOR INSTALLATION LIGHTING AND SMALL POWER DISTRIBUTION BOARD METHOD STATEMENT FOR LIGHTNING AND EARTHING SYSTEM INSTALLATION PROCEDURE FOR INSTALLATION OF INSTRUMENT PANELS AND JUNCTION BOXES INSTALLATION OF CABLE RACKS , TRAYS, & CONDUIT SYSTEM PROCEDURE

Upload: engmgs

Post on 23-Oct-2015

42 views

Category:

Documents


2 download

DESCRIPTION

TT14-Tanmia MDR 2013Dec13 for KamalTT14-Tanmia MDR 2013Dec13 for KamalTT14-Tanmia MDR 2013Dec13 for KamalTT14-Tanmia MDR 2013Dec13 for KamalTT14-Tanmia MDR 2013Dec13 for KamalTT14-Tanmia MDR 2013Dec13 for Kamal

TRANSCRIPT

Page 1: TT14-TanmiTT14-Tanmia MDR 2013Dec13 for Kamala MDR 2013Dec13 for Kamal

KHARIR CCU EXTENSION PROJECT WTU IFMaster Document Register

This document is the property of TOTAL EP YEMEN. It must not be stored, reproduced or disclosed to others without written authorization from COMPANY.

CONTRACTOR SITE MDR Friday, December 13, 2013

MD

R R

ev

isio

n N

o.

TS

Nu

mb

er

CT

R P

roje

ct

Nu

mb

er

Co

un

try

Fie

ld o

r a

rea

Zo

ne

or

ins

tall

or

WP

Ori

gin

ato

r

Ch

ron

o

Sh

ee

t N

um

be

r Document Title

Re

vis

ion

Sta

tus

Dis

cip

line

Do

cu

me

nt

typ

e

Fo

rma

t

Sy

ste

m -

Su

bs

ys

tem

Da

te o

f is

su

e

Da

te s

en

t to

CP

Y S

ite

DC

C

We

ek

of

Iss

ue

Re

turn

Co

de

Tra

ns

mit

tal f

rom

CP

Y

Da

te R

etu

rne

d a

t T

AN

MIA

TT14-TAST-TTST-TN010 TT14-WPS-001 YE KHA 99 TAN 161150 A IFA QUA PRC A4 Y 21-Mar-11 3/24/2011 3 1 KHAR/WTU/TT14/019 24-Mar-11

TT14-TAST-TTST-TN093 TT14-WPS-001 YE KHA 99 TAN 161150 INS MS Y 11-Jul-11 15-Jul-2011 3 1 KHAR/WTU/TT14/033 16-Jul-11

TT14-TAST-TTST-TN034 TT14-WPS-002 YE KHA 99 TAN 161151 COMMISSIONING PROCEDURE QUA PRC Y 16-Apr-11 4/16/2011 3 1 KHAR/WTU/TT14/019 24-Mar-11

TT14-TAST-TTST-TN093 TT14-WPS-002 YE KHA 99 TAN 161151 ULTRASONIC EXAMINATION PROCEDURE (COOPERHEAT) QUA PRC Y 11-Jul-11 15-Jul-2011 3 1 KHAR/WTU/TT14/033 16-Jul-11

TT14-TAST-TTST-TN034 TT14-WPS-003 YE KHA 99 TAN 161152 PROCEDURE FOR CABLE INSTALLATION ELE PRC Y 16-Apr-11 4/16/2011 3 1 KHAR/WTU/TT14/019 24-Mar-11

TT14-TAST-TTST-TN093 TT14-WPS-003 YE KHA 99 TAN 161152 CATHODIC PROTECTION INSTALLATION PROCEDURE ELE PRC Y 11-Jul-11 15-Jul-2011 3 1 KHAR/WTU/TT14/033 16-Jul-11

TT14-TAST-TTST-TN035 TT14-WPS-004 YE KHA 99 TAN 161153 PVV MS Y 18-Apr-11 4/18/2011 3 1 KHAR/WTU/TT14/019 24-Mar-11

TT14-TAST-TTST-TN093 TT14-WPS-004 YE KHA 99 TAN 161153 MEC MS Y 11-Jul-11 15-Jul-2011 3 1 KHAR/WTU/TT14/033 16-Jul-11

TT14-TAST-TTST-TN036 TT14-WPS-005 YE KHA 99 TAN 161154 CIV MS Y 19-Apr-11 4/19/2011 3 1 KHAR/WTU/TT14/019 24-Mar-11

TT14-TAST-TTST-TN093 TT14-WPS-005 YE KHA 99 TAN 161154 ELE MS Y 11-Jul-11 15-Jul-2011 3 1 KHAR/WTU/TT14/033 16-Jul-11

TT14-TAST-TTST-TN059 TT14-WPS-006 YE KHA 99 TAN 161155 ELE MS Y 30-May-11 5/30/2011 3 1 KHA/WTU/TT14/025 13-Jun-11

TT14-TAST-TTST-TN059 TT14-WPS-007 YE KHA 99 TAN 161156 ELE MS Y 30-May-11 5/30/2011 3 1 KHA/WTU/TT14/025 13-Jun-11

TT14-TAST-TTST-TN034 TT14-WPS-008 YE KHA 99 TAN 161157 ELE MS Y 16-Apr-11 4/16/2011 3 1 KHA/WTU/TT14/019 24-May-11

TT14-TAST-TTST-TN093 TT14-WPS-008 YE KHA 99 TAN 161157 METHOD STATEMENT FOR INSTALLATION OF CABLE TRAYS ELE MS Y 11-Jul-11 15-Jul-2011 3 1 KHAR/WTU/TT14/033 16-Jul-11

TT14-TAST-TTST-TN034 TT14-WPS-009 YE KHA 99 TAN 161158 ELE MS Y 16-Apr-11 4/16/2011 3 1 KHA/WTU/TT14/019 24-May-11

TT14-TAST-TTST-TN093 TT14-WPS-009 YE KHA 99 TAN 161158 ELE MS Y 11-Jul-11 15-Jul-2011 3 1 KHAR/WTU/TT14/033 16-Jul-11

TT14-TAST-TTST-TN059 TT14-WPS-010 YE KHA 99 TAN 161159 ELE MS Y 30-May-11 5/30/2011 3 1 KHA/WTU/TT14/025 13-Jun-11

TT14-TAST-TTST-TN059 TT14-WPS-011 YE KHA 99 TAN 161160 METHOD STATEMENT FOR CABLE PULLING IN CABLE TRENCH ELE MS Y 30-May-11 5/30/2011 3 1 KHA/WTU/TT14/025 13-Jun-11

TT14-TAST-TTST-TN0124 TT14-WPS-011 YE KHA 99 TAN 161160 INS MS Y 10-Sep-11 9/11/2011 1 1 KHA/WTU/TT14/052 17-Sep-11

TT14-TAST-TTST-TN059 TT14-WPS-012 YE KHA 99 TAN 161161 ELE PRC Y 30-May-11 5/30/2011 3 1 KHA/WTU/TT14/025 13-Jun-11

TT14-TAST-TTST-TN0124 TT14-WPS-012 YE KHA 99 TAN 161161 ELE PRC Y 10-Sep-11 11-Sept.-11 3 1 KHA/WTU/TT14/052 17-Sep-11

TT14-TAST-TTST-TN059 TT14-WPS-013 YE KHA 99 TAN 161162 PROCEDURE FOR THE INSTALLATION OF INTRUMENT CABLES INS PRC Y 30-May-11 5/30/2011 3 1 KHA/WTU/TT14/025 13-Jun-11

TT14-TAST-TTST-TN0124 TT14-WPS-013 YE KHA 99 TAN 161162 INSPECTION & TEST PLAN FOR PUMPS QUA PLN Y 10-Sep-11 11-Sept.-11 1 1 KHA/WTU/TT14/052 17-Sep-11

TT14-TAST-TTST-TN0132 TT14-WPS-013 YE KHA 99 TAN 161162 INSPECTION & TEST PLAN for POWER CABLES QUA PLN Y 21-Sep-11 22-Sept.-11 3 1 KHA/WTU/TT14/054 23-Sep-11

TT14-TAST-TTST-TN059 TT14-WPS-014 YE KHA 99 TAN 161163 INSPECTION & TEST PLAN FOR INBSTRUMENT CABLES QUA PLN Y 30-May-11 5/30/2011 3 1 KHA/WTU/TT14/025 13-Jun-11

TT14-TAST-TTST-TN0124 TT14-WPS-014 YE KHA 99 TAN 161163 INSPECTION & TEST PLAN for TRANSFORMER QUA PLN Y 10-Sep-11 11-Sept.-11 1 1 KHA/WTU/TT14/052 17-Sep-11

TT14-TAST-TTST-TN0132 TT14-WPS-014 YE KHA 99 TAN 161163 INSPECTION & TEST PLAN CABLE TRAYS /LADDER QUA PLN Y 21-Sep-11 22-Sept.-11 3 1 KHA/WTU/TT14/054 23-Sep-11

TT14-TAST-TTST-TN059 TT14-WPS-015 YE KHA 99 TAN 161164 INSPECTION & TEST PLAN for UNDERGROUND PIPING QUA PLN Y 30-May-11 5/30/2011 3 1 KHA/WTU/TT14/025 13-Jun-11

TT14-TAST-TTST-TN0124 TT14-WPS-015 YE KHA 99 TAN 161164 QUA PLN Y 10-Sep-11 11-Sept.-11 1 1 KHA/WTU/TT14/052 17-Sep-11

TT14-TAST-TTST-TN059 TT14-WPS-016 YE KHA 99 TAN 161165 INSPECTION & TEST PLAN FOR EARTHING SYSTEM QUA PLN Y 30-May-11 5/30/2011 3 1 KHA/WTU/TT14/025 13-Jun-11

Bas

ic a

nd

/or

Det

aile

d

En

gin

eeri

ng

To

be

app

rove

d b

y C

om

pan

y (Y

/N)

Ad

dit

ion

, (A

) M

od

ific

atio

n (

M),

D

elet

ion

(D)

to In

itia

l MD

R

WELDING PROCEDURE SPECIFICATIONS (Carbon Steel Piping - Class B01. B03, B10,D03)

METHOD STATEMENT FOR INSTALLATION OF FIELD MOUNTED INSTRUMENTS.

METHOD STATEMENT FOR THE PROTECTION OF FIBER GLASS DURING PIPE ERECTION AT CFU PIPE RACK

METHOD STATEMENT FOR THE OFFLOADING OF CHEMICAL INCJECTION PACKAGE

METHOD STATEMENT FOR THE SEQUENCING OF ROAD CROSSING FOR THE INSTALLATION OF FIRE MAIN

METHOD STATEMENT FOR THE INSTALLATION OF L.V. SWITCHBOARD

METHOD STATEMENT FOR THE INTALLATION OF STREET LIGHTING

METHOD STATEMENT FOR THE INSTALLATION OF CATHODIC PROTECTION

METHOD STATEMENT FOR THE INSTALLATION OF INTERPOSSING RELAY PANEL and MARSHALLING CABINET FOR WATER INJECTION PUMP

METHOD STATEMENT FOR INSTALLATION OF MARSHALLING AND SYSTEM CABINETS

METHOD STATEMENT FOR INSTALLATION LIGHTING AND SMALL POWER DISTRIBUTION BOARD

METHOD STATEMENT FOR LIGHTING TRANSFORMER INSTALLATION

METHOD STATEMENT FOR LIGHTNING AND EARTHING SYSTEM INSTALLATION

PROCEDURE FOR INSTALLATION OF INSTRUMENT PANELS AND JUNCTION BOXES

INSTALLATION OF CABLE RACKS , TRAYS, & CONDUIT SYSTEM PROCEDURE

INSPECTION & TEST PLAN for UNDERGROUND CABLE /TRENCHED CABLE

Page 2: TT14-TanmiTT14-Tanmia MDR 2013Dec13 for Kamala MDR 2013Dec13 for Kamal

KHARIR CCU EXTENSION PROJECT WTU IFMaster Document Register

This document is the property of TOTAL EP YEMEN. It must not be stored, reproduced or disclosed to others without written authorization from COMPANY.

CONTRACTOR SITE MDR Friday, December 13, 2013

MD

R R

ev

isio

n N

o.

TS

Nu

mb

er

CT

R P

roje

ct

Nu

mb

er

Co

un

try

Fie

ld o

r a

rea

Zo

ne

or

ins

tall

or

WP

Ori

gin

ato

r

Ch

ron

o

Sh

ee

t N

um

be

r Document Title

Re

vis

ion

Sta

tus

Dis

cip

line

Do

cu

me

nt

typ

e

Fo

rma

t

Sy

ste

m -

Su

bs

ys

tem

Da

te o

f is

su

e

Da

te s

en

t to

CP

Y S

ite

DC

C

We

ek

of

Iss

ue

Re

turn

Co

de

Tra

ns

mit

tal f

rom

CP

Y

Da

te R

etu

rne

d a

t T

AN

MIA

Bas

ic a

nd

/or

Det

aile

d

En

gin

eeri

ng

To

be

app

rove

d b

y C

om

pan

y (Y

/N)

Ad

dit

ion

, (A

) M

od

ific

atio

n (

M),

D

elet

ion

(D)

to In

itia

l MD

R

TT14-TAST-TTST-TN0124 TT14-WPS-016 YE KHA 99 TAN 161165 QUA PLN Y 10-Sep-11 11-Sept.-11 3 1 KHA/WTU/TT14/052 17-Sep-11

TT14-TAST-TTST-TN059 TT14-WPS-017 YE KHA 99 TAN 161166 QUA PLN Y 30-May-11 5/30/2011 3 1 KHA/WTU/TT14/025 13-Jun-11

TT14-TAST-TTST-TN0124 TT14-WPS-017 YE KHA 99 TAN 161166 QUA PLN Y 10-Sep-11 11-Sept.-11 1 1 KHA/WTU/TT14/052 17-Sep-11

TT14-TAST-TTST-TN0132 TT14-WPS-017 YE KHA 99 TAN 161166 0 AFC QUA PRC A4 Y 21-Sep-11 22-Sept.-11 3 1 KHA/WTU/TT14/054 23-Sep-11

TT14-TAST-TTST-TN059 TT14-WPS-018 YE KHA 99 TAN 161167 A IFA QUA PRC A4 Y 30-May-11 5/30/2011 3 1 KHA/WTU/TT14/025 13-Jun-11

TT14-TAST-TTST-TN0124 TT14-WPS-018 YE KHA 99 TAN 161167 0 AFC QUA PRC A4 Y 10-Sep-11 11-Sept.-11 1 1 KHA/WTU/TT14/052 17-Sep-11

TT14-TAST-TTST-TN0132 TT14-WPS-018 YE KHA 99 TAN 161167 A IFA QUA PRC A4 Y 21-Sep-11 22-Sept.-11 3 1 KHA/WTU/TT14/054 23-Sep-11

TT14-TAST-TTST-TN010 TT14-WPS-019 YE KHA 99 TAN 161168 0 AFC QUA PRC A4 Y 23-Mar-11 3/24/2011 3 1 KHA/WTU/TT14/019 24-May-11

TT14-TAST-TTST-TN093 TT14-WPS-019 YE KHA 99 TAN 161168 A IFA QUA PRC A4 Y 11-Jul-11 15-Jul-2011 3 1 KHAR/WTU/TT14/033 16-Jul-11

TT14-TAST-TTST-TN059 TT14-WPS-020 YE KHA 99 TAN 161170 0 AFC QUA PRC A4 Y 30-May-11 5/30/2011 3 1 KHA/WTU/TT14/025 13-Jun-11

TT14-TAST-TTST-TN059 TT14-WPS-021 YE KHA 99 TAN 161171 WELDING PROCEDURE SPECIFICATIONS (PIPING -CLASS H01C) A IFA QUA PRC A4 Y 30-May-11 05/30/11 3 1 KHA/WTU/TT14/025 13-Jun-11

TT14-TAST-TTST-TN059 TT14-WPS-022 YE KHA 99 TAN 161172 WELDING PROCEDURE SPECIFICATIONS (PIPING -CLASS H01C) 0 AFC QUA PRC A4 Y 30-May-11 05/30/11 3 1 KHA/WTU/TT14/025 13-Jun-11

TT14-TAST-TTST-TN059 TT14-WPS-023 YE KHA 99 TAN 161173 0 AFC QUA PRC A4 Y 30-May-11 05/30/11 3 1 KHA/WTU/TT14/025 13-Jun-11

TT14-TAST-TTST-TN0160 TT14-WPS-024 YE KHA 99 TAN 161174 0 AFC QUA PRC A4 Y 14-Jun-12 14-Jun-12 3 1 KHA/WTU/TT14/164 19-Jun-12

TT14-TAST-TTST-TN0160 TT14-WPS-025 YE KHA 99 TAN 161175 A IFA QUA PRC A4 Y 14-Jun-12 14-Jun-12 3 1 KHA/WTU/TT14/164 19-Jun-12

TT14-TAST-TTST-TN0160 TT14-WPS-026 YE KHA 99 TAN 161176 0 AFC QUA PRC A4 Y 14-Jun-12 14-Jun-12 3 1 KHA/WTU/TT14/164 19-Jun-12

TT14-TAST-TTST-TN0160 TT14-WPS-027 YE KHA 99 TAN 161177 A IFA QUA PRC A4 Y 14-Jun-12 14-Jun-12 3 1 KHA/WTU/TT14/164 19-Jun-12

TT14-TAST-TTST-TN105 TT14-PLN-001 YE KHA 99 TAN 162001 0 AFC QUA PRC A4 Y 31-Jul-11 4-Aug.-11 3 1 KHA/WTU/TT14/053 20-Sep-11

TT14-TAST-TTST-TN0134 TT14-PLN-001 YE KHA 99 TAN 162001 0 AFC QUA PRC A4 Y 22-Sep-11 23-Sep-11 4 1 KHA/WTU/TT14/055 25-Sep-2011

TT14-TAST-TTST-TN067 TT14-PLN-002 YE KHA 99 TAN 162002 WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to pipe) 0 AFC QUA PRC A4 Y 18-Oct-10 03-Jun-11 3 1 KHA/WTU/TT14/024 10-Jun-2011

TT14-TAST-TTST-TN070 TT14-PLN-002 YE KHA 99 TAN 162002 WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to pipe) 1 AFC QUA PRC A4 Y 11-Jun-11 11-Jun-11 3 1 KHA/WTU/TT14/025 13-Jun-2011

TT14-TAST-TTST-TN108 TT14-PLN-003 YE KHA 99 TAN 162003 0 AFC QUA PRC A4 Y 03-Aug.-11 10-Aug.-11 3 1 KHA/WTU/TT14/042 25-Aug-2011

TT14-TAST-TTST-TN108 TT14-PRC-001 YE KHA 99 TAN 162004 1 AFC QUA PRC A4 Y 07-Aug.-11 10-Aug.-11 3 1 KHA/WTU/TT14/076 13-Dec-2011

TT14-TAST-TTST-TN0172 TT14-PRC-001 YE KHA 99 TAN 162004 0 AFC QUA PRC A4 Y 14-Dec-11 30-Dec-11 3 1 KHA/WTU/TT14/079 31-Dec-2011

TT14-TAST-TTST-TN108 TT14-PRC-003 YE KHA 99 TAN 162006 1 AFC QUA PRC A4 Y 01-Aug.-11 10-Aug.-11 3 1 KHA/WTU/TT14/076 13-Dec-2011

TT14-TAST-TTST-TN0172 TT14-PRC-003 YE KHA 99 TAN 162006 2 AFC QUA PRC A4 Y 14-Dec-11 30-Dec-11 3 1 KHA/WTU/TT14/079 31-Dec-2011

TT14-TAST-TTST-TN0122 TT14-PRC-005 YE KHA 99 TAN 162008 0 AFC QUA PRC A4 Y 05-Sep-11 6-Sept.-11 3 1 KHA/WTU/TT14/076 13-Dec-2011

TT14-TAST-TTST-TN0172 TT14-PRC-005 YE KHA 99 TAN 162008 1 AFC QUA PRC A4 Y 14-Dec-11 30-Dec-11 3 1 KHA/WTU/TT14/079 31-Dec-2011

TT14-TAST-TTST-TN108 TT14-PRC-006 YE KHA 99 TAN 162009 2 AFC QUA PRC A4 Y 07-Aug.-1110-Aug.-11

3 1 KHA/WTU/TT14/076 13-Dec-2011

TT14-TAST-TTST-TN0172 TT14-PRC-006 YE KHA 99 TAN 162009 0 AFC QUA PRC A4 Y 14-Dec-1130-Dec-11

3 1 KHA/WTU/TT14/079 31-Dec-2011

TT14-TAST-TTST-TN005 TT14-MS-001 YE KHA 99 TAN 162010 1 AFC QUA PRC A4 Y 16-Dec-10 14-Mar-11 3 1 KHA/WTU/TT14/003 17-Mar-2011

INSPECTION & TEST PLAN FOR ELECRIC MOTOR (INCLUDING CONTROL UNIT)

INSPECTION & TEST PLAN FOR INSTRUMENT PRE-INSTALLATION AND CALIBRATION

INSPECTION & TEST PLAN FOR CONTROL VALVES PRE-INSTALLATION

WELDING PROCEDURE SPECIFICATIONS (Carbon Steel Piping - Class B01. B03, B10,D03)

WELDING PROCEDURE SPECIFICATIONS (API-650 Tank Nozzle & Internal Piping - Class B01. B03, B10,B13, D03

WELDING PROCEDURE SPECIFICATIONS (API-650 Tank Nozzle & Internal Piping - Class B01. B03, B10,B13, D03

WELDING PROCEDURE SPECIFICATIONS (API-650 Tank Nozzle & Internal Piping - Class B01. B03, B10,B13, D03

WELDING PROCEDURE SPECIFICATIONS (API-650 Tank Nozzle & Internal Piping - Class B01. B03, B10,B13, D03

WELDING PROCEDURE SPECIFICATIONSPIPING -(CLASS B50 + D50)

WELDING PROCEDURE SPECIFICATIONSPIPING -(CLASS B50 + D50)

WELDING PROCEDURE SPECIFICATIONS (API 650 Tank-SMAW+SAW- Sheel Plates)

WELDING PROCEDURE SPECIFICATIONS (API 650 Tank-SMAW+SAW- Sheel Plates)

WELDING PROCEDURE SPECIFICATIONS (API-650 Tank Nozzle & Internal Piping - Class B01. B03, B10,B13, D03

WELDING PROCEDURE SPECIFICATIONS (API-650 Tank Nozzle & Internal Piping - Class B01. B03, B10,B13, D03

WELDING PROCEDURE SPECIFICATIONS (API-650 Tank Nozzle & Internal Piping - Class B01. B03, B10,B13, D03

WELDING PROCEDURE SPECIFICATIONS (API-650 Tank Nozzle & Internal Piping - Class B01. B03, B10,B13, D03

WELDING PROCEDURE SPECIFICATIONS (API 650 Tank-SMAW -Shell Plates with PWHT)

WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to pipe- thruogh thickness repair)

WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to pipe- thruogh thickness repair)

WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to pipe- partial repair)

WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to pipe- partial repair)

WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to pipe- partial repair)

WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to pipe- cap repair)

WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to pipe- cap repair)

WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to pipe- cap repair)

WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to fittings)

WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to fittings)

Page 3: TT14-TanmiTT14-Tanmia MDR 2013Dec13 for Kamala MDR 2013Dec13 for Kamal

KHARIR CCU EXTENSION PROJECT WTU IFMaster Document Register

This document is the property of TOTAL EP YEMEN. It must not be stored, reproduced or disclosed to others without written authorization from COMPANY.

CONTRACTOR SITE MDR Friday, December 13, 2013

MD

R R

ev

isio

n N

o.

TS

Nu

mb

er

CT

R P

roje

ct

Nu

mb

er

Co

un

try

Fie

ld o

r a

rea

Zo

ne

or

ins

tall

or

WP

Ori

gin

ato

r

Ch

ron

o

Sh

ee

t N

um

be

r Document Title

Re

vis

ion

Sta

tus

Dis

cip

line

Do

cu

me

nt

typ

e

Fo

rma

t

Sy

ste

m -

Su

bs

ys

tem

Da

te o

f is

su

e

Da

te s

en

t to

CP

Y S

ite

DC

C

We

ek

of

Iss

ue

Re

turn

Co

de

Tra

ns

mit

tal f

rom

CP

Y

Da

te R

etu

rne

d a

t T

AN

MIA

Bas

ic a

nd

/or

Det

aile

d

En

gin

eeri

ng

To

be

app

rove

d b

y C

om

pan

y (Y

/N)

Ad

dit

ion

, (A

) M

od

ific

atio

n (

M),

D

elet

ion

(D)

to In

itia

l MD

R

TT14-TAST-TTST-TN006 TT14-MS-001 YE KHA 99 TAN 162010 0 AFC QUA PRC A4 Y 19-Mar-11 21-Mar-11 3 1 KHA/WTU/TT14/007 21-Mar-2011

TT14-TAST-TTST-TN0379 TT14-PRC-007 YE KHA 99 TAN 162011 1 AFC QUA PRC A4 Y 19-Jun-12 19-Jun-12 1 1 KHA/WTU/TT14/169 30-Jun-2012

TT14-TAST-TTST-TN0566 TT14-PRC-007 YE KHA 99 TAN 162011 0 AFC QUA PRC A4 Y 10-Jan-13 12-Jan-13 1 KHA/WTU/TT14/255 24-Jan-2013

TT14-TAST-TTST-TN004 TT14-PRC-008 YE KHA 99 TAN 162012 1 AFC QUA PRC A4 Y 20-Feb-11 14-Mar-11 3 1 KHA/WTU/TT14/006 20-Mar-2011

TT14-TAST-TTST-TN008 TT14-PRC-008 YE KHA 99 TAN 162012 2 AFC QUA PRC A4 Y 23-Mar-11 23-Mar-11 3 1 KHA/WTU/TT14/008 26-Mar-2011

TT14-TAST-TTST-TN004 TT14-PRC-009 YE KHA 99 TAN 162013 0 AFC QUA PRC A4 Y 21-Feb-11 14-Mar-11 3 1 KHA/WTU/TT14/005 19-Mar-2011

TT14-TAST-TTST-TN006 TT14-PRC-009 YE KHA 99 TAN 162013 1 AFC QUA PRC A4 Y 19-Mar-11 21-Mar-11 3 1 KHA/WTU/TT14/007 21-Mar-2011

TT14-TAST-TTST-TN004 TT14-PRC-010 YE KHA 99 TAN 162014 2 AFC QUA PRC A4 Y 21-Feb-11 14-Mar-11 3 1 KHA/WTU/TT14/006 20-Mar-2011

TT14-TAST-TTST-TN008 TT14-PRC-010 YE KHA 99 TAN 162014 A IFA QUA PRC A4 Y 23-Mar-11 23-Mar-11 3 1 KHA/WTU/TT14/008 26-Mar-2011

TT14-TAST-TTST-TN004 TT14-PRC-011 YE KHA 99 TAN 162015 0 AFC QUA PRC A4 Y 21-Feb-11 14-Mar-11 3 1 KHA/WTU/TT14/006 20-Mar-2011

TT14-TAST-TTST-TN008 TT14-PRC-011 YE KHA 99 TAN 162015 0 AFC QUA PRC A4 Y 23-Mar-11 23-Mar-11 3 1 KHA/WTU/TT14/008 26-Mar-2011

TT14-TAST-TTST-TN004 TT14-PRC-012 YE KHA 99 TAN 162016 0 AFC QUA PRC A4 Y 23-Feb-11 14-Mar-11 3 1 KHA/WTU/TT14/005 19-Mar-2011

TT14-TAST-TTST-TN006 TT14-PRC-012 YE KHA 99 TAN 162016 0 AFC QUA PRC A4 Y 19-Mar-11 21-Mar-11 3 1 KHA/WTU/TT14/007 21-Mar-2011

TT14-TAST-TTST-TN004 TT14-PRC-013 YE KHA 99 TAN 162017 0 AFC QUA PRC A4 Y 24-Feb-11 14-Mar-11 3 1 KHA/WTU/TT14/005 19-Mar-2011

TT14-TAST-TTST-TN006 TT14-PRC-013 YE KHA 99 TAN 162017 W2 MANIFOLD PIPELINE AS FOR API 1104 (PIPE TO PIPE) 0 IFA QUA PRC A4 Y 19-Mar-11 21-Mar-11 3 1 KHA/WTU/TT14/007 21-Mar-2011

TT14-TAST-TTST-TN004 TT14-PRC-014 YE KHA 99 TAN 162018 W2 MANIFOLD PIPELINE AS FOR API 1104 (PIPE TO FITTINGS) 0 IFA QUA PRC A4 Y 24-Feb-11 14-Mar-11 3 1 KHA/WTU/TT14/005 19-Mar-2011

TT14-TAST-TTST-TN006 TT14-PRC-014 YE KHA 99 TAN 162018 PIPE TO FITTINGS - THROUGH THICKNESS REPAIR 0 IFA QUA PRC A4 Y 19-Mar-11 21-Mar-11 3 1 KHA/WTU/TT14/007 21-Mar-2011

TT14-TAST-TTST-TN004 TT14-PRC-015 YE KHA 99 TAN 162019 PIPE TO PIPE THROUGH THICKNESS REPAIR 0 IFA QUA PRC A4 Y 25-Feb-11 14-Mar-11 3 1 KHA/WTU/TT14/005 19-Mar-2011

TT14-TAST-TTST-TN006 TT14-PRC-015 YE KHA 99 TAN 162019 PROJECT QA/QC PLAN B IFA QUA PLN A4 Y 19-Mar-11 21-Mar-11 3 1 KHA/WTU/TT14/007 21-Mar-2011

TT14-TAST-TTST-TN004 TT14-PRC-016 YE KHA 99 TAN 162020 PROJECT QA/QC PLAN 0 AFC QUA PLN A4 Y 25-Feb-11 14-Mar-11 3 1 KHA/WTU/TT14/005 19-Mar-2011

TT14-TAST-TTST-TN006 TT14-PRC-016 YE KHA 99 TAN 162020 PROJECT SITE HSE PLAN A IFR HSE PLN A4 Y 19-Mar-11 21-Mar-11 3 1 KHA/WTU/TT14/007 21-Mar-2011

TT14-TAST-TTST-TN004 TT14-PRC-017 YE KHA 99 TAN 162021 PROJECT SITE HSE PLAN 0 AFC HSE PLN A4 Y 25-Feb-11 14-Mar-11 3 1 KHA/WTU/TT14/005 19-Mar-2011

TT14-TAST-TTST-TN006 TT14-PRC-017 YE KHA 99 TAN 162021 PROJECT EXECUTION PLAN 0 AFC PJM PLN A4 Y 19-Mar-11 21-Mar-11 3 1 KHA/WTU/TT14/007 21-Mar-2011

TT14-TAST-TTST-TN072 TT14-PRC-018 YE KHA 99 TAN 162022 COORDINATION PROCEDURE C IFA PJM PRC A4 Y 04-Jul-11 06-Jul-11 2 1 KHA/WTU/TT14/037 27-Jul-2011

TT14-TAST-TTST-TN102 TT14-PRC-018 YE KHA 99 TAN 162022 COORDINATION PROCEDURE 0 AFC PJM PRC A4 Y 31-Jul-11 02-Aug-11 3 1 KHA/WTU/TT14/038 2-Aug-2011

TT14-TAST-TTST-TN110 TT14-PRC-018 YE KHA 99 TAN 162022 PROCUREMENT PROCEDURE D IFA PJM PRC A4 Y 11-Aug-11 13-Aug-11 3 1 KHA/WTU/TT14/040 17-Aug-2011

TT14-TAST-TTST-TN072 TT14-PRC-019 YE KHA 99 TAN 162023 PROCUREMENT PROCEDURE 0 AFC PJM PRC A4 Y 04-Jul-11 06-Jul-11 2 1 KHA/WTU/TT14/034 20-Jul-2011

TT14-TAST-TTST-TN102 TT14-PRC-019 YE KHA 99 TAN 162023 INTERFACE COORDINATION PROCEDURE A IFR PJM PRC A4 Y 27-Jul-11 02-Aug-11 3 1 KHA/WTU/TT14/038 2-Aug-2011

TT14-TAST-TTST-TN110 TT14-PRC-019 YE KHA 99 TAN 162023 INTERFACE COORDINATION PROCEDURE 0 AFC PJM PRC A4 Y 11-Aug-11 13-Aug-11 3 1 KHA/WTU/TT14/040 17-Aug-2011

TT14-TAST-TTST-TN012 TT14-PRC-022 YE KHA 99 TAN 162026 DOCUMENT MANAGEMENT PROCEDURE B IFA PJM PRC A4 Y 26-Mar-11 27-Mar-11 3 1 KHA/WTU/TT14/021 24-May-2011

TT14-TAST-TTST-TN062 TT14-PRC-022 YE KHA 99 TAN 162026 DOCUMENT MANAGEMENT PROCEDURE 0 AFC PJM PRC A4 Y 01-Jun-11 01-Jun-11 3 1 KHA/WTU/TT14/023 2-Jun-2011

TT14-TAST-TTST-TN012 TT14-PRC-023 YE KHA 99 TAN 162027 TEMPORARY FENCING ISOLATING WORK AREA FROM SIMOPS A IFR CIV MS A4 Y 26-Mar-11 27-Mar-11 3 1 KHA/WTU/TT14/028 22-Jun-2011

TT14-TAST-TTST-TN081 TT14-PRC-023 YE KHA 99 TAN 162027 TEMPORARY FENCING ISOLATING WORK AREA FROM SIMOPS 0 AFC CIV MS A4 Y 24-Jun-11 25-Jun-11 3 1 KHA/WTU/TT14/029 26-Jun-2011

TT14-TAST-TTST-TN016 TT14-PRC-024 YE KHA 99 TAN 162028 PROGRESS MEASUREMENT PROCEDURE 1 IFA PJM PRC A4 Y 29-Mar-11 31-Mar-11 3 1 KHA/WTU/TT14/013 25-Apr-2011

TT14-TAST-TTST-TN044 TT14-PRC-024 YE KHA 99 TAN 162028 PROGRESS MEASUREMENT PROCEDURE 2 IFA PJM PRC A4 Y 25-Apr-11 26-Apr-11 3 1 KHA/WTU/TT14/016 29-Apr-2011

TT14-TAST-TTST-TN012 TT14-PRC-025 YE KHA 99 TAN 162029 CONTROL OF NON-CONFORMING PRODUCTS PROCEDURE A IFR QUA PRC A4 Y 26-Mar-11 27-Mar-11 3 1 KHA/WTU/TT14/028 22-Jun-2011

TT14-TAST-TTST-TN081 TT14-PRC-025 YE KHA 99 TAN 162029 CONTROL OF NON-CONFORMING PRODUCTS PROCEDURE 0 AFC QUA PRC A4 Y 24-Jun-11 25-Jun-11 3 1 KHA/WTU/TT14/029 26-Jun-2011

TT14-MS-047 YE KHA 99 TAN 162030 A IFR CIV PRC A4

WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to fittings- thuogh thickness repair)

WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to fittings- thuogh thickness repair)

WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to fittings- partial repair)

WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to fittings- partial repair)

WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to fittings- partial repair)

WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to fittings- cap repair)

WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to fittings- cap repair)

WELDING PROCEDURE SPECIFICATIONS (Pipeline - Pipe to fittings- cap repair)

WELDING PROCEDURE SPECIFICATIONS (FOR STRUCTURAL WELDING)

WELDING PROCEDURE SPECIFICATIONS (FOR STRUCTURAL WELDING)

WELDING PROCEDURE SPECIFICATIONS (API 650 Tank-SMAW -Shell Plates without PWHT)

WELDING PROCEDURE SPECIFICATIONS (API 650 Tank-GTAW+SMAW -Nozzles)

WELDING PROCEDURE SPECIFICATIONS (API 650 Tank-GTAW -Nozzles)

WELDING PROCEDURE SPECIFICATIONS (API 650 Tank-GTAW+SMAW -Nozzles)

PREPARATION FOR BACKFILLING MATERIALS ON BORROW PIT PROCEDURE

Page 4: TT14-TanmiTT14-Tanmia MDR 2013Dec13 for Kamala MDR 2013Dec13 for Kamal

KHARIR CCU EXTENSION PROJECT WTU IFMaster Document Register

This document is the property of TOTAL EP YEMEN. It must not be stored, reproduced or disclosed to others without written authorization from COMPANY.

CONTRACTOR SITE MDR Friday, December 13, 2013

MD

R R

ev

isio

n N

o.

TS

Nu

mb

er

CT

R P

roje

ct

Nu

mb

er

Co

un

try

Fie

ld o

r a

rea

Zo

ne

or

ins

tall

or

WP

Ori

gin

ato

r

Ch

ron

o

Sh

ee

t N

um

be

r Document Title

Re

vis

ion

Sta

tus

Dis

cip

line

Do

cu

me

nt

typ

e

Fo

rma

t

Sy

ste

m -

Su

bs

ys

tem

Da

te o

f is

su

e

Da

te s

en

t to

CP

Y S

ite

DC

C

We

ek

of

Iss

ue

Re

turn

Co

de

Tra

ns

mit

tal f

rom

CP

Y

Da

te R

etu

rne

d a

t T

AN

MIA

Bas

ic a

nd

/or

Det

aile

d

En

gin

eeri

ng

To

be

app

rove

d b

y C

om

pan

y (Y

/N)

Ad

dit

ion

, (A

) M

od

ific

atio

n (

M),

D

elet

ion

(D)

to In

itia

l MD

R

TT14-PRC-055 YE KHA 99 TAN 162031 0 IFA CIV PRC A4

TT14-TAST-TTST-TN013 TT14-PRC-028 YE KHA 99 TAN 162032 INSPECTION, MEASURING & TEST EQUIPMENT PROCEDURE A IFR QUA PRC A4 Y 28-Mar-11 29-Mar-11 3 1 KHA/WTU/TT14/058 2-Oct-2011

TT14-TAST-TTST-TN0146 TT14-PRC-028 YE KHA 99 TAN 162032 INSPECTION, MEASURING & TEST EQUIPMENT PROCEDURE 0 AFC QUA PRC A4 Y 03-Oct-11 11-Oct-11 3 1 KHA/WTU/TT14/062 13-Oct-2011

TT14-TAST-TTST-TN028 TT14-PRC-029 YE KHA 99 TAN 162033 A IFR QUA PRC A4 Y 10-Apr-11 11-Apr-11 3 1 KHA/WTU/TT14/013 25-Apr-2011

TT14-TAST-TTST-TN044 TT14-PRC-029 YE KHA 99 TAN 162033 0 AFC QUA PRC A4 Y 25-Apr-11 26-Apr-11 3 1 KHA/WTU/TT14/016 29-Apr-2011

TT14-TAST-TTST-TN018 TT14-PRC-030 YE KHA 99 TAN 162034 PROCEDURE FOR BACKFILLING AND COMPACTION A IFR CIV PRC A4 Y 31-Mar-11 02-Apr-11 3 1 KHA/WTU/TT14/013 25-Apr-2011

TT14-TAST-TTST-TN044 TT14-PRC-030 YE KHA 99 TAN 162034 PROCEDURE FOR BACKFILLING AND COMPACTION 0 AFC CIV PRC A4 Y 25-Apr-11 26-Apr-11 3 1 KHA/WTU/TT14/016 29-Apr-2011

TT14-TAST-TTST-TN064 TT14-PRC-031 YE KHA 99 TAN 162036 EXCAVATION WORK PROCEDURE A IFR CIV PRC A4 Y 01-Jun-11 02-Jun-11 1 1 KHA/WTU/TT14/055 25-Sep-2011

TT14-TAST-TTST-TN0138 TT14-PRC-031 YE KHA 99 TAN 162036 EXCAVATION WORK PROCEDURE 0 IFA CIV PRC A4 Y 27-Sep-11 28-Sep-11 3 1 KHA/WTU/TT14/057 29-Sep-2011

TT14-TAST-TTST-TN0141 TT14-PRC-031 YE KHA 99 TAN 162036 FORM WORKS PROCEDURE A IFR CIV PRC A4 Y 29-Sep-11 01-Oct-11 3 1 KHA/WTU/TT14/059 3-Oct-2011

TT14-TAST-TTST-TN013 TT14-PRC-033 YE KHA 99 TAN 162037 FORM WORKS PROCEDURE 0 IFA CIV PRC A4 Y 26-Mar-11 29-Mar-11 3 1 KHA/WTU/TT14/013 25-Apr-2011

TT14-TAST-TTST-TN044 TT14-PRC-033 YE KHA 99 TAN 162037 A IFR CIV PRC A4 Y 25-Apr-11 26-Apr-11 3 1 KHA/WTU/TT14/016 29-Apr-2011

TT14-TAST-TTST-TN026 TT14-PRC-035 YE KHA 99 TAN 162038 0 IFA CIV PRC A4 Y 06-Apr-11 07-Apr-11 3 1 KHA/WTU/TT14/028 22-Jun-2011

TT14-TAST-TTST-TN081 TT14-PRC-035 YE KHA 99 TAN 162038 CONCRETE PLACEMENT PROCEDURE A IFR CIV PRC A4 Y 24-Jun-11 25-Jun-11 3 1 KHA/WTU/TT14/029 26-Jun-2011

TT14-TAST-TTST-TN038 TT14-PRC-036 YE KHA 99 TAN 162039 CONCRETE PLACEMENT PROCEDURE 0 IFA CIV PRC A4 Y 20-Apr-11 21-Apr-11 3 1 KHA/WTU/TT14/013 25-Apr-2011

TT14-TAST-TTST-TN044 TT14-PRC-036 YE KHA 99 TAN 162039 GROUTING PROCEDURE A IFR CIV PRC A4 Y 26-Apr-11 26-Apr-11 3 1 KHA/WTU/TT14/016 29-Apr-2011

TT14-TAST-TTST-TN093 TT14-PLN-004 YE KHA 99 TAN 162040 GROUTING PROCEDURE 0 AFC CIV PRC A4 Y 08-Jul-11 15-Jul-11 2 1 KHA/WTU/TT14/034 20-Jul-2011

TT14-TAST-TTST-TN099 TT14-PLN-004 YE KHA 99 TAN 162040 MATERIAL CONTROL PROCEDURE A IFR PJM PRC A4 Y 27-Jul-11 28-Jul-11 2 1 KHA/WTU/TT14/043 2-Sep-2011

TT14-TAST-TTST-TN0120 TT14-PLN-004 YE KHA 99 TAN 162040 MATERIAL CONTROL PROCEDURE B IFA PJM PRC A4 Y 03-Sep-11 04-Sep-11 3 1 KHA/WTU/TT14/045 5-Sep-2011

TT14-TAST-TTST-TN0122 TT14-PLN-004 YE KHA 99 TAN 162040 MATERIAL CONTROL PROCEDURE 0 AFC PJM PRC A4 Y 05-Sep-11 06-Sep-11 3 1 KHA/WTU/TT14/048 7-Sep-2011

TT14-TAST-TTST-TN0432 TT14-PLN-004 YE KHA 99 TAN 162040 MATERIAL LOGISTICS A IFR PJM PRC A4 Y 01-Sep-12 01-Sep-12 2 1 KHA/WTU/TT14/208 22-Oct-2012

TT14-TAST-TTST-TN0530 TT14-PLN-004 YE KHA 99 TAN 162040 MATERIAL LOGISTICS B IFA PJM PRC A4 Y 10-Nov-12 13-Nov-12

TT14-TAST-TTST-TN0118 TT14-PLN-006 YE KHA 99 TAN 162042 MATERIAL LOGISTICS 0 AFC PJM PRC A4 Y 31-Aug-11 02-Sep-11 2 1

TT14-TAST-TTST-TN0160 TT14-PLN-006 YE KHA 99 TAN 162042 WELDING CONSUMABLE CONTROL PROCEDURE A IFR QUA PRC A4 Y 23-Nov-11 27-Nov-11 3 1 KHA/WTU/TT14/073 3-Dec-2011

TT14-TAST-TTST-TN0162 TT14-PLN-006 YE KHA 99 TAN 162042 WELDING CONSUMABLE CONTROL PROCEDURE 0 AFC QUA PRC A4 Y 03-Dec-11 04-Dec-11 3 1 KHA/WTU/TT14/074 6-Dec-2011

TT14-TAST-TTST-TN0432 TT14-PLN-006 YE KHA 99 TAN 162042 WELDING REPAIR PROCEDURE A IFR QUA PRC A4 Y 01-Sep-12 01-Sep-12 1 1 KHA/WTU/TT14/0227 8-Nov-2012

TT14-TAST-TTST-TN0522 TT14-PLN-006 YE KHA 99 TAN 162042 WELDING REPAIR PROCEDURE 0 AFC QUA PRC A4 Y 07-Nov-12 10-Nov-12

TT14-TAST-TTST-TN078 TT14-PRC-037 YE KHA 99 TAN 162043 WELDER QUALIFICATION PROCEDURE A IFR QUA PRC A4 Y 19-Jun-11 20-Jun-11 3 1 KHA/WTU/TT14/028 22-Jun-2011

TT14-TAST-TTST-TN081 TT14-PRC-037 YE KHA 99 TAN 162043 WELDER QUALIFICATION PROCEDURE 0 AFC QUA PRC A4 Y 24-Jun-11 25-Jun-11 3 1 KHA/WTU/TT14/029 26-Jun-2011

TT14-TAST-TTST-TN055 TT14-PRC-038 YE KHA 99 TAN 162044 POST WELD HEAT TREATMENT PROCEDURE A IFR QUA PRC A4 Y 30-Apr-11 21-May-11 2 1 KHA/WTU/TT14/020 24-May-2011

TT14-TAST-TTST-TN056 TT14-PRC-038 YE KHA 99 TAN 162044 POST WELD HEAT TREATMENT PROCEDURE 0 AFC QUA PRC A4 Y 26-May-11 27-May-11 3 1 KHA/WTU/TT14/022 31-May-2011

TT14-TAST-TTST-TN060 TT14-PRC-038 YE KHA 99 TAN 162044 A IFR PVV PRC A4 Y 31-May-11 31-May-11 3 1 KHA/WTU/TT14/023 2-Jun-2011

TT14-TAST-TTST-TN054 TT14-PRC-039 YE KHA 99 TAN 162045 0 AFC PVV PRC A4 Y 17-May-11 21-May-11 2 1 KHA/WTU/TT14/065 1-Nov-2011

TT14-TAST-TTST-TN0153 TT14-PRC-039 YE KHA 99 TAN 162045 CAD WELDING PROCEDURE A IFR QUA PRC A4 Y 01-Nov-11 04-Nov-11 3 1 KHA/WTU/TT14/066 5-Nov-2011

TT14-TAST-TTST-TN0154 TT14-PRC-039 YE KHA 99 TAN 162045 CAD WELDING PROCEDURE 0 AFC QUA PRC A4 Y 04-Nov-11 07-Nov-11 3 1 KHA/WTU/TT14/067 7-Nov-2011

TT14-PRC-039 YE KHA 99 TAN 162045 A IFR QUA PRC A4 Y 26-Dec-13 1

TT14-TAST-TTST-TN079 TT14-PLN-007 YE KHA 99 TAN 162046 0 AFC QUA PRC A4 Y 21-Jun-11 23-Jun-11 3 1 KHA/WTU/TT14/029 26-Jun-2011

TT14-TAST-TTST-TN094 TT14-PLN-007 YE KHA 99 TAN 162046 PAINTING AND COATING REPAIR PROCEDURE A IFA COR PRC A4 Y 12-Jul-11 14-Jul-11 3 1 KHA/WTU/TT14/035 20-Jul-2011

TT14-TAST-TTST-TN0800 TT14-PLN-009 YE KHA 99 TAN 162048 PAINTING AND COATING REPAIR PROCEDURE B IFA COR PRC A4 Y 11-Nov-13 12-Nov-13

TT14-PLN-009 YE KHA 99 TAN 162048 PAINTING AND COATING REPAIR PROCEDURE 0 AFC COR PRC A4 Y 26-Dec-13 3 1

TT14-TAST-TTST-TN018 TT14-PRC-040 YE KHA 99 TAN 162047 WELDING QUALIFICATION PROCEDURE A IFR QUA PRC A4 Y 31-Mar-11 02-Apr-11 3 1 KHA/WTU/TT14/020 24-May-2011

TT14-TAST-TTST-TN062 TT14-PRC-040 YE KHA 99 TAN 162047 WELDING QUALIFICATION PROCEDURE 0 AFC QUA PRC A4 Y 01-Jun-11 01-Jun-11 3 1 KHA/WTU/TT14/023 2-Jun-2011

PREPARATION FOR BACKFILLING MATERIALS ON BORROW PIT PROCEDURE

MATERIAL RECEIPT, STORAGE, HANDLING & PRESERVATION PROCEDURE

MATERIAL RECEIPT, STORAGE, HANDLING & PRESERVATION PROCEDURE

PROCEDURE FOR CUTTING , BENDING and INSTALLATION OF REBAR

PROCEDURE FOR CUTTING , BENDING and INSTALLATION OF REBAR

STAINLESS STEEL PIPING FABRICATION AND ERECTION PROCEDURE

STAINLESS STEEL PIPING FABRICATION AND ERECTION PROCEDURE

INSTRUMENT CALIBRATION PRESSURE GAUGE/RECORDER PROCEDURE

INSTRUMENT CALIBRATION PRESSURE GAUGE/RECORDER PROCEDURE

Page 5: TT14-TanmiTT14-Tanmia MDR 2013Dec13 for Kamala MDR 2013Dec13 for Kamal

KHARIR CCU EXTENSION PROJECT WTU IFMaster Document Register

This document is the property of TOTAL EP YEMEN. It must not be stored, reproduced or disclosed to others without written authorization from COMPANY.

CONTRACTOR SITE MDR Friday, December 13, 2013

MD

R R

ev

isio

n N

o.

TS

Nu

mb

er

CT

R P

roje

ct

Nu

mb

er

Co

un

try

Fie

ld o

r a

rea

Zo

ne

or

ins

tall

or

WP

Ori

gin

ato

r

Ch

ron

o

Sh

ee

t N

um

be

r Document Title

Re

vis

ion

Sta

tus

Dis

cip

line

Do

cu

me

nt

typ

e

Fo

rma

t

Sy

ste

m -

Su

bs

ys

tem

Da

te o

f is

su

e

Da

te s

en

t to

CP

Y S

ite

DC

C

We

ek

of

Iss

ue

Re

turn

Co

de

Tra

ns

mit

tal f

rom

CP

Y

Da

te R

etu

rne

d a

t T

AN

MIA

Bas

ic a

nd

/or

Det

aile

d

En

gin

eeri

ng

To

be

app

rove

d b

y C

om

pan

y (Y

/N)

Ad

dit

ion

, (A

) M

od

ific

atio

n (

M),

D

elet

ion

(D)

to In

itia

l MD

R

TT14-TAST-TTST-TN032 TT14-PRC-041 YE KHA 99 TAN 162048 LINE PIPE BENDING PROCEDURE A IFR PVV PRC A4 Y 14-Apr-11 15-Apr-11 2 1 KHA/WTU/TT14/054 23-Sep-2011

TT14-TAST-TTST-TN0137 TT14-PRC-041 YE KHA 99 TAN 162048 LINE PIPE BENDING PROCEDURE 0 AFC PVV PRC A4 Y 25-Sep-11 26-Sep-11 3 1 KHA/WTU/TT14/056 28-Sep-2011

TT14-TAST-TTST-TN0265 TT14-PRC-041 YE KHA 99 TAN 162048 ROAD AND PAVEMENT CONSTRUCTION PROCEDURE A IFR CIV PRC A4 Y 29-Sep-11 28-Mar-12 3 1 KHA/WTU/TT14/123 28-Mar-2012

TT14-TAST-TTST-TN032 TT14-PRC-042 YE KHA 99 TAN 162049 ROAD AND PAVEMENT CONSTRUCTION PROCEDURE 0 AFC CIV PRC A4 Y 14-Apr-11 15-Apr-11 3 1 KHA/WTU/TT14/054 23-Sep-2011

TT14-TAST-TTST-TN0137 TT14-PRC-042 YE KHA 99 TAN 162049 CAMP EMERGENCY EVACUATION PLAN A IFR HSE PLN A4 Y 24-Sep-11 26-Sep-11 0 1 KHA/WTU/TT14/056 28-Sep-2011

TT14-TAST-TTST-TN032 TT14-PRC-043 YE KHA 99 TAN 162050 CAMP EMERGENCY EVACUATION PLAN B IFA HSE PLN A4 Y 14-Apr-11 15-Apr-11 3 1 KHA/WTU/TT14/029 26-Jun-2011

TT14-TAST-TTST-TN0289 TT14-PRC-043 YE KHA 99 TAN 162050 CAMP EMERGENCY EVACUATION PLAN C IFA HSE PLN A4 Y 08-Apr-12 08-Apr-12 3 1 KHA/WTU/TT14/135 9-Apr-2012

TT14-TAST-TTST-TN032 TT14-PRC-044 YE KHA 99 TAN 162051 CAMP EMERGENCY EVACUATION PLAN 0 AFC HSE PLN A4 Y 14-Apr-11 15-Apr-11 2 1 KHA/WTU/TT14/054 23-Sep-2011

TT14-TAST-TTST-TN0137 TT14-PRC-044 YE KHA 99 TAN 162051 CAMP EMERGENCY EVACUATION PLAN 1 AFC HSE PLN A4 Y 25-Sep-11 26-Sep-11 3 1 KHA/WTU/TT14/056 28-Sep-2011

TT14-TAST-TTST-TN0289 TT14-PRC-044 YE KHA 99 TAN 162051 CAMP EMERGENCY EVACUATION PLAN 2 AFC HSE PLN A4 Y 08-Apr-12 08-Apr-12 3 1 KHA/WTU/TT14/135 9-Apr-2012

TT14-TAST-TTST-TN033 TT14-PRC-045 YE KHA 99 TAN 162052 WORKSITE EMERGENCY EVACUATION PLAN A IFR HSE PLN A4 Y 14-Apr-11 16-Apr-11 2 1 KHA/WTU/TT14/054 23-Sep-2011

TT14-TAST-TTST-TN0137 TT14-PRC-045 YE KHA 99 TAN 162052 WORKSITE EMERGENCY EVACUATION PLAN B IFA HSE PLN A4 Y 25-Sep-11 26-Sep-11 3 1 KHA/WTU/TT14/056 28-Sep-2011

TT14-TAST-TTST-TN0289 TT14-PRC-045 YE KHA 99 TAN 162052 WORKSITE EMERGENCY EVACUATION PLAN 0 AFC HSE PLN A4 Y 08-Apr-12 08-Apr-12 3 1 KHA/WTU/TT14/135 9-Apr-2012

TT14-PRC-046 YE KHA 99 TAN 162053 WORKSITE EMERGENCY EVACUATION PLAN 1 AFC HSE PLN A4

TT14-TAST-TTST-TN018 TT14-PRC-047 YE KHA 99 TAN 162054 WORKSITE EMERGENCY EVACUATION PLAN 2 AFC HSE PLN A4 Y 02-Apr-11 02-Apr-11 3 1 KHA/WTU/TT14/013 25-Apr-2011

TT14-TAST-TTST-TN044 TT14-PRC-047 YE KHA 99 TAN 162054 HAZARDOUS MATERIALS MANAGEMENT PROCEDURE A IFR HSE PRC A4 Y 25-Apr-11 26-Apr-11 3 1 KHA/WTU/TT14/016 29-Apr-2011

TT14-PRC-048 YE KHA 99 TAN 162055 HAZARDOUS MATERIALS MANAGEMENT PROCEDURE 0 AFC HSE PRC A4

TT14-TAST-TTST-TN027 TT14-PRC-049 YE KHA 99 TAN 162056 SCAFFOLDING PROCEDURE A IFR HSE PRC A4 Y 07-Apr-11 10-Apr-11 3 1 KHA/WTU/TT14/013 25-Apr-2011

TT14-TAST-TTST-TN044 TT14-PRC-049 YE KHA 99 TAN 162056 SCAFFOLDING PROCEDURE B IFA HSE PRC A4 Y 25-Apr-11 26-Apr-11 3 1 KHA/WTU/TT14/016 29-Apr-2011

TT14-PRC-050 YE KHA 99 TAN 162057 SCAFFOLDING PROCEDURE 0 AFC HSE PRC A4

TT14-TAST-TTST-TN030 TT14-PRC-052 YE KHA 99 TAN 162059 LIFTING PROCEDURE A IFR HSE PRC A4 Y 06-Apr-11 12-Apr-11 3 1 KHA/WTU/TT14/058 2-Oct-2011

TT14-TAST-TTST-TN0146 TT14-PRC-052 YE KHA 99 TAN 162059 LIFTING PROCEDURE B IFA HSE PRC A4 Y 03-Oct-11 11-Oct-11 3 1 KHA/WTU/TT14/062 13-Oct-2011

TT14-TAST-TTST-TN012 TT14-PRC-053 YE KHA 99 TAN 162060 LIFTING PROCEDURE 0 AFC HSE PRC A4 Y 27-Mar-11 27-Mar-11 2 1 KHA/WTU/TT14/057 29-Sep-2011

TT14-TAST-TTST-TN0142 TT14-PRC-053 YE KHA 99 TAN 162060 LIFTING PROCEDURE 1 AFC HSE PRC A4 Y 30-Sep-11 01-Oct-11 3 1 KHA/WTU/TT14/059 3-Oct-2011

TT14-TAST-TTST-TN0265 TT14-PRC-053 YE KHA 99 TAN 162060 HSE TRAINING PLAN A IFR HSE PLN A4 Y 04-Oct-11 28-Mar-12 3 1 KHA/WTU/TT14/123 28-Mar-2012

TT14-TAST-TTST-TN0152 TT14-PRC-056 YE KHA 99 TAN 162063 HSE TRAINING PLAN 0 AFC HSE PLN A4 Y 27-Oct-11 30-Oct-11 3 1 KHA/WTU/TT14/065 1-Nov-2011

TT14-TAST-TTST-TN0153 TT14-PRC-056 YE KHA 99 TAN 162063 TANMIA Journey Management Plan A IFA HSE PLN A4 Y 01-Nov-11 04-Nov-11 3 1 KHA/WTU/TT14/066 5-Nov-2011

TT14-TAST-TTST-TN021 TT14-PRC-058 YE KHA 99 TAN 162065 TANMIA Journey Management Plan 0 AFC HSE PLN A4 Y 02-Apr-11 04-Apr-11 1 1 KHA/WTU/TT14/013 25-Apr-2011

TT14-TAST-TTST-TN053 TT14-PRC-058 YE KHA 99 TAN 162065 OUTGOING PERSONNEL TURN-OVER PROCEDURE A IFR PJM PRC A4 Y 16-May-11 18-May-11 3 1 KHA/WTU/TT14/022 31-May-2011

TT14-TAST-TTST-TN060 TT14-PRC-058 YE KHA 99 TAN 162065 OUTGOING PERSONNEL TURN-OVER PROCEDURE 0 AFC PJM PRC A4 Y 31-May-11 31-May-11 3 1 KHA/WTU/TT14/023 2-Jun-2011

TT14-TAST-TTST-TN0117 TT14-PRC-059 YE KHA 99 TAN 162066 RADIOGRAPHIC TESTING PROCEDURE (COOPERHEAT) A IFR QUA PRC A4 Y 29-Aug-11 31-Aug-11 2 1 KHA/WTU/TT14/054 23-Sep-2011

TT14-TAST-TTST-TN0141 TT14-PRC-061 YE KHA 99 TAN 162068 RADIOGRAPHIC TESTING PROCEDURE (COOPERHEAT) B IFA QUA PRC A4 Y 29-Sep-11 01-Oct-11 3 1 KHA/WTU/TT14/059 3-Oct-2011

TT14-TAST-TTST-TN116 TT14-PRC-063 YE KHA 99 TAN 162120 RADIOGRAPHIC TESTING PROCEDURE (COOPERHEAT) 0 AFC QUA PRC A4 Y 06-Aug.-11 27-Aug-11 1 1 KHA/WTU/TT14/047 6-Sep-2011

TT14-TAST-TTST-TN0127 TT14-PRC-063 YE KHA 99 TAN 162120 RADIATION EMERGENCY PROCEDURE A IFR QUA PRC A4 Y 08-Sep-11 14-Sep-11 2 1 KHA/WTU/TT14/050 16-Sep-2011

TT14-TAST-TTST-TN0128 TT14-PRC-063 YE KHA 99 TAN 162120 RADIATION EMERGENCY PROCEDURE 0 AFC QUA PRC A4 Y 17-Sep-11 17-Sep-11 3 1 KHA/WTU/TT14/052 17-Sep-2011

TT14-TAST-TTST-TN0131 TT14-PRC-063 YE KHA 99 TAN 162120 RADIATION OPERATION PROCEDURE (COOPERHEAT) A IFR QUA PRC A4 Y 19-Sep-11 19-Sep-11 3 1 KHA/WTU/TT14/053 20-Sep-2011

TT14-TAST-TTST-TN0118 TT14-PRC-065 YE KHA 99 TAN 162122 RADIATION OPERATION PROCEDURE (COOPERHEAT) 0 AFC QUA PRC A4 Y 01-Sep-11 04-Sep-11 2 1 KHA/WTU/TT14/054 23-Sep-2011

TT14-TAST-TTST-TN0137 TT14-PRC-065 YE KHA 99 TAN 162122 MAGNETIC PARTICLE TESTING PROCEDURE (COOPERHEAT) A IFR QUA PRC A4 Y 25-Sep-11 26-Sep-11 3 1 KHA/WTU/TT14/056 28-Sep-2011

TT14-TAST-TTST-TN0141 TT14-PRC-065 YE KHA 99 TAN 162122 MAGNETIC PARTICLE TESTING PROCEDURE (COOPERHEAT) B IFR QUA PRC A4 Y 29-Sep-11 01-Oct-11 3 1 KHA/WTU/TT14/059 3-Oct-2011

KHARIR/WTU&IF-C-L-060 TT14-PRC-066 YE KHA 99 TAN 162197 MAGNETIC PARTICLE TESTING PROCEDURE (COOPERHEAT) 0 AFC QUA PRC A4 Y 23-May-12 31-May-12 2 1 WTU&IF-M-L-0216 3-Oct-2011

TT14-TAST-TTST-TN0490 TT14-PRC-066 YE KHA 99 TAN 162197 A IFR QUA PRC A4 Y 19-Oct-12 21-Oct-12 2 1 KHA/WTU/TT14/213 29-Oct-2012

TT14-TAST-TTST-TN0534 TT14-PRC-066 YE KHA 99 TAN 162197 B IFA QUA PRC A4 Y 15-Nov-12 15-Nov-12 3 1 KHA/WTU/TT14/237 20-Nov-2012

TT14-TAST-TTST-TN0539 TT14-PRC-066 YE KHA 99 TAN 162197 0 AFC QUA PRC A4 Y 22-Nov-12 22-Nov-12 1 KHA/WTU/TT14/239 24-Nov-2012

TT14-TAST-TTST-TN0448 TT14-PRC-067 YE KHA 99 TAN 162010 INSPECTION AND TESTING OF CABLES PROCEDURE A IFR ELE PRC A4 Y 17-Sep-12 18-Sep-12 1

LIQUID PENETRANT EXAMINATION PROCEDURE (COOPERHEAT)

LIQUID PENETRANT EXAMINATION PROCEDURE (COOPERHEAT)

LIQUID PENETRANT EXAMINATION PROCEDURE (COOPERHEAT)

Page 6: TT14-TanmiTT14-Tanmia MDR 2013Dec13 for Kamala MDR 2013Dec13 for Kamal

KHARIR CCU EXTENSION PROJECT WTU IFMaster Document Register

This document is the property of TOTAL EP YEMEN. It must not be stored, reproduced or disclosed to others without written authorization from COMPANY.

CONTRACTOR SITE MDR Friday, December 13, 2013

MD

R R

ev

isio

n N

o.

TS

Nu

mb

er

CT

R P

roje

ct

Nu

mb

er

Co

un

try

Fie

ld o

r a

rea

Zo

ne

or

ins

tall

or

WP

Ori

gin

ato

r

Ch

ron

o

Sh

ee

t N

um

be

r Document Title

Re

vis

ion

Sta

tus

Dis

cip

line

Do

cu

me

nt

typ

e

Fo

rma

t

Sy

ste

m -

Su

bs

ys

tem

Da

te o

f is

su

e

Da

te s

en

t to

CP

Y S

ite

DC

C

We

ek

of

Iss

ue

Re

turn

Co

de

Tra

ns

mit

tal f

rom

CP

Y

Da

te R

etu

rne

d a

t T

AN

MIA

Bas

ic a

nd

/or

Det

aile

d

En

gin

eeri

ng

To

be

app

rove

d b

y C

om

pan

y (Y

/N)

Ad

dit

ion

, (A

) M

od

ific

atio

n (

M),

D

elet

ion

(D)

to In

itia

l MD

R

TT14-TAST-TTST-TN0468 TT14-PRC-068 YE KHA 99 TAN 162062 INSPECTION AND TESTING OF CABLES PROCEDURE 0 AFC ELE PRC A4 Y 29-Sep-12 02-Oct-12 1 1 KHA/WTU/TT14/204 7-Oct-2012

TT14-TAST-TTST-TN0472 TT14-PRC-068 YE KHA 99 TAN 162062 INSTRUMENT TUBE LEAK TEST PROCEDURE A IFR ELE PRC A4 Y 05-Oct-12 06-Oct-12 1

TT14-TAST-TTST-TN0485 TT14-PRC-068 YE KHA 99 TAN 162062 INSTRUMENT TUBE LEAK TEST PROCEDURE 0 AFC ELE PRC A4 Y 15-Oct-12 16-Oct-12 3 1 KHA/WTU/TT14/206 18-Oct-2012

TT14-TAST-TTST-TN0468 TT14-PRC-069 YE KHA 99 TAN 162061 AIR BLOWING/DRYING FOR PIPING PROCEDURE A IFR PVV PRC A4 Y 02-Oct-12 02-Oct-12 1 1 KHA/WTU/TT14/204 41189 TT14-TAST-TTST-TN0474 TT14-PRC-069 YE KHA 99 TAN 162061 AIR BLOWING/DRYING FOR PIPING PROCEDURE 0 AFC PVV PRC A4 Y 09-Oct-12 09-Oct-12 1

TT14-TAST-TTST-TN038 TT14-PRC-027 YE KHA 99 TAN 162069 PROCEDURE FOR STRUCTURAL FABRICATION & ERECTION A IFR CIV PRC A4 Y 20-Apr-11 21-Apr-11 3 1 KHA/WTU/TT14/058 2-Oct-2011

TT14-TAST-TTST-TN0146 TT14-PRC-027 YE KHA 99 TAN 162069 PROCEDURE FOR STRUCTURAL FABRICATION & ERECTION B IFA CIV PRC A4 Y 03-Oct-11 11-Oct-11 3 1 KHA/WTU/TT14/062 13-Oct-2011

TT14-TAST-TTST-TN033 TT14-MS-002 YE KHA 99 TAN 162070 PROCEDURE FOR STRUCTURAL FABRICATION & ERECTION 0 AFC CIV PRC A4 Y 15-Apr-11 16-Apr-11 3 1 KHA/WTU/TT14/013 25-Apr-2011

TT14-TAST-TTST-TN044 TT14-MS-002 YE KHA 99 TAN 162070 A IFR PVV PRC A4 Y 25-Apr-11 26-Apr-11 3 1 KHA/WTU/TT14/016 29-Apr-2011

TT14-TAST-TTST-TN0168 TT14-MS-003 YE KHA 99 TAN 162071 0 AFC PVV PRC A4 Y 13-Dec-11 18-Dec-11 3 1 KHA/WTU/TT14/078 23-Dec-2011

TT14-TAST-TTST-TN0172 TT14-MS-003 YE KHA 99 TAN 162071 PAINTING AND COATING PROCEDURE A IFR COR PRC A4 Y 24-Dec-11 30-Dec-11 3 1 KHA/WTU/TT14/079 31-Dec-2011

TT14-TAST-TTST-TN0152 TT14-MS-004 YE KHA 99 TAN 162072 PAINTING AND COATING PROCEDURE B IFA COR PRC A4 Y 28-Oct-11 30-Oct-11 2 1 KHA/WTU/TT14/065 1-Nov-2011

TT14-TAST-TTST-TN0153 TT14-MS-004 YE KHA 99 TAN 162072 PAINTING AND COATING PROCEDURE 0 AFC COR PRC A4 Y 01-Nov-11 04-Nov-11 3 1 KHA/WTU/TT14/066 5-Nov-2011

TT14-TAST-TTST-TN0154 TT14-MS-004 YE KHA 99 TAN 162072 PIPELINE HYDROTEST PROCEDURE A IFR PLR PRC A4 Y 04-Nov-11 07-Nov-11 3 1 KHA/WTU/TT14/067 7-Nov-2011

TT14-TAST-TTST-TN072 TT14-MS-005 YE KHA 99 TAN 162073 PIPING FABRICATION & INSTALLATION PROCEDURE 0 AFC QUA PRC A4 Y 10-Jun-11 13-Jun-11 3 1 KHA/WTU/TT14/026 15-Jun-2011

TT14-TAST-TTST-TN073 TT14-MS-005 YE KHA 99 TAN 162073 A IFR CIV PRC A4 Y 15-Jun-11 15-Jun-11 3 1 KHA/WTU/TT14/027 18-Jun-2011

TT14-TAST-TTST-TN0182 TT14-MS-006 YE KHA 99 TAN 162074 B IFA CIV PRC A4 Y 22-Aug-11 14-Jan-12 1 1 KHA/WTU/TT14/095 31-Jan-2012

TT14-TAST-TTST-TN0206 TT14-MS-006 YE KHA 99 TAN 162074 C IFA CIV PRC A4 Y 10-Feb-12 16-Feb-12 2 1 KHA/WTU/TT14/107 19-Feb-2012

TT14-TAST-TTST-TN0206 TT14-MS-006 YE KHA 99 TAN 162074 0 AFC CIV PRC A4 Y 22-Feb-12 24-Feb-12 3 1 KHA/WTU/TT14/110 26-Feb-2012

TT14-TAST-TTST-TN0206 TT14-MS-006 YE KHA 99 TAN 162074 WTU & IF PROJECT PIPELINES INSTALLATION PROCEDURE A IFR PLR PRC A4 Y 27-Feb-12 27-Feb-12 3 1 KHA/WTU/TT14/112 29-Feb-2012

TT14-TAST-TTST-TN0302 TT14-MS-011 YE KHA 99 TAN 162079 WTU & IF PROJECT PIPELINES INSTALLATION PROCEDURE B IFA PLR PRC A4 Y 17-Apr-12 21-Apr-12 3 1 KHA/WTU/TT14/138 28-Apr-2012

TT14-TAST-TTST-TN0313 TT14-MS-011 YE KHA 99 TAN 162079 WTU & IF PROJECT PIPELINES INSTALLATION PROCEDURE 0 AFC PLR PRC A4 Y 01-May-12 01-May-12 3 1 KHA/WTU/TT14/142 2-May-2012

TT14-TAST-TTST-TN0302 TT14-MS-012 YE KHA 99 TAN 162080 ENGINEERING MODIFICATION ON SITE PROCEDURE A IFR PJM PRC A4 Y 17-Apr-12 21-Apr-12 1 1 KHA/WTU/TT14/141 1-May-2012

TT14-TAST-TTST-TN063 TT14-MS-017 YE KHA 99 TAN 162082 ENGINEERING MODIFICATION ON SITE PROCEDURE B IFA PJM PRC A4 Y 01-Jun-11 01-Jun-11 2 1 KHA/WTU/TT14/055 25-Sep-2011

TT14-TAST-TTST-TN0138 TT14-MS-017 YE KHA 99 TAN 162082 ENGINEERING MODIFICATION ON SITE PROCEDURE C IFA PJM PRC A4 Y 27-Sep-11 28-Sep-11 3 1 KHA/WTU/TT14/057 29-Sep-2011

TT14-TAST-TTST-TN0141 TT14-MS-017 YE KHA 99 TAN 162082 ENGINEERING MODIFICATION ON SITE PROCEDURE 0 IFA PJM PRC A4 Y 29-Sep-11 01-Oct-11 3 1 KHA/WTU/TT14/059 3-Oct-2011

TT14-TAST-TTST-TN0221 TT14-MS-018 YE KHA 99 TAN 162086 0 IFA PJM PRC A4 Y 21-Feb-12 25-Feb-12 1 1 KHA/WTU/TT14/114 3-Mar-2012

TT14-TAST-TTST-TN0236 TT14-MS-018 YE KHA 99 TAN 162086 A IFR OPE PRC A4 Y 03-Mar-12 04-Mar-12 1 1 KHA/WTU/TT14/116 5-Mar-2012

TT14-TAST-TTST-TN0264 TT14-MS-018 YE KHA 99 TAN 162086 B CLD OPE PRC A4 Y 20-Mar-12 27-Mar-12 2 1 NONE 28-Mar-2012

TT14-TAST-TTST-TN0271 TT14-MS-018 YE KHA 99 TAN 162086 C IFA OPE PRC A4 Y 29-Mar-12 30-Mar-12 3 1 KHA/WTU/TT14/126 1-Apr-2012

TT14-TAST-TTST-TN0276 TT14-MS-018 YE KHA 99 TAN 162086 COMMISSIONING OPERATIONAL TEST - EARLY START-UP PBV A IFR OPE PRC A4 Y 01-Apr-12 01-Apr-12 3 1 KHA/WTU/TT14/129 2-Apr-2012

TT14-TAST-TTST-TN0160 TT14-MS-019 YE KHA 99 TAN 162087 COMMISSIONING OPERATIONAL TEST - EARLY START-UP PBV B CLD OPE PRC A4 Y 23-Nov-11 27-Nov-11 1 1 KHA/WTU/TT14/073 3-Dec-2011

GRP PIPING FABRICATION, INSTALLATION & TESTING PROCEDURE

GRP PIPING FABRICATION, INSTALLATION & TESTING PROCEDURE

WTU WATER INJECTION PIPELINE ROAD CROSSING PROCEDURE

WTU WATER INJECTION PIPELINE ROAD CROSSING PROCEDURE

WTU WATER INJECTION PIPELINE ROAD CROSSING PROCEDURE

WTU WATER INJECTION PIPELINE ROAD CROSSING PROCEDURE

PROGRESS MEASUREMENT PROCEDURE (FOR THE BILLING)1 X

NITROGEN LEAK TESTING AND INERTING - PBV SUBSYSTEM 20-5110

NITROGEN LEAK TESTING AND INERTING - PBV SUBSYSTEM 20-5110

EARLY START-UP PRESSURE BREAK VESSEL - LEAK TESTING AND OPERATIONAL TEST

Page 7: TT14-TanmiTT14-Tanmia MDR 2013Dec13 for Kamala MDR 2013Dec13 for Kamal

KHARIR CCU EXTENSION PROJECT WTU IFMaster Document Register

This document is the property of TOTAL EP YEMEN. It must not be stored, reproduced or disclosed to others without written authorization from COMPANY.

CONTRACTOR SITE MDR Friday, December 13, 2013

MD

R R

ev

isio

n N

o.

TS

Nu

mb

er

CT

R P

roje

ct

Nu

mb

er

Co

un

try

Fie

ld o

r a

rea

Zo

ne

or

ins

tall

or

WP

Ori

gin

ato

r

Ch

ron

o

Sh

ee

t N

um

be

r Document Title

Re

vis

ion

Sta

tus

Dis

cip

line

Do

cu

me

nt

typ

e

Fo

rma

t

Sy

ste

m -

Su

bs

ys

tem

Da

te o

f is

su

e

Da

te s

en

t to

CP

Y S

ite

DC

C

We

ek

of

Iss

ue

Re

turn

Co

de

Tra

ns

mit

tal f

rom

CP

Y

Da

te R

etu

rne

d a

t T

AN

MIA

Bas

ic a

nd

/or

Det

aile

d

En

gin

eeri

ng

To

be

app

rove

d b

y C

om

pan

y (Y

/N)

Ad

dit

ion

, (A

) M

od

ific

atio

n (

M),

D

elet

ion

(D)

to In

itia

l MD

R

TT14-TAST-TTST-TN0214 TT14-MS-019 YE KHA 99 TAN 162087 PIPING HYDROTEST PROCEDURE A IFR PVV PRC A4 Y 22-Feb-12 22-Feb-12 1 1 KHA/WTU/TT14/114 3-Mar-2012

TT14-TAST-TTST-TN0244 TT14-MS-019 YE KHA 99 TAN 162087 PIPING HYDROTEST PROCEDURE 0 AFC PVV PRC A4 Y 08-Mar-12 10-Mar-12 1 1 KHA/WTU/TT14/128 1-Apr-2012

TT14-TAST-TTST-TN0322 TT14-MS-019 YE KHA 99 TAN 162087 METHOD STATEMENT FOR SOURCING OF BORROW PIT A IFR CIV MS A4 Y 09-May-12 09-May-12 2 1 KHA/WTU/TT14/146 11-May-2012

TT14-TAST-TTST-TN0347 TT14-MS-019 YE KHA 99 TAN 162087 METHOD STATEMENT FOR SOURCING OF BORROW PIT 0 AFC CIV MS A4 Y 12-May-12 23-May-12 3 1 KHA/WTU/TT14/151 24-May-2012

TT14-TAST-TTST-TN0158 TT14-MS-022 YE KHA 99 TAN 162090 METHOD STATEMENT FOR TANK SHELL RT MAP A IFR QUA MS A4 Y 12-Nov-11 21-Nov-11 2 1 KHA/WTU/TT14/073 3-Dec-2011

TT14-TAST-TTST-TN0162 TT14-MS-022 YE KHA 99 TAN 162090 METHOD STATEMENT FOR TANK SHELL RT MAP 0 AFC QUA MS A4 Y 04-Dec-11 04-Dec-11 3 1 KHA/WTU/TT14/074 6-Dec-2011

TT14-TAST-TTST-TN0164 TT14-MS-022 YE KHA 99 TAN 162090 A IFR CIV MS A4 Y 07-Dec-11 08-Dec-11 3 1 KHA/WTU/TT14/075 10-Dec-2011

TT14-MS-029 YE KHA 99 TAN 162097 B IFA CIV MS A4

TT14-MS-030 YE KHA 99 TAN 162098 0 AFC CIV MS A4

TT14-MS-031 YE KHA 99 TAN 162099 A IFR CIV MS A4

TT14-TAST-TTST-TN0169 TT14-MS-032 YE KHA 99 TAN 162100 0 AFC CIV MS A4 Y 15-Dec-11 19-Dec-11 2 1 KHA/WTU/TT14/078 23-Dec-2011

TT14-TAST-TTST-TN0174 TT14-MS-032 YE KHA 99 TAN A IFR CIV MS A4 Y 24-Dec-11 03-Jan-12 3 1 KHA/WTU/TT14/081 5-Jan-2012

TT14-TAST-TTST-TN0179 TT14-MS-032 YE KHA 99 TAN 162100 B IFA CIV MS A4 Y 06-Jan-12 09-Jan-12 3 1 KHA/WTU/TT14/082 10-Jan-2012

TT14-TAST-TTST-TN0186 TT14-MS-033 YE KHA 99 TAN 162101 C IFA CIV MS A4 Y 03-Jan-12 22-Jan-12 1 1 KHA/WTU/TT14/090 28-Jan-2012

TT14-TAST-TTST-TN0194 TT14-MS-033 YE KHA 99 TAN 162101 0 AFC CIV MS A4 Y 31-Jan-12 31-Jan-12 3 1 KHA/WTU/TT14/096 2-Feb-2012

TT14-TAST-TTST-TN0198 TT14-MS-033 YE KHA 99 TAN 162101 A IFR MEC MS A4 Y 04-Feb-12 04-Feb-12 3 1 KHA/WTU/TT14/097 6-Feb-2012

TT14-TAST-TTST-TN0186 TT14-MS-034 YE KHA 99 TAN 162102 0 AFC MEC MS A4 Y 03-Jan-12 22-Jan-12 1 1 KHA/WTU/TT14/090 28-Jan-2012

TT14-TAST-TTST-TN0194 TT14-MS-034 YE KHA 99 TAN 162102 A IFR MEC MS A4 Y 31-Jan-12 31-Jan-12 3 1 KHA/WTU/TT14/096 2-Feb-2012

TT14-TAST-TTST-TN0198 TT14-MS-034 YE KHA 99 TAN 162102 A IFA QUA MS A4 Y 04-Feb-12 04-Feb-12 3 1 KHA/WTU/TT14/097 6-Feb-2012

TT14-TAST-TTST-TN0120 TT14-MS-035 YE KHA 99 TAN 162103 B IFA QUA MS A4 Y 31-Aug-11 04-Sep-11 3 1 KHA/WTU/TT14/050 16-Sep-2011

TT14-TAST-TTST-TN0128 TT14-MS-035 YE KHA 99 TAN 162103 0 AFC QUA MS A4 Y 17-Sept.-11 17-Sep-11 3 1 KHA/WTU/TT14/052 17-Sep-2011

by hand TT14-MS-036 YE KHA 99 TAN 162104 A IFR MEC MS A4 Y 19-Dec-13 19-Dec-13 3 1 by hand 20-Dec-2013

TT14-MS-036 YE KHA 99 TAN 162104 B IFA MEC MS A4 Y 26-Dec-13 3 1

TT14-MS-037 YE KHA 99 TAN 162105 C IFA MEC MS A4

TT14-MS-038 YE KHA 99 TAN 162106 D IFA MEC MS A4

TT14-MS-039 YE KHA 99 TAN 162107 0 AFC MEC MS A4

TT14-MS-040 YE KHA 99 TAN 162108 A IFR MEC MS

TT14-MS-041 YE KHA 99 TAN 162109 B IFA MEC MS

TT14-MS-042 YE KHA 99 TAN 162110 C IFA MEC MS A4

TT14-MS-043 YE KHA 99 TAN 162111 D IFA MEC MS A4

TT14-MS-044 YE KHA 99 TAN 162112 0 AFC MEC MS A4

TT14-MS-045 YE KHA 99 TAN 162113 A IFR MEC MS

TT14-MS-046 YE KHA 99 TAN 162114 B IFA MEC MS

METHOD STATEMENT FOR THE CONSTRUCTION OF CABLE TRENCH TO TECHNCAL BUILDING

METHOD STATEMENT FOR THE CONSTRUCTION OF CABLE TRENCH TO TECHNCAL BUILDING

METHOD STATEMENT FOR THE CONSTRUCTION OF CABLE TRENCH TO TECHNCAL BUILDING

METHOD STATEMENT FOR THE PRE-CASTING AND SITE INSTALLATION OF PIPE SLEEPERS

METHOD STATEMENT FOR THE PRE-CASTING AND SITE INSTALLATION OF PIPE SLEEPERS

METHOD STATEMENT FOR THE CONSTRUCTION OF BUFFER SUMP PIT

METHOD STATEMENT FOR THE CONSTRUCTION OF BUFFER SUMP PIT

METHOD STATEMENT FOR THE CONSTRUCTION OF BUFFER SUMP PIT

METHOD STATEMENT FOR THE CONSTRUCTION OF BUFFER SUMP PIT

METHOD STATEMENT FOR THE INSTALLATION OF PIG RECEIVER IN THE RUNNING AREA

METHOD STATEMENT FOR THE INSTALLATION OF PIG RECEIVER IN THE RUNNING AREA

METHOD STATEMENT FOR THE CONSTRUCTION /INSTALLATION OF PIG RECEIVER IN CPU MANIFOLD UNIT

METHOD STATEMENT FOR CLEAN WATER TANK 20-TZ-5105 AND OIL SKIM TANK 20-TZ-2111 BLASTING AND PAINTING

METHOD STATEMENT FOR CLEAN WATER TANK 20-TZ-5105 AND OIL SKIM TANK 20-TZ-2111 BLASTING AND PAINTING

METHOD STATEMENT FOR CLEAN WATER TANK 20-TZ-5105 AND OIL SKIM TANK 20-TZ-2111 BLASTING AND PAINTING

METHOD STATEMENT FOR THE ERECTION OF COLD VENT SRTUCTURE AND DEGASSING VENT PIPE

METHOD STATEMENT FOR THE ERECTION OF COLD VENT SRTUCTURE AND DEGASSING VENT PIPE

METHOD STATEMENT FOR THE ERECTION OF COLD VENT SRTUCTURE AND DEGASSING VENT PIPE

METHOD STATEMENT FOR THE ERECTION OF COLD VENT SRTUCTURE AND DEGASSING VENT PIPE

METHOD STATEMENT FOR THE ERECTION OF COLD VENT SRTUCTURE AND DEGASSING VENT PIPE

METHOD STATEMENT FOR DRESSING, ERECTION AND FINAL FIX OF DEGASSING VESSEL (20-VZ-5110)

METHOD STATEMENT FOR DRESSING, ERECTION AND FINAL FIX OF DEGASSING VESSEL (20-VZ-5110)

METHOD STATEMENT FOR DRESSING, ERECTION AND FINAL FIX OF DEGASSING VESSEL (20-VZ-5110)

METHOD STATEMENT FOR DRESSING, ERECTION AND FINAL FIX OF DEGASSING VESSEL (20-VZ-5110)

METHOD STATEMENT FOR DRESSING, ERECTION AND FINAL FIX OF DEGASSING VESSEL (20-VZ-5110)

METHOD STATEMENT FOR THE SCAFFOLDING ERECTION AND DISMANTLING AT SKIM TANK

METHOD STATEMENT FOR THE SCAFFOLDING ERECTION AND DISMANTLING AT SKIM TANK

Page 8: TT14-TanmiTT14-Tanmia MDR 2013Dec13 for Kamala MDR 2013Dec13 for Kamal

KHARIR CCU EXTENSION PROJECT WTU IFMaster Document Register

This document is the property of TOTAL EP YEMEN. It must not be stored, reproduced or disclosed to others without written authorization from COMPANY.

CONTRACTOR SITE MDR Friday, December 13, 2013

MD

R R

ev

isio

n N

o.

TS

Nu

mb

er

CT

R P

roje

ct

Nu

mb

er

Co

un

try

Fie

ld o

r a

rea

Zo

ne

or

ins

tall

or

WP

Ori

gin

ato

r

Ch

ron

o

Sh

ee

t N

um

be

r Document Title

Re

vis

ion

Sta

tus

Dis

cip

line

Do

cu

me

nt

typ

e

Fo

rma

t

Sy

ste

m -

Su

bs

ys

tem

Da

te o

f is

su

e

Da

te s

en

t to

CP

Y S

ite

DC

C

We

ek

of

Iss

ue

Re

turn

Co

de

Tra

ns

mit

tal f

rom

CP

Y

Da

te R

etu

rne

d a

t T

AN

MIA

Bas

ic a

nd

/or

Det

aile

d

En

gin

eeri

ng

To

be

app

rove

d b

y C

om

pan

y (Y

/N)

Ad

dit

ion

, (A

) M

od

ific

atio

n (

M),

D

elet

ion

(D)

to In

itia

l MD

R

TT14-PRC-054 YE KHA 99 TAN 162115 0 AFC MEC MS

TT14-PRC-032 YE KHA 99 TAN 162116 A IFR MEC MS A4

TT14-PRC-026 YE KHA 99 TAN 162117 B IFA MEC MS A4

TT14-TAST-TTST-TN027 TT14-PRC-034 YE KHA 99 TAN 162118 0 AFC MEC MS A4 Y 07-Apr-11 10-Apr-11 3 1 KHA/WTU/TT14/013 25-Apr-2011

TT14-TAST-TTST-TN044 TT14-PRC-034 YE KHA 99 TAN 162118 A IFR MEC MS A4 Y 25-Apr-11 26-Apr-11 3 1 KHA/WTU/TT14/016 29-Apr-2011

TT14-TAST-TTST-TN026 TT14-MS-048 YE KHA 99 TAN 162180 B IFA MEC MS A4 Y 04-Apr-11 07-Apr-11 3 1 KHA/WTU/TT14/058 2-Oct-2011

TT14-TAST-TTST-TN0146 TT14-MS-048 YE KHA 99 TAN 162180 0 AFC MEC MS A4 Y 03-Oct-11 11-Oct-11 3 1 KHA/WTU/TT14/062 13-Oct-2011

TT14-TAST-TTST-TN021 TT14-MS-049 YE KHA 99 TAN 162181 A IFR MEC MS A4 Y 04-Apr-11 04-Apr-11 3 1 KHA/WTU/TT14/028 22-Jun-2011

TT14-TAST-TTST-TN081 TT14-MS-049 YE KHA 99 TAN 162181 B IFA MEC MS A4 Y 24-Jun-11 25-Jun-11 3 1 KHA/WTU/TT14/029 26-Jun-2011

TT14-TAST-TTST-TN026 TT14-MS-050 YE KHA 99 TAN 162182 0 AFC MEC MS A4 Y 05-Apr-11 07-Apr-11 3 1 KHA/WTU/TT14/028 22-Jun-2011

TT14-TAST-TTST-TN081 TT14-MS-050 YE KHA 99 TAN 162182 A IFA MEC MS A4 Y 24-Jun-11 25-Jun-11 3 1 KHA/WTU/TT14/029 26-Jun-2011

TT14-TAST-TTST-TN077 TT14-MS-051 YE KHA 99 TAN 162183 0 AFC MEC MS A4 Y 19-Jun-11 20-Jun-11 3 1 KHA/WTU/TT14/028 22-Jun-2011

TT14-TAST-TTST-TN082 TT14-MS-051 YE KHA 99 TAN 162183 A IFR ELE MS A4 Y 24-Jun-11 26-Jun-11 3 1 KHA/WTU/TT14/029 26-Jun-2011

TT14-TAST-TTST-TN099 TT14-MS-052 YE KHA 99 TAN 162184 0 AFC ELE MS A4 Y 22-Jul-11 28-Jul-11 3 1 KHA/WTU/TT14/039 6-Aug-2011

TT14-TAST-TTST-TN108 TT14-MS-052 YE KHA 99 TAN 162184 PROCEDURE FOR CABLE PULLING A IFR ELE PRC A4 Y 08-Aug-11 10-Aug-11 3 1 KHA/WTU/TT14/040 17-Aug-2011

TT14-TAST-TTST-TN0128 TT14-MS-053 YE KHA 99 TAN 162185 PROCEDURE FOR CABLE PULLING 0 AFC ELE PRC A4 Y 12-Sep-11 17-Sep-11 2 1 KHA/WTU/TT14/055 25-Sep-2011

TT14-TAST-TTST-TN0137 TT14-MS-053 YE KHA 99 TAN 162185 METHOD STATEMENT FOR TANK HYDROTEST A IFR QUA MS A4 Y 26-Sep-11 26-Sep-11 3 1 KHA/WTU/TT14/056 28-Sep-2011

TT14-TAST-TTST-TN0265 TT14-MS-053 YE KHA 99 TAN 162185 METHOD STATEMENT FOR TANK HYDROTEST 0 AFC QUA MS A4 Y 29-Sep-11 28-Mar-12 3 1 KHA/WTU/TT14/123 28-Mar-2012

TT14-TAST-TTST-TN099 TT14-MS-054 YE KHA 99 TAN 162186 METHOD STATEMENT FOR TANK VACUUM BOX TESTING A IFR QUA MS A4 Y 22-Jul-11 28-Jul-11 2 1 KHA/WTU/TT14/039 6-Aug-2011

TT14-TAST-TTST-TN108 TT14-MS-054 YE KHA 99 TAN 162186 METHOD STATEMENT FOR TANK VACUUM BOX TESTING 0 AFC QUA MS A4 Y 08-Aug-11 10-Aug.-11 3 1 KHA/WTU/TT14/040 17-Aug-2011

TT14-TAST-TTST-TN116 TT14-MS-054 YE KHA 99 TAN 162186 METHOD STATEMENT FOR TANK PNEUMATIC TESTING A IFR MEC MS A4 Y 18-Aug-11 27-Aug-11 3 1 KHA/WTU/TT14/044 4-Sep-2011

TT14-TAST-TTST-TN108 TT14-MS-055 YE KHA 99 TAN 162187 METHOD STATEMENT FOR TANK PNEUMATIC LEAK TESTING 0 AFC MEC MS A4 Y 22-Jul-11 10-Aug.-11 3 1 KHA/WTU/TT14/042 25-Aug-2011

TT14-TAST-TTST-TN116 TT14-MS-055 YE KHA 99 TAN 162187 A IFA MEC MS A4 Y 27-Aug-11 27-Aug-11 3 1 KHA/WTU/TT14/044 4-Sep-2011

TT14-TAST-TTST-TN102 TT14-MS-056 YE KHA 99 TAN 162188 0 AFC MEC MS A4 Y 31-Jul-11 02-Aug-11 3 1 KHA/WTU/TT14/038 2-Aug-2011

TT14-TAST-TTST-TN102 TT14-MS-056 YE KHA 99 TAN 162188 A IFR MEC MS A4 Y 08-Aug-11 13-Aug-11 3 1 KHA/WTU/TT14/040 17-Aug-2011

TT14-TAST-TTST-TN0158 TT14-MS-057 YE KHA 99 TAN 162189 0 AFC MEC MS A4 Y 19-Nov-11 21-Nov-11 3 1 KHA/WTU/TT14/071 25-Nov-2011

TT14-TAST-TTST-TN0160 TT14-MS-057 YE KHA 99 TAN 162189 A IFR MEC MS A4 Y 26-Nov-11 27-Nov-11 3 1 KHA/WTU/TT14/072 28-Nov-2011

TT14-TAST-TTST-TN0158 TT14-MS-058 YE KHA 99 TAN 162190 B IFA MEC MS A4 Y 19-Nov-11 21-Nov-11 3 1 KHA/WTU/TT14/070 24-Nov-2011

TT14-TAST-TTST-TN0160 TT14-MS-058 YE KHA 99 TAN 162190 0 AFC MEC MS A4 Y 23-Nov-11 27-Nov-11 3 1 KHA/WTU/TT14/072 28-Nov-2011

TT14-TAST-TTST-TN0179 TT14-MS-059 YE KHA 99 TAN 162191 A IFR MEC MS A4 Y 03-Jan-12 09-Jan-12 3 1 KHA/WTU/TT14/084 14-Jan-2012

METHOD STATEMENT FOR THE SCAFFOLDING ERECTION AND DISMANTLING AT SKIM TANK

METHOD STATEMENT FOR THE ERECTION OF CLEAN WATER TANK (20-TZ-5105)

METHOD STATEMENT FOR THE ERECTION OF CLEAN WATER TANK (20-TZ-5105)

METHOD STATEMENT FOR THE ERECTION OF CLEAN WATER TANK (20-TZ-5105)

METHOD STATEMENT FOR THE INSTALLTION OF FLOATATION SEPARATION TANK (20-TZ-5106)

METHOD STATEMENT FOR THE INSTALLTION OF FLOATATION SEPARATION TANK (20-TZ-5106)

METHOD STATEMENT FOR THE INSTALLTION OF FLOATATION SEPARATION TANK (20-TZ-5106)

METHOD STATEMENT FOR THE INSTALLATION OF FLOATATION TRANSFER TANK (20-TZ-5104)

METHOD STATEMENT FOR THE INSTALLATION OF FLOATATION TRANSFER TANK (20-TZ-5104)

METHOD STATEMENT FOR THE INSTALLATION OF FLOATATION TRANSFER TANK (20-TZ-5104)

METHOD STATEMENT FOR THE INSTALLATION OF WATER INJECTION PUMPS (99-PA-2007 A/B)

METHOD STATEMENT FOR THE INSTALLATION OF WATER INJECTION PUMPS (99-PA-2007 A/B)

METHOD STATEMENT FOR THE INSTALLATION OF POWER TRANSFORMER

METHOD STATEMENT FOR THE INSTALLATION OF POWER TRANSFORMER

METHOD STATEMENT FOR SHIFTING OF WATER INJECTION PUMP

METHOD STATEMENT FOR SHIFTING OF WATER INJECTION PUMP

METHOD STATEMENT FOR THE INSTALLATION OF AIR BLOWER KE 5101 A/B

METHOD STATEMENT FOR THE INSTALLATION OF AIR BLOWER KE 5101 A/B

METHOD STATEMENT FOR THE INSTALLATION OF CARTRIDGE FILTERS 20 VF 5102 A/B

METHOD STATEMENT FOR THE INSTALLATION OF CARTRIDGE FILTERS 20 VF 5102 A/B

METHOD STATEMENT FOR THE INSTALLATION OF CARTRIDGE FILTERS 20 VF 5102 A/B

METHOD STATEMENT FOR THE INSTALLATION OF BACKWASH WATER PUMPS PA 5101 A/B

Page 9: TT14-TanmiTT14-Tanmia MDR 2013Dec13 for Kamala MDR 2013Dec13 for Kamal

KHARIR CCU EXTENSION PROJECT WTU IFMaster Document Register

This document is the property of TOTAL EP YEMEN. It must not be stored, reproduced or disclosed to others without written authorization from COMPANY.

CONTRACTOR SITE MDR Friday, December 13, 2013

MD

R R

ev

isio

n N

o.

TS

Nu

mb

er

CT

R P

roje

ct

Nu

mb

er

Co

un

try

Fie

ld o

r a

rea

Zo

ne

or

ins

tall

or

WP

Ori

gin

ato

r

Ch

ron

o

Sh

ee

t N

um

be

r Document Title

Re

vis

ion

Sta

tus

Dis

cip

line

Do

cu

me

nt

typ

e

Fo

rma

t

Sy

ste

m -

Su

bs

ys

tem

Da

te o

f is

su

e

Da

te s

en

t to

CP

Y S

ite

DC

C

We

ek

of

Iss

ue

Re

turn

Co

de

Tra

ns

mit

tal f

rom

CP

Y

Da

te R

etu

rne

d a

t T

AN

MIA

Bas

ic a

nd

/or

Det

aile

d

En

gin

eeri

ng

To

be

app

rove

d b

y C

om

pan

y (Y

/N)

Ad

dit

ion

, (A

) M

od

ific

atio

n (

M),

D

elet

ion

(D)

to In

itia

l MD

R

TT14-TAST-TTST-TN0186 TT14-MS-059 YE KHA 99 TAN 162191 B IFA MEC MS A4 Y 14-Jan-12 22-Jan-12 3 1 KHA/WTU/TT14/086 23-Jan-2012

TT14-TAST-TTST-TN0174 TT14-MS-060 YE KHA 99 TAN 162192 0 AFC MEC MS A4 Y 03-Dec-12 03-Dec-12 3 1 KHA/WTU/TT14/081 5-Jan-2012

TT14-TAST-TTST-TN0179 TT14-MS-060 YE KHA 99 TAN 162192 A IFR MEC MS A4 Y 06-Jan-12 09-Jan-12 3 1 KHA/WTU/TT14/082 10-Jan-2012

TT14-TAST-TTST-TN0230 TT14-MS-061 YE KHA 99 TAN 162193 0 AFC MEC MS A4 Y 27-Feb-12 26-Feb-12 1 1 KHA/WTU/TT14/113 1-Mar-2012

TT14-TAST-TTST-TN0241 TT14-MS-061 YE KHA 99 TAN 162193 A IFR MEC MS A4 Y 07-Mar-12 07-Mar-12 1 1 KHA/WTU/TT14/119 17-Mar-2012

TT14-TAST-TTST-TN0256 TT14-MS-061 YE KHA 99 TAN 162193 0 AFC MEC MS A4 Y 21-Mar-12 21-Mar-12 2 1 KHA/WTU/TT14/126 1-Apr-2012

TT14-TAST-TTST-TN0276 TT14-MS-061 YE KHA 99 TAN 162193 A IFR MEC MS A4 Y 01-Apr-12 01-Apr-12 3 1 KHA/WTU/TT14/129 2-Apr-2012

TT14-TAST-TTST-TN0280 TT14-MS-061 YE KHA 99 TAN 162193 0 AFC MEC MS A4 Y 03-Apr-12 03-Apr-12 3 1 KHA/WTU/TT14/131 3-Apr-2012

TT14-TAST-TTST-TN0376 TT14-MS-061 YE KHA 99 TAN 162193 A IFR CIV MS A4 Y 16-Jun-12 16-Jun-12 3 1 KHA/WTU/TT14/162 16-Jun-2012

TT14-TAST-TTST-TN0260 TT14-MS-062 YE KHA 99 TAN 162194 0 AFC CIV MS A4 Y 22-Mar-12 24-Mar-12 2 1 KHA/WTU/TT14/122 28-Mar-2012

TT14-TAST-TTST-TN0270 TT14-MS-062 YE KHA 99 TAN 162194 A IFR QUA MS A4 Y 28-Mar-12 30-Mar-12 3 1 KHA/WTU/TT14/125 30-Mar-2012

TT14-TAST-TTST-TN0276 TT14-MS-062 YE KHA 99 TAN 162194 0 AFC QUA MS A4 Y 01-Apr-12 01-Apr-12 3 1 KHA/WTU/TT14/129 2-Apr-2012

TT14-TAST-TTST-TN0302 TT14-MS-063 YE KHA 99 TAN 162195 A IFR QUA MS A4 Y 17-Apr-12 21-Apr-12 3 1 KHA/WTU/TT14/138 28-Apr-2012

TT14-TAST-TTST-TN0313 TT14-MS-063 YE KHA 99 TAN 162195 0 AFC QUA MS A4 Y 01-May-12 01-May-12 3 1 KHA/WTU/TT14/142 2-May-2012

TT14-TAST-TTST-TN0320 TT14-MS-064 YE KHA 99 TAN 162196 A IFR QUA MS A4 Y 07-May-12 08-May-12 1 1 KHA/WTU/TT14/145 10-May-2012

TT14-TAST-TTST-TN0330 TT14-MS-064 YE KHA 99 TAN 162196 B IFA QUA MS A4 Y 14-May-12 14-May-12 3 1 KHA/WTU/TT14/147 15-May-2012

METHOD STATEMENT FOR THE INSTALLATION OF BACKWASH WATER PUMPS PA 5101 A/B

METHOD STATEMENT FOR THE INSTALLATION OF BACKWASH WATER PUMPS PA 5101 A/B

METHOD STATEMENT FOR THE INSTALLATION OF BACKWASH WATER TANKS 20 TZ 5101 A/B

METHOD STATEMENT FOR THE INSTALLATION OF BACKWASH WATER TANKS 20 TZ 5101 A/B

METHOD STATEMENT FOR THE REPAIR OF BACKWASH WATER TANKS 20 TZ 5101 "A" DAMAGED ANCHOR BOLT LUG

METHOD STATEMENT FOR THE REPAIR OF BACKWASH WATER TANKS 20 TZ 5101 "A" DAMAGED ANCHOR BOLT LUG

METHOD STATEMENT FOR THE INSTALLATION OF MULTIMEDIA FILTERS VF 5101 A/B/C/D/E

METHOD STATEMENT FOR THE INSTALLATION OF MULTIMEDIA FILTERS VF 5101 A/B/C/D/E

METHOD OF STATEMENT FOR ENGINEERING FILL OF OIL SKIM TANK (20 TZ 5111) AND CLEAN WATER TANK (20 TZ 5105)

METHOD OF STATEMENT FOR ENGINEERING FILL OF OIL SKIM TANK (20 TZ 5111) AND CLEAN WATER TANK (20 TZ 5105)

METHOD OF STATEMENT FOR THE ERECTION OF OIL SKIM TANK (20-TZ-5111)

METHOD OF STATEMENT FOR THE ERECTION OF OIL SKIM TANK (20-TZ-5111)

METHOD OF STATEMENT FOR OIL SKIM TANK (20 TZ 5111) SHELL RT MAP

METHOD OF STATEMENT FOR OIL SKIM TANK (20 TZ 5111) SHELL RT MAP

METHOD STATEMENT FOR HYDROTESTING & PIGGING OF OVERFLOW & BACKWASH WATER PIPELINE FROM WTU TO CPU POND

METHOD STATEMENT FOR HYDROTESTING & PIGGING OF OVERFLOW & BACKWASH WATER PIPELINE FROM WTU TO CPU POND

Page 10: TT14-TanmiTT14-Tanmia MDR 2013Dec13 for Kamala MDR 2013Dec13 for Kamal

KHARIR CCU EXTENSION PROJECT WTU IFMaster Document Register

This document is the property of TOTAL EP YEMEN. It must not be stored, reproduced or disclosed to others without written authorization from COMPANY.

CONTRACTOR SITE MDR Friday, December 13, 2013

MD

R R

ev

isio

n N

o.

TS

Nu

mb

er

CT

R P

roje

ct

Nu

mb

er

Co

un

try

Fie

ld o

r a

rea

Zo

ne

or

ins

tall

or

WP

Ori

gin

ato

r

Ch

ron

o

Sh

ee

t N

um

be

r Document Title

Re

vis

ion

Sta

tus

Dis

cip

line

Do

cu

me

nt

typ

e

Fo

rma

t

Sy

ste

m -

Su

bs

ys

tem

Da

te o

f is

su

e

Da

te s

en

t to

CP

Y S

ite

DC

C

We

ek

of

Iss

ue

Re

turn

Co

de

Tra

ns

mit

tal f

rom

CP

Y

Da

te R

etu

rne

d a

t T

AN

MIA

Bas

ic a

nd

/or

Det

aile

d

En

gin

eeri

ng

To

be

app

rove

d b

y C

om

pan

y (Y

/N)

Ad

dit

ion

, (A

) M

od

ific

atio

n (

M),

D

elet

ion

(D)

to In

itia

l MD

R

TT14-TAST-TTST-TN0335 TT14-MS-064 YE KHA 99 TAN 162196 C IFA QUA MS A4 Y 18-May-12 19-May-12 3 1 KHA/WTU/TT14/149 21-May-2012

TT14-TAST-TTST-TN0503 TT14-MS-065 YE KHA 99 TAN 162197 D IFA QUA MS A4 Y 01-Nov-12 01-Nov-12 3 1 KHA/WTU/TT14/222 6-Nov-2012

TT14-TAST-TTST-TN0518 TT14-MS-065 YE KHA 99 TAN 162197 0 AFC QUA MS A4 Y 01-Nov-12 01-Nov-12 3 1 KHA/WTU/TT14/226 8-Nov-2012

TT14-TAST-TTST-TN0624 TT14-MS-066 YE KHA 99 TAN 162198 1 AFC QUA MS A4 Y 07-Mar-13 23-Mar-13 3 1 KHA/WTU/TT14/307 4-May-2013

TT14-TAST-TTST-TN0795 TT14-MS-066 YE KHA 99 TAN 162198 A IFR MEC MS A4 Y 05-May-13 05-May-13 1 by hand 21-Sep-2013

TT14-TAST-TTST-TN0734 TT14-MS-066 YE KHA 99 TAN 162198 B IFA MEC MS A4 Y 27-May-13 27-May-13 3 KHA/WTU/TT14/338 2-Jun-2013

TT14-TAST-TTST-TN0624 TT14-MS-067 YE KHA 99 TAN 162199 0 AFC MEC MS A4 Y 08-Mar-13 23-Mar-13 1 1 KHA/WTU/TT14/332 25-May-2013

TT14-TAST-TTST-TN0795 TT14-MS-067 YE KHA 99 TAN 162199 A IFR MEC MS A4 Y 16-Sep-13 19-Sep-13 1 by hand

TT14-TAST-TTST-TN0803 TT14-MS-067 YE KHA 99 TAN 162199 0 AFC MEC MS A4 Y 15-Nov-13 15-Nov-13

TT14-TAST-TTST-TN0804 TT14-MS-067 YE KHA 99 TAN 162199 A IFR QUA MS A4 Y 17-Nov-13 18-Nov-13 3 2 KHA/WTU/TT14/357 26-Nov-2013

TT14-MS-067 YE KHA 99 TAN 162199 B IFA QUA MS A4 Y 3 1

TT14-TAST-TTST-TN0797 TT14-MS-068 YE KHA 99 TAN 162199 0 AFC QUA MS A4 Y 25-Aug-13 04-Oct-13 3 by hand

TT14-TAST-TTST-TN0805 TT14-MS-069 YE KHA 99 TAN 162201 Method Statement for Air Flushing / Blowing by Pig for Pipeline A IFR QUA MS A4 Y 19-Nov-13 19-Nov-13 3 2 KHA/WTU/TT14/357 26-Nov-2013

TT14-MS-069 YE KHA 99 TAN 162201 Method Statement for Air Flushing / Blowing by Pig for Pipeline 0 AFC QUA MS A4 Y 26-Dec-13 3 1

TT14-TAST-TTST-TN0810 TT14-MS-070 YE KHA 99 TAN 162202 A IFA PVV MS A4 Y 19-Nov-13 23-Nov-13 2 by hand 10-Dec-2013

TT14-TAST-TTST-TN0823 TT14-MS-070 YE KHA 99 TAN 162202 0 AFC PVV MS A4 Y 10-Dec-13 10-Dec-13 3 KHA/WTU/TT14/362 13-Dec-2013

METHOD STATEMENT FOR HYDROTESTING & PIGGING OF OVERFLOW & BACKWASH WATER PIPELINE FROM WTU TO CPU POND

METHOD STATEMENT FOR HYDROTESTING & PIGGING OF OVERFLOW & BACKWASH WATER PIPELINE FROM WTU TO CPU POND

METHOD STATEMENT FOR HYDROTESTING & PIGGING OF OVERFLOW & BACKWASH WATER PIPELINE FROM WTU TO CPU POND

METHOD STATEMENT FOR HYDROTESTING & PIGGING OF OVERFLOW & BACKWASH WATER PIPELINE FROM WTU TO CPU POND

METHOD STATEMENT FOR INSTALLATION OF WEMCO FLOTATION UNIT (20-UK-5103)

METHOD STATEMENT FOR INSTALLATION OF WEMCO FLOTATION UNIT (20-UK-5103)

METHOD STATEMENT FOR INSTALLATION OF WEMCO FLOTATION UNIT (20-UK-5103)

METHOD STATEMENT FOR INSTALLATION OF PIG LAUNCHER VP-5121 & VP-5501

METHOD STATEMENT FOR INSTALLATION OF PIG LAUNCHER VP-5121 & VP-5501

Canceled by Tanmia and reissued in new

revision

Method Statement for The Flushing/Blowing/Cleaning/Drying of Piping

Method Statement for The Flushing/Blowing/Cleaning/Drying of Piping

Method Statement for The Flushing/Blowing/Cleaning/Drying of Piping

METHOD STATEMENT FOR THE CONSTRUCTION AND INSTALLATION OF 10'' GRP FIRE WATER LINE IN SIMOPS AREA

METHOD STATEMENT FOR THE CONSTRUCTION AND INSTALLATION OF 10'' GRP FIRE WATER LINE IN SIMOPS AREA

Page 11: TT14-TanmiTT14-Tanmia MDR 2013Dec13 for Kamala MDR 2013Dec13 for Kamal

KHARIR CCU EXTENSION PROJECT WTU IFMaster Document Register

This document is the property of TOTAL EP YEMEN. It must not be stored, reproduced or disclosed to others without written authorization from COMPANY.

CONTRACTOR SITE MDR Friday, December 13, 2013

MD

R R

ev

isio

n N

o.

TS

Nu

mb

er

CT

R P

roje

ct

Nu

mb

er

Co

un

try

Fie

ld o

r a

rea

Zo

ne

or

ins

tall

or

WP

Ori

gin

ato

r

Ch

ron

o

Sh

ee

t N

um

be

r Document Title

Re

vis

ion

Sta

tus

Dis

cip

line

Do

cu

me

nt

typ

e

Fo

rma

t

Sy

ste

m -

Su

bs

ys

tem

Da

te o

f is

su

e

Da

te s

en

t to

CP

Y S

ite

DC

C

We

ek

of

Iss

ue

Re

turn

Co

de

Tra

ns

mit

tal f

rom

CP

Y

Da

te R

etu

rne

d a

t T

AN

MIA

Bas

ic a

nd

/or

Det

aile

d

En

gin

eeri

ng

To

be

app

rove

d b

y C

om

pan

y (Y

/N)

Ad

dit

ion

, (A

) M

od

ific

atio

n (

M),

D

elet

ion

(D)

to In

itia

l MD

R

TT14-MS-070 YE KHA 99 TAN 162202 1 AFC PVV MS A4 Y 26-Dec-13 3 1

by hand TT14-MS-071 YE KHA 99 TAN 162203 A IFR CIV MS A4 Y 08-Dec-13 08-Dec-13 3 by hand 10-Dec-2013

TT14-MS-071 YE KHA 99 TAN 162203 B IFA CIV MS A4 Y 26-Dec-13 3 1

TT14-TAST-TTST-TN009 TT14-ITP-001 YE KHA 99 TAN 169119 C IFA CIV MS A4 Y 19-Mar-11 23-Mar-11 3 1 KHA/WTU/TT14/010 2-Apr-2011

TT14-TAST-TTST-TN020 TT14-ITP-001 YE KHA 99 TAN 169119 D IFA CIV MS A4 Y 03-Apr-11 03-Apr-11 3 1 KHA/WTU/TT14/011 4-Apr-2011

TT14-TAST-TTST-TN009 TT14-ITP-002 YE KHA 99 TAN 169120 0 AFC CIV MS A4 Y 14-Mar-11 23-Mar-11 3 1 KHA/WTU/TT14/010 2-Apr-2011

TT14-TAST-TTST-TN020 TT14-ITP-002 YE KHA 99 TAN 169120 A IFR CIV MS A4 Y 03-Apr-11 03-Apr-11 3 1 KHA/WTU/TT14/011 4-Apr-2011

TT14-TAST-TTST-TN009 TT14-ITP-003 YE KHA 99 TAN 169121 A IFR CIV MS A4 Y 14-Mar-11 23-Mar-11 2 1 KHA/WTU/TT14/010 2-Apr-2011

TT14-TAST-TTST-TN020 TT14-ITP-003 YE KHA 99 TAN 169121 0 AFC CIV MS A4 Y 03-Apr-11 03-Apr-11 3 1 KHA/WTU/TT14/011 4-Apr-2011

TT14-TAST-TTST-TN024 TT14-ITP-003 YE KHA 99 TAN 169121 A IFR PVV MS A4 Y 05-Apr-11 05-Apr-11 3 1 KHA/WTU/TT14/012 7-Apr-2011

TT14-TAST-TTST-TN018 TT14-ITP-004 YE KHA 99 TAN 169122 B IFA PVV MS A4 Y 02-Apr-11 02-Apr-11 3 1 KHA/WTU/TT14/057 29-Sep-2011

TT14-TAST-TTST-TN0141 TT14-ITP-004 YE KHA 99 TAN 169122 0 AFC PVV MS A4 Y 30-Sep-11 01-Oct-11 3 1 KHA/WTU/TT14/059 3-Oct-2011

TT14-TAST-TTST-TN009 TT14-ITP-005 YE KHA 99 TAN 169123 A IFR PVV MS A4 Y 14-Mar-11 23-Mar-11 2 1 KHA/WTU/TT14/010 2-Apr-2011

TT14-TAST-TTST-TN020 TT14-ITP-005 YE KHA 99 TAN 169123 0 AFC PVV MS A4 Y 03-Apr-11 03-Apr-11 3 1 KHA/WTU/TT14/011 4-Apr-2011

TT14-TAST-TTST-TN024 TT14-ITP-005 YE KHA 99 TAN 169123 A IFR QUA PLN A4 Y 05-Apr-11 05-Apr-11 3 1 KHA/WTU/TT14/012 7-Apr-2011

TT14-TAST-TTST-TN038 TT14-ITP-006 YE KHA 99 TAN 169124 0 AFC QUA PLN A4 Y 21-Apr-11 21-Apr-11 3 1 KHA/WTU/TT14/057 29-Sep-2011

TT14-TAST-TTST-TN0141 TT14-ITP-006 YE KHA 99 TAN 169124 A IFR QUA PLN A4 Y 30-Sep-11 01-Oct-11 3 1 KHA/WTU/TT14/059 3-Oct-2011

TT14-TAST-TTST-TN0637 TT14-ITP-007 YE KHA 99 TAN 169125 0 AFC QUA PLN A4 31-Mar-13 31-Mar-13 1 KHA-WTU-TT14-275 2-Apr-2013

TT14-TAST-TTST-TN0644 TT14-ITP-007 YE KHA 99 TAN 169125 A IFR QUA PLN A4 03-Apr-13 03-Apr-13 2 KHA-WTU-TT14-286 11-Apr-2013

TT14-TAST-TTST-TN0644 TT14-ITP-007 YE KHA 99 TAN 169125 B IFA QUA PLN A4 03-Apr-13 13-Apr-13 2 KHA/WTU/TT14/0286 11-Apr-2013

TT14-TAST-TTST-TN041 TT14-ITP-008 YE KHA 99 TAN 169126 0 AFC QUA PLN A4 Y 22-Apr-11 24-Apr-11 2 1 KHA/WTU/TT14/022 31-May-2011

TT14-TAST-TTST-TN063 TT14-ITP-008 YE KHA 99 TAN 169126 A IFR QUA PLN A4 Y 01-Jun-11 01-Jun-11 3 1 KHA/WTU/TT14/029 26-Jun-2011

TT14-TAST-TTST-TN096 TT14-ITP-008 YE KHA 99 TAN 169126 0 AFC QUA PLN A4 Y 21-Jul-11 24-Jul-11 3 1 KHA/WTU/TT14/036 26-Jul-2011

TT14-TAST-TTST-TN041 TT14-ITP-009 YE KHA 99 TAN 169127 INSPECTION & TEST PLAN for BACKFILLING AND COMPACTION A IFR QUA PLN A4 Y 22-Apr-11 24-Apr-11 3 1 KHA/WTU/TT14/058 2-Oct-2011

METHOD STATEMENT FOR THE CONSTRUCTION AND INSTALLATION OF 10'' GRP FIRE WATER LINE IN SIMOPS AREA

METHOD STATEMENT- FOR THE CONSTRUCTION OF CABLE TRENCH FOR WTU & IF PROJECT E&I CABLE @ NEW TECHNICAL BUILDING (REMOTE AREAS)

METHOD STATEMENT- FOR THE CONSTRUCTION OF CABLE TRENCH FOR WTU & IF PROJECT E&I CABLE @ NEW TECHNICAL BUILDING (REMOTE AREAS)

METHOD STATEMENT- FOR THE CONSTRUCTION OF CABLE TRENCH FOR WTU & IF PROJECT E&I CABLE @ NEW TECHNICAL BUILDING (REMOTE AREAS)

METHOD STATEMENT FOR THE Construction of Cable Trench AND DUCT BANKSS FOR WTU&IF PROJECT E&I CABLES @ REMOTE AREAS

METHOD STATEMENT FOR THE Construction of Cable Trench AND DUCT BANKSS FOR WTU&IF PROJECT E&I CABLES @ REMOTE AREAS

METHOD STATEMENT FOR THE OFFLOADING OF ELECTRICAL SHELTER (41 TONS)

METHOD STATEMENT FOR THE Construction of Cable Trench AND DUCT BANKSS FOR WTU&IF PROJECT E&I CABLES @ SIMOPS AREAS

METHOD STATEMENT FOR THE Construction of Cable Trench AND DUCT BANKSS FOR WTU&IF PROJECT E&I CABLES @ SIMOPS AREAS

METHOD STATEMENT FOR THE CONSTRUCTION & INSTALLATION OF 10"GRP FIRE WATER LINE IN SIMOPS AREA "C"

METHOD STATEMENT FOR THE CONSTRUCTION & INSTALLATION OF 10"GRP FIRE WATER LINE IN SIMOPS AREA "C"

METHOD STATEMENT FOR THE CONSTRUCTION & INSTALLATION OF 10"GRP FIRE WATER LINE IN SIMOPS AREA "C"

METHOD STATEMENT FOR THE INSTALLATION OF ELECTRICAL AND INSTRUMENT SHELTERS

METHOD STATEMENT FOR THE INSTALLATION OF ELECTRICAL AND INSTRUMENT SHELTERS

INSPECTION & TEST PLAN - EARTHWORKS; MATERIAL SELECTION, BACKFILLING & COMPACTION

INSPECTION & TEST PLAN - EARTHWORKS; MATERIAL SELECTION, BACKFILLING & COMPACTION

IINSPECTION & TEST PLAN for CONCRETE; FORMWORKS, REBAR BENDING, CONCRETE PLACEMENT, GROUTING

IINSPECTION & TEST PLAN for CONCRETE; FORMWORKS, REBAR BENDING, CONCRETE PLACEMENT, GROUTING

INSPECTION & TEST PLAN for EARTHWORKS; EXCAVATION WORKS

INSPECTION & TEST PLAN for EARTHWORKS; EXCAVATION WORKS

INSPECTION & TEST PLAN for EARTHWORKS; EXCAVATION WORKS

INSPECTION & TEST PLAN for STRUCTURAL; FABRICATION AND ERECTION

INSPECTION & TEST PLAN for STRUCTURAL; FABRICATION AND ERECTION

Page 12: TT14-TanmiTT14-Tanmia MDR 2013Dec13 for Kamala MDR 2013Dec13 for Kamal

KHARIR CCU EXTENSION PROJECT WTU IFMaster Document Register

This document is the property of TOTAL EP YEMEN. It must not be stored, reproduced or disclosed to others without written authorization from COMPANY.

CONTRACTOR SITE MDR Friday, December 13, 2013

MD

R R

ev

isio

n N

o.

TS

Nu

mb

er

CT

R P

roje

ct

Nu

mb

er

Co

un

try

Fie

ld o

r a

rea

Zo

ne

or

ins

tall

or

WP

Ori

gin

ato

r

Ch

ron

o

Sh

ee

t N

um

be

r Document Title

Re

vis

ion

Sta

tus

Dis

cip

line

Do

cu

me

nt

typ

e

Fo

rma

t

Sy

ste

m -

Su

bs

ys

tem

Da

te o

f is

su

e

Da

te s

en

t to

CP

Y S

ite

DC

C

We

ek

of

Iss

ue

Re

turn

Co

de

Tra

ns

mit

tal f

rom

CP

Y

Da

te R

etu

rne

d a

t T

AN

MIA

Bas

ic a

nd

/or

Det

aile

d

En

gin

eeri

ng

To

be

app

rove

d b

y C

om

pan

y (Y

/N)

Ad

dit

ion

, (A

) M

od

ific

atio

n (

M),

D

elet

ion

(D)

to In

itia

l MD

R

TT14-TAST-TTST-TN0146 TT14-ITP-009 YE KHA 99 TAN 169127 INSPECTION & TEST PLAN for BACKFILLING AND COMPACTION B IFA QUA PLN A4 Y 03-Oct-11 11-Oct-11 3 1 KHA/WTU/TT14/062 13-Oct-2011

TT14-TAST-TTST-TN053 TT14-ITP-010 YE KHA 99 TAN 169129 INSPECTION & TEST PLAN for BACKFILLING AND COMPACTION 0 AFC QUA PLN A4 Y 08-May-11 18-May-11 3 1 KHA/WTU/TT14/029 26-Jun-2011

TT14-TAST-TTST-TN0120 TT14-ITP-010 YE KHA 99 TAN 169129 A IFR QUA PLN A4 Y 02-Sep-11 04-Sep-11 3 1 KHA/WTU/TT14/058 2-Oct-2011

TT14-ITP-011 YE KHA 99 TAN 169130 0 AFC QUA PLN A4

TT14-ITP-012 YE KHA 99 TAN 169132 A IFA QUA PLN A4

TT14-ITP-013 YE KHA 99 TAN 169133 B IFA QUA PLN A4

TT14-ITP-014 YE KHA 99 TAN 169134 B IFA QUA PLN A4

TT14-ITP-015 YE KHA 99 TAN 169135 INSPECTION & TEST PLAN for PAINTING & COATING A IFR QUA PLN A4

TT14-ITP-016 YE KHA 99 TAN 169136 INSPECTION & TEST PLAN for PAINTING & COATING B IFA QUA PLN A4

TT14-ITP-017 YE KHA 99 TAN 169137 INSPECTION & TEST PLAN for PAINTING & COATING 0 AFC QUA PLN A4

TT14-ITP-018 YE KHA 99 TAN 169138 IINSPECTION & TEST PLAN for PIPING; HYDROTESTING A IFR QUA PLN A4

TT14-ITP-019 YE KHA 99 TAN 169139 IINSPECTION & TEST PLAN for PIPING; HYDROTESTING 0 AFC QUA PLN A4

TT14-ITP-020 YE KHA 99 TAN 169140 A IFR QUA PLN A4

TT14-ITP-021 YE KHA 99 TAN 169141 0 AFC QUA PLN A4

TT14-TAST-TTST-TN0239 TT14-ITP-022 YE KHA 99 TAN 169142 INSPECTION & TEST PLAN FOR ERECTION OF TANKS A IFR QUA PLN A4 Y 06-Mar-12 06-Mar-12 3 1 KHA/WTU/TT14/118 9-Mar-2012

TT14-TAST-TTST-TN0251 TT14-ITP-022 YE KHA 99 TAN 169142 INSPECTION & TEST PLAN FOR ERECTION OF TANKS 0 AFC QUA PLN A4 Y 16-Mar-12 16-Mar-12 3 1 KHA/WTU/TT14/120 19-Mar-2012

NOTES:1. Deleted some not applicable ITP's MS and PRC's

2. In Blue font, TO BE SUBMITTED

3. In Red font, SUBMITTED TO TEPY for Review and Approval

INSPECTION & TEST PLAN for PIPING FABRICATION & INSTALLATION

INSPECTION & TEST PLAN for PIPING FABRICATION & INSTALLATION

INSPECTION & TEST PLAN for GRP PIPING FABRICATION, ASSEMBLY, INSTALLATION AND HYDROTESTING.

INSPECTION & TEST PLAN for GRP PIPING FABRICATION, ASSEMBLY, INSTALLATION AND HYDROTESTING.

INSPECTION & TEST PLAN for GRP PIPING FABRICATION, ASSEMBLY, INSTALLATION AND HYDROTESTING.

INSPECTION and TEST PLAN for STATIC AND ROTATING EQUIPMENT

INSPECTION and TEST PLAN for STATIC AND ROTATING EQUIPMENT