Tuff-Rib Install Guide

bestbuymetalroof.com

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

Tuff-Rib Page 2 of 27

2.

a. Installation Guide

b. Panel Squaring

3.

4.

a. Fascia (optional)

b. Eave / 1.5x3.5 Angle

c. Gable / Corner

d. Preformed Valley

e. Pitch Break

f. Gambrel

g. Hip

h. Ridge

i. Vented Ridge

j. High Side Peak

k. Side Wall

l. End Wall

5.

6.

a. Valley Lapping and Cuttingb. Pipe Flashing

Pages 5, 6

Pages 7, 8

Pages 9, 10

Page 11

Page 12

Page 13

Page 14Page 15

Page 16

Page 17

Page 18

Page 19

Page 20

Page 21

Page 22

Pages 23, 24

Page 25, 26

Page 27

1. Page 4

Tuff-Rib Page 3 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

LIVE LOAD (PSF) WIND LOAD (PSF)SPAN (INCHES)

29 Gauge26 Gauge

36” 48” 54” 18” 24” 30” 36”30”24”18” 48” 54”49 28 22 211 118 76 5271112199 29 2367 37 29 276 155 99 6996150268 38 30

1. Theoretical allowable loads are based on section properties and allowables calculated in accordance with 2001 AISI Specifications. 2.Theoretical allowable loads are based on three or more uniform spans.3. For roof panels, deduct self weight for actual ‘live load’ capacity of the panel.4. These loads are for panel strength. Frames, purlins, decks and fasteners must be designed to resist all loads imposed on the panel.

5. Check local building codes if panel testing is required.

The Tuff-Rib® panel is an industry leader in strength and durability. This popular and versatile panel featuresclassic looks and is used in a wide range of applications including residential, commercial, andpost-frame buildings. Tuff-Rib® was designed with strong trapezoidal ribs to increase strength and easehandling and installation. In addition, the anti-siphoning channel on the under-lap provides extra leakresistance in the presence of extreme wind and rain loads.

Tuff-Rib® is available in many different paint colors and in both 26 and 29 gauge steel. It is also available inunpainted Galvalume® or in some cases unpainted galvanized. Our paint system and Galvalume® substrateare individually covered by a limited warranty. Please see our color chart for details on our paint system.

The Tuff-Rib® panel is available in 36” coverage. The panel has five major support ribs at ¾” high that addrigidity and strength to the panel.

Tuff-Rib®Tuff-Rib Page 4 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

Tuff-Rib®

OversizedAntisiphoningChannel3/4”

SCREW FASTENERS – INTERMEDIATE SUPPORTS

SCREW FASTENERS – EAVE, RIDGE, & ENDLAPS

If metal is not to be used immediately, store inside in a well ventilated, dry location. Condensation or other moisture can formbetween the sheets during storage causing water stains or white rust which detract from the appearance of the product andmay affect the product’s useful life. Trapped moisture between sheets of painted metal can cause white rust to form under-neath the paint. This can cause the paint to flake off the panel immediately or several years later. To prevent white rust andstaining, break the shipping bands on the material. Store the material on end or on an incline of at least 8” with a supportingboard underneath to prevent sagging. Fan the sheets slightly at the bottom to allow for air circulation. Keep the sheets off ofthe ground with an insulator such as wood. Any outdoor storage is at the customer’s own risk. If outdoor storage cannot beavoided, protect the metal using a canvas cover or waterproof paper. Never cover the metal with plastic as this will causecondensation to form.

Always wear protective gloves when working with steel panels to avoid cuts from sharp edges. When cutting or drilling steelpanels, always wear safety glasses and sweep off any metal shavings immediately to prevent eye injury from flying metalfragments. If you must walk on a metal roof, take great care. Metal panels can become slippery, so always wear shoes withnon-slip soles. Avoid working on metal roofs during wet conditions when the panels can become extremely slippery.

Insure that the structure is square and true before beginning panel installation. If the structure is not square, the panels willnot properly seal at the sidelaps. Start the first panel square to eave by using the 3, 4, 5 Triangle Method. Green or damplumber is not recommended. Moisture released from the damp lumber may damage the metal panels. Nails installed ingreen or damp lumber may back out. Remove any loose metal shavings left on the roof surface immediately to preventcorrosion. After installing roof, remove any debris such as leaves or dirt to prevent moisture from getting trapped on panels.

If you wish to predrill fastener holes, use a cover sheet to prevent hot shavings from sticking to panels. Screws - For bestresults, use a 1-1/2” washered wood screw in the flat of the panel as shown in the illustration below. Drive the fastener sothat the washer is compressed securely against the metal. Do not over drive the fastener as this will form a dimple thatcan collect water and cause leakage. Do not leave any loose fasteners that have missed the purlin. Use a #14 stitch screwor caulk to fill the hole.

Tuff-Rib®Tuff-Rib Page 5 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

LIVE LOAD (PSF) WIND LOAD (PSF)SPAN (INCHES)

29 Gauge26 Gauge

36” 48” 54” 18” 24” 30” 36”30”24”18” 48” 54”49 28 22 211 118 76 5271112199 29 2367 37 29 276 155 99 6996150268 38 30

1. Theoretical allowable loads are based on section properties and allowables calculated in accordance with 2001 AISI Specifications.2. Theoretical allowable loads are based on three or more uniform spans.3. For roof panels, deduct self weight for actual ‘live load’ capacity of the panel.4. These loads are for panel strength. Frames, purlins, decks and fasteners must be designed to resist all loads imposed on the panel.5. Check local building codes if panel testing is required.

Underlayment Underlayment

2”x4”s

2’ Spacing

PrevailingWinds

2

13

4

5 Install Metal Directlyto Wood Frame

• Use Maximum 2’ Purlin Spacing• Install Metal*NOT RECOMMENDED FOR HEATEDSPACES UNLESS INSULATION AND VAPORBARRIER PROTECTION IS USED

Install Metal onSolid Deck

• Lay Plywood Deck• Apply SyntheticUnderlayment or other VaporBarrier Protection

• Install Metal

Install Metal OverExisting Shingles

• Apply SyntheticUnderlayment or otherVapor Barrier Protection

• Install Metal

Maximum Purlin Spacing forRoof 2’ on Center

Slopes of less than 2.5” on 12” are not recommended. For slopes of 2.5” on 12” or greater, end lap panels 6”. Side laps shouldface away from the prevailing wind. Lay the first sheet along the eave at the down-wind side of the roof, farthest away fromthe direction of the prevailing winds (See Figure #4). Install sheets in the sequence shown in Figure #4.

Allow an overhang a minimum of 1” at the eave to provide for a drip edge. Use inside closure at eave to prevent waterinfiltration, insect or bird infestation at openings. To protect against uplifting winds and to provide a finished appearance, applygable trim. Apply fasteners every 6”-10”. Optionally apply butyl tape as shown in Figure #6 along the top of lap ribs. Do notblock the siphon channel with the tape. Also an option: apply a 3/4” or 7/8” lap stitch screw into the crown of the rib to securethe side lap. This is especially a good idea on roofs with a slope less than 4:12.

* Proper ventilation and vapor barrier protection recommended for heated spaces

Tuff-Rib®Tuff-Rib Page 6 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

1 3

1

2

3

4

5

6

1

3

4

2

Point A

Point C

Point A

Point C

Point B

Using two tape measures, locate point C by hookingone tap to a nail at point A and the second tapeto a nail at point B. Extend the tapes until they crossand meet at 4’ on the first tape and 5’ on the secondtape and place a temporary nail where 4’ and 5’ meet.

...the 4’ and 5’ measurements arethe 4 and 5 sides of the 3...4...5...triangle.

For larger 3...4...5...Triangles multipleeach side of the triangle by the desiredincrease in size. For example, if the roofpanels are 25’ from eave to ridge,multiply each side by a factor of 6 for an18’...24’...30’...Triangle. Obviously, thecloser the triangle vertical leg length isto matching the panel length, thegreater the squaring accuracy.

Hook a chalk line to point A and pull it inline with point C and mark a chalk line onthe roof deck.

This will be the square reference line for theTuff-Rib® panel installation.

Tuff-Rib®

Establish a line from point A to point B bytemporarily marking each point with anail. The line must be parallel to the eaveand in this example 3’ long (this is the 3side of the 3...4...5... Triangle).

Tuff-Rib Page 7 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

1 2

1 2

Mark chalk lines parallel with the square referenceline out ahead of panel installation so that panelsquare can be checked as the panels are installed.Suggested line spacing is one foot beyond 3 panelswide or about 10 feet.

Check for square by measuring thedistance from the installed paneledge to the chalk line at both theeave and ridge. If themeasurements match, then theinstalled panels are square, if not,adjustments must be made tobring the panels back into square.

Tuff-Rib®Tuff-Rib Page 8 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

The following is an example of a typical sequence for the installation of Tuff-Rib® panels and trims and is specificto the roof plan and conditions illustrated. The actual sequence may vary based on the specific roof plan andapplicable conditions.

Install the Moisture Barrier per themanufacturer’s recommendations.

Install the Fascia Trim along alleaves and rakes.

Install the Eave Trim along alleaves lapping over the Fascia Trim.

Install the Valley Trim over theEave Trim working from the eave

to the valley peak.

Install the panels over the Eaveand Valley Trims. Do not install

panels where the Ridge Trim lapsunder the panels.

Install the Hip Trim over thepanels.

Tuff-Rib®Tuff-Rib Page 9 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

Install the Ridge Trim over the Hip Trimintersection and valley peak.

Install the Pitch Break over the low slopepanels and moisture barrier.

Complete the panel installation installing the highslop panels over the Trim Transition and the other

remaining exposed locations.

Install the Corner Trim over the panels alongall gable edges.

Install the High Side Peak Trim over thepanels.

Install the Ridge Trim over the panels.

Install the Side Wall Trim over the panels. Install the Side Wall Trim over the panels. Install the End Wall Trim over the panels.

Tuff-Rib®Tuff-Rib Page 10 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

Install the roof substrate according to localbuilding code requirements.

Install moisture barrier according to the manufacture’s recommendedprocedure and in compliance with local building code requirements.

Install the Fascia trim and butt ends.

Fasten trim with Pancake Screws 2’ apartalong the length of the trim.

Fasten trim with Wood Screws spaced 2’apart along the length of the trim.

Tuff-Rib®Tuff-Rib Page 11 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

Fasten trim with Pancake Screws spaced 2’ apart along thelenght of the trim.

Install the 1.5x3.5 Angle and butt ends.

Fasten panels to the roof substrate using Wood Screws spacedaccording to the recommended fastening pattern and frequency, andin compliance with local building codes.

Install the panel and overhang the panel a minimum of 1” beyondthe 1.5x3.5 Angle edge. See panel squaring method in thismanual.

Place the Inside Closure over the top of the1.5x3.5 Angle or underlayment.

Install moisture barrier according to the manufacture’s recommendedprocedure and in compliance with local building code requirements.

Install the roof substrate according to local buildingcode requirements.

Tuff-Rib®Tuff-Rib Page 12 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

Apply Butyl Tape along the length of the panel.

Install moisture barrier according to themanufacture’s recommendedprocedure and in compliance with localbuilding code requirements.

Install the roof substrate according tolocal building code requirements.

Fasten panels to the roof substrateusing Wood Screws spaced accordingto the recommended fastening patternand frequency, and in compliance withlocal building codes.

Install the panel and overhang the panel aminimum of 1” beyond the Eave trim edge.See panel squaring method in this manual.

Install the Corner trim and overlap the ends4”. See lapping diagram in this manual.

Fasten trim with Wood Screws spaced 2’apart along the length of the trim.

Fasten trim with Wood Screwsspaced 2’ apart along the length ofthe trim.

Tuff-Rib®Tuff-Rib Page 13 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

Install moisture barrier according to themanufacture’s recommended procedure and incompliance with local building code requirements.

Fasten trim with Pancake Screws spaced 2’ apart along the lengthof the trim. See lapping diagram fastener pattern in this manual.

Install the roofsubstrate according to localbuilding code requirements.

Fasten panels to the roof substrate using Wood Screws spaced according to the recommendedfastening pattern and frequency, and in compliance with local building codes.

Install the panel a minimum of 3” up from thewater diverter at the bottom of the Valley and minimumof 3” down from the top of the Valley. See panel squaring method in this manual.

Install the Valley trim and overlap the ends 4”.See lapping diagram in this manual.

Place Expanding Closure parallel to each side of the Valleycenter water diverter. Closure should be up from the panelend about 1”. See panel minimum set back above.

1. See Valley Lapping - Page 252. See Valley Cutting - Page 26

3”minimum

Tuff-Rib®Tuff-Rib Page 14 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

Place the Outside Closure over panels.

Fasten panels to the roof substrate using Wood Screwsspaced according to the recommended fastening pattern

and frequency, and in compliance with local building codes.

Install the panel and overhang the panel a minimum of 1” beyondthe eave edge. See panel squaring method in this manual.

Install moisture barrier according to the manufacture’s recommendedprocedure and in compliance with local building code requirements.

Install the roof substrate according to local building code requirements.

Fasten panels to the roof substrate using Wood Screwsspaced according to the recommended fastening patternand frequency, and in compliance with local building codes.

Install the panel up 1” the transition bend. See panelsquaring method in this manual.

Place the Inside Closure over the top of the Transition.The closure should be about 1” up from the panel end.

Place the Pitch Break Trimover the Outside Closure.

Fasten trim withWood Screwsspaced 18” apartalong the length ofthe trim, throughthe rib. See lappingdiagram.

Tuff-Rib®Tuff-Rib Page 15 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

Install the panel and overhangthe panel a minimum of 1”beyond the eave edge.

Install moisture barrieraccording to the manufacturer’srecommended procedure andin compliance with localbuilding code requirements.

Fasten panels to the roof substrate using Wood Screwsspaced according to the recommended fastening patternand frequency, and in compliance with local building codes.

Install the panel up 1” the transition bend. See panel squaringmethod in this manual.

Fasten trim with WoodScrews spaced 18” apartalong the length of the trim,through the rib.

Place the Outside Closure over thetop of the panels.

Fasten panels to the roofsubstrate using WoodScrews spaced according tothe recommended fasteningpattern and frequency, andin compliance with localbuilding codes.

Place the Inside Closure overthe top of the Gambrel up

about 1” from the panel end.

Place the Gambrel Flashing Trimover the Outside Closure.

Tuff-Rib Page 16 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

Fasten trim with Wood Screws spaced 18” apart alongthe length of the trim, through the rib. See lappingdiagram fastener pattern in this manual.

Place the Hip Trim over the Expanding Closure

Place Expanding closure parallel toeach side of the hip center line so that hipfastener penetrates the center of the closure.Closure should be up from the panel endabout 1”.

Fasten panels to the roof substrate using Wood Screwsspaced according to the recommended fastening pattern

and frequency, and in compliance with local building codes.

Install the panel and overhang the panel a minimum of 1” beyondthe eave edge. See panel squaring method in this manual.

Install moisture barrier according to the manufacture’srecommended procedure and in compliance with local

building code requirements.

Install the roof substrate according to localbuilding code requirements.

Tuff-Rib®Tuff-Rib Page 17 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

Fasten trim with Wood Screws spaced 18” apart along thelength of the trim, through the rib. See lapping diagram.

Place the Ridge Trim over the Outside Closure.

Place the Outside Closure over the topof the panel.

Fasten panels to the roof substrate using Wood Screwsspaced according to the recommended fastening pattern

and frequency, and in compliance with local building codes.

Install the panel and overhang the panel a minimum of 1” beyondthe eave edge. See panel squaring method in this manual.

Install moisture barrier according to the manufacture’s recommendedprocedure and in compliance with local building code requirements.

Install the roof substrate according to local building code requirements.

Tuff-Rib®Tuff-Rib Page 18 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

Fasten trim with Wood Screws spaced 18” apart alongthe length of the trim, through the rib. See lappingdiagram fastener pattern in this manual.

Place the Ridge Trim over the Profile Vent.

Apply the ridge venting material over the panels on eachside.

Fasten panels to the roof substrate using Wood Screwsspaced according to the recommended fastening pattern

and frequency, and in compliance with local building codes.

Install the panel and overhang the panel a minimum of 1” beyondthe eave edge. See panel squaring method in this manual.

Install moisture barrier according to the manufacture’s recommendedprocedure and in compliance with local building code requirements.

Install the roof substrate according to local building code requirements.

Tuff-Rib®Tuff-Rib Page 19 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

Install the panel and overhang the panel a minimum of 1”beyond the eave edge. See panel squaring method in this manual.

Install moisture barrier according to the manufacturer'srecommended procedure and in compliance with localbuilding code requirements.

Fasten trim with Wood Screws spaced 2’ apart alongthe length of the trim. See lapping diagram.

Fasten panels to the roof substrate using WoodScrews spaced according to the recommendedfastening pattern and frequency, and incompliance with local building codes.

Place the High Side Peak Trim over the Outside Closure.

Fasten trim with Wood Screws spaced 18”apart along the length of the trim, through therib. See lapping diagram.

Place the Outside Closure over thepanels.

Install the roof substrate according tolocal building code requirements.

Tuff-Rib®Tuff-Rib Page 20 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

Position the Counter Flashing above the Side Wall Trim asshown. Some applications may not need counter flashing.

Fasten trim withWood Screws spaced 2’ apart along thelength of the trim. See lapping diagram.

Apply Tube Sealant continuously along the Counter Flashing andgenerously filling the space between the flashing and the wall.Round or slope the Sealant top so that water will run off.

Fasten panels to the roof substrate using Wood Screws spacedaccording to the recommended fastening pattern andfrequency, and in compliance with local building codes.

Apply Butyl Tape along thelength of the panel.

Install the panel and overhang the panel a minimum of 1”beyond the eave edge. See panel squaring method in this manual.

Install moisture barrier according to the manufacturer'srecommended procedure and in compliance with localbuilding code requirements.

Place the Side Wall Trim over theButyl tape and overlap the ends 4”.See lapping diagram in this manual.

Install the roof substrate according to local buildingcode requirements.

Fasten trim with Wood Screws spaced 2’ apart along the length ofthe trim. If wall material is not wood, fasteners will be by others.

Tuff-Rib®Tuff-Rib Page 21 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

Fasten trim with Wood Screws spaced 18”apart along the length of the trim,through the rib. See lapping diagram.

Apply Tube Sealant continuously along the Counter Flashing and generously filling the spacebetween the flashing and the wall. Round or slope the Sealant top so that water will run off.

Fasten panels to the roof substrate using Wood Screws spaced according to the recommendedfastening pattern and frequency, and in compliance with local building codes.

Install the panel and overhang the panel aminimum of 1” beyond the eave edge. Seepanel squaring method in this manual.

Install moisture barrieraccording to the manufacturer’srecommended procedure.

Position the Counter Flashing above the Side Wall Trim asshown. Some applications may not need counter flashing.

Place the End Wall Trim over the Butyl tape and overlapthe ends 4”. See lapping diagram in this manual.

Install the roof substrate according tolocal building code requirements.

Fasten trim with Wood Screws spaced 2’ apart along the length ofthe trim. If wall material is not wood, fasteners will be by others.

Place the Outside Closure over the top of the panel.

Tuff-Rib®Tuff-Rib Page 22 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

Tuff-Rib®Tuff-Rib Page 23 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

12" Ridge Cap 16" Ridge Cap SM O/S Corner / Gable LG O/S Corner / Gable

Post Trim / Eave "W" Valley Endwall / Pitch Break Sidewall

J-Channel Rat Guard Drip Cap Flat Sheet

PAINTED SIDE

140°

1.5"

1"

4"PAINTED SIDE

140°

1.5"

1"

6"

.75"

2.5"

PAINTED SIDE

1"

2.5".75"

4"

PAINTED SIDE

1"

4"

PAINTED SIDE

1.5"

3.5, 5.5,or 7.5"

PAINTED SIDE

3.5"

1"

.75"

3.75"

PAINTED SIDE

.875"

1"

2"PAINTED SIDE

1.5"

1"1.625"

45°

PAINTEDSIDE

.5"

1"

2.625"40.875"

10'

8.625" 8.625"1" 1"

PAINTED SIDE.5".5"

5.875"

3.875"X*

PAINTED SIDE

Tuff-Rib®Tuff-Rib Page 24 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

4” lap line

Cross section of completedvalley Lap

After cutting notches and applying Tube Sealant, slide the up slope valley into thehem groove while lapping over the top of the low slope valley 4”.

Cut 4” notch in Valley hem if applicable Cut 4” notch in Valley hem if applicable

Edge ofPanel

After lapping, install screws spaced 2” apart between Tube Sealant rows.Do not install screws above edge of panel line.

Apply two rows of Tube Sealant spaced 2” apart

Edge ofPanel

Edge ofPanel

Edge ofPanel

Tuff-Rib®Tuff-Rib Page 25 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

Valley starter cutting diagram with water diverter tabs.

Before folding tabs

2. Bend Line, bend left tab down 90º 3. Bend Line, bend right tab down 90º

After folding tabs

Cut along dashed lines1.

Tuff-Rib®Tuff-Rib Page 26 of 27

Chattanooga, TN(423) 468-4897

Greenville, SC(864) 568-5300

Asheville, NC(828) 667-8555

Cleveland, TN(423) 728-3336

Cut pipe flashing 15%smaller than actual pipe.

Apply tube sealant to theunderside of the pipe flashing.

Slide pipe flashingdown over the pipe.

Press the pipe flashing into contours of panel configurationand fasten to the Tuff-Rib® panel with wood screws or stitch

screws. Apply additional sealant around base if desired.

Tuff-Rib®Tuff-Rib Page 27 of 27