Introduction

• Riyadh Metro Project is the present and future work experience as a new megaproject in Saudi Arabia.

• It consists of 6 lines integrated to each other by 4 Main Stations.

• A total length of 176 km linked with 85 stations

Metro Lines

• Line 1: “Olaya Street” 38 km

• Line 2: “King Abdullah Road” 25.3 km

• Line 3: “Almadinah Road” 40.7 km

• Line 4: “King Khalid Airport” 29.6 km

• Line 5: “King Abdulaziz Road” 12.9 km

• Line 6: “Abdulrahman bin Awf” 30 km

Underground Trains

Length (km) Total Length Tunnel At Grade Elevated

Line 1 38 17.3 4.8 15.9

Line 2 25.3 3.3 16.6 5.4

Line 3 40.7 9.4 5.2 26.1

Line 4 29.6 5.9 6.9 16.7

Line 5 12.9 12.9 0 0

Line 6 30 8 2 19.7

Line 1 has the tallest tunneling path

Line 1

- At Grade - Elevated - Underground

Line 1 Contractors

• “BACS” CONSORTIUM

- Bechtel

- Almabani

- CCC

- Siemens

• The contract is “Design and Build” contract

Project Time Schedule

60

60 Months Overall Program

Contract Award

Design &

Long-lead

Procurment

48 Months Core Construction

Test &

Commission

Start Construction

SCHEDULE

OVERALL SCHEDULE

8-month

LD Holiday

Time Chainage Diagram

Stations

• Line 1 is connecting 3 Main stations and has 22 Pick-Up stations.

• The main stations are:

• 1- King Abdullah Financial District Station

• 2- Olaya Station

• 3- Qaser Al Hokm Station

• One Example of the Pick-Up stations is 1A2 “shown in figure”

Olaya Station

o Location: South of King Abdullah

road at the intersection of Line 1

Olaya-Batha with Line 2 king

Abdullah road.

oArea: 11,000 m2.

oDesigner: Gerber Architekten (Germany).

1A2 TEXT

PRINCE TURKI IBN ABDULAZIZ ATH THANI

1A2 TEXT 1A2 EXISTING CONDITIONS

1A2 TEXT 1A2 EXISTING CONDITIONS

1A2 TEXT 1A2 EXISTING CONDITIONS

1A2 TEXT 1A2 EXISTING CONDITIONS

PRINCE TURKI IBN ABDULAZIZ ATH THANI

PRINCE TURKI IBN ABDULAZIZ ATH THANI

Shopping Street

Shopping Street

Shopping Street

Shopping Street

Shopping Street

Shopping Street

BLUE TBM ORANGE TBM BROWN TBM PURPLE TBM

DRIVE NORTH FROM LAUNCH SHAFT

SOUTH OF 1B3 INTO RECEPTION SHAFT

SOUTH OF 1A2

3947m

TOTAL DIST.

4155m 5125m 3250m

DRIVE SOUTH FROM LAUNCH SHAFT

SOUTH OF 1B3 INTO RECEPTION SHAFT

NORTH OF 1C4

DRIVE NORTH FROM LAUNCH SHAFT

BETWEEN 1F2 & 1F4 INTO RECEPTION

SHAFT SOUTH OF 1C4

DRIVE SOUTH FROM LAUNCH

SHAFT BETWEEN 1F2 & 1F4 INTO

RECEPTION SHAFT NORTH OF 1F8

1A2 1B4

1B3

1C4

1F2

1F8 1F4

TBM Launching Shafts

PRINCE SULTAN IBN SALMAN IBN ABDULAZIZ STREET

1B4 EXISTING CONDITIONS

1B4 EXISTING CONDITIONS

1B4 EXISTING CONDITIONS

1B4 EXISTING CONDITIONS

TBM General Information

• The excavation depth in Line 1 starts from 11 m and reaches a maximum of 36 m depth at the segment between (1B1-1B2).

• Design life of TBM Bored tunnel is 100 years.

• Design fire resistance is 3 hours.

Geotechnical Design Consideration

• In almost half of the route of Line 1 competent limestone with limited weathering and without groundwater table is expected.

• From station “1F2” to “1F4” in line 1, TBM cross a silty clayey sand layer.

• Typically settlements over the tunnel (0-10mm).

• Some areas of greater predicted settlement (10-30mm) in the southern section of the Line 1 tunnel, near Station “1F2”.

Geometry of TBM

• The tunnel internal diameter is 9.0m

• This diameter is further increased by 0.2 meter to accommodate TBM construction tolerance as required.

• The proposed TBM final lining is precast segments of 360mm thick.

Lining Thickness

(mm)

360

Internal diameter (mm)

9200

External diameter (mm)

9920

3635.874328.4174674.694674.694328.417

31164.599

3817.663

1887.19

3817.663

91

1.9

02

90

3.9

86

91

0.9

81

90

5.0

71

3649.721

3950.1131623.1563949.247

17

71

.71

6

17

83

.73

1

17

97

.90

7

18

14

.98

4

18

29

.25

4

18

38

.45

18

39

.26

5

17

78

.24

2

17

79

.39

8

17

66

.07

8

17

60

.15

2

17

62

.41

2

17

71

.71

6

18

16

.26

9

3371.9764014.2574335.3984335.3984014.257

3524.518

1782.33

3524.518

28902.652

3663.411

17

73

.76

9

17

98

.05

9

18

27

.13

1

18

36

.41

5

90

3.5

94

91

1.1

22

91

0.2

04

90

4.6

8

17

80

.89

4

17

63

.04

4

17

73

.76

9

17

84

.91

1

18

13

.89

7

18

35

.66

18

15

.08

9

17

68

.54

17

65

.14

3384.8222060.923385.625

1505.3463662.608

2222.2093650.587

18

00

.00

0

18

00

.00

0

18

00

.00

0

18

00

.00

0

17

60

.00

0

18

37

.09

7

17

62

.90

3

18

40

.00

0

PROJECT

DRAWN BY

REVISIONS

No Date Description

NAME

CHECKED BY

NAME NAME

DRAWING TITLE

DRAWING NUMBER

BACS CONSORTIUM

CONSULTANT / SUB-CONTRACTOR

Drawn Checked Approved

DRAWING STATUS

SCALE

APPROVED BY LDE

NAME

APPROVED BY

DOCUMENT REVIEW STATUS

DATE DATE DATE DATE

16151413121110987654321

M

L

K

J

H

G

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A

B

C

D

E

F

G

H

J

K

L

M

LEAD DESIGN ENTITY (LDE)

AREVIEWED

Work may proceed

DREJECTED

EREVIEW NOT REQUIRED

Work may proceed

COBJEC TION

Revise and re-submit. Work may not proceed

BREVIEWED WITH COMMENTS

Revise and re-submit. Work may proceed subjec t to

incorporation of comments

www.bacsrmp.com

LINE 1 - TBM TUNNEL

PRECAST SEGMENTAL LINING

GENERAL ARRANGEMENT-

RIGHT HAND TAPER

M-BD2-100000-CTLI-EDR-000002 00A

00Av1

09/04/1408/04/1407/04/1409/04/14

G. CHARLESWORTHW.LIEWC.D . ZHONGM. MIRZAKASHANI

60% DEVELOPED DESIGN

1:50G.C.W.L.C.D.Z.60% DEVELOPED DESIGN09/04/1400A 09 APRIL 2014

3635.874328.4174674.694674.694328.417

31164.599

3817.663

1887.19

3817.663

91

1.9

02

90

3.9

86

91

0.9

81

90

5.0

71

3649.721

3950.1131623.1563949.247

17

71

.71

6

17

83

.73

1

17

97

.90

7

18

14

.98

4

18

29

.25

4

18

38

.45

18

39

.26

5

17

78

.24

2

17

79

.39

8

17

66

.07

8

17

60

.15

2

17

62

.41

2

17

71

.71

6

18

16

.26

9

3371.9764014.2574335.3984335.3984014.257

3524.518

1782.33

3524.518

28902.652

3663.411

17

73

.76

9

17

98

.05

9

18

27

.13

1

18

36

.41

5

90

3.5

94

91

1.1

22

91

0.2

04

90

4.6

8

17

80

.89

4

17

63

.04

4

17

73

.76

9

17

84

.91

1

18

13

.89

7

18

35

.66

18

15

.08

9

17

68

.54

17

65

.14

3384.8222060.923385.625

1505.3463662.608

2222.2093650.587

18

00

.00

0

18

00

.00

0

18

00

.00

0

18

00

.00

0

17

60

.00

0

18

37

.09

7

17

62

.90

3

18

40

.00

0

PROJECT

DRAWN BY

REVISIONS

No Date Description

NAME

CHECKED BY

NAME NAME

DRAWING TITLE

DRAWING NUMBER

BACS CONSORTIUM

CONSULTANT / SUB-CONTRACTOR

Drawn Checked Approved

DRAWING STATUS

SCALE

APPROVED BY LDE

NAME

APPROVED BY

DOCUMENT REVIEW STATUS

DATE DATE DATE DATE

16151413121110987654321

M

L

K

J

H

G

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A

B

C

D

E

F

G

H

J

K

L

M

LEAD DESIGN ENTITY (LDE)

AREVIEWED

Work may proceed

DREJECTED

EREVIEW NOT REQUIRED

Work may proceed

COBJEC TION

Revise and re-submit. Work may not proceed

BREVIEWED WITH COMMENTS

Revise and re-submit. Work may proceed subjec t to

incorporation of comments

www.bacsrmp.com

LINE 1 - TBM TUNNEL

PRECAST SEGMENTAL LINING

GENERAL ARRANGEMENT-

RIGHT HAND TAPER

M-BD2-100000-CTLI-EDR-000002 00A

00Av1

09/04/1408/04/1407/04/1409/04/14

G. CHARLESWOR THW.LIEWC.D . ZHONGM. MIRZAKASHANI

60% DEVELOPED DESIGN

1:50G.C.W.L.C.D.Z.60% DEVELOPED DESIGN

09/04/1400A 09 APRIL 2014

Soil Excavation Quantity

• In a simple calculation, we can assume the quantity of soil to be excavated.

• Area of tunneling= 77.29 m2

• Tunneling Length= 17.3 km

• Soil Volume= 17300*77.29= 1337117 m3