Tunnel Instrumentation for Settlement ControlZhangwei Ning, Ph.D.Sixense Inc.
Field instrumentation is vital to the practice of geotechnics, in contrast
to the practice of most other branches of engineering in which people
have greater control over the materials with which they deal. For this
reason Geotechnical engineers, unlike their colleagues in other fields,
must have more than casual knowledge of instrumentation: to them it
is a working tool, not merely one of the components of research.
--- Ralph B. Peck
2
3
Tunnel Instrumentation and Monitoring (I&M)
Ground MovementSurface Settlement
▪ Long duration (usually >3 years)
▪ Big Zone Of Influence (ZOI)
▪ Complex and sensitive environments
4
Tunnel Instrumentation and Monitoring (I&M)
Complicated and challenging I&M Plan
5
Tunnel Project I&M
6
Tunnel Project I&M
▪ Spatial and Temporal Distribution
▪ Accuracy and Precision
▪ Monitoring Frequency
▪ Baseline Monitoring
▪ System Redundancy
7
Important Monitoring Design Considerations
▪ Accuracy: to describe how close a measurement is to the true value.
‘The correctness with which a measured value represents the true
value.’ - ASCE (2000), Guidelines for instruments and measurements for
monitoring dam performance
▪ Precision: To describe how close a series of measurements are to
each other.
‘The ability of a sensor to repeatedly give the same reading for
the same measurand, is termed precision.’ - Barrie Sellers President
Emeritus of Geokon
8
Accuracy and Precision
9
Accuracy VS Precision
10
The only truth is we don’t know about the truth
11
The only truth is we don’t know about the truth
The monitoring frequency depends on a number of factors,
including:
▪ The rate at which change is expected to develop
▪ The stage of construction
▪ The distance to active construction zone
▪ Requirements of any contingency or emergency plan
▪ Practical response time to control a construction process
12
Monitoring Frequency
▪ Miss the details in the true signal
13
When Monitoring Frequency Is Low
▪ Late/Mis-detection of changes
It is tempting to over-specify monitoring frequency
requirement simply because of the available technology, but
with no real benefits and even adverse effects:
▪ Overload data transmission and management system
▪ Increase system cost
▪ Shorten system life
▪ More data ≠ more useful information
▪ Create digital-waste
14
The Curse of Over-sampling (high frequency)
▪ Baseline monitoring are needed to establish the stability of any
monitoring system prior to construction. It is used as a reference
against which subsequent change is measured.
▪ The baseline measurements should also be used to determined any
existing movements which could be otherwise be attributed to the
works.
▪ A long period of baseline monitoring will increase confidence, but this
may need to be balanced against other factors such as cost or the risk
of delay to the works.
- British Tunneling Society, Monitoring Underground Construction, A best practice guide15
Baseline Monitoring
Stressmeter
Levelling
Theodolite Digital imagecorrelation
Extensometer VibrationMonitor
Total Station GSM Data
Transmission
Laser Scanner Drones
Piezometer Submarine Monitor
Data-logger Time DomainReflectometry
Fiber Optics Multi-parametric borehole system
Web-based Data
Management
Load cell Inclinometer Laser distance-meter
In-place
inclinometer
GNSS Interferometric
radar
Wireless
Monitoring
1950s 1960s 1970s 1980s 1990s 2000s 2010s
16
Evolution of Geotechnical I&M
Paolo Mazzanti, 2018
17
Sub-surface and Surface Monitoring for Tunneling
The primary way for sub-surface parameters monitoring are still
through those conventional sensors, such as:
▪ Piezometer
▪ Borehole extensometer
▪ Inclinometer (SAA is a new counterpart)
Improvements:
▪ Miniaturized, Lighter
▪ Built-in wireless communication
▪ Digitized
18
Subsurface Instruments
▪ Multiple Point Borehole Extensometers (MPBX) and vibrating wire Piezometers
were placed together in boreholes along the entire tunnel alignment, with an
averaged 50 ft spacing;
▪ MPBX: 5 ft, 10ft and 20 ft above tunnel crown; (145)
▪ Piezometer: near the bottom anchor of MPBX; (250)
▪ Manual inclinometer: adjacent or in the path of the TBM. (110)
▪ Automatic In-place inclinometer (IPI): around the rescue shaft
19
Subsurface Instruments used in SR-99 Tunnel in Seattle
▪ Piezometer installed near rescue shaft
It captured both the construction related
dewatering effect and the non-
construction related daily tidal effect.
▪ MPBX and Piezometer installed along
TBM alignment
MPBX measured the above crown
settlement and its partial rebound while
piezometer responded to and tracked
shield pressure
20
Subsurface Instruments used in SR-99 Tunnel in Seattle
(Cording et al., 2017)
Shape Accelerometer Array (SAA)
Image courtesy of Measurand
Horizontal SAA▪ A low overburden railway tunnel constructed in Toronto, with 11 Horizontal
SAA installed 1.5 m below surface to monitor Highway (21 lane) settlement
Image courtesy of TTP
Horizontal SAA
Image courtesy of GKM
Horizontal Shape Array (SAA)
Image courtesy of GKM
▪ Drilling
▪ Uncertainty in subsurface
▪ Installation quality control
▪ Difficulties in verifying results
▪ Non-repairable
25
Subsurface Instruments - limitations
26
Data Acquisition and Wireless Transmission
Lower Power Wide Area Network (LPWAN)
Image courtesy of Loadsensing
Automatic Motorized Total Station (AMTS), or
Robotic Total Station (RTS)
27
Surface Monitoring - AMTS
28
Evolution of AMTS
28
Theodolite Total Station[Thodolite + EDM]
1920s 1980s 1990s 2010s
• Angle measurement • Angle measurement• Distance measurement
Automatic Motorized Total Station[Total Station + ATR + Motorization]
• Angle measurement• Distance measurement• Motorized• Automatic target detection
• Reflectorless EDM • Imaging • Piezo-motorization• Integrated scanner
29
HOW AMTS Settlement Monitoring Works
Xi, Yi, Zi
Xi, Yi, Zi
Xi, Yi, Zi
Xi, Yi, Zi
Xi, Yi, Zi
Settlement Zone?,?,?X, Y, Z ?i, ?i, ?i
?i, ?i, ?i
?i, ?i, ?i
?i, ?i, ?i
?i, ?i, ?i
?i, ?i, ?i
Xi, Yi, Zi
Xi, Yi, Zi
Xi, Yi, Zi
Xi, Yi, Zi
Xi, Yi, Zi
Xi, Yi, Zi
30
AMTS Remote Control and Data Communication
30
Cloud Server
Computation and data/alert management
Control boxAMTS control and communication module
Engineer
Monitoring data reporting
AMTS
Internet connection
Instrumentation Specialist
Remote Control and Programing
31
AMTS Grouping
510
510
32
AMTS + IoT
33
AMTS + IoT
34
SR-99 (Alaskan Way Viaduct Replacement)- Seattle
35
NorthLink - Seattle
▪ NO ATR (Automatic Target Recogntion)
▪ Fixed Horizontal and Vertical Angle
▪ Dz at (X0, Y0) is approximately = |Z1-Z0|
▪ The flatter the surface and the bigger the shooting angle, the closer the
approximation
36
AMTS in Reflectorless Mode
X0, Y0, Z0
X1, Y1, Z1
▪ A 350ft long 42-inch OD casing pipe by micro-tunneling under the Interstate 405
37
Reflectorless AMTS Monitoring I-405 Los Angeles
38
Reflectorless AMTS Monitoring I-405 Los Angeles
39
Reflectorless AMTS Monitoring I-405 Los Angeles
40
Reflectorless AMTS Monitoring
▪ Started early in the 1990’s
▪ Take a long way to becomes popular today [In many instrumentation
and monitoring specification]
▪ High precision in 3D: 1mm within 100 m distance
▪ Fast Measurement: 80 - 100 targets per hour/one AMTS
▪ 24/7 operations with remote control
▪ Near-real time data processing and control
▪ Harsh weather resistance
▪ No traffic closure for prism installation in reflectorless mode
41
AMTS Features
42
Monitoring from the Sky - Satellite Radar Interferometry▪ Phase comparison to reveal surface deformation at mm-scale.
43
Satellite Radar InterferometryHistorical studies/Baseline Monitoring Monitoring
44
InSAR for Tunneling Monitoring
Satellite monitoring
Construction Active Ground-based instrumentation + wide coverage low frequency InSAR Monitoring
Post-Construction Long term Residual settlement monitoring by InSAR
Pre-constructionBaseline monitoring through InSAR
Active Ground-based monitoring Manual Survey
45
InSAR in SR-99 Seattle
Cosmo-SkyMed (X Band) 130 images from Jul-2012 to Dec-
2017
46
InSAR in SR-99 Seattle
▪ Over 85,000 monitoring points
▪ Nearly 5-year continuous monitoring
with mm-scale accuracy
▪ Measures actual extent and
magnitude of the effect of the
project, even beyond the theoretical
ZOI
▪ Identifies settlements areas adjacent
to project but not directly related to
project
▪ Complements and validates other
ground-based instruments
47
InSAR Monitoring in CrossRail - London
Area of interest 36 km2
902,394 measurement points
24,800 PS/km2
Courtesy of Mike Black, Crossrail
48
Satellite Radar Interferometry
▪ City-scale coverage extending outside ZOI.
▪ Settlement accuracy < 3mm
▪ Up to 10,000 points/km2
▪ Historical ground analysis prior to construction
▪ No ground installation required
▪ Absolute and Large Scale. Identify
▪ Validation of ground instrumentation
▪ Litigation mitigation
49
More Eyes in Future Sky
More planned SAR satellite constellation will:
▪ Reduce the cost
▪ reduce revisit from days to hours
Photo credit: Capella Space
50
Tunnel Monitoring Visualization
51
Integrating TBM Data (Bertha)
• TBM Parameters display
52
Future of Visualization – Mixed Reality
Photo Credit: BGC Engineering Inc.
53
Future of Visualization – Mixed Reality
Photo Credit: BGC Engineering Inc.
▪ Fusion of monitoring and numerical modeling for back-analysis
and prediction
▪ From construction to operation (Tunnel Structure Health
Monitoring)
▪ Artificial Intelligence techniques in tunnel construction
(intelligent early warning, TBM auto-piloting etc.)
▪ Education
54
Future Developments