turnkey project solutions brochure.pdf · turnkey project solutions. our expertise is based on more...

36
1 Turnkey Project Solutions

Upload: others

Post on 14-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

1

Turnkey Project Solutions

Page 2: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

2

reasons for

Highest quality integrated services provider from AustriaMore than 80 years expertise in well engineering and constructionMore than 15 years expertise in drilling data warehousing and analytics More than 1,100 wells with more than two million meters drilledData-driven decision makingPerformance focusedAgile project management

Page 3: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

3

Foreword

Today’s oil price scenario does not allow for inefficiencies at any stage of a project and yet field development projects have these inefficiencies inherent. This leads to high investment cost and excessively long realisation time. The main reason for this is the currently prevailing procurement-driven business model of oil and gas projects and the lack of integrated solutions.

media nova seven energy (MN7) provides the needed alternative with its Turnkey Project Solutions.Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the continuous pursuit for performance improvement and optmization through data acquisition and analytics.

RAG.Energy.Drilling (RED), our exclusive partner in drilling and well services, originates from the very first Austrian oil and gas operator established in 1935. By today this operator (RAG) produced more than 15 million tons of oil and more than 27 billion cubic metres of gas in the geologically highly demanding areas of Central Europe.

Founded in 2000 TDE became with proNova, a leader of drilling monitoring and analysis services. The only service holding a patent for automated data recognition operation. Worldwide major oil companies as well as the largest drilling contractors rely on proNova services for their daily operations.

Under the global presence of TDE Group we combine these two major areas of expertise and extend them with MN7’s Integrated Reservoir Studies and training capabilites to deliver projects faster and with higher quality, allowing you to produce your reserves earlier, with greater ultimate recovery and less investment cost.

Additionally this Service Portfolio is especially suited for the Iranian market, with a strong focus on technology and knowledge exchange and therefore our training services are emphasised throughout the document. MN7 is pleased to train and certify our client’s staff to our and international standards adding value to both of our companies.

Page 4: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

4

6

24

12

28

14

32

Introduction

Well Services andTesting

Services at a Glance

Operational Excellence

Integrated Reservoir Studies

Training Services

Page 5: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

5

16 18 20Well Engineering Rig Site Engineering

and ConstructionDrilling Operations

DisclaimerThis document does not claim thoroughness and completeness. Services may have been changed, added or excluded since the date of issue. Content is only informative and not the basis for any contractual or legal issues. Contact TDE Group GmbH for any additional and detailed information.

Page 6: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

6

Rohöl - Aufsuchungs Aktiengesellschaft (RAG)is founded by Socony Vacuum Oil Company Inc.

(now Exxon Mobil Corporation) and N.V. de Bataafsche Petroleum Maatschappij

(now Royal Dutch Shell plc).

1935

First oil with RAG 2 well in Zistersdorf,Austria.

1937

The Puchkirchen gas storage facility, with acapacity of around 40 million cubic metres of

working gas, is built. The Oberhofen well near Lake Irrsee is drilled

to a depth of 4,597 metres.

1982

The largest ever gas discovery in theAustrian section of the Molasse basin

– around 4 billion cubic metres – is made at Haidach.

1997

RAG sets a new company record of 805 consecutiveaccident-free days.

The Zagling gas �eld is discovered.

2004

RAG sets up wholly owned subsidiaries, RAGEnergy Storage and RAG Energy Drilling.

2013 & 2014

Think & Vision is established as TDE Group’s laboratory for engineering and development of surface and downhole

sensors, and advanced drilling technology.

2008

eCOREx is established as an unique integrated oil and gas exploration drilling and geophysical

analysis service.

2012

TDE Equipment and Manufacturing isfounded to become a leading supplier

of advanced drilling technology.

2013

KOBI is established to become a leading oil �eld automation and

smart solutions provider.

2014

proNova by TDE celebrates 15 years of operation, being a world leader in

drilling performance monitoring and analysis.

2015

TDE Arvand is established to serve the Iranian market.

MN7.NRG is established in order to provide integrated solutions to the oil and gas industry.

2016

MN7.NRG and RAG.Energy.Drilling join forces to provide Best In Class

integrated solutions to the Middle East and North African market.

NOW

TDE is established to promote drilling process optimization, remote monitoring and analysis

solutions under the proNova brand.

2000

2009RAG acquires a Hungarian company

and establishes RAG Hungary, a wholly owned subsidiary.

RAG takes a 26 percent stake in a shalegas project in Poland.

RAG operates under government control during WWII and several years after.First wells are drilled as a contractor. Operations extended to today’s Germany and Slovenia.

1938 - 1945

Introduction

media nova seven energy (MN7) is a provider of Turnkey Project Solutions for the oil and gas industry, operating under the mission statement:

“Maximize value using data analytics to deliver optimized turnkey solutions to the oil and gas industry”.

Performance optimization and continuous improvement are key elements of our corporate philosophy. This is conveyed along the complete line of communication down to the rig floor and in turn MN7 encourages through distinct actions the feedback up to the project management. It is these actions that allow us to perform Best in Class when it comes to project efficiency and quality. Furthermore MN7’s unique agile project management approach allows us to react quickly to any changes of circumstances and customer requirements. This leads to faster and better well construction, allowing our clients to produce earlier with a greater ultimate recovery and less CAPEX spending.

Page 7: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

7

Rohöl - Aufsuchungs Aktiengesellschaft (RAG)is founded by Socony Vacuum Oil Company Inc.

(now Exxon Mobil Corporation) and N.V. de Bataafsche Petroleum Maatschappij

(now Royal Dutch Shell plc).

1935

First oil with RAG 2 well in Zistersdorf,Austria.

1937

The Puchkirchen gas storage facility, with acapacity of around 40 million cubic metres of

working gas, is built. The Oberhofen well near Lake Irrsee is drilled

to a depth of 4,597 metres.

1982

The largest ever gas discovery in theAustrian section of the Molasse basin

– around 4 billion cubic metres – is made at Haidach.

1997

RAG sets a new company record of 805 consecutiveaccident-free days.

The Zagling gas �eld is discovered.

2004

RAG sets up wholly owned subsidiaries, RAGEnergy Storage and RAG Energy Drilling.

2013 & 2014

Think & Vision is established as TDE Group’s laboratory for engineering and development of surface and downhole

sensors, and advanced drilling technology.

2008

eCOREx is established as an unique integrated oil and gas exploration drilling and geophysical

analysis service.

2012

TDE Equipment and Manufacturing isfounded to become a leading supplier

of advanced drilling technology.

2013

KOBI is established to become a leading oil �eld automation and

smart solutions provider.

2014

proNova by TDE celebrates 15 years of operation, being a world leader in

drilling performance monitoring and analysis.

2015

TDE Arvand is established to serve the Iranian market.

MN7.NRG is established in order to provide integrated solutions to the oil and gas industry.

2016

MN7.NRG and RAG.Energy.Drilling join forces to provide Best In Class

integrated solutions to the Middle East and North African market.

NOW

TDE is established to promote drilling process optimization, remote monitoring and analysis

solutions under the proNova brand.

2000

2009RAG acquires a Hungarian company

and establishes RAG Hungary, a wholly owned subsidiary.

RAG takes a 26 percent stake in a shalegas project in Poland.

RAG operates under government control during WWII and several years after.First wells are drilled as a contractor. Operations extended to today’s Germany and Slovenia.

1938 - 1945

What lies behind …

MN7 can refer to a long and successful history and its main expertise is the result of combining all aspects of oil and gas field development with the power of big data.

Through our exclusive drilling and well services partner RAG.Energy.Drilling (RED) we provide our clients the Best in Class integrated drilling services. RED is a spin-off company from the very first Austrian oil and gas production and exploration company Rohöl-Aufsuchungs Gesellschaft (RAG) established in 1935, but with roots reaching back to the nineteenth century. Over the past decades RAG managed to prevail on the market despite two world wars, several economic crises and oil price shocks. RAG builds their success on flexible and sustainable management with a strong focus on their human resources and all stakeholders. This is also the very reason why RAG operates, as one of the last operators in the western world, its own rigs and is able to execute all phases of a field development project from seismic data processing, over project planning, drilling, completing and testing, production, workover and finally abandonment on their own. Compared to other operators, RAG always performs best when it comes to HSEQ, operational efficiency, equipment lifetime and production efficiency due to its strong in-house knowledge. Thus the decision was made to offer this

Page 8: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

8

Rohöl - Aufsuchungs Aktiengesellschaft (RAG)is founded by Socony Vacuum Oil Company Inc.

(now Exxon Mobil Corporation) and N.V. de Bataafsche Petroleum Maatschappij

(now Royal Dutch Shell plc).

1935

First oil with RAG 2 well in Zistersdorf,Austria.

1937

The Puchkirchen gas storage facility, with acapacity of around 40 million cubic metres of

working gas, is built. The Oberhofen well near Lake Irrsee is drilled

to a depth of 4,597 metres.

1982

The largest ever gas discovery in theAustrian section of the Molasse basin

– around 4 billion cubic metres – is made at Haidach.

1997

RAG sets a new company record of 805 consecutiveaccident-free days.

The Zagling gas �eld is discovered.

2004

RAG sets up wholly owned subsidiaries, RAGEnergy Storage and RAG Energy Drilling.

2013 & 2014

Think & Vision is established as TDE Group’s laboratory for engineering and development of surface and downhole

sensors, and advanced drilling technology.

2008

eCOREx is established as an unique integrated oil and gas exploration drilling and geophysical

analysis service.

2012

TDE Equipment and Manufacturing isfounded to become a leading supplier

of advanced drilling technology.

2013

KOBI is established to become a leading oil �eld automation and

smart solutions provider.

2014

proNova by TDE celebrates 15 years of operation, being a world leader in

drilling performance monitoring and analysis.

2015

TDE Arvand is established to serve the Iranian market.

MN7.NRG is established in order to provide integrated solutions to the oil and gas industry.

2016

MN7.NRG and RAG.Energy.Drilling join forces to provide Best In Class

integrated solutions to the Middle East and North African market.

NOW

TDE is established to promote drilling process optimization, remote monitoring and analysis

solutions under the proNova brand.

2000

2009RAG acquires a Hungarian company

and establishes RAG Hungary, a wholly owned subsidiary.

RAG takes a 26 percent stake in a shalegas project in Poland.

RAG operates under government control during WWII and several years after.First wells are drilled as a contractor. Operations extended to today’s Germany and Slovenia.

1938 - 1945

Page 9: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

powered by

by

PATENTED ®

Training Services

IntegratedReservoirStudies

WellEngineering

Rigsite Engineeringand Construction

DrillingOperations

Well Servicesand Testing

9

expertise to other operators and RAG.Energy.Drilling was established in 2014. With more than 80 years of drilling experience and more than 1,100 wells drilled in the highly demanding area of Central Europe, RED serves the European market with two modern rigs and its own crews and engineering teams. It is headquartered in Austria and operates under the highest national and international standards (SCC**, ISO 14001) with clients from national and international oil and gas companies like Austrian OMV and German Wintershall. Also energy providers as well as public institutions and communities are served. By 2014 an average of 13 wells per year were drilled. RED reached the highest total amount of meters drilled in a year with around 66,000 metres in the year 2010. In addition to conventional oil and gas exploration and production wells and gas storage wells, also highly deviated, horizontal and extended reach (ERD) wells have been drilled, as well as landmark geothermal projects have been executed. RED owned and operated surface test equipment is used on many wells to conduct open hole tests in order to obtain information on the size of the gas, oil or water resources and therefore determine the economic viability for production.

What sets MN7 apart is the pursuit for transition from experienced driven to fact based decision making. Therefore data analytics plays an important role in all phases of project assessment, planning and execution. MN7 utilises the power of proNova for monitoring and improving the operational excellence at all stages of project management. proNova is a service of TDE which is a sister company of MN7 and a world leading drilling performance and benchmarking provider with more than 15 years expertise in this area. Since its foundation in 2000,practically every major national and international oil company, but also the world’s largest drilling contractors rely on its data analytics for their daily operations.

Page 10: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

10

powered by

by

PATENTED ®

Training Services

IntegratedReservoirStudies

WellEngineering

Rigsite Engineeringand Construction

DrillingOperations

Well Servicesand Testing

Page 11: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

11

powered by

by

PATENTED ®

Training Services

IntegratedReservoirStudies

WellEngineering

Rigsite Engineeringand Construction

DrillingOperations

Well Servicesand Testing

Where we stand today ...

media nova seven energy provides Turnkey Project Solutions for complete well campaigns. We offer our clients a central interface for their field development projects and cover the complete process from processing and interpretation of seismic data down to executing the well construction operations with all the necessary engineering, procurement, operational, legal and financial activities.

Through all these processes proNova is our main tool for assessment, planning, monitoring and analysis. This is our main difference allowing us to deliver better results in less time with minimum risk for our clients.

An MN7 Turnkey Project Solution is an integrated approach to field development and may consist of all of the following services or certain parts only:

Integrated Reservoir Studies

Well Engineering

Rigsite Engineering and Construction

Drilling Operations

Well Services and Testing

Training Services

Added value for our clients

One single interface for your field development project

Earlier production due to faster well delivery

Greater ultimate recovery and less interventions due to improved well quality

Improved reservoir and drilling knowledge due to high quality data and analytics

Technology and knowledge transfer from the Best In Class drilling and performance

companies with MN7 training services

Page 12: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

12

Turnkey Project SolutionsServices at a Glance

Integrated Reservoir Studies

We offer a comprehensive view of the reservoir starting at the raw seismic data.

Processing and interpretation of seismic data

Reservoir characterisation and simulation

Geological, petrophysical and geomechanical studies

Field development planning and well placement

Petroleum economics

Well Engineering

We provide an experienced and multidisciplinary well engineering team to developthe right well design and drilling programme to allow for maximum production and data recovery.

Risk assessment

Offset analysis

Well design

Project scheduling

Cost calculation

Drilling programme

Rig Site Engineering and Construction

We perform all necessary technical, legal and financial actions to allow successful drilling operations, production and renaturation.

Civil engineering

Permits

Negotiations

Construction

Renaturation

Tendering

Drilling Operations

As an operator spin-off drilling company we can account a vast history in drilling and offer Best in Class integrated well construction and training services.

Oil and gas well drilling

Geothermal drilling

Water well drilling

Own rig fleet

Procurement

Operations supervision

Page 13: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

13

Project scheduling

Cost calculation

Drilling programme

Construction

Renaturation

Tendering

Own rig fleet

Procurement

Operations supervision

Well Services and Testing

Same as for drilling operations we offer our gained services and testing knowledge as an operator spin-off to our clients.

Completions design

Well intervention assessment and planning

Well test design and analysis

Workover operations

Well testing operations

Procurement

Operational Excellence

Continuous improvement is at the core of our corporate philosophy.

proNova is at all stages of our operations

Data is our commitment

We pursue the transition from experience based to fact based decision making

Training Services

We are committed to share our experience and knowledge to improve our industries efficiency.

Engineering workshops

Offset Well Analysis and Benchmarking Workshops

Performance Driller Training

Performance Roughneck Training

proNova Rig Move on Paper Workshops

®

Page 14: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

14

Starting at the raw seismic data we provide the capabilities to process, interpret and utilise your exploration data for further field development. TDE and RED combine their Austrian data handling and processing capacities with data centres in Vienna, Graz and Leoben to deliver optimum insights to what is buried deep below the surface. Our reservoir engineers, geologists, geo- and petrophysicists are well trained professionals with decades of experience. RED is famous for exploring and exploiting very thin layers of less than a meter thickness. This expertise can only be achieved through well integrated services and MN7 provides this expertise to its clients.

Integrated Reservoir Studies

Page 15: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

15

The Integrated Reservoir Studies comprise

Processing and interpretation of seismic data

Reservoir characterisation and simulation

Geological, petrophysical and geomechanical studies

Field development planning and well placement

Petroleum economics

Well construction support and concept design

Technical support

Technical assurance

Page 16: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

16

Page 17: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

17

Well Engineering

The design and planning of the certain wells to assess feasibility is the next step in the run up to a field development project and the point at which well objectives are agreed upon, in collaboration with the customer, to achieve the optimum technical and commercial solution with respect to the environmental conditions and economic restraints.It is here where a project‘s success can be predetermined and MN7 internally applies an agile project management system within a gate process. This assures top quality with maximum flexibility in order to meet our client‘s needs. A project proposal has to pass three gates in order to proceed to the execution phase. All of these gates demand high quality standards and an increasing level of detail. Once the third gate is passed, the responsible Drilling Engineer will be involved throughout the execution phase of the project.

Design and Planning

Project scheduling Cost estimation

Project organisation Tendering and auditing

Equipment coordination and procurement Well planning Using industry standard software (Landmark)

Using proNova for scheduling and benchmarking Offset data acquisition and analysis

Tubing and casing design Directional drilling and trajectory design Drill bit and BHA selection

Hydraulics analysis Hole cleaning analysis and optimisation

Torque and drag analysis Well control Complete drilling programme development

Formation evaluation programme development in conjunction with Geologists

Page 18: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

18

Rigsite Engineering and Construction

RED has decades of experience when it comes to optimal placement and design of rigsite locations. Whether they are located in the countryside or in a town, all considerations are covered and handled by the Well Engineering and Civil Engineering team. We will assess the infrastructure in place in order to tackle any logistical problems and ensure optimum placement and layout of the rigsite. RED has a proven track record of negotiating successfully with local authorities and land owners in order to provide the best setup for the rig and the local community to minimize the impact on their day to day lives. Furthermore with the last drilling operation completed the renaturation of the site already begins. We manage all the services necessary to leave a minimum footprint on surface and an optimum workspace for future workover operations for producer wells.

Page 19: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

19

Civil Engineering

Permits

Negotiation

Construction

Renaturation

Tendering

Supervision

An integrated approach

Page 20: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

20

Page 21: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

21

Drilling Operations

RAG.Energy.Drilling with its more than 80 years of experience and a track record of more than 1,100 wells drilled and a total drilled depth of more than two million meters has an unmatched expertise in executing drilling operations. All types of wells were drilled, from conventional oil and gas exploration and development wells, water wells, geothermal wells, storage wells up to highly complex extended reach and multi-lateral wells. RED drilled down to 4,600 m depth and drilled horizontal sections with a step out of up to 3,500 m. Our excellent integrated services are a result of decades of continuous improvement and focus on human resources.

23 km

40 km

48 km

31 km

48 km

58 km

66 km

60 km

41 km

49 km46 km

Meters drilled per year (2004 - 2014)

12

9

12

7

12 11 11

8

10

13

7

12

26

31

16

26

28

31

2826

23

17

Wells spudded per year (1993 - 2014)

Page 22: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

22

MN7 offers two rigs for executing drilling operations within a Turnkey Project Solution contract or for training purposes. These are fully equipped Bentec rigs which are rated up to 300 metric tonnes hookload, capable of drilling wells down to 5,500 m depth. With RED’s Best In Class crew and experienced proNova coaches, contracted drilling crews are trained and certified to our standard prior to any operations for MN7.

Integrated drilling services including

A full complement of drill crew dedicated to the specific rig and covering 24 hours. All drill

crew members are long term employees, not contract workers

Our own supervisors with nearly 100 years of combined experience in the drilling industry

Dedicated Drilling Fluids Engineers who operate the on-site mud and solids control

equipment 24 hours a day and provide daily mud reports to the customer

Mudlogging and sample catching service with gas chromatograph

A comprehensive inventory of spare parts for the rig to cover critical maintenance

Dedicated maintenance team covering regular preventative maintenance

100% SCC certified employees

Noise protection walls

Casing running and coring capabilities

Full project procurement

Page 23: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

23

Bentec EURO RIG 250 - HighlightsRated hookload 250t

Maximum hookload 300t

Height 40.77 m (inc. substructure)

Drawworks Bentec E 1250 AC

Centrifuges Hiller with integrated barite recovery and Flottweg centrifuge

Top drive Maritime Hydraulics PTD 500 AC

Flocculation unit

Iron roughneck NOV ST-80C

Entire tank system automated, remotely monitored & visualised on a process control system

Energy supply

6 x 532 kW diesel generators with optional replacement of 3 x 532 kW diesel generators by 3 x 410 kW CNG-driven generators

Pipe handling unit P.U.L.D. 05 series pipe handling

Driller‘s cabin

Mud pumps 2 x Wirth TPK 1600 AC

Mud farm capacity 100 m³ max. total volume in 8 compartments

Cutting containers 2 x 35 m³

Shale shakers 2 x VSM 300 shale shaker, NOV Brandt

Operations Supervision

We provide very experienced supervisors to control daily rig activity during all phases of rig operations. These personnel are available to be contracted to take over the daily running of any customer’s rig operations. With their extensive experience from an integrated services provider standpoint and high level training they are capable of making first-rate, 24 hour real time decisions during operations, ensure all safety procedures are carried out in accordance with regulations and report daily on the progress of the well.

Drilling Optimization

To further enhance the drilling performance of a project, a specialist engineer can monitor the conditions and drilling parameters remotely or on location in order to ensure the best rate of penetration is achieved while maintaining good hole cleaning and downhole conditions. Directional performance can also be monitored in order to ensure the actual wellpath is drilled as effectively as possible. Advanced software from proNova is used to monitor torque, drag and hydraulic trends, enabling us not only to improve performance but moreover to reduce risk for drilling problems and even enhance wellbore quality.

Rig Move Optimization

Another distinctive key feature of MN7 is the strong focus on rig move optimization. proNova Rig Move On Paper© is the key to reduce rig move time by up to 50%. This significantly adds to a rig‘s utilization rate and leads in the end to more wells drilled in a certain time ultimately accelerating the client‘s field development.

Page 24: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

24

Page 25: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

25

Well Services and Testing

RED has extensive experience in completion and artificial lift design, well services and well testing with a track record of more than 300 well completions for oil, gas, storage and injection wells. More than 650 Wireline and Slickline operations were executed from 2010 and open hole testing is an integral part of our service portfolio. This experience gives MN7 the necessary technical and commercial expertise and capacity to master all of our client’s challenges. We have the cutting-edge technology to bring in our projects on spec, on budget and on time whilst meeting the strictest international safety and environmental standards.

Design and Planning

Design and Planning of well completions

Design and calculation of production strings (tubing)

Including all necessary subsurface equipment (packers, profiles, SSDs,

subsurface safety valves, etc.)

Stress calculations due to mechanical loads or change of temperature, due

to workover operations, production scenarios and possible incidents using

simulation software WellCat

Design and Planning of artificial lift systems using software like Petrel, Prosper,

Avocet Well and Surface Modeller and Rodstar

Bottom-hole pumps (Sucker Rod Pumps)

Centrifugal pumps (ESP)

Positive cavity pumps (PCP)

Analysis and interpretation of data from pressure and PLT measurements using

Saphire and Emeraude

Design, planning, preparation and execution of all types of well interventions

Design and planning of well testing operations

Technical supervision

Coordination and procurement

RED has the expertise and equipment to perform and train all necessary well services in order to meet our client’s well objectives. MN7 utilises this expertise to provide these services within our Turnkey Project Solutions contract or in order to audit and supervise third party contractors. Furthermore MN7 offers training and certification according our and international standards on various well services and equipment, of which a selection is presented on the next page.

Page 26: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

26

Wireline Services

Production logging (PLT und MLT) – measurement of production specific data in cased hole

(pressure, temperature, media, performance of perforations).

Point and Step measurements (pressure and temperature)

Well inspection with downhole HD video camera (VMT)

Gamma ray and casing collar locator (GR-CCL)

Gyro orientation

Radial Bond Tool (cement bond)

OH-Calliper

Slickline Services

Hydraulic pull/punch Winch

Scraper / Calliper

Standard wire works for tubing sizes from 2 3⁄8” to 7”

Setting and retrieving of subsurface equipment (including mandatory checktool run)

Run in hole mechanical fuse for TCPs

Open / close sliding side doors (SSDs) with shifting tool

Page 27: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

27

Additional Services

Online temperature measurements using fibre optic cable

Online integrity measurements in boreholes

Tube wall thickness measurements (up to two casing strings)

Cement quality determination

Error detection and interpretation

Implementation and supervision of open hole and cased hole tests with own test equipment

Operation and maintenance of three test facilities

Auditing and Supervision of third party contractors

Perforation design and planning

Page 28: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

28

plan

evaluate

measure

understand the process

improve & sustain

act

by

PATENTED ®

Page 29: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

29

Operational Excellence

MN7’s most outstanding unique feature is its focus on overall efficiency and operational excellence by utilizing the power of drilling data through proNova Drilling and Monitoring services. proNova is a leader in efficiency improvement and cost saving and has more than 15 years of experience in this area. This allows us to improve daily meterage while at the same time enhance wellbore quality and safety on the rig site. Wells are completed faster, leading to earlier production and more ultimate recovery.

At the core proNova deals with the drilling data during the actual well construction execution itself. It is designated to the translation of large sensor data streams into valuable information in real-time and 24/7 to support objective decision making. proNova introduced first the concept of Invisible Lost Time to the oil and gas industry. The total well construction time may be divided into:

BOBT – Bit On Bottom Time is the time needed when actually drilling and

producing hole

FLAT – Flat Time is the necessary time needed for constructing a well besides

the BOBT (BHA handling, tripping, running casing, BOP work etc.)

LT – Lost Time is the deviation from plan due to unexpected/unplanned events

like hole problems, tool failures, rig repair etc.

ILT – Invisible Lost Time is defined as the difference between actual operation

duration and a best practice or benchmark performance (inefficient rig floor

operations, underperforming drilling crew, etc.)

“What gets measured gets improved.”, Peter F. Drucker stated correctly. Therefore the core of any proNova service is an objective, accurate, detailed and quality-controlled measurement of the well construction process.

Moreover proNova additionally stores any other related data, like Morning Reports, Logs, Well Plans and Final Well Reports etc. and with its Online Analytical Processing (OLAP) functionalities, is our main tool for project follow-up and even for project planning through the processing of historical and offset data.

ILTInvisible Lost Time

BOBTBit-On-Bottom-Time

FLATFlat Time

LTLost Time

Page 30: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

30

proNova ILT Measurement and Reporting Services make use of our capability to process large volumes of data streams in an automated and cost effective way. These services can be applied to any rig operation worldwide without the need of personnel or equipment at the rig site itself. Furthermore these services are fully web-based thus being IT infrastructure independent (no additional software or hardware installations). There is also no need to have a Real Time Operating Centre (RTOC) operational at the client’s offices in order to run proNova and make use of its benefits.

proNova LT Reporting and Lessons Learned Services is the key to fully unlocking the value of improvement services for the entire well delivery cycle. It shines the light on the major contributors to AFE and Well Construction Efficiency. The service focus is on the critical elements of activities which deviate from plan and are categorised as Lost Time. The service provides detailed analysis and breakdown of waste under the categories of Equipment, Well, Process and Safety & Environment. Daily, Weekly, Section, Well and or Campaign reporting is provided.

Conventional Reporting

vsSteps to Efficiency

Page 31: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

31

In the end proNova allows us to assess risks, being of geological, operational or technical nature and mitigate them. This and our training services described in the next section is what sets us apart from any other integrated services provider in the industry.

proNova Expert Support Services bring the human factor into the proNova world for those clients who either do not have the resources or not the knowledge and experience to unlock the full potential of the other proNova services provided.

proNova Process Planning and Scheduling Services is provision of dedicated planners & schedulers who work directly with planning and logistical rig & supervisor staff to optimise people, rigs, and resources to work effectively and improve productivity.

Additional proNova Services are a direct result of the experiences gathered when working for the oil and gas industry, especially in the fields of data management and data analysis we realized that despite being a very capital intensive business, the drilling community shows a lack of available hardware and software systems which are purpose designed and built.

vs

Page 32: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

32

Training Services

Due to our combined expertise of more than 95 years in project management, drilling services, well services, operational excellence improvement and data warehousing, MN7 offers a wide range of training services from engineering to operations management and data analytics. Our own and our partners high class facilities around the globe are very welcoming to any guests keen on broadening their horizon. Furthermore we are also pleased to give in-house seminars at the customers facilities if they are proper suited for the training.

Engineering Workshops

We offer workshops in well design, BHA and bit selection, drilling programme establishment, project scheduling, risk assessment, basic geomechanics, completions and workover design. Our experienced engineers and senior supervisors are pleased to share their wide knowledge on this highly demanding realm.

Drill Well On Paper courses are at the very basis of these workshops and the participants will learn how to face drilling problems prior to spudding the well.

Well Intervention Training

Our senior workover experts give dedicated courses in well intervention planning and execution jobs. From selecting well intervention candidates, over planning the operations and executing them in an efficient way, our trainers guide the participants through this demanding topic.

Page 33: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

33

Offset Well Analysis and Benchmarking Workshops

This is a multidisciplinary workshop where senior drilling engineers and senior data analysts forward the power of data to the participants. It facilitates the transition from experience based to data-driven planning, where the participants will learn

how to structure historical data from final well reports, morning reports,

BHA records, bit records, etc. in order to analyse them efficiently,

how to compare the historical data and establish a benchmark for new

well projects,

how to revise well designs and drilling programmes based on findings,

how to establish a risk assessment for new projects based on historical

data,

and in the end how to plan for the new projects properly.

Performance Driller Training

This training is especially aimed for the drillers on the brake handle or joystick and tool pushers. Basic physics and geology build the basis of this course and the aim is to give the driller an understanding of the influencing factors to achieve fast ROP while in the same time improving well bore quality and reducing the risk of drilling problems. Performance Drillers are more independent and can take remedial actions immediately, taking off load from Tool Pushers and Drilling Engineers. proNova is the main tool for planning, monitoring and evaluating and graduates are able to make use of its power.

Performance Roughneck Training

Repeatable manual processes present a very major time consumer in any drilling project. These training courses will train participants to become Performance Roughnecks. The main training includes Efficient Tripping, Efficient Drilling Connections, Efficient Casing Running, Rig Floor Organisation and Operational Awareness.

proNova Rig Move On Paper© Workshops

Participants learn how to use proNova for optimizing their rig moves. proNova monitors and analyzes rig moves and quantifies the Invisible Lost Time and Lost Time within. During the workshop the participants use this information to find the critical path of the operation and to build an optimized rig move schedule without waste. At the end they can utilize this knowledge for their projects and improve the company’s performance by drilling more wells in a certain time.

Page 34: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

34

powered by

by

PATENTED ®

Training Services

IntegratedReservoirStudies

WellEngineering

Rigsite Engineeringand Construction

DrillingOperations

Well Servicesand Testing

media nova seven energy is a member of the TDE GROUP

TDEEquipment andManufacturing

Page 35: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

35

www.mn7.com [email protected]

EUROPETDE Thonhauser Data Engineering GmbHParkstrasse 25 8700 Leoben AustriaPhone: +43 3842 48481 10

MIDDLE EAST, AFRICA and ASIATDE International Ltd.Level 1 Incubator Building Masdar CityAbu Dhabi UAEPhone: +971 2 8157872

RUSSIATDE Energy Services Ltd.Molodogvardeyskaya 204 5th floor443001 Samara RussiaPhone: +7 846 267 36 11

NORTH and SOUTH AMERICATDE Petroleum Data Solutions Inc.1650 Highway 6 Suite 130 Sugar Land TX 77478 U.S.APhone: +1 281 755 7595

NORTH SEATDE Norge ASProf. Olav Hanssensvei 7A4021 Stavanger Norge Phone: +47 90270985

Page 36: Turnkey Project Solutions Brochure.pdf · Turnkey Project Solutions. Our expertise is based on more than 95 years of history in the petroleum industry and what sets us apart is the

0705

2016

| ©

by

TDE

Gro

up

visit us on www.mn7.com