tweaks in csc digis
DESCRIPTION
Tweaks in CSC Digis. ME1/1 amplitudes were too big Now tuned to peak sizes I saw in MTCC 350 ADC counts in ME1/1 250 ADC counts elsewhere Can anyone confirm these numbers?. Centered Wire Timing ð Bad ALCTs. ALCT algorithm picks BX of second earliest digi. - PowerPoint PPT PresentationTRANSCRIPT
1
Tweaks in CSC Digis
ME1/1 amplitudes were too big
Now tuned to peak sizes I saw in MTCC
350 ADC counts in ME1/1
250 ADC counts elsewhere
Can anyone confirm these numbers?
2
Centered Wire Timing Bad ALCTs
ALCT algorithm picks BX of second earliest digi
3
Tune Wire Timing Better ALCTs
• Delay by 7 ns• ALCTs now centered well• Some efficiency loss (0.4%). Because of late tail?• Keep this?