Tweed Byron Hinterland Trails Mount Jerusalem National ParkUnicorn Falls Master Plan
NSW NATIONAL PARKS & WILDLIFE SERVICE
© 2020 State of NSW and Department of Planning, Industry and Environment
With the exception of photographs, the State of NSW and Department of Planning, Industry and Environment are pleased to allow this material to be reproduced in whole or in part for educational and non-commercial use, provided the meaning is unchanged and its source, publisher and authorship are acknowledged. Specific permission is required for the reproduction of photographs.
The Department of Planning, Industry and Environment (DPIE) has compiled this report in good faith, exercising all due care and attention. No representation is made about the accuracy, completeness or suitability of the information in this publication for any particular purpose. DPIE shall not be liable for any damage which may occur to any person or organisation taking action or not on the basis of this publication. Readers should seek appropriate advice when applying the information to their specific needs.
All content in this publication is owned by DPIE and is protected by Crown Copyright, unless credited otherwise. It is licensed under the Creative Commons Attribution 4.0 International (CC BY 4.0), subject to the exemptions contained in the licence. The legal code for the licence is available at Creative Commons.
DPIE asserts the right to be attributed as author of the original material in the following manner: © State of New South Wales and Department of Planning, Industry and Environment 2020.
DISCLAIMER The plans were prepared by NewScape Design in good faith exercising all due care and attention, but no representation or warranty, express or implied, is made as to the relevance, accuracy, completeness or fitness for purpose of this document in respect of any particular user’s circumstances. Users of this document should satisfy themselves concerning its application to, and where necessary seek expert advice in respect of, their situation. The views expressed within are not necessarily the views of the Department of Planning, Industry and Environment (DPIE) and may not represent DPIE policy.
All photos in master plan: Unicorn Falls and South Chowan Creek, Mount Jerusalem National Park. Dean Trezise.
Published by:
Environment, Energy and Science Department of Planning, Industry and Environment4 Parramatta Square,12 Darcy St Parramatta NSW 2124Locked Bag 5022, Parramatta NSW 2124Phone: +61 2 9995 5000 (switchboard)Phone: 1300 361 967 (Environment, Energy and Science enquiries)TTY users: phone 133 677, then ask for 1300 361 967Speak and listen users: phone 1300 555 727, then ask for 1300 361 967Email: [email protected] Website: www.environment.nsw.gov.au
Find out more about your environment at:www.environment.nsw.gov.au
ISBN 978 1 922431 90 5EES2020/0196 June 2020
Contents1 Executive Summary 52 Background 6
2.1 Tweed Byron Hinterland Trails 62.2 Project objectives 62.3 What is proposed? 72.4 Plan of management amendments 72.5 The Environment 82.6 Construction 82.7 Why is it needed? 8
3 Have your say 93.1 How to comment on the masterplan 93.2 Make your submission count 9
4 Master plan drawings 104.1 Unicorn Falls day use area - General arrangement plan overview L-102 114.2 Unicorn Falls day use area - General arrangement plan 01 of 02 L-103 124.3 Unicorn Falls day use area - General arrangement plan 02 of 02 L-104 134.4 Unicorn Falls day use area - Sections 1-3 L-109 144.5 Unicorn Falls day use area - Sections 4-6 L-110 154.6 Unicorn Falls day use area - Sections 7-11 L-111 164.7 Manns Road campground - General arrangement plan L-202 174.8 Manns Road campground - Section 01 L-205 184.9 Manns Road campground - Section 02-03 L-206 194.10 Manns Road campground - Section 04-05 L-207 204.11 Manns Road campground - Section 06-08 L-208 214.12 Manns Road campground - Section 09-10 L-209 22
4
Queensland
Bangalow Road
Ewingsdale Road
Kyogle
Road
Zara Road
Tyalgum Road
Caw
onglaR
o ad
Mistral Road
Twee
dS
tree
t
Dunoon Road
Hin
terla
nd
Way
Myocum
Road
BlueK
nobR
oad
Eviron Roa
d
Clothiers CreekRoad
Main
ArmRoad
Koo
norig
an
Road
Mount Warning Road
Stony Chute Road
Lim
pinw
ood
Roa
d
Goo
neng
erry
Road
Numinbah Road
Farra
nts Road
The Pocket Road
LeftBank
Road
Williams Road
Tweed
ValleyW
ay
Potts
ville
Roa
d
Fede
ral
Driv
eStokers
Road
Coo
lam
on
Scenic
Drive
Nim
bin
Roa
d
Gulga
nR
oad
Tuntable Falls Roa
d
Repentance CreekRoad
Tunt
able
Cre
ekR
oad
Frid
ayH
utR
oad
Ros
eban
kRoa
d
Uki
CAWONGLA
LILLIAN ROCK
BLUE KNOB
GEORGICA
JIGGI
LARNOOK COORABELL
GOONENGERRY
MULLUMBIMBYCREEK
TERANIA CREEK
THE POCKET
UPPERCOOPERSCREEK
UPPERMAIN ARM
WILSONS CREEK
CHILLINGHAM CONDONG
FERNVALE
KIELVALE
NUNDERI
DORROUGHBY FEDERAL
TUNTABLECREEK WHIAN WHIAN
CRABBES CREEK
BURRINGBAR
STOKERSSIDING
TYALGUM
CASUARINA
CABARITABEACHBOGANGAR
HASTINGSPOINT
POTTSVILLE
SOUTHGOLDENBEACHBILLINUDGEL
OCEAN SHORES
NEW BRIGHTON
EWINGSDALE
Mullumbimby
Murwillumbah
ByronBay
Nimbin
DunoonRosebank
The Channon
BrunswickHeads
Pac
if ic
Hig
hway
Pac
ific
Mot
orway
Rous River
Wilsons River
Oxle y Rive r
Rous River
Brunswick
Rive r
Tweed River
Unicorn Falls
Manns Rd
MountJerusa lem NP
Arakwal NP
Billinudgel NR
BorderRanges NP
CapeByronSCA
Cudgen NR
CudgeraCreek NR
Goonengerry NP
InnerPocket NR
Limpinwood NR
Mebbin NP
MooballNP
MountNullum NR
Nightcap NP
Tyagarah NR
WhianWhianSCA
Wollumbin NP
WollumbinSCA
Wooyung NR
Mount Jerusalem NP
Other NPWS reserve
Primary road
Distributor road
Sealed road
Unsealed road
Watercourse
0 2 4
km
from via distance duration
Byron Bay Main Arm Rd 40 km 53 min
LismoreMullumbimby and Pacific Motorway 86 km 1 hr 20
Tweed Heads Murwillumbah 56 km 1 hr
Mullumbimby Main Arm Rd 20 km 28 min
MurwillumbahRowlands Creek Rd and Kyogle Rd 24 km 30 min
UkiManns Rd and Rowlands Creek Rd 11 km 20 min
Travel to Unicorn Falls
Figure 1 Unicorn Falls is located approximately 15 km south-east of the village of Uki on South Chowan Road within Mount Jerusalem National Park
5
1. Executive summaryThis master plan outlines concepts for the proposed day use area development at Unicorn Falls and the nearby campground at Manns Road. Unicorn Falls is located approximately 15 kilometres south-east of the village of Uki on South Chowan Road within Mount Jerusalem National Park (see Figure 1 Location map).
The Unicorn Falls day use area is the trail head for the Tweed Byron Hinterland Trail (working title), a three-night/four-day hiking trail that finishes at Minyon Falls in Nightcap National Park. As well as acting as the trail head for the walk, the proposed day use area features visitor information, picnic tables, a toilet, steps to the base of the falls and parking for seven vehicles. A parking bay will also be provided for a small mini bus to allow commercial operators to drop off walkers for the multi-day walk.
The design of the proposed campground at Manns Road provides for seven campsites, three of which are drive-in and four where campers will need to carry their equipment up to twenty metres.
6
2.2 Project objectivesThe objectives of the Tweed Byron Hinterland Trails project are:
• To create an iconic long-distance walk experience that is competitive at a national and international scale and complements and leverages existing nature-based tourism products and experiences in northern NSW.
• Identify opportunities for partnerships and supporting tourism products that will benefit the regional economy.
• Promote, protect, and respect the environmental and cultural heritage of the region and inspire future conservation advocacy and stewardship.
• Provide meaningful engagement with and opportunities for Aboriginal people.
• Disperse the high volumes of people from Wollumbin and Byron Bay by providing a compelling alternative experience.
• Achieve long-term sustainability through best practice design, choice of materials and construction techniques.
2. BackgroundIn 2018, the NSW Government announced funding for a program of works to upgrade visitor facilities within NSW national parks aiming to increase nature-based tourism in NSW, boost regional visitor economies and improve community wellbeing.
These visitor infrastructure projects will significantly enhance visitor facilities and create new iconic experiences in NSW national parks including new walking trails, nature-based experiences and tourism partnerships. See Walking tracks and trails in national parks for more information.
The initiatives were proposed by the National Parks and Wildlife Service (NPWS) in response to the growing global popularity of nature-based walks. This funding provides an outstanding opportunity to strengthen the appeal of NSW as a walking destination and engage visitors with the values of NSW national parks by improving the quality and accessibility of walking tracks and trails.
National parks are for everyone and through these projects we aim to foster an appreciation and desire to protect the environment and our shared heritage; increase visitor numbers to support regional economic growth; create local employment opportunities and partnerships, and; inspire everyone to love their national parks.
2.1 Tweed Byron Hinterland TrailsTweed Byron Hinterland Trails aims to create high quality nature-based visitor experiences focusing on a signature walk from Unicorn Falls, near the village of Uki, to Minyon Falls in the far north New South Wales hinterland. The project will provide alternative visitor experiences to the Wollumbin Summit walk and see new sustainable visitor infrastructure at Minyon Falls and Unicorn Falls.
Characterised by lush rainforests, mountain views, countless waterfalls and hidden rockpools set within the remnant caldera of an ancient shield volcano, this region has the potential for a range of new recreational opportunities. Unicorn Falls is at the northern end of a network of tracks and trails offering short to medium walks supported by visitor hubs with facilities for day use and overnight stays.
The project is part of a cohesive approach to market and enhance the tourism and local economies in the region, particularly in Tweed Shire. It will enable the development of strong partnerships with community members, including Aboriginal communities, and industry and government stakeholders.
This is the second of four separate master plans for different precincts within the Tweed Byron Hinterland Trails project. The master plan will guide the development of a day use area at Unicorn Falls, and a small campground nearby, in Mount Jerusalem National Park.
The draft master plan illustrates the design concepts developed for the precinct. It presents a picture of planned visitor infrastructure improvements at the site including site plans and diagrams.
7
3.2.2 Day Use Area As part of the multi-day walking track concept, this plan enables development of a day use area at Unicorn Falls on Chowan Creek, South Chowan Road, in Mount Jerusalem National Park. The facility will incorporate car parking, a toilet, picnic tables, BBQs, visitor information and formalised access to the waterfall. Final design will include measures to prevent unauthorised vehicle access to the creek bank and revegetation.
3.2.3 Camping Area As part of the multi-day walking track network, this plan enables development of a camping area adjacent to Manns Road, near Unicorn Falls, in Mount Jerusalem National Park. The facility will incorporate car parking, campsites, toilets, picnic tables, BBQs, an information shelter and a walking track to the waterfall. New walking tracks will link the camping area to Unicorn Falls (approximately 1 kilometre away) and to the Whiskey Creek Trail (approximately 200 metres away), providing connections to the multi-day walking track network.
2.3 What is proposed?The Unicorn Falls master plan is the second of four separate master plans for different precincts within the Tweed Byron Hinterland Trails project.
There are two development areas covered by this master plan – a day use area and trailhead at Unicorn Falls, and a campground on Manns Road just over a 1km to the north-west (see Figure 2 Locality map).
Day use area• The day use area will feature picnic
tables, a toilet and parking for sevenvehicles.
• A parking bay will also be provided fora small mini bus to allow commercialoperators to drop off walkers for themulti-day walk.
• Steps to the pool at the base of thefalls will provide a safe access routeand prevent further erosion.
• Those starting the multi-day walk willbe discouraged from leaving vehiclesovernight due to the remoteness.
Campground• The campground on Manns Road
will provide three drive-in sites and afurther four sites where campers willneed to carry their equipment up to 20metres.
South
Chowan Road
Man
ns
Roa
d
Unicorn Fallsday use
Manns Rdcamping
Mount Jerusalem NP
Unsealed road
Hinterland track
Watercourse0 50 100
m
Figure 2 Locality map
2.4 Plan of management amendmentsAmendments to the Parks and Reserves of the Tweed Caldera Plan of Management (PoM) were adopted by the Minister in late 2019 to facilitate the Teed Byron Hinterland Trails project. The proposed amendments were on public exhibition in January-March 2019. See Tweed Byron Hinterland Trails amendments to plans of management.
The amended plan specifies that separate master plans are to be developed that will provide detailed information on the multi-day walk, Minyon Falls day use area in Nightcap National Park, Unicorn Falls day use area and camping area in Mount Jerusalem National Park, and visitor facilities in Wollumbin National Park, and that all masterplans will be publicly exhibited.
Sections 3.2.2 Day Use Area and 3.2.3 Camping of the PoM address the Unicorn Falls day use area and the Manns Road camping area specifically:
8
2.5 The environmentGreat care has been taken to ensure that the designs for both the day use area and campground have minimal impact on natural and cultural values. Both areas take advantage of previously disturbed areas – a former log dump in the case of the campground – and a denuded informal picnic area.
Reports prepared by environmental and cultural heritage consultants (the latter included input from Aboriginal advisors) have greatly assisted with the design process in identifying sensitive areas and mitigation measures, and informed the preparation of a Review of Environmental Factors.
The Review of Environmental Factors (REF) documents the environmental impact assessment of the proposed activities. It examines the significance of likely environmental impacts of the proposal and measures required to mitigate any adverse impacts to the environment. The REF helps to determine whether the activity can go ahead under the Environmental Planning and Assessment Act 1979.
The proposed day use area will be located in a level clearing in a stand of warm temperate/lowland subtropical rainforest adjacent to South Chowan Road. The rainforest extends along Chowan Creek. The associated carpark and toilets will be located on the disturbed edge of South Chowan Road.
The short walking track from the day use area to the waterfall commences in Coachwood dominated rainforest which transitions to wet sclerophyll forest with Coachwood, Tallowwood, Brush Box and Turpentine emergents.
The campground is proposed for a mainly level site, which is partly cleared within moist eucalypt forest dominated by Ironbark, Tallowwood, Grey Gum and White Mahogany with a rainforest midstorey. Some native vegetation will be removed to construct the campground under strict conditions to minimise impacts.
Threatened species assessments have been completed for eight fauna species, including the koala, and one ecological community. The assessments concluded that, if the recommended environmental safeguards, mitigation measures and a habitat compensation program are implemented, there is unlikely to be a significant impact on the threatened species and community.
The proposed precincts, and buffers to these areas, have also been searched for threatened plants. Only two critically endangered rainforest trees where found near the campground. These will be protected during construction, and monitored regularly. Forest Sheoaks (Allocasuarina torulosa) will also be protected as feed trees for the threatened Glossy Black-cockatoo.
2.6 ConstructionIt is proposed to commence construction on the day use area in the second half of 2020. Traffic management plans will be prepared for each site to respond to the different construction timeframes. For road safety, heavy vehicles will not use Manns Road during school bus operation times and work will not occur at Unicorn Falls on weekends due to potential for conflict with existing visitor use.
2.7 Why is it needed?The multi-day walk commences at Unicorn Falls and finishes 45 kilometres to the south at Minyon Falls in Nightcap National Park. The developments at the Unicorn Falls end will act as the northern visitor hub.
The purpose of the proposed day use area at Unicorn Falls is twofold:
• to act as the trailhead drop-off point for walkers
• to provide a small day-use area for visitors to enjoy the beauty of Unicorn Falls and the surrounding rainforest.
No facilities are currently provided at the site and parking is restricted to several informal bays on South Chowan Road. There are no formal paths and visitors often walk across the top of the falls to get to the pool below, which is a risk to their safety. The steep descent to the pool has led to erosion and also presents a safety hazard. There is evidence of trail bike riders riding through the creek above the falls and the proposed picnic area and this is degrading the environment.
Currently there are no camping facilities in Mount Jerusalem National Park and the proposed campground on Manns Road will provide a new recreation opportunity for the local community. The campground will also allow users of the trail to stay overnight before commencing their journey if preferred.
9
3. Have your sayThe Unicorn Falls master plan is on public exhibition from Friday 12 June to Monday 13 July 2020.
Public exhibition of this master plan provides an opportunity for members of the community to have a say in relation to this activity proposed by the NSW National Parks and Wildlife Service.
Hard copies are available for comment at the following NPWS offices:• Murwillumbah – 1/135 Murwillumbah St, Murwillumbah NSW 2484• Byron Bay – Tallow Beach Road, Byron Bay NSW 2481
3.1 How to comment on the master planYou are invited to comment on the master plan before 13 July 2020.
You can provide your written submission in any of the following ways:
• Post your written submission to: Unicorn Falls master plan submissionNPWS North Coast BranchPO Box 1236, Coffs Harbour NSW 2450
• Email your submission to: Unicorn Falls master plan submission at [email protected]
• Make a submission online at www.environment.nsw.gov.au/consult
3.2 Make your submission countWhile all submissions count, they are most effective when we understand your ideas and the outcomes you want for the precinct. Here are some suggestions to help you write your submission:• Write clearly and be specific about the issues of concern to you.• Tell us specifically what you agree/disagree with and why (and note page number).• Give reasoning in support of your points – this makes it easier for us to consider
your ideas and helps avoid misinterpretation.Your comments will be used to finalise the master plan before further assessments are undertaken. NPWS handles personal information included in your submission in accordance with a Privacy Plan which you can view on our privacy page.
Figure 3 Legend for plan drawings
GENERAL
Existing survey boxes and marks disturbed during construction shall be replaced to new positions as directed by Principal.
Do not use vibratory equipment, except for hand held machines, over the subsurface services. It is the Contractor's responsibility to ensure there is no damage to the services during the works. Replace all materials/ surface damaged to private/ public property. Ensure dated photographs are taken to kerbs and gutters to clearly indicate the existing conditions or any other structures before commencement of construction - supply one set of photographs to The Principal and retain one set on site.
The Contractor is to provide temporary silt barriers such as gravel bags/roll, around all stormwater inlet pits to minimise silt and contaminants entering the stormwater lines. During construction the silt traps are to be regularly maintained and any accumulated silt and debris is to be removed from such devices to maintain at least 60% of their capacities.
All existing service access pits, inspection pits and valve covers conflicting with finished surface levels are to be raised or lowered. The Contractor is to ensure that these adjustments are undertaken in accordance with engineer's details. Confirm treatment of unknown owner covers with Principal prior to undertaking adjustment.
Refer Principal for approval of setout before continuing with works.
SET OUT
1. Do not scale off drawings. 2. Setout alignment and levels of all structures for approval by Principal prior to commencement of works. If any discrepancy is found or doubt exists between setout and levels as indicated on dwgs and site conditions this shall be referred to the Principal with adequate notice for provision of advice prior to the continuation of works. 3. Benchmarks will be clearly marked on site by the Contractor. Benchmark shall be maintained by the Contractor during the course of the project4. All setting out shall be established by the Contractor, who will be responsible for the accuracy of lines and levels of finished work. If any discrepancy is found or doubt exists between setout and levels as indicated on dwgs and site conditions this shall be referred to the Principal with adequate notice for provision of advice prior to the continuation of works. 5. Setout locations of furniture items are to be verified on site by Principal prior to the excavation of footings and installation
LEVELS
• Setout all levels for construction and approve on site with marker stakes to which levels are notated and clearly marked.• Adjust all levels as instructed prior to final construction works.• All falls are to be established as uniform grades between spot heights and contours.• Paving to all landings to be profiled to provide 1:80 fall for stormwater over land flow.
SURVEY
Survey provided by RCS Group
DEMOLITION
• All benchmarks and control set out points should be verified by the Contractor in the field prior to the commencement of works.• Extent of excavations shown on drawings is indicative only - refer to levels for detailed information.• Existing items noted for stockpile and removed without breakage shall be stockpiled and transported to the depot by the Contractor. Damaged items shall be removed from site and disposed of by the Contractor.• Existing trees to be removed shall be marked on site following
approval of setout by Principal. No trees other than those marked and approved shall be removed or damaged. • Trees not indicated on the survey or demolition plans shall be retained - seek advise and approval from Principal prior to removal of any tree not shown on plans.• Provide protective fencing to all trees to be retained adjoining the works area of the canopy line of these trees. To trees as marked provide timber batten buffer to 1.8m height from base of tree - wire fix on outside for duration of works.
EROSION AND SEDIMENT CONTROL
1. All work shall be generally carried out in accordance with (a) Local government authority and local government authority requirements (b) EPA - Pollution control manual for urban stormwater,2. The Contractor shall provide an Erosion and Sediment Control Plan for the works prior to commencement on-site for approval by the Principal.3. Maintain all erosion and sediment control devices to the satisfaction of the Principal.4. When stormwater pits are constructed prevent site runoff entering the pits unless silt fences are erected around pits.5. Minimise the area of site being disturbed at any one time.6. Protect all stockpiles of materials from scour and erosion. Do not stockpile loose material in roadways, near drainage pits or in watercourses.7. All soil and water control measures are to be put back in place at the end of each working day, and modified to best suit site conditions. 8. Control water from upstream of the site such that it does not enter the disturbed site. 9. All construction vehicles shall enter and exit the site via the designated construction entry / exit.10. All vehicles entering the site shall be cleaned and inspected before leaving.11. Maintain all stormwater pipes and pits clear of debris and sediment. Inspect stormwater system and clean out after each storm event. 12. Clean out all erosion and sediment control devices after each storm event.
SEQUENCE OF WORKS
1. Prior to commencement of excavation the following soil management devices must be installed.1.1 Construct silt fences below the site and across all potential runoff sites.1.2 Construct temporary construction entry / exit and divert runoff to suitable control systems. 1.3 Construct measures to divert upstream flows into existing stormwater system.1.4 Construct sedimentation traps / basins including outlet control and overflow.1.5 Construct turf lined swales.1.6 Provide sandbag sediment traps upstream of existing pits.2. Construct geotextile filter pit surround around all proposed pits as they are constructed.3. On completion of pavement provide sand bag kerb inlet sediment traps around pits.
NOTES LEGEND
Demolition & earthworks
Remove and stockpile off site
Cut and fill balanced
Cut and spread topsoil locally
Existing Tree to be removed
Fill and spread from on-site soil
Existing major contours (1m interval)
Existing minor contours (0.2m interval)
Proposed major contours (1m interval)
Levels and grading
Existing level in metres+EX 158.00
Proposed Gradients1:20
Proposed level in metres+RL 158.00
Proposed minor contours (0.2m interval)
Existing trees to be removed
Legend
Proposed Gravel Pavement (Pedestrian)
Proposed Stone Steps
Existing Trees to be retained
Native Planting Bed
(Bush Regeneration Works)
Existing Bushland Tree line
Proposed Hardwood Table Seat
Proposed Skillion Information Shelter
Proposed Double Stall Skillion Toilet
Proposed Totem Sign Post
Proposed Bollards
Proposed Galvanised Steel Type C Barrier
Existing major contours
Existing minor contours
S12/L-302
S2
P1
ST11/L-302
I11/L-301
B1
I2
F1
1/L-303
B21/L-304
Proposed Stone Wall2/L-303 W1
2/L-301
3/L-300
1/L-300 F2
Proposed Slip Rail Vehicle BarrierB31/L-305
Proposed Rock Vehicle Barrier
Proposed Log Vehicle Barrier
ST2
ST3
Existing Ground
Proposed Gravel Pavement (Vehicular)P22/L-300
Proposed Double Stall Skillion
Composting toiletF3
2/L-301Proposed Barrier Free Accessible
Picnic TableF4
Proposed Coir Logs
Proposed Water Bar
B4
B5
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Notes and Legend
NA
A1
SA
04-20
146
L-001 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
Camping platform
(3.6x5.4) x4F51/L306
LANDSCAPE CONSTRUCTION DRAWINGS
DWG NO. DRAWING TITLE SCALE ISSUE
L-000 Cover Sheet NA F
L-001 Notes and Legend NA F
L-100 Day Use- Survey 1:250 F
L-101 Demolition Plan 1:250 F
L-102 Day Use- GA Plan Overview 1:250 F
L-103 GA Plan 01 OF 02 1:100 F
L-104 GA Plan 02 OF 02 1:100 F
L-105 Set Out Plan 01 OF 02 1:100 F
L-106 Set Out Plan 02 OF 02 1:100 F
L-107 Levels and Grading Plan 01 OF 02 1:100 F
L-108 Levels and Grading Plan 02 OF 02 1:100 F
L-109 Sections 1-3 1:100 F
L-110 Sections 4-6 1:100 F
L-111 Sections 7-9 1:100 F
L-200 Campground- Survey 1:200 F
L-201 Campground - Demolition Plan 1:200 F
L-202 Campground- GA Plan 1:200 F
L-203 Campground - Set Out Plan 1:200 F
L-204 Campground - Levels and Grading Plan 1:200 F
L-205 Section 01 1:50 F
L-206 Sections 02-03 1:50 F
L-207 Sections 04-05 1:50 F
L-208 Sections 06-08 1:50 F
L-209 Sections 09-10 1:50 F
L-300 Details Sheet 01 AS SHOWN F
L-301 Details Sheet 02 AS SHOWN F
L-302 Details Sheet 03 AS SHOWN F
L-303 Details Sheet 04 AS SHOWN F
L-304 Details Sheet 05 AS SHOWN F
L-305 Details Sheet 06 AS SHOWN F
L-306 Details Sheet 07 AS SHOWN F
L-307 Details Sheet 08 AS SHOWN F
L-308 Details Sheet 09 AS SHOWN F
LANDSCAPE DRAWINGS SHEET REGISTER
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Cover Sheet
NA
A1
SA
04-20
146
L-000 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LOCATION MAP
Unicorn Falls Day Use Area
Campground
ISSUE D: FOR TENDER 9.04.2020
UNICORN FALLS
4. Master plan drawings
10
Plan 4.1 Unicorn Falls day use area - General arrangement plan overview L-102
11
F4
Legend
Proposed Gravel Pavement (Pedestrian)
Proposed Stone Steps
Existing Trees to be retained
Native Planting Bed
(Bush Regeneration Works)
Existing Bushland Tree line
Proposed Hardwood Table Seat
Proposed Skillion Information Shelter
Proposed Double Stall Skillion Toilet
Proposed Totem Sign Post
Proposed Bollards
Proposed Galvanised Steel Type C Barrier
Existing major contours
Existing minor contours
S12/L-302
S2
P1
ST11/L-302
I11/L-301
B1
I2
F1
1/L-303
B21/L-304
Proposed Stone Wall2/L-303 W1
2/L-301
2/L-302
1/L-302
1/L-301
2/L-303
3/L-300
1/L-300 F2
Proposed Slip Rail Vehicle BarrierB31/L-305
3/L-300
Existing Ground
Proposed Gravel Pavement (Vehicular)P22/L-3002/L-300
1/L-305
2/L-301Proposed Barrier Free Accessible
Picnic Table
Proposed Rock BarrierST2
F4
Proposed Coir Logs
Proposed Water Bar
B4
B5
W1
1
2
3
4
5
6
7
8
9
11S2
S2
S2
S2
S2
P2
ST1
ST1
ST1
I1
I2
I2
F1
F1
W1
W1B2
B1
S2
10
B3
P2
S1
S1
S1
F2
B1
B1
B1
B1
B1
S1
S1
S1
P1
F4
ST2
ST2
P1
B4
B4
B4
B4
B4
B4
B4
B5
B4
155.0
156.0
157.0
158.0
159.0
160.0
161.0
162.0
163.0
164.0
165.0
166.0
167.0
168.0
169.0
South Chowan Road
Bridge
Bridge
Existing Clearing
Tweed Byron Hinterland
Trail
Upper pool Base pool
0 5 10 15 20 m
To Manns Road
SHEET 1
SHEET 2
155.97
156.09
156.43
154.69
155.76
155.54
156.98
157.86
157.34
157.99
158.06
158.87
158.41
158.41
158.92
158.99
158.98
158.82
158.08
158.04
158.00
159.21
159.0815
9.02
157.52
157.69
157.85
157.88
157.51
157.83
157.46
157.48 157.09
156.86
157.1815
7.1415
7.41
156.87
156.56
156.5715
6.43
156.99
157.44
157.77
157.85
157.75
157.32
157.13
157.43
157.23
157.01
157.66
156.73
157.81
157.80
157.42
157.31
157.14
155.49
156.55
156.73
156.20
156.69
156.34
154.71
153.61
154.39
151.76
155.12
149.03
158.37
158.69
153.08
153.50
153.03
151.89
154.65
152.52
158.46
158.91
154.64
154.11
155.13
157.52
160.00
154.61
152.51
155.22
153.06
159.51
158.01
160.37
156.54
152.01
152.72
153.19
158.23
151.85
148.62
152.74
151.76
147.25
153.12
151.81
155.21
150.35
158.91
153.39
155.28
151.87
152.53
154.17
148.77
153.47
158.44
158.98
153.39
154.80
156.51
151.88
154.21
153.96
152.61
159.16
160.06
164.24
154.66
152.34
153.25
155.60
157.95
158.11
160.56
155.35
154.49
154.49
152.64
152.59
153.49
158.78
148.91
152.99
151.85
152.10
152.64
148.00
158.29
153.08
152.39
153.68
154.82
151.13
159.23
154.79
153.99
154.99
154.93
157.79
158.66
154.93
151.89
152.38
154.63
160.56
163.75
154.73
156.79
151.98
151.66
156.70
156.10
157.98
160.35
157.56
148.61
151.84
152.69
155.03
1
2
3
4
5
6
7
8
9
11S2
S2
S2
S2
S2
P2
ST1
ST1
ST1
I1
I2
I2
F1
F1
W1
W1B2
B1
S2
10
B3
P2
S1
S1
S1
F2
B1
B1
B1
B1
B1
S1
S1
S1
P1
F4
ST2
ST2
P1
B4
B4
B4
B4
B4
B4
B4
B5
B4
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Day Use- GA Plan Overview
1:250
A1
SA
04-20
146
L-102 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LANDSCAPE CONSTRUCTION DRAWINGS
DWG NO. DRAWING TITLE SCALE ISSUE
L-000 Cover Sheet NA F
L-001 Notes and Legend NA F
L-100 Day Use- Survey 1:250 F
L-101 Demolition Plan 1:250 F
L-102 Day Use- GA Plan Overview 1:250 F
L-103 GA Plan 01 OF 02 1:100 F
L-104 GA Plan 02 OF 02 1:100 F
L-105 Set Out Plan 01 OF 02 1:100 F
L-106 Set Out Plan 02 OF 02 1:100 F
L-107 Levels and Grading Plan 01 OF 02 1:100 F
L-108 Levels and Grading Plan 02 OF 02 1:100 F
L-109 Sections 1-3 1:100 F
L-110 Sections 4-6 1:100 F
L-111 Sections 7-9 1:100 F
L-200 Campground- Survey 1:200 F
L-201 Campground - Demolition Plan 1:200 F
L-202 Campground- GA Plan 1:200 F
L-203 Campground - Set Out Plan 1:200 F
L-204 Campground - Levels and Grading Plan 1:200 F
L-205 Section 01 1:50 F
L-206 Sections 02-03 1:50 F
L-207 Sections 04-05 1:50 F
L-208 Sections 06-08 1:50 F
L-209 Sections 09-10 1:50 F
L-300 Details Sheet 01 AS SHOWN F
L-301 Details Sheet 02 AS SHOWN F
L-302 Details Sheet 03 AS SHOWN F
L-303 Details Sheet 04 AS SHOWN F
L-304 Details Sheet 05 AS SHOWN F
L-305 Details Sheet 06 AS SHOWN F
L-306 Details Sheet 07 AS SHOWN F
L-307 Details Sheet 08 AS SHOWN F
L-308 Details Sheet 09 AS SHOWN F
LANDSCAPE DRAWINGS SHEET REGISTER
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Cover Sheet
NA
A1
SA
04-20
146
L-000 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LOCATION MAP
Unicorn Falls Day Use Area
Campground
ISSUE D: FOR TENDER 9.04.2020
UNICORN FALLS
Plan 4.2 Unicorn Falls day use area - General arrangement plan 01 of 02 L-103
12
W1
1
2
3
4
5
P2
I1
B1
S2
B3
P2
F2
B1
B1
B1
B1
B1
S1
B4
B4
B4
B4South Chowan Road
Bridge
To Manns
Road
Twee
d Byr
on H
inte
rland
Tra
il
0 5 15 25 m
F4
Legend
Proposed Gravel Pavement (Pedestrian)
Proposed Stone Steps
Existing Trees to be retained
Native Planting Bed
(Bush Regeneration Works)
Existing Bushland Tree line
Proposed Hardwood Table Seat
Proposed Skillion Information Shelter
Proposed Double Stall Skillion Toilet
Proposed Totem Sign Post
Proposed Bollards
Proposed Galvanised Steel Type C Barrier
Existing major contours
Existing minor contours
S12/L-302
S2
P1
ST11/L-302
I11/L-301
B1
I2
F1
1/L-303
B21/L-304
Proposed Stone Wall2/L-303 W1
2/L-301
2/L-302
1/L-302
1/L-301
2/L-303
3/L-300
1/L-300 F2
Proposed Slip Rail Vehicle BarrierB31/L-305
3/L-300
Existing Ground
Proposed Gravel Pavement (Vehicular)P22/L-3002/L-300
1/L-305
2/L-301Proposed Barrier Free Accessible
Picnic Table
Proposed Rock BarrierST2
F4
Proposed Coir Logs
Proposed Water Bar
B4
B5
155.97
156.09
156.43
154.69
155.76
155.54
156.98
157.86
157.34
157.99
158.06
158.87
158.41
158.41
158.92
158.99
158.98
158.82
158.08
158.04
158.00
159.21
159.0815
9.02
157.52
157.69
157.85
157.88
157.51
157.83
157.46
157.48 157.09
156.86
157.1815
7.1415
7.41
156.87
156.56
156.5715
6.43
156.99
157.44
157.77
157.85
157.75
157.32
157.13
157.43
157.23
157.01
157.66
156.73
157.81
157.80
157.42
157.31
157.14
155.49
156.55
156.73
156.20
156.69
156.34
154.71
153.61
154.39
151.76
155.12
149.03
158.37
158.69
153.08
153.50
153.03
151.89
154.65
152.52
158.46
158.91
154.64
154.11
155.13
157.52
160.00
154.61
152.51
155.22
153.06
159.51
158.01
160.37
156.54
152.01
152.72
153.19
158.23
151.85
148.62
152.74
151.76
147.25
153.12
151.81
155.21
150.35
158.91
153.39
155.28
151.87
152.53
154.17
148.77
153.47
158.44
158.98
153.39
154.80
156.51
151.88
154.21
153.96
152.61
159.16
160.06
164.24
154.66
152.34
153.25
155.60
157.95
158.11
160.56
155.35
154.49
154.49
152.64
152.59
153.49
158.78
148.91
152.99
151.85
152.10
152.64
148.00
158.29
153.08
152.39
153.68
154.82
151.13
159.23
154.79
153.99
154.99
154.93
157.79
158.66
154.93
151.89
152.38
154.63
160.56
163.75
154.73
156.79
151.98
151.66
156.70
156.10
157.98
160.35
157.56
148.61
151.84
152.69
155.03
1
2
3
4
5
6
7
8
9
11S2
S2
S2
S2
S2
P2
ST1
ST1
ST1
I1
I2
I2
F1
F1
W1
W1B2
B1
S2
10
B3
P2
S1
S1
S1
F2
B1
B1
B1
B1
B1
S1
S1
S1
P1
F4
ST2
ST2
P1
B4
B4
B4
B4
B4
B4
B4
B5
B4
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
GA Plan 01 OF 02
1:100
A1
SA
04-20
146
L-103 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LANDSCAPE CONSTRUCTION DRAWINGS
DWG NO. DRAWING TITLE SCALE ISSUE
L-000 Cover Sheet NA F
L-001 Notes and Legend NA F
L-100 Day Use- Survey 1:250 F
L-101 Demolition Plan 1:250 F
L-102 Day Use- GA Plan Overview 1:250 F
L-103 GA Plan 01 OF 02 1:100 F
L-104 GA Plan 02 OF 02 1:100 F
L-105 Set Out Plan 01 OF 02 1:100 F
L-106 Set Out Plan 02 OF 02 1:100 F
L-107 Levels and Grading Plan 01 OF 02 1:100 F
L-108 Levels and Grading Plan 02 OF 02 1:100 F
L-109 Sections 1-3 1:100 F
L-110 Sections 4-6 1:100 F
L-111 Sections 7-9 1:100 F
L-200 Campground- Survey 1:200 F
L-201 Campground - Demolition Plan 1:200 F
L-202 Campground- GA Plan 1:200 F
L-203 Campground - Set Out Plan 1:200 F
L-204 Campground - Levels and Grading Plan 1:200 F
L-205 Section 01 1:50 F
L-206 Sections 02-03 1:50 F
L-207 Sections 04-05 1:50 F
L-208 Sections 06-08 1:50 F
L-209 Sections 09-10 1:50 F
L-300 Details Sheet 01 AS SHOWN F
L-301 Details Sheet 02 AS SHOWN F
L-302 Details Sheet 03 AS SHOWN F
L-303 Details Sheet 04 AS SHOWN F
L-304 Details Sheet 05 AS SHOWN F
L-305 Details Sheet 06 AS SHOWN F
L-306 Details Sheet 07 AS SHOWN F
L-307 Details Sheet 08 AS SHOWN F
L-308 Details Sheet 09 AS SHOWN F
LANDSCAPE DRAWINGS SHEET REGISTER
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Cover Sheet
NA
A1
SA
04-20
146
L-000 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LOCATION MAP
Unicorn Falls Day Use Area
Campground
ISSUE D: FOR TENDER 9.04.2020
UNICORN FALLS
Plan 4.3 Unicorn Falls day use area - General arrangement plan 02 of 02 L-104
13
F4
Legend
Proposed Gravel Pavement (Pedestrian)
Proposed Stone Steps
Existing Trees to be retained
Native Planting Bed
(Bush Regeneration Works)
Existing Bushland Tree line
Proposed Hardwood Table Seat
Proposed Skillion Information Shelter
Proposed Double Stall Skillion Toilet
Proposed Totem Sign Post
Proposed Bollards
Proposed Galvanised Steel Type C Barrier
Existing major contours
Existing minor contours
S12/L-302
S2
P1
ST11/L-302
I11/L-301
B1
I2
F1
1/L-303
B21/L-304
Proposed Stone Wall2/L-303 W1
2/L-301
2/L-302
1/L-302
1/L-301
2/L-303
3/L-300
1/L-300 F2
Proposed Slip Rail Vehicle BarrierB31/L-305
3/L-300
Existing Ground
Proposed Gravel Pavement (Vehicular)P22/L-3002/L-300
1/L-305
2/L-301Proposed Barrier Free Accessible
Picnic Table
Proposed Rock BarrierST2
F4
Proposed Coir Logs
Proposed Water Bar
B4
B5
x
6
7
8
9
11S2
S2
S2
S2
S2
ST1
ST1
ST1
I2
I2
F1
F1
W1
W1B2
10
S1
S1
S1
S1
P1
F4
ST2
ST2
P1
B4
B4
B4
B5
B4
0 5 15 25 m
155.97
156.09
156.43
154.69
155.76
155.54
156.98
157.86
157.34
157.99
158.06
158.87
158.41
158.41
158.92
158.99
158.98
158.82
158.08
158.04
158.00
159.21
159.0815
9.02
157.52
157.69
157.85
157.88
157.51
157.83
157.46
157.48 157.09
156.86
157.1815
7.1415
7.41
156.87
156.56
156.5715
6.43
156.99
157.44
157.77
157.85
157.75
157.32
157.13
157.43
157.23
157.01
157.66
156.73
157.81
157.80
157.42
157.31
157.14
155.49
156.55
156.73
156.20
156.69
156.34
154.71
153.61
154.39
151.76
155.12
149.03
158.37
158.69
153.08
153.50
153.03
151.89
154.65
152.52
158.46
158.91
154.64
154.11
155.13
157.52
160.00
154.61
152.51
155.22
153.06
159.51
158.01
160.37
156.54
152.01
152.72
153.19
158.23
151.85
148.62
152.74
151.76
147.25
153.12
151.81
155.21
150.35
158.91
153.39
155.28
151.87
152.53
154.17
148.77
153.47
158.44
158.98
153.39
154.80
156.51
151.88
154.21
153.96
152.61
159.16
160.06
164.24
154.66
152.34
153.25
155.60
157.95
158.11
160.56
155.35
154.49
154.49
152.64
152.59
153.49
158.78
148.91
152.99
151.85
152.10
152.64
148.00
158.29
153.08
152.39
153.68
154.82
151.13
159.23
154.79
153.99
154.99
154.93
157.79
158.66
154.93
151.89
152.38
154.63
160.56
163.75
154.73
156.79
151.98
151.66
156.70
156.10
157.98
160.35
157.56
148.61
151.84
152.69
155.03
1
2
3
4
5
6
7
8
9
11S2
S2
S2
S2
S2
P2
ST1
ST1
ST1
I1
I2
I2
F1
F1
W1
W1B2
B1
S2
10
B3
P2
S1
S1
S1
F2
B1
B1
B1
B1
B1
S1
S1
S1
P1
F4
ST2
ST2
P1
B4
B4
B4
B4
B4
B4
B4
B5
B4
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
GA Plan 02 OF 02
1:100
A1
SA
04-20
146
L-104 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LANDSCAPE CONSTRUCTION DRAWINGS
DWG NO. DRAWING TITLE SCALE ISSUE
L-000 Cover Sheet NA F
L-001 Notes and Legend NA F
L-100 Day Use- Survey 1:250 F
L-101 Demolition Plan 1:250 F
L-102 Day Use- GA Plan Overview 1:250 F
L-103 GA Plan 01 OF 02 1:100 F
L-104 GA Plan 02 OF 02 1:100 F
L-105 Set Out Plan 01 OF 02 1:100 F
L-106 Set Out Plan 02 OF 02 1:100 F
L-107 Levels and Grading Plan 01 OF 02 1:100 F
L-108 Levels and Grading Plan 02 OF 02 1:100 F
L-109 Sections 1-3 1:100 F
L-110 Sections 4-6 1:100 F
L-111 Sections 7-9 1:100 F
L-200 Campground- Survey 1:200 F
L-201 Campground - Demolition Plan 1:200 F
L-202 Campground- GA Plan 1:200 F
L-203 Campground - Set Out Plan 1:200 F
L-204 Campground - Levels and Grading Plan 1:200 F
L-205 Section 01 1:50 F
L-206 Sections 02-03 1:50 F
L-207 Sections 04-05 1:50 F
L-208 Sections 06-08 1:50 F
L-209 Sections 09-10 1:50 F
L-300 Details Sheet 01 AS SHOWN F
L-301 Details Sheet 02 AS SHOWN F
L-302 Details Sheet 03 AS SHOWN F
L-303 Details Sheet 04 AS SHOWN F
L-304 Details Sheet 05 AS SHOWN F
L-305 Details Sheet 06 AS SHOWN F
L-306 Details Sheet 07 AS SHOWN F
L-307 Details Sheet 08 AS SHOWN F
L-308 Details Sheet 09 AS SHOWN F
LANDSCAPE DRAWINGS SHEET REGISTER
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Cover Sheet
NA
A1
SA
04-20
146
L-000 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LOCATION MAP
Unicorn Falls Day Use Area
Campground
ISSUE D: FOR TENDER 9.04.2020
UNICORN FALLS
14
Plan 4.4 Unicorn Falls day use area - Sections 1-3 L-109
SECTION 1
SKILLION
INFORMATION
SHELTER CAR PARKING (x6)
SECTION 3
SOUTH CHOWAN ROAD CAR PARKING
SECTION 2
SOUTH CHOWAN ROAD
RL 158.8
RL 158.56 EX 158.65
EX 158.14
RL 158.03 EX 158.107EX 157.6
MINI BUS PARKING BAY
1:20
PEDESTRIAN
PATH
PATH
1.2m
PATH
1.2m
EXISTING VEGETATION WITH
REGENERATIVE PLANTING
WHERE REQUIRED
TOW 159.00
TOW 158.4
RETAINED SECTION OF
MOUND FOR
EXISTING TREE
RL 157.14RL 157.41
RL 158
1:3
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Sections 1-3
1:100
A1
SA
04-20
146
L-109 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LANDSCAPE CONSTRUCTION DRAWINGS
DWG NO. DRAWING TITLE SCALE ISSUE
L-000 Cover Sheet NA F
L-001 Notes and Legend NA F
L-100 Day Use- Survey 1:250 F
L-101 Demolition Plan 1:250 F
L-102 Day Use- GA Plan Overview 1:250 F
L-103 GA Plan 01 OF 02 1:100 F
L-104 GA Plan 02 OF 02 1:100 F
L-105 Set Out Plan 01 OF 02 1:100 F
L-106 Set Out Plan 02 OF 02 1:100 F
L-107 Levels and Grading Plan 01 OF 02 1:100 F
L-108 Levels and Grading Plan 02 OF 02 1:100 F
L-109 Sections 1-3 1:100 F
L-110 Sections 4-6 1:100 F
L-111 Sections 7-9 1:100 F
L-200 Campground- Survey 1:200 F
L-201 Campground - Demolition Plan 1:200 F
L-202 Campground- GA Plan 1:200 F
L-203 Campground - Set Out Plan 1:200 F
L-204 Campground - Levels and Grading Plan 1:200 F
L-205 Section 01 1:50 F
L-206 Sections 02-03 1:50 F
L-207 Sections 04-05 1:50 F
L-208 Sections 06-08 1:50 F
L-209 Sections 09-10 1:50 F
L-300 Details Sheet 01 AS SHOWN F
L-301 Details Sheet 02 AS SHOWN F
L-302 Details Sheet 03 AS SHOWN F
L-303 Details Sheet 04 AS SHOWN F
L-304 Details Sheet 05 AS SHOWN F
L-305 Details Sheet 06 AS SHOWN F
L-306 Details Sheet 07 AS SHOWN F
L-307 Details Sheet 08 AS SHOWN F
L-308 Details Sheet 09 AS SHOWN F
LANDSCAPE DRAWINGS SHEET REGISTER
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Cover Sheet
NA
A1
SA
04-20
146
L-000 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LOCATION MAP
Unicorn Falls Day Use Area
Campground
ISSUE D: FOR TENDER 9.04.2020
UNICORN FALLS
15
Plan 4.5 Unicorn Falls day use area - Sections 4-6 L-110
STEPPED ACCESS TO CREEK CROSSING
SECTION 6
DOUBLE STALL
SKILLION TOILET
SECTION 4
SOUTH CHOWAN ROAD CAR PARKING
EX 158.4 RL 158.50RL 159.00
PEDESTRIAN
PATH
EX 158.39
SECTION 5
SOUTH CHOWAN ROAD MINI BUS PARKING BAYPATH
1.2m
RL 158.80 RL 159.00
RL 158.40
SWALE
3000
B
A
30001265
123
FOOTING SET OUT PLAN (sloped ground)scale 1:50
AFSRS-B
AFSRS-D
BFSRS-B
30001265
123
FOOTING SET OUT SECTION (sloped ground)scale 1:50
BFSRS-B
AFSRS-C
BFSRS-C
BFSRS-D
Note: original drawings to scale at A3 size
© NSW Office of Environment and Heritage – not to be reproduced without permissionDrawing No:
Dimensions in mm unless otherwise noted
PFM Iss: 26.08.15
Current engineering certification will be void if design modified – engineer certification required for any changesMaximum altitude: 1000m above AHDMaximum wind loading: class N4 to AS 4055-2012Drawings to be read in conjunction with Specification
Rev: 26.08.15
FTPFooting Timber PostFSPFooting Steel Post
FSTFootings Summary Table
FSRGFooting Steel Raised Gable
FTRGFooting Timber Raised GableFSRSFooting Steel Raised Skillion
FTRSFooting Timber Raised Skillion
Park Facilities Manual
Shelter Ancillaries / 6.5.4 / Footings / Steel Skillion / Raised Platform
FSRS-1
FSRS-2
Components List
Note:
Floor Base slab
Floor Support Beam125 x 125 x 8 EA Steel
Refer to Drawing 6.5.3 FSP for footing options
120mm Bondek Slab 0.75mm BMT Propped mid-spanTwo layers of SL 82 Top Face 30mm Cover
FSRS-5
FSRS-6Mesh Screen
Mesh Screen Framing65 x 65 x 5 SHS Steel
refer to Materials, Finishes and Fixtures schedule
FSRS-4BoltsM12 High Strength Steel to specification
Glossary
FSRS-7Angled Column to Floor Support Beam125 x 75 x 8mm UA steel
FSRS-8Angled Column Connector BracketFabricated 10mm Steel bracket
FSRS-3Concrete Pad footingRefer to footing detail drawings as above.
FSRS-9Platform to Ramp Connector PlateFabricated 100 x 125 x 10mm Steel plate
FSRS-10RampRefer to drawings 5.9.5 BES for construction
Note: Refer to AS 1428.1, Design for Access and Mobility,for ramp and handrail design requirements.
FSRS - B
3000
B
A
30001265
123
FOOTING SET OUT PLAN (sloped ground)scale 1:50
AFSRS-B
AFSRS-D
BFSRS-B
30001265
123
FOOTING SET OUT SECTION (sloped ground)scale 1:50
BFSRS-B
AFSRS-C
BFSRS-C
BFSRS-D
Note: original drawings to scale at A3 size
© NSW Office of Environment and Heritage – not to be reproduced without permissionDrawing No:
Dimensions in mm unless otherwise noted
PFM Iss: 26.08.15
Current engineering certification will be void if design modified – engineer certification required for any changesMaximum altitude: 1000m above AHDMaximum wind loading: class N4 to AS 4055-2012Drawings to be read in conjunction with Specification
Rev: 26.08.15
FTPFooting Timber PostFSPFooting Steel Post
FSTFootings Summary Table
FSRGFooting Steel Raised Gable
FTRGFooting Timber Raised GableFSRSFooting Steel Raised Skillion
FTRSFooting Timber Raised Skillion
Park Facilities Manual
Shelter Ancillaries / 6.5.4 / Footings / Steel Skillion / Raised Platform
FSRS-1
FSRS-2
Components List
Note:
Floor Base slab
Floor Support Beam125 x 125 x 8 EA Steel
Refer to Drawing 6.5.3 FSP for footing options
120mm Bondek Slab 0.75mm BMT Propped mid-spanTwo layers of SL 82 Top Face 30mm Cover
FSRS-5
FSRS-6Mesh Screen
Mesh Screen Framing65 x 65 x 5 SHS Steel
refer to Materials, Finishes and Fixtures schedule
FSRS-4BoltsM12 High Strength Steel to specification
Glossary
FSRS-7Angled Column to Floor Support Beam125 x 75 x 8mm UA steel
FSRS-8Angled Column Connector BracketFabricated 10mm Steel bracket
FSRS-3Concrete Pad footingRefer to footing detail drawings as above.
FSRS-9Platform to Ramp Connector PlateFabricated 100 x 125 x 10mm Steel plate
FSRS-10RampRefer to drawings 5.9.5 BES for construction
Note: Refer to AS 1428.1, Design for Access and Mobility,for ramp and handrail design requirements.
FSRS - B
RL 156.3
EX 151.74
RL 154.30
RL 155.10
RL 155.9
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Sections 4-6
1:100
A1
SA
04-20
146
L-110 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LANDSCAPE CONSTRUCTION DRAWINGS
DWG NO. DRAWING TITLE SCALE ISSUE
L-000 Cover Sheet NA F
L-001 Notes and Legend NA F
L-100 Day Use- Survey 1:250 F
L-101 Demolition Plan 1:250 F
L-102 Day Use- GA Plan Overview 1:250 F
L-103 GA Plan 01 OF 02 1:100 F
L-104 GA Plan 02 OF 02 1:100 F
L-105 Set Out Plan 01 OF 02 1:100 F
L-106 Set Out Plan 02 OF 02 1:100 F
L-107 Levels and Grading Plan 01 OF 02 1:100 F
L-108 Levels and Grading Plan 02 OF 02 1:100 F
L-109 Sections 1-3 1:100 F
L-110 Sections 4-6 1:100 F
L-111 Sections 7-9 1:100 F
L-200 Campground- Survey 1:200 F
L-201 Campground - Demolition Plan 1:200 F
L-202 Campground- GA Plan 1:200 F
L-203 Campground - Set Out Plan 1:200 F
L-204 Campground - Levels and Grading Plan 1:200 F
L-205 Section 01 1:50 F
L-206 Sections 02-03 1:50 F
L-207 Sections 04-05 1:50 F
L-208 Sections 06-08 1:50 F
L-209 Sections 09-10 1:50 F
L-300 Details Sheet 01 AS SHOWN F
L-301 Details Sheet 02 AS SHOWN F
L-302 Details Sheet 03 AS SHOWN F
L-303 Details Sheet 04 AS SHOWN F
L-304 Details Sheet 05 AS SHOWN F
L-305 Details Sheet 06 AS SHOWN F
L-306 Details Sheet 07 AS SHOWN F
L-307 Details Sheet 08 AS SHOWN F
L-308 Details Sheet 09 AS SHOWN F
LANDSCAPE DRAWINGS SHEET REGISTER
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Cover Sheet
NA
A1
SA
04-20
146
L-000 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LOCATION MAP
Unicorn Falls Day Use Area
Campground
ISSUE D: FOR TENDER 9.04.2020
UNICORN FALLS
16
Plan 4.6 Unicorn Falls day use area - Sections 7-11 L-111
RL 154.6
RL 157.8
RL 157.68m
RL 153.6
RL 155.0
RL 156.0
RL 157.0
RL 157.6
RL 158.0m
RL 147.0m
EX158.6
SECTION 7 SECTION 8 SECTION 9
SECTION 10 SECTION 11
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Sections 7-9
1:100
A1
SA
04-20
146
L-111 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LANDSCAPE CONSTRUCTION DRAWINGS
DWG NO. DRAWING TITLE SCALE ISSUE
L-000 Cover Sheet NA F
L-001 Notes and Legend NA F
L-100 Day Use- Survey 1:250 F
L-101 Demolition Plan 1:250 F
L-102 Day Use- GA Plan Overview 1:250 F
L-103 GA Plan 01 OF 02 1:100 F
L-104 GA Plan 02 OF 02 1:100 F
L-105 Set Out Plan 01 OF 02 1:100 F
L-106 Set Out Plan 02 OF 02 1:100 F
L-107 Levels and Grading Plan 01 OF 02 1:100 F
L-108 Levels and Grading Plan 02 OF 02 1:100 F
L-109 Sections 1-3 1:100 F
L-110 Sections 4-6 1:100 F
L-111 Sections 7-9 1:100 F
L-200 Campground- Survey 1:200 F
L-201 Campground - Demolition Plan 1:200 F
L-202 Campground- GA Plan 1:200 F
L-203 Campground - Set Out Plan 1:200 F
L-204 Campground - Levels and Grading Plan 1:200 F
L-205 Section 01 1:50 F
L-206 Sections 02-03 1:50 F
L-207 Sections 04-05 1:50 F
L-208 Sections 06-08 1:50 F
L-209 Sections 09-10 1:50 F
L-300 Details Sheet 01 AS SHOWN F
L-301 Details Sheet 02 AS SHOWN F
L-302 Details Sheet 03 AS SHOWN F
L-303 Details Sheet 04 AS SHOWN F
L-304 Details Sheet 05 AS SHOWN F
L-305 Details Sheet 06 AS SHOWN F
L-306 Details Sheet 07 AS SHOWN F
L-307 Details Sheet 08 AS SHOWN F
L-308 Details Sheet 09 AS SHOWN F
LANDSCAPE DRAWINGS SHEET REGISTER
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Cover Sheet
NA
A1
SA
04-20
146
L-000 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LOCATION MAP
Unicorn Falls Day Use Area
Campground
ISSUE D: FOR TENDER 9.04.2020
UNICORN FALLS
17
I2
B3
S2
W1
S1
S2
P2
B1
P2
B1
W1
W1
P2
P2
P2
ST3
F3
I1
F5
F5
F5
F5W1
W1
6
2
4
1
3
109 87
P1
P1
5
0 5 10 15 20 m
Proposed Gravel Pavement (Pedestrian)
Existing trees to be retained
Native Planting Bed
(Bush Regeneration Works)
Existing Bushland Tree line
Skillion Information Shelter
Existing Ground
New Totem Sign Post
Campsite (10x10) x1
Legendxx
Campsite (10x13) x2
Proposed Slip Rail Vehicle Barrier
Existing trees to be removed
Existing road/ track alignment
Proposed track alignment
Proposed Stone Wall
S1
S2
P1
I2
Proposed Stone StepsST1
I1
W1
2/L-302
1/L-302
1/L-301
2/L-303
B3
Proposed Double Stall Skillion
Composting toilet
3/L-300
Proposed Gravel Pavement (vehicular)P22/L-300
1/L-305
Proposed Rock Vehicle Barrier
Proposed Log Vehicle Barrier
ST2
ST3
F3
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Campground- GA Plan
1:200
A1
SA
04-20
146
L-202 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
Camping platform
(3.6x5.4) x41/L306 F5
Plan 4.7 Manns Road campground - General arrangement plan L-202
LANDSCAPE CONSTRUCTION DRAWINGS
DWG NO. DRAWING TITLE SCALE ISSUE
L-000 Cover Sheet NA F
L-001 Notes and Legend NA F
L-100 Day Use- Survey 1:250 F
L-101 Demolition Plan 1:250 F
L-102 Day Use- GA Plan Overview 1:250 F
L-103 GA Plan 01 OF 02 1:100 F
L-104 GA Plan 02 OF 02 1:100 F
L-105 Set Out Plan 01 OF 02 1:100 F
L-106 Set Out Plan 02 OF 02 1:100 F
L-107 Levels and Grading Plan 01 OF 02 1:100 F
L-108 Levels and Grading Plan 02 OF 02 1:100 F
L-109 Sections 1-3 1:100 F
L-110 Sections 4-6 1:100 F
L-111 Sections 7-9 1:100 F
L-200 Campground- Survey 1:200 F
L-201 Campground - Demolition Plan 1:200 F
L-202 Campground- GA Plan 1:200 F
L-203 Campground - Set Out Plan 1:200 F
L-204 Campground - Levels and Grading Plan 1:200 F
L-205 Section 01 1:50 F
L-206 Sections 02-03 1:50 F
L-207 Sections 04-05 1:50 F
L-208 Sections 06-08 1:50 F
L-209 Sections 09-10 1:50 F
L-300 Details Sheet 01 AS SHOWN F
L-301 Details Sheet 02 AS SHOWN F
L-302 Details Sheet 03 AS SHOWN F
L-303 Details Sheet 04 AS SHOWN F
L-304 Details Sheet 05 AS SHOWN F
L-305 Details Sheet 06 AS SHOWN F
L-306 Details Sheet 07 AS SHOWN F
L-307 Details Sheet 08 AS SHOWN F
L-308 Details Sheet 09 AS SHOWN F
LANDSCAPE DRAWINGS SHEET REGISTER
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Cover Sheet
NA
A1
SA
04-20
146
L-000 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LOCATION MAP
Unicorn Falls Day Use Area
Campground
ISSUE D: FOR TENDER 9.04.2020
UNICORN FALLS
18
Plan 4.8 Manns Road campground - Section 01 L-205
1:20
CAMPGROUND ROAD ACCESS FROM MANNS ROAD
EX 248.80
EX 250.00
RL 250.50
1:40
RL 250.00
RL 249.50
EX 1:8
RL 249.50
EX 248.094
EX 247.08
CONNECTION TO EXISTING FIRE TRAIL
SECTION 1
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Section 01
1:50
A1
SA
04-20
146
L-205 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LANDSCAPE CONSTRUCTION DRAWINGS
DWG NO. DRAWING TITLE SCALE ISSUE
L-000 Cover Sheet NA F
L-001 Notes and Legend NA F
L-100 Day Use- Survey 1:250 F
L-101 Demolition Plan 1:250 F
L-102 Day Use- GA Plan Overview 1:250 F
L-103 GA Plan 01 OF 02 1:100 F
L-104 GA Plan 02 OF 02 1:100 F
L-105 Set Out Plan 01 OF 02 1:100 F
L-106 Set Out Plan 02 OF 02 1:100 F
L-107 Levels and Grading Plan 01 OF 02 1:100 F
L-108 Levels and Grading Plan 02 OF 02 1:100 F
L-109 Sections 1-3 1:100 F
L-110 Sections 4-6 1:100 F
L-111 Sections 7-9 1:100 F
L-200 Campground- Survey 1:200 F
L-201 Campground - Demolition Plan 1:200 F
L-202 Campground- GA Plan 1:200 F
L-203 Campground - Set Out Plan 1:200 F
L-204 Campground - Levels and Grading Plan 1:200 F
L-205 Section 01 1:50 F
L-206 Sections 02-03 1:50 F
L-207 Sections 04-05 1:50 F
L-208 Sections 06-08 1:50 F
L-209 Sections 09-10 1:50 F
L-300 Details Sheet 01 AS SHOWN F
L-301 Details Sheet 02 AS SHOWN F
L-302 Details Sheet 03 AS SHOWN F
L-303 Details Sheet 04 AS SHOWN F
L-304 Details Sheet 05 AS SHOWN F
L-305 Details Sheet 06 AS SHOWN F
L-306 Details Sheet 07 AS SHOWN F
L-307 Details Sheet 08 AS SHOWN F
L-308 Details Sheet 09 AS SHOWN F
LANDSCAPE DRAWINGS SHEET REGISTER
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Cover Sheet
NA
A1
SA
04-20
146
L-000 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LOCATION MAP
Unicorn Falls Day Use Area
Campground
ISSUE D: FOR TENDER 9.04.2020
UNICORN FALLS
19
Plan 4.9 Manns Road campground - Section 02-03 L-206
RL 249.95
STEPPED ACCESS TO
TOILET AND
CAMPGROUND ROAD
RL 249.27
1:3
MANNS ROAD PARKING BAY
SECTION 2
CAMPGROUND ROAD
EX 249.865RL 250.96
EX 250.472 EX 250.479
RL 249.794
SECTION 3
RL 249.88RL 249.519
1:25
RL 249.85
EX 248.83
TRAIL TO UNICORN FALLS
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Sections 02-03
1:50
A1
SA
04-20
146
L-206 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LANDSCAPE CONSTRUCTION DRAWINGS
DWG NO. DRAWING TITLE SCALE ISSUE
L-000 Cover Sheet NA F
L-001 Notes and Legend NA F
L-100 Day Use- Survey 1:250 F
L-101 Demolition Plan 1:250 F
L-102 Day Use- GA Plan Overview 1:250 F
L-103 GA Plan 01 OF 02 1:100 F
L-104 GA Plan 02 OF 02 1:100 F
L-105 Set Out Plan 01 OF 02 1:100 F
L-106 Set Out Plan 02 OF 02 1:100 F
L-107 Levels and Grading Plan 01 OF 02 1:100 F
L-108 Levels and Grading Plan 02 OF 02 1:100 F
L-109 Sections 1-3 1:100 F
L-110 Sections 4-6 1:100 F
L-111 Sections 7-9 1:100 F
L-200 Campground- Survey 1:200 F
L-201 Campground - Demolition Plan 1:200 F
L-202 Campground- GA Plan 1:200 F
L-203 Campground - Set Out Plan 1:200 F
L-204 Campground - Levels and Grading Plan 1:200 F
L-205 Section 01 1:50 F
L-206 Sections 02-03 1:50 F
L-207 Sections 04-05 1:50 F
L-208 Sections 06-08 1:50 F
L-209 Sections 09-10 1:50 F
L-300 Details Sheet 01 AS SHOWN F
L-301 Details Sheet 02 AS SHOWN F
L-302 Details Sheet 03 AS SHOWN F
L-303 Details Sheet 04 AS SHOWN F
L-304 Details Sheet 05 AS SHOWN F
L-305 Details Sheet 06 AS SHOWN F
L-306 Details Sheet 07 AS SHOWN F
L-307 Details Sheet 08 AS SHOWN F
L-308 Details Sheet 09 AS SHOWN F
LANDSCAPE DRAWINGS SHEET REGISTER
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Cover Sheet
NA
A1
SA
04-20
146
L-000 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LOCATION MAP
Unicorn Falls Day Use Area
Campground
ISSUE D: FOR TENDER 9.04.2020
UNICORN FALLS
20
Plan 4.10 Manns Road campground - Section 04-05 L-207
DRIVE-IN CAMPSITE CAMPGROUND ROAD
SECTION 4
RL 250.705RL 250.31 RL 250.234EX 250.20
RL 249.221:40
1:40
1:3
3000
B
A
30001265
123
FOOTING SET OUT PLAN (sloped ground)scale 1:50
AFSRS-B
AFSRS-D
BFSRS-B
30001265
123
FOOTING SET OUT SECTION (sloped ground)scale 1:50
BFSRS-B
AFSRS-C
BFSRS-C
BFSRS-D
Note: original drawings to scale at A3 size
© NSW Office of Environment and Heritage – not to be reproduced without permissionDrawing No:
Dimensions in mm unless otherwise noted
PFM Iss: 26.08.15
Current engineering certification will be void if design modified – engineer certification required for any changesMaximum altitude: 1000m above AHDMaximum wind loading: class N4 to AS 4055-2012Drawings to be read in conjunction with Specification
Rev: 26.08.15
FTPFooting Timber PostFSPFooting Steel Post
FSTFootings Summary Table
FSRGFooting Steel Raised Gable
FTRGFooting Timber Raised GableFSRSFooting Steel Raised Skillion
FTRSFooting Timber Raised Skillion
Park Facilities Manual
Shelter Ancillaries / 6.5.4 / Footings / Steel Skillion / Raised Platform
FSRS-1
FSRS-2
Components List
Note:
Floor Base slab
Floor Support Beam125 x 125 x 8 EA Steel
Refer to Drawing 6.5.3 FSP for footing options
120mm Bondek Slab 0.75mm BMT Propped mid-spanTwo layers of SL 82 Top Face 30mm Cover
FSRS-5
FSRS-6Mesh Screen
Mesh Screen Framing65 x 65 x 5 SHS Steel
refer to Materials, Finishes and Fixtures schedule
FSRS-4BoltsM12 High Strength Steel to specification
Glossary
FSRS-7Angled Column to Floor Support Beam125 x 75 x 8mm UA steel
FSRS-8Angled Column Connector BracketFabricated 10mm Steel bracket
FSRS-3Concrete Pad footingRefer to footing detail drawings as above.
FSRS-9Platform to Ramp Connector PlateFabricated 100 x 125 x 10mm Steel plate
FSRS-10RampRefer to drawings 5.9.5 BES for construction
Note: Refer to AS 1428.1, Design for Access and Mobility,for ramp and handrail design requirements.
FSRS - B
3000
B
A
30001265
123
FOOTING SET OUT PLAN (sloped ground)scale 1:50
AFSRS-B
AFSRS-D
BFSRS-B
30001265
123
FOOTING SET OUT SECTION (sloped ground)scale 1:50
BFSRS-B
AFSRS-C
BFSRS-C
BFSRS-D
Note: original drawings to scale at A3 size
© NSW Office of Environment and Heritage – not to be reproduced without permissionDrawing No:
Dimensions in mm unless otherwise noted
PFM Iss: 26.08.15
Current engineering certification will be void if design modified – engineer certification required for any changesMaximum altitude: 1000m above AHDMaximum wind loading: class N4 to AS 4055-2012Drawings to be read in conjunction with Specification
Rev: 26.08.15
FTPFooting Timber PostFSPFooting Steel Post
FSTFootings Summary Table
FSRGFooting Steel Raised Gable
FTRGFooting Timber Raised GableFSRSFooting Steel Raised Skillion
FTRSFooting Timber Raised Skillion
Park Facilities Manual
Shelter Ancillaries / 6.5.4 / Footings / Steel Skillion / Raised Platform
FSRS-1
FSRS-2
Components List
Note:
Floor Base slab
Floor Support Beam125 x 125 x 8 EA Steel
Refer to Drawing 6.5.3 FSP for footing options
120mm Bondek Slab 0.75mm BMT Propped mid-spanTwo layers of SL 82 Top Face 30mm Cover
FSRS-5
FSRS-6Mesh Screen
Mesh Screen Framing65 x 65 x 5 SHS Steel
refer to Materials, Finishes and Fixtures schedule
FSRS-4BoltsM12 High Strength Steel to specification
Glossary
FSRS-7Angled Column to Floor Support Beam125 x 75 x 8mm UA steel
FSRS-8Angled Column Connector BracketFabricated 10mm Steel bracket
FSRS-3Concrete Pad footingRefer to footing detail drawings as above.
FSRS-9Platform to Ramp Connector PlateFabricated 100 x 125 x 10mm Steel plate
FSRS-10RampRefer to drawings 5.9.5 BES for construction
Note: Refer to AS 1428.1, Design for Access and Mobility,for ramp and handrail design requirements.
FSRS - B
RL 250.7EX 250.464
RL 250.2RL 249.95
DRIVE-IN CAMPSITE CAMPGROUND ROAD
SECTION 5
ACCESS TO COMPOSTING TOILET
EX 247.843
1:40
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Sections 04-05
1:50
A1
SA
04-20
146
L-207 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LANDSCAPE CONSTRUCTION DRAWINGS
DWG NO. DRAWING TITLE SCALE ISSUE
L-000 Cover Sheet NA F
L-001 Notes and Legend NA F
L-100 Day Use- Survey 1:250 F
L-101 Demolition Plan 1:250 F
L-102 Day Use- GA Plan Overview 1:250 F
L-103 GA Plan 01 OF 02 1:100 F
L-104 GA Plan 02 OF 02 1:100 F
L-105 Set Out Plan 01 OF 02 1:100 F
L-106 Set Out Plan 02 OF 02 1:100 F
L-107 Levels and Grading Plan 01 OF 02 1:100 F
L-108 Levels and Grading Plan 02 OF 02 1:100 F
L-109 Sections 1-3 1:100 F
L-110 Sections 4-6 1:100 F
L-111 Sections 7-9 1:100 F
L-200 Campground- Survey 1:200 F
L-201 Campground - Demolition Plan 1:200 F
L-202 Campground- GA Plan 1:200 F
L-203 Campground - Set Out Plan 1:200 F
L-204 Campground - Levels and Grading Plan 1:200 F
L-205 Section 01 1:50 F
L-206 Sections 02-03 1:50 F
L-207 Sections 04-05 1:50 F
L-208 Sections 06-08 1:50 F
L-209 Sections 09-10 1:50 F
L-300 Details Sheet 01 AS SHOWN F
L-301 Details Sheet 02 AS SHOWN F
L-302 Details Sheet 03 AS SHOWN F
L-303 Details Sheet 04 AS SHOWN F
L-304 Details Sheet 05 AS SHOWN F
L-305 Details Sheet 06 AS SHOWN F
L-306 Details Sheet 07 AS SHOWN F
L-307 Details Sheet 08 AS SHOWN F
L-308 Details Sheet 09 AS SHOWN F
LANDSCAPE DRAWINGS SHEET REGISTER
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Cover Sheet
NA
A1
SA
04-20
146
L-000 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LOCATION MAP
Unicorn Falls Day Use Area
Campground
ISSUE D: FOR TENDER 9.04.2020
UNICORN FALLS
21
Plan 4.11 Manns Road campground - Section 06-08 L-208
SECTION 6
DRIVE-IN CAMPSITE CAMPGROUND ROAD CARPARK
RL 249.65RL 249.983
TOW 249.335
EX 247.38
EX 249.40
1:401:20
RL 249.581
SECTION 7
EX 249.16
TOD 248.65
SECTION 8
EX 248.6
TOD 248.05
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Sections 06-08
1:50
A1
SA
04-20
146
L-208 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LANDSCAPE CONSTRUCTION DRAWINGS
DWG NO. DRAWING TITLE SCALE ISSUE
L-000 Cover Sheet NA F
L-001 Notes and Legend NA F
L-100 Day Use- Survey 1:250 F
L-101 Demolition Plan 1:250 F
L-102 Day Use- GA Plan Overview 1:250 F
L-103 GA Plan 01 OF 02 1:100 F
L-104 GA Plan 02 OF 02 1:100 F
L-105 Set Out Plan 01 OF 02 1:100 F
L-106 Set Out Plan 02 OF 02 1:100 F
L-107 Levels and Grading Plan 01 OF 02 1:100 F
L-108 Levels and Grading Plan 02 OF 02 1:100 F
L-109 Sections 1-3 1:100 F
L-110 Sections 4-6 1:100 F
L-111 Sections 7-9 1:100 F
L-200 Campground- Survey 1:200 F
L-201 Campground - Demolition Plan 1:200 F
L-202 Campground- GA Plan 1:200 F
L-203 Campground - Set Out Plan 1:200 F
L-204 Campground - Levels and Grading Plan 1:200 F
L-205 Section 01 1:50 F
L-206 Sections 02-03 1:50 F
L-207 Sections 04-05 1:50 F
L-208 Sections 06-08 1:50 F
L-209 Sections 09-10 1:50 F
L-300 Details Sheet 01 AS SHOWN F
L-301 Details Sheet 02 AS SHOWN F
L-302 Details Sheet 03 AS SHOWN F
L-303 Details Sheet 04 AS SHOWN F
L-304 Details Sheet 05 AS SHOWN F
L-305 Details Sheet 06 AS SHOWN F
L-306 Details Sheet 07 AS SHOWN F
L-307 Details Sheet 08 AS SHOWN F
L-308 Details Sheet 09 AS SHOWN F
LANDSCAPE DRAWINGS SHEET REGISTER
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Cover Sheet
NA
A1
SA
04-20
146
L-000 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LOCATION MAP
Unicorn Falls Day Use Area
Campground
ISSUE D: FOR TENDER 9.04.2020
UNICORN FALLS
22
Plan 4.12 Manns Road campground - Section 09-10 L-209
EX 243.8
EX 248.84EX 249.02
SECTION 9
TOD 246.856TOW 247.267
RL 246.374
EX 248.00
SECTION 10
TOW 247.06
TOD 246.60
RL 246.132
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Sections 09-10
1:50
A1
SA
04-20
146
L-209 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LANDSCAPE CONSTRUCTION DRAWINGS
DWG NO. DRAWING TITLE SCALE ISSUE
L-000 Cover Sheet NA F
L-001 Notes and Legend NA F
L-100 Day Use- Survey 1:250 F
L-101 Demolition Plan 1:250 F
L-102 Day Use- GA Plan Overview 1:250 F
L-103 GA Plan 01 OF 02 1:100 F
L-104 GA Plan 02 OF 02 1:100 F
L-105 Set Out Plan 01 OF 02 1:100 F
L-106 Set Out Plan 02 OF 02 1:100 F
L-107 Levels and Grading Plan 01 OF 02 1:100 F
L-108 Levels and Grading Plan 02 OF 02 1:100 F
L-109 Sections 1-3 1:100 F
L-110 Sections 4-6 1:100 F
L-111 Sections 7-9 1:100 F
L-200 Campground- Survey 1:200 F
L-201 Campground - Demolition Plan 1:200 F
L-202 Campground- GA Plan 1:200 F
L-203 Campground - Set Out Plan 1:200 F
L-204 Campground - Levels and Grading Plan 1:200 F
L-205 Section 01 1:50 F
L-206 Sections 02-03 1:50 F
L-207 Sections 04-05 1:50 F
L-208 Sections 06-08 1:50 F
L-209 Sections 09-10 1:50 F
L-300 Details Sheet 01 AS SHOWN F
L-301 Details Sheet 02 AS SHOWN F
L-302 Details Sheet 03 AS SHOWN F
L-303 Details Sheet 04 AS SHOWN F
L-304 Details Sheet 05 AS SHOWN F
L-305 Details Sheet 06 AS SHOWN F
L-306 Details Sheet 07 AS SHOWN F
L-307 Details Sheet 08 AS SHOWN F
L-308 Details Sheet 09 AS SHOWN F
LANDSCAPE DRAWINGS SHEET REGISTER
PROJECT
DRAWING TITLE
SCALE
VERIFIED
DATE
DESIGNED/DRAWN
JOB NUMBER
STATUS1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE
WORK.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
CONTRACTS, SPECIFICATIONS AND DRAWINGs.
5. THE LEVELS SHOWN ON THIS PLAN HAVE BEEN BASED ON SURVEY BY GEOFFREY
BROWNE, DATED MAY 2015.
THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.
DRAWING NOTES OTHER CONSULTANTS
DRAWING NUMBER ISSUE
Level 1, 24-26 Botany Rd, Alexandria, NSWP: 1800 464 207 M: 0490 016 526
E: [email protected]: www.newscapedesign.com.au
ISSUE APP'DDESCRIPTION DATEBYNORTH
UNICORN FALLS
Cover Sheet
NA
A1
SA
04-20
146
L-000 F
CLIENT
National Parks and Wildlife Service
For Tender
90% DOCUMENTATION 16/12/19A SA
95% DOCUMENTATION 19/12/19B SA
95% DOCUMENTATION 13/01/20C SA
FOR TENDER 9/4/20D SA
REVISED FOR TENDER 8/5/20E SA
REVISED FOR TENDER 18/5/20F SA
LOCATION MAP
Unicorn Falls Day Use Area
Campground
ISSUE D: FOR TENDER 9.04.2020
UNICORN FALLS
23