twitter server project
TRANSCRIPT
OverviewRemove system boards together with all internal components
Send boxed board offsite for rework.Reinstall system boards into chassis upon return.
Daily Volumes 20 or 40
Work Stream Overview
1. Twitter removes 20 to 40 servers from racks and hands off to Onsight technician.
2. Technicians removes system boards from server chassis.
3. Technicians pack system boards for shipment.
4. Carrier pick up from Twitter arrives at Data Center to exchange motherboards
Workstation
Phase 1
Power Testing De-install System board
Packaging and Shipping of System board
Servers given from Twitter, ready to dismantle
Power Testing Server Units
System board in anti-static bag ready to be packaged and sent for rework
Phase 2System board Exchange
System boards packaged and ready for shipment to be reworked with capacitor upgrades
Reworked System board Exchange
Phase 3
System board to Chassis Assembly and Power Tests
Reworked system boards received and ready to re-install system boards back into chassis
Rack of server chassis awaiting installation of reworked system boards
Re-Installation of Reworked system boards and servers ready for power testing
Phase 4
BIOS Testing and Return upgraded units back to Twitter
Power Testing Server Units after Re-install
BIOS Test: The final process before returning Servers to Twitter
BIOS (HP PROLIANT)
Updated Servers ready for Server racks
1000 of 3000 Servers Completed
Troubleshooting and Diagnostic Testing of problems we had during the process of completing the project
Power Failure
System board failure
Broken Heat Sink
Tear-down process of swapping components from defective system boards to a new one
Removing CPU for Motherboard swap
CPU Swap from defective system board
System board returned with bad heat sink
Fun FactI used this single Torx screwdriver to de-install, Re-install 800 motherboards in a four month
duration