ufo led high bay installation manual - lamp shining led led high bay installation manual cable ac...

2
Screw the Circular Ring Tightly Hang the Safety chain on the Hook Lock Circular Ring to the Safety Chain carefully Juunction box input LED L -Brown N - Blue -Green/Yellow Then light up the lamp Must be installed by a licenced electrician as per the latest AS-3000 wiring regulations UFO LED High Bay Installation Manual Cable AC 100-277V Note: Brown L N Blue Green / Yellow Please make sure the power off before opertion Warning 1

Upload: others

Post on 25-Apr-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UFO LED High Bay Installation Manual - Lamp Shining LED LED High Bay Installation Manual Cable AC 100-277V Note: L Brown N Blue Green / Yellow Please make sure the power off before

Screw the Circular Ring Tightly

Hang the Safety chain on the Hook

Lock Circular Ring to the Safety Chain carefully

Juunction boxinput

LED

L-Brown N - Blue -Green/YellowThen light up the lamp

Must be installed by a licenced electrician as per the latest AS-3000 wiring regulations

UFO LED High Bay Installation Manual

Cable

AC 100-277V

Note:BrownL

N Blue

Green / Yellow

Please make sure the power off before opertionWarning

1

Page 2: UFO LED High Bay Installation Manual - Lamp Shining LED LED High Bay Installation Manual Cable AC 100-277V Note: L Brown N Blue Green / Yellow Please make sure the power off before

For Reference

Tight the nuts to expansion screws

Juunction box

input

LED

L-Brown N - Blue -Green/YellowThen light up the lamp

Must be installed by a licenced electrician as per the latest AS-3000 wiring regulations

UFO LED High Bay Installation Manual

Cable

AC 100-277V

Note:BrownL

N Blue

Green / Yellow

Please make sure the power off before opertionWarning

Hammer

Expansion Screw

85.0mm

or 3.15 in

Takes off the nut after expansion screws are well mounted

Drill holes according to the outlet on the canopy light

Double check of all drilled holes are right position as canopyoutlet before mounted.Use a hammer to hit expansion crews tightlyto ceiling,make sure it’s not loose.

2

Φ10mm

85.0mm