uia, faculty of engineering & science...study programs 2014 - faculty of engineering &...
TRANSCRIPT
UiA, Faculty of Engineering & ScienceIngeniørutdanningene, med vekt på mekatronikk
«The sky is not the limit»
TonjeUiA/IMR PhD student
EnriqueUiA/IMR postdoc
SFF 2016
Competence to preserve the Skagerak Eco-system.UiA Marine Research Center - Towards an SFF in 2016
8:54, Nov.8, Oslo: SFU Agder!
Source: http://www.regjeringen.no/nb/dep/kd/lyd_bilde/nett-tv/nett-tv-nokut-konferansen-2013-2.html?id=744799#
Prof. Duncan Lawson, Chair, International Expert Panel
Statssekretær i Kunnskapsdepartementet Birgitte Jordahl
contribute to the development of excellent quality in higher education and to highlight the fact that education and research are equally important .
Drive national developmentof mathematics education
SFU 2014
UiA1100 employees10000 Students
Frank!
• Health and Sport Sciences• Humanities and Education• Fine Arts• Engineering and Science• Economics and Social Sciences• Teacher Education Unit
Our industry is world-leading
NODE EYDE DIGIN
USUS
Biomedical Lab. S.
Biology
Math. & Physics
Math. Finance
Study Programs 2014 - Faculty of Engineering & Science - UiA
Engineering & Technology Mathematical & Natural Sciences
PhD Program at Faculty of Engineering & SciencePhD
MSc
BSc
ICT
MechatronicsRen. Energy
Ind. & Tech. Mgmt
Mathematics Education
LectorMath. & Natural S.
Ren. Energy
Electronics
Aeronautical E.
Mechatronics
ICT
Civil Eng.
Multimedia
PhD
MSc
BSc
Construction Aq. Ecology 2014
«eLearning» 2014
2200 students240 employees250 courses
ICT – Mechatronics – R. Energy – Applied Mathematics – Mathematics Education
Registered Students 2005-2013
About 800 new Technology students
261
384
Norges mest produktive universiteter
KUF-komitéen 25.01.12 8
•UiN
•UiN
Norges mest produktive universiteter
KUF-komitéen 25.01.12 9
•UiN
Faculty of Engineering & Science2011 (14,6; 1,7)
© 2014 Aker Solutions Preferred partner
Model Based Design of Offshore Drilling Equipment
■ Collaborative Ph.D. project between UiA and Aker Solutions.
■ December 2009 – December 2013.
Identification and development of tools and methods
to assist engineers with system design.
• Reducing development time and cost.
• Reducing number of design errors.
• Increasing machine performance and reliability.
Morten Kollerup Bak
Senior Engineer, Aker Solutions
Ph.D. candidate, Specialization in Mechatronics
Education & Research KPIs
prioritetsøkere , all programs• 2012: 1998• 2013: 2369 (+18.6%)
prioritetsøkere• 2012: prioritetsøkere pr plass: 2.4• 2013: prioritetsøkere pr plass: 2.8
toårige masterprogram • 2012: 225 1. pri søkere • 2013: 306 1. pri søkere (+36%)
Registered Students (DBH)• 2008: 1468• 2013: 2185 (+48,8%)
Publications (DBH pts.)• 2008: 66,4• 2012: 182,9 (+275%)
Why worry?
Jenter og Teknologi - Feb. 2014
Feb. 2014
Dependency on large global companies
… few new high-tech businesses …
Idea Concept Business
1100 UiA employees10000 students
290000 people in the Agder region
Plan B?
Our dream for 2015
• 100 potential business concepts tested / year
• 3-5 break-through start-ups
MechatronicsGlobal Knowledge Hub
Agder Region Industry UiA
NODE NCE / GCE – Industry Cluster 1
SFI Offshore Mechatronics – Long Term Research Activities 2
Sørlandslab – Innovation Arena & Infrastructure 3
103:57:14
SFI Offshore Mechatronics – Long Term Research Activities 2
SFI Offshore Mechatronics
Academic partners: University of Agder (UiA, Kristiansand/Grimstad), NTNU (Trondheim), Teknova (TEK, Kristiansand), Ålesund University College (AUC, Aalesund), Rheinisch-Westfälische Technische Hochschule (RWTH, Germany), Aalborg University (AAU, Denmark), new: University of Texas Industrial partners: Aker MH AS (AK), Cameron Sense AS (CAM), National Oilwell Varco AS (NOV), Skeie Technology AS (SK), Lundin Norway AS (LUN), ABB AS (ABB), Devoteam AS (DEV), Lockless AS (LOC), Stepchange (ST), Applica AS (APP), NCE NODE (NCEN), NCE Maritime (NCEM).
MechatronicsGlobal Knowledge Hub
Agder Region Industry UiA
NODE NCE / GCE – Industry Cluster 1
SFI Offshore Mechatronics – Long Term Research Activities 2
Sørlandslab – Innovation Arena & Infrastructure 3
[email protected], Faculty of Engineering & Science, University of Agder
Sørlandslab – Innovation Arena & Infrastructure 3
UiA’s rolefor the future of Sørlandet
HiA
UiA
2007++
time
relevance Sørlandet’sInnovation Hub
2014++
today
=
+ Activities
+ Expertise
+ Infrastructure
A building without activities is meaningless!
Reality Check – Can it be done? 1
Grimstad «Kompetansområdet»
Step1: Attract Industrial Support
Industry50 MNOK
UiA &Region50 MNOK
CONFIDENTIAL
NFR50 MNOK+
SFI, Petromaks, …
Research Funding
NFR
Industry
Industry
NFR
Before Now
UiA UiA
Status: LOIs for 2014-2018: 50.2 MNOK
received
50,2 MNOK
announced 10-15 MNOK
Wish list
Challenge: Research & EVU agenda
Regional Backing
Political Backing
UiA Backing – Sept. 11, 2013
2014
• Start Sørlandslab R&D activities
• Start Sørlandslab implementation
Important challenges
• Legal organization model
• Financing
• Implementation details
• Risk assessment
• Time table
Thanks!