Seminar onRoad PavementRecycling,WarsawOctober, 2002
UK experience of in situ recycling with cement for the structural maintenance
of pavements
Sally EllisSally Ellis
Head of Centre for SustainabilityHead of Centre for SustainabilityTRL LimitedTRL Limited
sjellissjellis@@trltrl.co..co.ukuk
Seminar onRoad PavementRecycling,WarsawOctober, 2002
UK EXPERIENCE OF IN SITU UK EXPERIENCE OF IN SITU RECYCLING WITH CEMENTRECYCLING WITH CEMENT
Introduction
Background to current guidance
Current guidance
SMART
Seminar onRoad PavementRecycling,WarsawOctober, 2002
UK EXPERIENCE OF IN SITU RECYCLING WITH CEMENT
INTRODUCTION
COLD IN SITU RECYCLINGCOLD IN SITU RECYCLING‘… the procedures using specialistplant to pulverise and stabilise existing road materials, in-place, at ambient temperature with the addition of hydraulic and/or bitumen binder…’
LINEAR QUARRY PROJECTLINEAR QUARRY PROJECT‘Every deteriorated road is a ‘Every deteriorated road is a source of aggregate for its ownsource of aggregate for its ownstructural maintenance by coldstructural maintenance by coldin situ recycling.’in situ recycling.’
TRL 386 (1999)TRL 386 (1999)
Seminar onRoad PavementRecycling,WarsawOctober, 2002
UK EXPERIENCE OF IN SITU RECYCLING WITH CEMENT
INTRODUCTIONPavement thickness designPavement thickness design
Original pavement Recycled pavement
Original surfacing
Original roadbase
New surfacing
Recycled structural course
Original subbase
Sub-grade Sub-grade
Remaining subbase as foundation platform
Seminar onRoad PavementRecycling,WarsawOctober, 2002
UK EXPERIENCE OF IN SITU RECYCLING WITH CEMENTBACKGROUND TO CURRENT GUIDANCE
THE LINEAR QUARRY PROJECTTHE LINEAR QUARRY PROJECTRESEARCH METHODOLOGYRESEARCH METHODOLOGY
Examination of nine in-service roadsmaintained by cold in situ recycling
• 7 foamed bitumen• 2 cement
Construction and monitoring of two full-scale road trials on A3008Cartgate Road in Somerset
Seminar onRoad PavementRecycling,WarsawOctober, 2002
UK EXPERIENCE OF IN SITU RECYCLING WITH CEMENTBACKGROUND TO CURRENT GUIDANCE
CARTGATE ROAD TRIAL PHASE 1CARTGATE ROAD TRIAL PHASE 1• 2.5 lane kilometres• 8 trial sections
• 4 cement• 4 foamed bitumen
• 2 control sections
• 2.4 lane kilometres• 2 trial sections
• 1 cement• 1 foamed bitumen
CARTGATE ROAD TRIAL PHASE 2
Seminar onRoad PavementRecycling,WarsawOctober, 2002
UK EXPERIENCE OF IN SITU RECYCLING WITH CEMENTBACKGROUND TO CURRENT GUIDANCE
DATA COLLECTION FROM ROAD TRIALSDATA COLLECTION FROM ROAD TRIALS
• Extraction of cores• Falling Weight Deflectometer• Visual inspection• Particle size distribution• Moisture content• Cube refusal density• As placed density by NDM• Thickness of recycled layer• Cube compressive strength
Seminar onRoad PavementRecycling,WarsawOctober, 2002
UK EXPERIENCE OF IN SITU RECYCLING WITH CEMENTCURRENT GUIDANCE
TRL 386TRL 386(1999)(1999)
Seminar onRoad PavementRecycling,WarsawOctober, 2002
UK EXPERIENCE OF IN SITU RECYCLING WITH CEMENTCURRENT GUIDANCE
PART ONEPART ONE•• Environmental considerationsEnvironmental considerations•• Cold in situ recyclingCold in situ recycling•• Site evaluationSite evaluation•• Design of recycled materialDesign of recycled material•• Pavement designPavement design•• Specification Specification •• ConstructionConstructionPART TWOPART TWO•• SpecificationSpecification•• Notes for GuidanceNotes for Guidance
Seminar onRoad PavementRecycling,WarsawOctober, 2002
FLOW CHART A: SITE EVALUATIONFLOW CHART A: SITE EVALUATIONNo
Conventional reconstructionIs site of sufficient area?
Is depth sufficient? Can levels be raised?
No
Can subgrade be included?
Import supplementary aggregateYes
Is material OK for pulverisation?
Is aggregate consistent?
Are services deep enough?
Is strength/stiffness OK?
Central plant recycling
Cold in-situ recycling
YesNo No
Yes Yes
No
Yes
No
YesNo
Recycle as alternative materialYesNo
Yes
Seminar onRoad PavementRecycling,WarsawOctober, 2002
FLOW CHART B: PRIMARY BINDER FLOW CHART B: PRIMARY BINDER SELECTIONSELECTION
Structural maintenance by cold in-situ recycling
YesIs the pulverised aggregate
too fine and plastic?Pre-treat with hydrated lime or cement
to produce non-plastic aggregate
Is there any doubt about the binder to use?
Is groundwater a problem?
Is subgrade free from seasonal ground movement?
Portland cementFoamed bitumen
Overriding preference of engineer
No
Yes
NoYes
No
Yes
No
Seminar onRoad PavementRecycling,WarsawOctober, 2002
UK EXPERIENCE OF IN SITU RECYCLING WITH CEMENTCURRENT GUIDANCE
LIMITATIONSLIMITATIONS
•• Limited to in situ recyclingLimited to in situ recycling•• restricts depth of recycled layerrestricts depth of recycled layer
•• Generally limited to cement and Generally limited to cement and foamed bitumen binders used foamed bitumen binders used separatelyseparately
•• Prescriptive in naturePrescriptive in nature
Seminar onRoad PavementRecycling,WarsawOctober, 2002
SMART PROJECTSMART PROJECT
SSustainable ustainable MAMAintenanceintenance of roads of roads using cold using cold RRecycling ecycling TTechniquesechniques
Seminar onRoad PavementRecycling,WarsawOctober, 2002
MATERIAL ‘FAMILIES’MATERIAL ‘FAMILIES’
Unbound
Fullyvisco-elastically
bound
FAMILY 1‘HYDRAULIC’ BINDERS
Family 2(a)Foamix only mixtures
Family 2(b)Emulsion only mixtures
FAMILY 2‘VISCO-ELASTIC’ BINDERS
Family 3(a)Foamix + cementitious/pozzolanic mixtures
Family 3(b)Emulsion + cementitious/pozzolanic mixtures
FAMILY 3‘VISCO-ELASTIC / HYDRAULIC’ BINDERS
Fullyhydraulically
bound
Seminar onRoad PavementRecycling,WarsawOctober, 2002
TEST METHODS TO BE CARRIED TEST METHODS TO BE CARRIED FORWARDFORWARD
•• PRIMAPRIMA
•• Norwegian Torsion MeterNorwegian Torsion Meter
•• Geogauge Geogauge
Controls:•• German Dynamic PlateGerman Dynamic Plate•• FWDFWD•• Nuclear Density GaugesNuclear Density Gauges
Seminar onRoad PavementRecycling,WarsawOctober, 2002
COMPARISON OF IN SITU TEST COMPARISON OF IN SITU TEST EQUIPMENTEQUIPMENT
0
100
200
300
400
500
600
700
800
A1 A2 A3 B1 B2 B3 C1 C2 C3 D1 D2 D3 E1 E2 E3 F1 F2 F3 G1 G2 G3 H1 H2 H3 I1 I2 I3 J1 J2 J3
Locations
Stif
fnes
s, M
pa
0
50
100
150
200
250
300
350
400
Torq
ue, N
.m
PRIMA 29/11PRIMA 30/11GDP 29/11torsion meter 29/11
Seminar onRoad PavementRecycling,WarsawOctober, 2002
CONCLUSIONSCONCLUSIONS
•• The development of a performance The development of a performance based specification should broaden based specification should broaden the use of cold recyclingthe use of cold recycling
•• Recycled cold mix material can be Recycled cold mix material can be cored during early lifecored during early life
•• After achieving its design life, the After achieving its design life, the recycled material is in place to be recycled material is in place to be recycled againrecycled again