(4,248 meters), bringing total footage drilled to 8,662 feet (2,640
meters) with zero NP.
o drill and log through the HP/H reservoir in the 8 -inch hole,Halliburton used a SOLAR Geo-Pilot XL system with a full suite of
SOLAR LWD tools including gamma, resistivity, density, bi-modal
acoustic sonic (BA) and neutron porosity sensors. Te SOLAR
suite made it possible to assess and characterize the quality of the
reservoir, identify perforation intervals and assist in correlation and
casing point selection, while providing better understanding of the
field. Te 8 -inch section was treated with BARACARB bridging
agent and SEELSEAL lost circulation material incorporated into
the drilling fluid to seal microfractures and help strengthen the
formation during drilling operations.
With all LWD sensors working perfectly in both real-time and
memory modes, the SOLAR Geo-Pilot BHA with SOLAR LWD quad
combo delivered the entire 2,323-foot (708-meter) section in a single
run, intersecting all geological targets with zero NP. In what was the
fourth longest section in the UK for drilling hours on bottom since
records began, the SOLAR LWD quad combo was down hole for
355.25 hrs (14.8 days) with the telemetry pulser functioning flawlessly
for 296 circulating hrs (12.3 days). Successful LWD performance
eliminated the need for wireline logging, and the well reached total
depth at 16,232 feet (4,948 meters) 25 days ahead of plan.
ECONOMIC VALUE CREATED Halliburton executed the
Drilling Performance solution and delivered the well 25 days ahead of
plan. Assuming an approximate rig rate of $250k per day, Halliburtons
performance resulted in economic savings to the customer of
approximately $2 million. In addition, successful acquisition of a full
suite of LWD logs eliminated the need to perform wireline logging
a first for the operator in this North Sea reservoir.
2011 Halliburton. All rights reserved. Sales of Halliburton products and services will be in accord solely with the terms and conditions contained in the contract
between Halliburton and the customer that is applicable to the sale. H08942 12/1
www.halliburton.com
High-torque rotary steerable solution combining the Geo-Pilot rotary steerable system with GeoForce constant wall thickness motor for increased ROP
HAL36267
Days vs depth graph