Ukrainian Market Readiness Proposal Preparation phase Outline of progress PMR PA 7, Marrakesh 22-23 October 2013 www.seia.gov.ua

Upload: others

Post on 03-Jan-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ukrainian Market Readiness Proposal

Ukrainian Market Readiness

Proposal

Preparation phase

Outline of progress

PMR PA 7, Marrakesh

22-23 October 2013

www.seia.gov.ua

Page 2: Ukrainian Market Readiness Proposal

www.seia.gov.ua

Outline of Presentation

Overview

• Key background information on Ukraine

• MRP Objective and Focus

• MRP Development Process

2

Page 3: Ukrainian Market Readiness Proposal

FACT BOX

Greenhouse Gas Emissions incl. LULUCF (MtCO2e) excl. LULUCF (MtCO2e) Change from base year (1990)

394 401 -57

Latest reporting year

2011

UNFCCC ratification status and date

Date of signature: 11 Jun 1992 Date of ratification: 13 May 1997 Date of entry into force: 11 Aug 1997

Kyoto Protocol ratification status and date

Date of signature: 15 March 1999 Date of ratification: 12 April 2004 Date of entry into force: 16 Feb 2005

Flagship climate change legislation

National Action Plan on Implementation of the KP, 2005

Flagship energy legislation Ukraine’s Energy Strategy to 2030

3 www.seia.gov.ua

Page 4: Ukrainian Market Readiness Proposal

National Action Plan on Implementation of the KP Main tasks

Improve the national GHG emission and absorption inventory system,

Create favourable conditions to implement the "flexible mechanisms" of the Kyoto Protocol in Ukraine,

Prepare and publish national reports on climate change issues,

Develop National plans on adaptation and climate change impact mitigation,

Evaluate GHG emission reduction potential to 2020, strategic forecast and the assessment of climate change impact on various economy sectors, on the population and ecosystems,

Create a data bank on ecologically safe technologies that allow reducing emission volumes and increasing GHG absorption volumes,

Implement measures on training and qualification improvement within the scope of UNFCCC and its Kyoto Protocol, for State employees, preparing personnel, and informing the public on climate change issues.

4 www.seia.gov.ua

Page 5: Ukrainian Market Readiness Proposal

www.seia.gov.ua

National Energy Strategy

Broad objectives create favorable conditions for meeting energy demand, increase energy security, reduce the impact of the energy sector on the environment, reduce the cost of energy production, integrate Ukraine’s energy system into the European energy system, expand hydro, nuclear and renewables, decrease GDP energy intensity through energy efficiency and

reduction of transmission losses, and it calls for a 50% reduction in energy intensity by 2030.

5

Page 6: Ukrainian Market Readiness Proposal

www.seia.gov.ua

• Reduce dependence on international energy sources

Reduce intensity of energy use

Increase part of domestic energy and fuels

• Stay internationally competitive by increasing production efficiencies

Attract investment to renew industrial facilities

• Diversify the economy to reduce impact of external shocks

• Use Agriculture as growth driver for the economy

Fundamental Economy Strategy

6

Page 7: Ukrainian Market Readiness Proposal

www.seia.gov.ua

MRP Objective and Focus

(A) Develop a GHG emissions monitoring, reporting, and verification system in Ukraine as a first step towards the ETS, and

(B) Develop assessments to support an informed decision making process on the use of market based instruments for Ukraine.

7

To support Ukraine’s Energy and Low Carbon Policies, the MRP will have two main objectives

Page 8: Ukrainian Market Readiness Proposal

www.seia.gov.ua

Two Primary Reasons for Delaying the MRP

The legislative process which was initiated by the

SEIA with draft MRV law which was submitted to Ministry of Environment and Natural Resources and was planned to be reviewed and submitted to other governmental bodies for review and submission to the Parliament later this autumn. So far this law is still reviewing and the consultation process on this law is starting.

Ongoing work financed by Donor Countries and IFIs which results should be an integral part of MRP.

8

Page 9: Ukrainian Market Readiness Proposal

www.seia.gov.ua

Ongoing work financed by Donor Countries and IFIs

Project Team

‘Capacity Building for Low Carbon Growth in Ukraine’ is still in development stage and major deliverables as well as consultations are scheduled for this December 2013 and only after completion of several tasks and finalization of deliverables, this work can be used and incorporated into draft MRP.

UNDP

‘MRV for Enterprise-Level GHG Emissions in energy sector in Ukraine’ has being delayed because of the selection of local consultant and only in May this work has commenced and main phase is planned in November 2013.

USAID

Preparedness for Emissions Trading in the EBRD Region (“PETER“) which is concentrated on Ukraine and Kazakhstan has only commenced in June 2013 and schedule is finalized on tasks and deliverables only in Oct 2013. Deadline – June-July 2014

EBRD

9

Page 10: Ukrainian Market Readiness Proposal

www.seia.gov.ua

Design of MRV system

Draft MRV Law provides authority to mandate MRV for GHG emissions

Secondary and complementary legislation is necessary 1. Procedure for realization of MRV of GHG emissions (monitoring,

reporting, verification);

2. Procedure for accreditation of independent expert organizations

that carry out verification of GHG emission monitoring reports;

3. Procedure for state registration of installations carrying out GHG

emissions;

4. Procedure for state control over MRV of GHG emissions.

10

Page 11: Ukrainian Market Readiness Proposal

www.seia.gov.ua

MRV system – Focus on electricity and industry

Electricity and industry are included, because: They have easily identifiable, large point sources which make

up most of the emissions in the sector; They release a significant portion of GHG emissions (17%, 25%

respectively); The reduction opportunities in these sectors are numerous

and largely profitable; They has ambitious targets for decreasing dependency to

exported fuels and increasing competitiveness, respectively; They are subject to many regulations and reporting

requirements, so this will not create significant incremental burden.

11

Page 12: Ukrainian Market Readiness Proposal

Analysis to Support Development of Carbon Pricing Instruments

The cap and trade options, and other existing direct carbon pricing mechanisms

ETS vs. Carbon tax

The transition from one instrument to another

The key challenges of introducing ETS as opposed to other policy instruments

12 www.seia.gov.ua

Page 13: Ukrainian Market Readiness Proposal

Timing

Ukraine’s MRP submission Time

Zero Draft MRP for peer-review Feb 2013-March 2014

Draft MRP May 2014

Final MRP October 2014

13 www.seia.gov.ua

Page 14: Ukrainian Market Readiness Proposal

State Environmental Investment Agency

Address : 35 V. Lipkovskogo Str., Kiev , 03035 Contacts: Telephone: 380 44 594-91-11 Fax: 380 44 594-91-15 E-mail: [email protected] Press service: Telephone: 380 44 594-91-09 Fax: 380 44 594-91-15 E-mail: [email protected]