umgeni river canalisation: final basic assessment …projects.gibb.co.za/portals/3/projects/201305...

2
Head Office 14 Eglin Road, Sunninghill 2191 Johannesburg, South Africa Tel: +27 11 519 4600 Fax: +27 11 807 5670 www.gibb.co.za DAEA EIA Reference: DM/0068/2012 eThekwini Municipality: Coastal, Stormwater and Catchment Department UMGENI RIVER CANALISATION: FINAL BASIC ASSESSMENT REPORT – Revision 0.1 Volume 1 April 2013 J25130/D

Upload: others

Post on 03-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UMGENI RIVER CANALISATION: FINAL BASIC ASSESSMENT …projects.gibb.co.za/Portals/3/projects/201305 Umgeni/Appendix A - S… · UMGENI RIVER CANALISATION: BASIC ASSESSMENT REPORT Revision

Head Office 14 Eglin Road, Sunninghill 2191 Johannesburg, South Africa Tel: +27 11 519 4600 Fax: +27 11 807 5670 www.gibb.co.za

DAEA EIA Reference: DM/0068/2012

eThekwini Municipality: Coastal, Stormwater and Catchment Department

UMGENI RIVER CANALISATION: FINAL BASIC ASSESSMENT REPORT – Revision 0.1 Volume 1

April 2013 J25130/D

Page 2: UMGENI RIVER CANALISATION: FINAL BASIC ASSESSMENT …projects.gibb.co.za/Portals/3/projects/201305 Umgeni/Appendix A - S… · UMGENI RIVER CANALISATION: BASIC ASSESSMENT REPORT Revision

\

UMGENI RIVER CANALISATION: BASIC ASSESSMENT REPORT

Revision 0.1

CONTENTS

Volume Description

VOLUME 1

BASIC ASSESSMENT REPORT

APPENDIX A Site Plans

APPENDIX B Photographs

APPENDIX C Facility Illustration

VOLUME 2

APPENDIX D Specialist Reports

APPENDIX D1 Biodiversity

APPENDIX D2 Heritage

APPENDIX D3 Umgeni Canal Assessment (Flood Level)

APPENDIXD4 Umgeni Canal Soils Investigation

VOLUME 3

APPENDIX E Public Participation

VOLUME 4

APPENDIX F Environmental Management Programme

VOLUME 5

APPENDIX G Other Information

APPENDIX G1 Final Scoping Study (2005)

APPENDIX G2 Record of Decision (2006)

APPENDIX G3 Water Use Licence (2006)

APPENDIX G4 Exemption from Mining Permit (2008)

APPENDIX G5 GIBB Document Control Sheet