ZXUR 9000 UMTS Radio Network Controller Hardware Installation Guide Intended audience: Staff with Skill Certificate Level IIReleased by GU Product Support Dept.
Internal Use Only▲
Version Introduction
References
1. SJ-20110401144726-008-ZXUR 9000 UMTS (V4.11.10) Hardware Installation.pdf
2.
Version Date Author Checked by Revision Record
R1.0 2011-11-30 Liu Xiaohua Wang Wenqiong None
R2.0 2012-6-6 Liu Xiaohua Wang Wenqiong Installation steps and screenshots revised
Internal Use Only▲
Course Objectives
To be familiar with ZXUR 9000 hardware installation
To master the method of connecting ZXUR 9000 cables
To be familiar with the power-on & power-off of ZXUR 9000
Internal Use Only▲
Contents
Cabinet Installation Cable Installation Equipment Power-On & Power-OffBoard Installation Attached Equipment Installation
Internal Use Only▲
Cabinet Installation Modes
The cabinet can be installed in two modes: Cabinet installation on adjustable base: This installation mode is
applied when the equipment room has the antistatic floor. In this mode, the installation personnel should use the adjusting washer, which is provided by ZTE Corporation, to adjust the level of the cabinet.
Cabinet installation on cement floor: This installation mode is applied when the equipment room does not have the antistatic floor.
After a single cabinet is installed, if it is required to connect multiple cabinets, adjacent cabinets should be connected.
Internal Use Only▲
Cabinet Installation Flow
Internal Use Only▲
Cabinet Installation Flow
Internal Use Only▲
Cabinet Components Adjusting Washer
When the floor on which the cabinet is installed is not flat, installation personnel can use the adjusting washer to adjust the height of the cabinet or the adjustable base. The washer has two types of thickness: 1 mm and 2 mm.
Internal Use Only▲
1. Cabinet 3. Adjustable Base2. Antistatic Floor 4. Groundsill
Cabinet Components Adjustable Base – Installation Diagram (Front View)
1. 机柜2. 防静电地板
3. 可调底座4. 地基
Internal Use Only▲
Installation Flow – Step 1Removing Cabinet Front/Rear Door
1. Remove the grounding cable connecting the rack and the lower part of the door
2. Remove the front door and the rear door of the cabinet
Internal Use Only▲
Installation Flow – Step 2 Positioning & Installing Expansion Bolts
According to the installation drilling template, decide the positions of expansion bolt holes.
1. The four holes marked with1 are for installing the adjustable base.2. The four holes marked with2 are for installing the cabinet on the cement floor.
Internal Use Only▲
Installation Flow – Step 2 Positioning & Installing Expansion Bolts
Positioning expansion bolts
Internal Use Only▲
Installation Flow – Step 3Installing Adjustable Base (For Cabinet Installation on Adjustable Base Only)
1. Spring washer 2. Flat washer 3. Insulating gasket 4. Sleeve5. Hexagon head bolt M12×90 6. Insulating washer 7. Adjusting washer
Internal Use Only▲
Installation Flow – Step 4 Fixing Cabinet
1. Cabinet installation on cement floor 2. Cabinet installation on adjustable base
Internal Use Only▲
Installation Flow – Step 5 Insulation Test
1. Cabinet installation on cement floor 2. Cabinet installation on adjustable base
Internal Use Only▲
Installation Flow – Step 6Plugging in Antistatic Wrist Strap
Plug the antistatic wrist strap into the ESD hole of the service subrack
Internal Use Only▲Installation Flow – Step 7Installing Indoor Cable Tray & Cable Drum
Internal Use Only▲Installation Flow – Step 8Installing Side Door
Internal Use Only▲
Installation Flow – Step 9Installing Cabinet Front/Rear Door
1. Pin2. Hinge
Internal Use Only▲
Installation Flow – Step 10Cabinet Grounding
Top routing: Connect End A of the grounding cable with the grounding nut at the top of the outer cabinet, and then extend to the cabling rack. Connect End B with the PE copper bar on the DC Power Cabinet.
Bottom routing: Connect End A of the grounding cable with the grounding nut at the bottom of the inner cabinet. Lead the cable out of the cabinet bottom to the anti-static floor. Connect End B with the PE copper bar on the DC Power Cabinet.
Internal Use Only▲
Installation Flow – Step 11Connecting Adjacent Cabinets
1. Connecting plate for combining cabinets 2. Cross recess head screw (M4×12)
Internal Use Only▲
Contents
Cabinet Installation Cable Installation Equipment Power-On & Power-OffBoard Installation Attached Equipment Installation
Internal Use Only▲
Cable Installation
Power Cables •Power cable installation
Grounding Cables •Grounding cable installation
Clock Cables
•Line reference clock cable•BITS reference clock cable•Inter-shelf clock cable
Internal Use Only▲
Cable Installation
Service Cables
• Media plane interconnection fiber• Control plane interconnection Ethernet cable• Interface fiber• Interface network cable• Interface E1/T1 cable
Other Cables
• OMC network cable• PD485 cable
Internal Use Only▲
Cable Installation Cabling of Power Cables Inside the Cabinet
1. No.1/3/5/7 : -48V2. No.2/4/6/8 : -48VRTN
Internal Use Only▲
Cable Installation Cabling of Power Cables Outside the Cabinet
Internal Use Only▲
Cable Installation Installing Grounding Cable
Internal Use Only▲
Cable Installation Installing Grounding Cable
Internal Use Only▲
Cable Installation Installing Grounding Cable
Internal Use Only▲
Cable Installation Installing Grounding Cable
Internal Use Only▲
Cable Installation Installing Clock Cable – Cabling of Line Reference Clock Cables
Internal Use Only▲
Cable Installation Installing Clock Cable – Cabling of BITS Reference Clock Cables
Internal Use Only▲
Cable Installation Installing Clock Cable – Inter-Shelf Clock Cables
1. 8P8C straight cable crimped connector 2. Horizontal twisted pair cable3. Labels
Internal Use Only▲
Cable Installation Installing Clock Cable – Inter-Shelf Clock Cables
Internal Use Only▲
Cable Installation Installing Service Cable – Cabling of Media Plane Interconnection Fibers
Internal Use Only▲Cable Installation Installing Service Cable – Cabling of Control Plane Interconnection Ethernet Cables
Internal Use Only▲
Cable Installation Installing Service Cable – Interface Fibers
Internal Use Only▲
Cable Installation Installing Service Cable – Cabling of Interface Network Cables
Internal Use Only▲
Cable Installation Installing Service Cable – Cabling of Interface E1/T1 Cable
Internal Use Only▲
Cable Installation Installing Other Cables – Cabling of OMC Cables
Internal Use Only▲
Cable Installation Installing Other Cables – Cabling of the PD485 Cable
Internal Use Only▲
Contents
Cabinet Installation Cable Installation Equipment Power-On & Power-OffBoard Installation Attached Equipment Installation
Internal Use Only▲
Equipment Power-On and Power-Off
Power-on check: Plug out all boards Use a multimeter to measure whether the power output from the DC distribution
cabinet satisfies the voltage fluctuation range: -57 V DC ~ -40 V DC. Use a multimeter to measure the power input to the service subracks. The voltage
range should be -57 V DC ~ -40 V DC. Set the air switch of the power distribution subrack as ON. Observe the PWR IN
indicator on the power distribution subrack. The indicator should be on. Set the air switch for each service subrack on power distribution box as "ON". The
fans in the service subracks should operate normally. Insert all boards to the correct slots.
Internal Use Only▲
Equipment Power-On and Power-Off
Power-off procedure: Turn off the -48 V power switch corresponding to the service
subrack on the panel of the power distribution subrack. Turn off the -48 V power supply output to the cabinet on the DC
power distribution cabinet.
Internal Use Only▲
Contents
Cabinet Installation Cable Installation Equipment Power-On & Power-OffBoard Installation Attached Equipment Installation
Internal Use Only▲
Board Installation Plugging in Boards
Internal Use Only▲
Board Installation Plugging out Boards
Internal Use Only▲
Contents
Cabinet Installation Cable Installation Equipment Power-On & Power-OffBoard Installation Attached Equipment Installation
Internal Use Only▲
Attached Equipment Installation
The following accessories are required to be installed after the ZXUR 9000 UMTS equipment is installed:
Alarm box Environment monitoring system
Power distribution subrack Smog Sensor Infrared Sensor Temperature/Humidity Sensor Access Control Sensor
Switch