un. chdswhernoam soug shr..t £ ~~ch•ikfnc 20x-0 · randy gideon lee grzeck ... ben waldrep dave...

33
- DU UN. ChdsWherNoAM DUKE 526 Soug Church Shr..t £ &Ec2zF/P.O. Box iW06 • ; ~~Ch•IkfNC"_20X-0 7043•2-7426 . i , " . , - Serial: RA-15-0005 . .10 CFR 50.4 February 5, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325, 50-324/ RENEWED LICENSE NOS. DPR-71 AND DPR-62 CATAWBA NUCLEAR STATION, UNIT NOS. I AND 2 DOCKET NOS. 50-413,50-414 / RENEWED LICENSE NOS. NPF-35 AND NPF-52 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302/ LICENSE NO. DPR-72' SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400/ RENEWED UCENSE NO. NPF-63 MCGUIRE NUCLEAR STATION, UNIT NOS. I AND 2 DOCKET NOS. 50-369, 50-370/ RENEWED UCENSE NOS. NPF-9 AND NPF-17 OCONEE NUCLEAR STATION, UNIT NOS. 1, 2 AND 3 DOCKET NOS. 50-269,50-270, AND 60-287 / RENEWED UCENSE NOS. DPR-38, DPR-47, AND DPR-55 H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 1 RENEWED UCENSE NO. DPR-23 Subject: RESPONSE TO NRC REGULATORY ISSUE SUMMARY 2014-13 PLANNED LICENSING ACTION SUINITTALS FOR ALL POWER REACTOR LICENSEES On December 17,2014, the Nuclear Regulatory Commission issued Regulatory issue Summary (RIS) 2014-13, "Planned Licensing Action Submittals for All Power Reactor Licensees." The RIS requests the voluntary submittal of licensees to provide Information regarding the licensing actions that they plan to submit to the NRC for review over the next 3 calendar years and power uprate applications that they plan to submit to the NRC for review over the next 5 calendar years. The Included attachments contain the estimated future licensing actions and power uprate applications for the Brunswick Steam Electric Plant, Catawba Nuclear Station, Shearon Harris Nuclear Power Plant, McGulre Nuclear Station, Oconee Nuclear Station, and H.S. AitoI

Upload: others

Post on 02-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

- DU UN. ChdsWherNoAMDUKE 526 Soug Church Shr..t

£ &Ec2zF/P.O. Box iW06• • ; • ~~Ch•IkfNC"_20X-0 •

7043•2-7426

• • • . i , " . , -

Serial: RA-15-0005 . .10 CFR 50.4February 5, 2015

U.S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555-0001

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2DOCKET NOS. 50-325, 50-324/ RENEWED LICENSE NOS. DPR-71 AND DPR-62

CATAWBA NUCLEAR STATION, UNIT NOS. I AND 2DOCKET NOS. 50-413,50-414 / RENEWED LICENSE NOS. NPF-35 AND NPF-52

CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANTDOCKET NO. 50-302/ LICENSE NO. DPR-72'

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1DOCKET NO. 50-400/ RENEWED UCENSE NO. NPF-63

MCGUIRE NUCLEAR STATION, UNIT NOS. I AND 2DOCKET NOS. 50-369, 50-370/ RENEWED UCENSE NOS. NPF-9 AND NPF-17

OCONEE NUCLEAR STATION, UNIT NOS. 1, 2 AND 3DOCKET NOS. 50-269,50-270, AND 60-287 / RENEWED UCENSE NOS. DPR-38, DPR-47,AND DPR-55

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2DOCKET NO. 50-261 1 RENEWED UCENSE NO. DPR-23

Subject: RESPONSE TO NRC REGULATORY ISSUE SUMMARY 2014-13PLANNED LICENSING ACTION SUINITTALS FOR ALL POWER REACTORLICENSEES

On December 17,2014, the Nuclear Regulatory Commission issued Regulatory issue Summary(RIS) 2014-13, "Planned Licensing Action Submittals for All Power Reactor Licensees." TheRIS requests the voluntary submittal of licensees to provide Information regarding the licensingactions that they plan to submit to the NRC for review over the next 3 calendar years and poweruprate applications that they plan to submit to the NRC for review over the next 5 calendaryears. The Included attachments contain the estimated future licensing actions and poweruprate applications for the Brunswick Steam Electric Plant, Catawba Nuclear Station, ShearonHarris Nuclear Power Plant, McGulre Nuclear Station, Oconee Nuclear Station, and H.S.

AitoI

Page 2: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Serial: RA-15-0005February 5, 2015Page 2

Robinson Steam Electric Plant. Crystal River Unit 3 is not included due to its expected transitionfrom Nuclear Reactor Regulation (NRR) to Nuclear Material Safety and Safeguards (NMSS) inthe near future.

This sbrnmittal contains no new regulatory commitments or changes to previous commitments.Please direct any questions to Art Zaremba at (980) 373-2062.

Sincerely,

M. Christopher NolanDirectorNuclear Regulatory Affairs

Attachment(s)1. Table of Estimated Licensing Actions, Brunswick Steam Electric Plant2. Table of Estimated Licensing Actions, Catawba Nuclear Station3. Table of Estimated Licensing Actions, Shearon Harris Nuclear Power Plant4. Table of Estimated Licensing Actions, McGuire Nuclear Station5. Table of Estimated Licensing Actions, Oconee Nuclear Station6. Table of Estimated Licensing Actions, H.B. Robinson Steam Electric Plant

cc: Tracy Off, Division of Operating Reactor Licensing TechniCal AssistantU.S. Nuclear Regulatory CommissionMail Stop O-8C2Rockville, MD 20852-2738

USNRC Region IIUSNRC Senior Resident Inspector - SHNPPUSNRC Senior Resident Inspector - HBRSEPUSNRC Senior Resident inspector - MNSUSNRC Senior Resident Inspector - CNSUSNRC Senior Resident Inspector - ONSUSNRC Senior Resident Inspecor - BSEPUSNRC Senior Resident Inspector - CRNGP

M.C. Barillas, NRRProject Manager - SHNPP & HBRSEPG. E. Miller, NRR Project Manager - CNS & MNSJ. R. Hall, NRR Project Manager - ONSA. L. Hon, NRR Project Manager - BSEPM. D. Orenak, NRR Project Manager - CRNGP

Page 3: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Serial: RA-15-0005February 5, 2015Page 3

bcc: Chris NolanArt ZarembaLara NicholsDavid CummingsFile: (Corporate)Electronic Licensing Library (ELL)

Randy GideonLee GrzeckBill Murray (For BNP Licensing/Nuclear Records Files)

Ben WaldrepDave Corlett A!Cindy Hereford (For HNP Licensing/Nuclear Records Files)

- ~ .. . .

Mike GloverRichard HightowerHeidi Walters (For RNP Licensing/Nuclear Records Files)

Kelvin HendersonBentley JonesNorth Carolina Municipal Power Agency No. I (NCMPA)Piedmont Municipal Power Agency (PMPA)North Carolina Electric Membership Corporation (NCEMC)CNS Master File 801.01 - CN04DMT. K. Pasour (For CNS Licensing/Nuclear Records)

Steven CappsJeff RobertsonMNS Master File 801.01 - MG01DIMK. L. Crane (For MNS Licensing/Nuclear Records)

Scott BatsonChris WasikSandy SeveranceONS Master File 801.01 - ONO3DMJ. E. Smith (For ONS Licensing/Nuclear Records)

Page 4: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 1RA-15-0005

Attachment I

Tabl" of destimaed Licensing Actions, Brunswick Steam Electric Plant

Page 5: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 1RA-15-0005Page 1

1. For all planned licensing actions expected to be submitted in the next 3 calendar years, Brunswick Units I and 2.are providingthe following information:

TABLE OF ESTIMATED UCENSING ACTIONSBrunswick Steam Electric Plant

Units I and 2Docket Nos. 60-325 and 50-324

Rf Al nfns apply oW both units

UCENSING LICENSING LICENSING ACTION PROJECTED OUTAGE COMMENTS (ASACTION ACTION TYPE DESCRIPTION SUBMITTAL RELATED? IF SO, NEEDED)

NUMBER -DATE..' DATE NEEDEDI License Revise Emergency Action 1st Quarter 2015 No

Amendment Levels consistent with NEIRequest 9-01, Revision 6

2 License Adopt TSTF-523, 2nd Quarter 2015 No Brunswick, Harris,Amendment "Managing Gas Catawba, McGuire,Request Accumulation" Oconee combined:

.%"- submittal3 License Emergency Response 2nd Quarter 2015 No

Amendment Organization (ERO)Request ResponseT iunes _,

4 License Merged Quality Assurance 2nd Quarter 2015 No Brunswick, Harris,Amendment Topical Report Catawba, McGuire,Request Oconee, Robinson

_________"__combined submittal5 License Electrical Protection 3rd Quarter 2015 No

Amendment Assembly (EPA) Breaker___Reques . Voltag Allowable Value I_____ ...____ ______

Page 6: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 1RA-15-0005Page 2

6 License Adopt TSTF-427, 3rd Quarter 2015 No Brunswick, Harris,Amendment "Allowance for Non- Catawba, McGuire,Request Technical Specification Oconee, Robinson

Barrier Degradation on combined submittalSupported System_ Operabdity

7 License Adopt TSTF-52Z "Revise 3rd Quarter 2015 No Brunswick, Harris,Amendment Ventilation System Catawba, McGuire,Request Surveillance Requirements Oconee, Robinson

to Operate for 10 hours per combined submittalMonth"

8 License Common Emergency 4th Quarter 2015 No Brunswick, Harris,Amendment Operations Facility Robinson combinedRequest submittal

9 License Adopt TSTF-425, 1st Quarter 2016 NoAmendment "Relocate SurveillanceRequest Frequencies to Licensee

Control - RITSTFInitiative 5b"

10 License Adopt new type of 2nd Quarter 2016 No Brunswick, Harris,Amendment respirator (Respirex) Robinson combinedRequest submittal

11 License Adopt TSTF-505, 4th Quarter 2016 NoAmendment "Provide Risk-InformedRequest Extended Completion

Times - RITSTF Initiative4b"

12 License Extend Appendix J, Type A 1st Quarter 2017 Yes, Spring 2020Amendment (ILRT) and Type C (LLRT)Request Test Intervals

13 License 50.69 - Graded Quality 4th Quarter 2017 No Brunswick, Harris,Amendment Assurance Program Catawba, McGuire,Request Oconee, Robinson

combined submittal

Page 7: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment IRA-15-0005Page 3

2. Brunswick Units 1 and 2 do not plan to apply for a power uprate in the next 5 calendar years,

3. The NRC staff may make the above Information public.

Page 8: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 2RA- 15-0005

Afttchmewnt 2

TWO of EstimatedLicensing Actions, Catawba Nuclear Station

:-'( ,

Page 9: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 2RA-15-0005Page 1

1. For all planned licensing actions expected to be submitted in the next 3 calendar years, Catawba Units 1 and 2 are providingthe following information:

TABLE OF ESTIMATED LICENSING ACTIONSCatawba Nuclear Station

U"Itsliand 2Docket NoM 50-413 and 50-414

Noft: Achd 10is zap tps fa VAN (IoZkxM, $0413) ouly. M ad m we v Wb. to both wnt

LICENSING LICENSING LICENSING ACTION PROJECTED OUTAGE COMMENTS (ASACTION ACTION TYPE DESCRIPTION SUBMITTAL RELATED? IF SO, NEEDED)NUMBER DATE -DATE NEEDED

1 License Reduce Reactor Coolant 1st Quarter 2015 NoAmendment (NC) flow on both Units toRequest Increase flow margin to

>1% ,2 License Extend the Completion 2nd Quarter 2015 No Catawba, McGuire

Amendment Tone for two trains of combined submittalRequest Control Area Chilled Water

,_______ ____,,___ _ System (YC) inoperable ...._,-

3 License Adopt .TSTF-510, t 2nd Quarter 2015 Yes, Fall 2016 Catawba, McGuire,Amendment 'Revision, to Steam , Oconee combinedRequest Generator Program submittal

Inspection Frequenciesand Tube SampleSelection"

4 License Adopt TSTF-523, 2nd Quarter 2015 No Brunswick, Harrs,,Amendment "Managing Gas Catawba, McGuire,Request Accumulation" Oconee combined

.. .. ___-_submittal

Page 10: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 2RA-15-0005Page 2

5 License Alternative Non-LOCA 2nd Quarter 2015 No Catawba, McGuire,Amendment Fission Product Gap Oconee combinedRequest Fractions submittal

Pre-submittal meetingheld on January 14,2015

6 License Merged Quality Assurance 2nd Quarter 2015 No Brunswick, Harris,Amendment Topical Report Catawba, McGuire,Request Oconee, Robinson

combined submittal7 License Revise Emergency Action 2nd Quarter 2015 No

Amendment Levels consistent with NEIR( ., 99-01, Revision 6

8 License Extend Appendix J, TypeA 3rd Quarter 2015 Yes, Fall2016Amendment (ILRT) and Type C (LLRT)Reus Test Intervals_______

9 License Adopt TSTF-522, -Revise 3rd Quarter 2015 No Brunswick, Harris,Amendment Ventilation System Catawba, McGuire,Request Surveillance Requirements Oconee, Robinson

to Operate for 10 hours per combined submittalMonth" ....

10 License Adopt TSTF-427, 3rd Quarter 2015 No Brunswick, Harris,Amendment "Allowance for Non- Catawba, McGuire,Request Technical Specification Oconee, Robinson

Barrier Degradation on combined submittalSupported SystemOperability"

11 License Administrative LAR to 4th Quarter 2015 No Catawba, McGuireAmendment delete the superseded TS combined submittalRequest- and Bases requirements

for the Source Range /Intermediate Range

________ - __replacement TS change

Page 11: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 2RA-15-0005Page 3

12 License Diesel Generator AOT 1st Quarter 2016 NoAmendment extension 72 hrs, to 14Request days using BTP-8.8.

13 License UFSAR Change - Request 1st Quarter 2016 No Catawba, McGuireAmendment review and approval of the combined submittalRequest TORMIS methodology to

resolve a non-conformance related to theReactor BuildingDoghouse openings.SSCs inside aresusceptible to tornadomissile damage. _ _

14 License Removal of the License 1st Quarter 2016 NoAmendment Condition that limits DoseRequest Equivalent Iodine to a

value less than TechnicalSpeicf tkons __

15 Lcense 50.69 - Graded Quality 4th Quarte 2017 No Brunswick, Harris,Amendment Assurance Program Catawba, McGuire,Request Oconee, Robinson

____combined submittal16 License Revise Reactor Coolant 1st Quarter 2018 No Applicable to Catawba

Amendment System (NC) Unit I (Docket 50-413)Request pressure/temperature only.

limits to extend beyond 34EFPY _..,

2. Catawba Units I and 2 do not plan to apply for a power uprate in the next 5 calendar years.

3. The NRC staff may make the above information public.

Page 12: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 3RA-15-0005

.1

Atachmet 3

Table otdEstimated Ucensing Actions, Shearon Haris Nuclear Power Plant

,. C

Page 13: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 3RA-15-0005Page I

1. For all planned licensing actions expected to be submitted in the next 3 calendar years, Harris Unit 1 is providing the followinginformation

TABLE OF ESTIMATED UCENSING ACTIONSSheaRon Harris Nuclear Power Plant

Unit 1Docket No. 50400

LICENSING UCENSING LICENSING ACTION PROJECTED OUTAGE COMMENTS (ASACTION ACTIONTYPE DESCRIPTION SUBMI'TAL DATE RELATED? IF NEEDED)

NUMBER SO, DATENEEDED

1 License DPC-NE-2005 1st Quarter 2015 No Harris, RobinsonAmendment Thermal Hydraulics combined submittalRequest Statistical Core Design

Methodology Revision of ExstingFuels MethodologyReport Adoption Into

_,___-__.___. ... _:_ _____ _ _"__ "__'Tech Specs-

2 Relief Request Generic approval of 1st Quarter 2015 Notemper bead weld processfor reactor vessel headrepaw' _ _ _ _ _ _

3 License Adopt TSTF-425, lt Quarter 2015 NoAmendment 'Relocate Surveillance..Request Frequencies to Licensee

Control - RITSTFInitiative 5b"

4 License Move Waste Gas 1st Quarter 2015 NoAmendment Explosive Limits TS toRequest program for consistency

with ITS

Page 14: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 3RA-15-0005Page 2

5 License DPC-NE-1008 2nd Quarter 2015 No Harris, RobinsonAmendment Nuclear Design combined submittalRequest Methodology using

CASMO-6/SIMULATE-3 New FuelsDPC-NE-3008 Methodology ReportsThermal-Hydraulic Adoption into Tech

. Transient Analysis SpecsMethodology __--

6 License Revise'Emergency Action 2nd Quarter'2015 NoAmendment Levels consistent withRequest NEI 99-01, Revision 6 .._•_..

7 License Revise FSAR to take • 2nd Quarter 2015 NoAmendment exception to RG 1.78,Request Rev. I regarding the 330

foot bulk chemicalexclusion to the ControlRoom_

8 License Adopt TSTF-523, 2nd Quarter 2015 No Brunswick, Harris,Amendment 'Managing Gas Catawba; McGuire,Request Accumulation" Oconee combined

submittal9 License Merged Quality Assurance 2nd Quarter 2015 No Brunswick, Harris,

Amendment Topical Report Catawba, McGuire,Request - Oconee, Robinson

.... ___ _____-_combined submittal10 License Adopt TSTF-427, 3rd Quarter 2015 No Brunswick, Harris,

Amendment "Allowance for Non- Catawba, McGuire,Request Technical Specification Oconee, .Robinson

Barrier Degradation on combined submittalSupported System

__ _ _ _- 'Operability" ....

Page 15: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 3RA-15-0005Page 3

Ventilation SystemSurveillance Requirementsto Operate for 10 hours perMonth"

Brunswick, Harris,Catawba, McGuire,Oconee, Robinsoncombined submittal

LicenseAmendmentRequest

DPC-NE-3009UFSAR Chapter 15TransientAnalysisMethodologyDPC-NF-2010Nuclear PhysicsMethodology for ReloadDesignDPC-NE-2011Nuclear DesignMethodology Report forCore Operating Limits ofWestinahouse Reactors

Harris, Robinsoncombined submittal

New and RevisedFuels MethodologyReports Adoption intoTech Specs

13 License Common Emergency 4th Quarter 2015 No Brunswick, Harris,Amendment Operations Facility Robinson combinedRequest submittal

14 License Adopt TSTF-505, 1st Quarter 2016 NoAmendment "Provide Risk-InformedRequest Extended Completion

Times - RITSTF Initiative4b"

15 License Adopt new type of 2nd Quarter 2016 No Brunswick, Harris,Amendment respirator (Respirex) Robinson combinedRequest submittal

16 License DPC-NE-1003 2nd Quarter 2016 Yes, Spring Harris, RobinsonAmendment Rod Swap Methodology 2018 combined submittalRequest Report for Startup Physics

Testing Revision of ExistingFuels MethodologyReport

Page 16: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 3RA-15-0005Page 4

17 License Revise Main Steam 2nd Quarter 2016 NoAmendment Safety Valve Setpoints inRequest Table &7-2 for

_consistency with ITS18 License Extend Appendix J, Type A 1st Quarter 2017 Yes, Spring

Amendment (ILRT) and Type C (LLRT) 2021Request Test Intervals

19 License 50.69 - Graded Quality 4th Quarter 2017. No Brunswick, Harris,Amendment Assurance Program Catawba, McGuire,Request Oconee, Robinson

combined submittal

2. Harris Unit 1 does not plan to apply for a power uprate In the next 5 calendar years

3. The NRC staff may make the above Information public.

Page 17: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 4RA-15-0005

Attachmnint 4

Tibleof EStiOmted Licensing Actions, McGuire Nuclear Station

Page 18: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 4RA-15-0005Page 1

1. For all planned lcensing actions expected to be submitted in the next 3 calendar years, McGuire Units 1 and 2 are providingthe following information:

TABLE OF ESTIMATED MCENSING ACTIONSMcGuire Nuclear Station

Unbt I and2Docket Nos. 50-369 and 50-370

o•t: Acion Ile applIOc toW -t 1 (00t 504.1Mony. 0* olAN 0eMS WO#a to both nits.

UCENSING LICENSING LICENSING ACTION PROJECTED OUTAGE COMMENTS (ASACTION ACTION TYPE DESCRIPTION SUBMITTAL RELATED? IF SO, NEEDED)

NUMBER DATE DATE NEEDED1 Relief Request A Relief Request to delay 1stQuarter2015 Yes, Fall 2015 Applicable to McGuire

inspection of Unit I Unit 1 (Docket 50-369)Reactor Coolant (NC) cold only.leg nozzle welds from1EOC24 (March-2016) to Precedents: Safetya later outage. Code Evaluations for IndianCase N-770-1 and MRP- Point Unit 3349, "PWR Reactor (ML14199A444); FarleyCoolant System Cold- Units 1 and 2Loop Dissimilar Metal Butt (ML-14262A317);Weld Reexamination Arkansas Nuclear OneInterval Extension, Unit 1 (ML14282A479)provlde the technical basisto support extension of thereexamination interval forlarge-diameter Alloy82/182 dissimilar metalbutt welds.

Page 19: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 4RA-15-0005Page 2

2 License Administrative LAR to 1st Quarter 2015 NoAmendment delete the supersededRequest Rated Thermal Power

definition footnote'on TSPage 1.1-5 within: 180days after implementationof the MUR uprate on thelast unit. MUR wasImplemented on the lastunit (Unit 1) on 9/24/14. ___.. ..

3 License Adopt TSTF-510, 2nd Quarter 2015 Yes, Fall 2016 (for Catawba, McGuire,Amendment "Revision to Steam Catawba) Oconee combinedRequest Generator Program submittal

Inspection Frequenciesand Tube Sample

4 Ucense Revise Emergency Action 2nd Quarter 2015 NoAmendment Levels consistent with NEIRequest 99-01, Revision 6S

5 License Alternative Non-LOCA 2nd Quarter 2015 No Catawba, McGuire,Amendment Fission Product Gap Oconee combinedRequest Fractions submittal

Pre-submittal meeting-. . . .held on January 14,

_ _ .- _ _ _. _ __. , _ _ _ _ _ _ _2015 .4.. ,

6 License, Extend the Completion 2nd Quarter 2015 No Catawba, McGuireAmendment Time for two trains of combined submittalRequest Control Area Chilled

Water System (YC)I inoperable

Page 20: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 4RA-1S-000SPage 3

7 License Adopt TSTF-493, "Clarify 2nd Quarter 2015 NoAmendment Application of SetpointRequest Methodology for LSSS

FunctionsW for TS Table3.3.1-1 Function 12,Setpoint forunderfrequency Reactor.

8 Licese Adopt TSTF-523, 2nd Quarter 2015 No Brunswick, Harris,Amendment "Managing Gas Catawba, McGuire,Request Accumulalton" Oconee combined

subittal9 License Merged Quality Assurance 2nd Quarter 2015 No Brunswick, Harris,

Amendment Topical Report Catawba, McGuire,Request Oconee, Robinson

combined submittal10 License Diesel Generator AOT 3rd Quarter 2015 No

Amendment extension 72 hrs. to 14Requestdays using BTP-8.8.

11 License Adopt TSTF-522, "Revise. 3rd Quarter 2015 No Brunswick, Harris,Amendment Ventilation System Catawba, McGuire,Request Sur"eillanrce . Oconee, Robinson

Requirements to. Operate combined submittalfor 10 hours per Month"

12 License Adopt TSTF-427, 3rd Quarter 2015 No Brunswick, Harris,Amendment "Allowance for Non- .. - Catawba, McGuire,Request , Technical Specification Oconee, Robinson

Barrier Degradation on combined submittalSupported System_OperabIiy

13 License Extend Appendix J, Type 4th Quarter 2015 Yes, Spring 2017Amendment A (ILRT) and Type CRequest (LLRT) Test Intervals

Page 21: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 4RA-15-0005Page 4

14 License Administrative LAR to 4th Quarter 2015 No Catawba, McGuireAmendment delete the superseded TS combined submittalRequest and Bases requirements

for the Source Rang, IIrdnermediate Rangereplacement TS change,

15 License UFSAR Change- Request 1stOuarter2016 No Catawba, McGuireAmendment review and approval of the combined submittalRequest TORMIS methodology to

resolve a non-conformance related tothe Reactor BuildingDoghouse openingsSSCs inside aresusceptible to tornadomissile damage._

16 License TS 3.6.13- Ice condenser st Quarter 2016 NoAmendment door alternate positionRequest monitoring. . ;

17 License RevIseTS3.6.14,iIvider 1st Quarter 2016 NoAmendment Barri Integrity,- to allowRequest an indMdual Steam

Generator manway.hatchto be open for up to sixhours.,

18 License Revise TS.3.&9, 1 st Quarter'2016 NoAmendment "Hydrogen MitigationRequest System," to allow more

than one inoperablehydrogen igniter while stillconsidering the trainoperable _.

Page 22: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 4RA-15-0005Page 5

19 License Refueling canal drain 1st Quarter 2016 NoAmendment surveillance change fromRequest a drain valve to a drain

flange.20 License Revise TS 3.8.9 to allow. 1st Quarter 2016 No

Amendment 1) adequate time toRequest respond to a single unit

fire event without initiatinga shutdown of theunaffected unit, 2) testmanual transfer of anessential MCC to a SSFMCC, and 3) performeffective PM on plantequiment.

21 License Re-submitting a revised 4th Quarter 2016 -NoAmendment version of the one-time TSRequest 3.7.7, Nuclear Service

Water System (RN),change to extend thecompletion time to recoveranything that might be inthe 'A' RN StandbyNuclear Service WaterPond (SNSWP) suctionheader.

22 License 50.69 - Graded Quality 4th Quarter 2017 No Brunswick, Harris,Amendment Assurance Program Catawba, McGuire,Request Oconee, Robinson

combined submittal

2. McGuire Units 1 and 2do not plan for apower uprate in the next 5calendar years.

3. The NRC staff may make the above Information public.

Page 23: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 5RA-15-0005

)

Attachment 5

TaWi. of Easniated Licensing Actions, Oconee Nuclear Station

.4o ;-

.h

Page 24: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 5RA-15-0005Page 1'

1. For all planned licensing actions, eWpcted to be submitted in the next 3 calendar years, Oconee Units, 1,2, and 3 are,-

providing the following informatlon.:.

TABLE OF ESTIMATED UCENSING ACTIONS*Ocone. Nuciow Station

Uni t t Zand3Docket Nos 50469v 504270, and W0287

us.. -Alwt mo me app.I. to aD ftw, imib

UCENSING LICENSING UCENSING ACTION PROJECTED OUTAGE COMMENTS (ASACTION ACTION TYPE DESCRIPTION SUBMITTAL RELATED? IF SO, NEEDED)

NUMBER DATE DATE NEEDED4 License Add High Flm Thp for 3 lot Quarter 2015 No

Amendmient Reactor Coolant Pump2 MM- Opertin

2 License Adopt TSTF-523- 2nd Quarter 2015 No Brunswick, Harris,Amendment -Managing Gas Catawba, McGuire,Request Accumulation. - ,.. . - Oconee combined

. .submittal3 Lwn Atemative Non-LOCA 2nd Quarter 2015 No Catawba, McGuire,

Amendment Fission:Product Gap Oconee combinedRequest Fractos submittal

rPr&-ubmfttal tmeeting.: .-- . ..... . . held on January 14,

_-__ _ _, _ _._ _ _ _ __..,_ _ _ _ __._ 20154 License Merged Quality 2nd Quarter 2015 No Brunswick, Harris,

Amendment Assunme Topical Report Catawba, McGuire,Request Oconee, Robinson

combined submittal

Page 25: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 5RA1 5-0005Page

5 License Adt" TSTF-510, 2nd-Quarter 2015 Yes, Fad12016 (for Catawba, McGuire,Amendment "Pevision to Steam Catawba) Oconee combined

equest Generator Program' . submittalInspection FrequenciesandTube SampleSele-tlor"

6 icense Revise Emergency Action 2fid-Quarter 2015 NoAmenditient Lvels consistent with NEI______ 99-01, Revision 6 _"____

7 License Adopt TSTF-448, Rl"', " 2ndQua~ter 2015 NoAmendment ",WoI Room

" Ucense Standby Shutdown 3rd uatb 2015 NoAmendment Facity (SSF) ThermalRest Margn LAR

9 License Correct Technical 3rdQuarter ,015 NbAmndme h m .... ReentlyReque"t Issued Amendment to TS

3.8.1 "AC Sources- .. d .... ,, ,NOper~t

10 Lcense TS3.8.1 "ACSources- 3rd uarter 2015 No.':Amendment Operating" CompletionRequest Time Extension to

Suppoit Keowes " ....Hydroelectric Statice.

, •:." ... -Stator W ork .:-,•',

11 License Adopt TSTF-522, "Revise 3rd Quarter 2015 No Buriswick, Harris,Amendment Ventilation System Catawba, McGuire,Request Surveillance Oconee, Robinson

Requirements to Operate , combined submittalfor 10 hours per Month"

Page 26: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachmeht 5RA-15-0005Page 3

12 License Adopt TSTF-427, 3rd lQuter 2015 No Brunswick, Harris,Amendment *Allowance for WlW Catawba, McGuire,Request Technical Specification Oconee, Robinson

Barrier Degradation on combined submittalSupported System- -". ",O e bi " : .- ":,'

13 ... ense..- DeletOTS3.7.18-Dryý Ist Quarter 2016 NoAmendment Spent Fuel StoragCaeskRequest Lobdi and Unloading

14 License Main FDW Contrd Valve -ý 4th Quarter 2016 NoAmendment Inadequate Air SupplyRequest

15 License SSF Sump Upgrade/ Kirk- 4th Quarter 2016 No

16 License Tormado Mfidigation lst Quarter 2017 No LAR was submittedAmendment Recostitution LAR previously but NRCRequest review has been

17 LIcense HELB MitigaionhtAR 1st Quarter 2017 No LAR was submittedAmendment ;" ,, previously but NRCRequest ... "-vi- has bednsuspended

t8 License MUR ReviewRestartafter 1st Quarter 2017 Yes, SeeNo. 2 To be subh*W -afterAmendment RAI response submittal below the HELB LAR - MURRequest LAR depends on the

safety analysis of theMFDW break in theHELB LAR.

19 License Extend Appendix J, Type 1st Quarter 2017 Yes, Spring 2024Amendment A (ILRT) and Type CRequest (LLRT) Test Intervals

20 License Atmospheric Dump Valve 4th Quarter 2017 NoAmendment Allowed Outage TimeRequest Extension (12 hour)

Page 27: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 5RA-M15-0005

Page4

21 License Adopt TSTF-498 "Risk- 4thQuarte 2017 NoAmendment Wormed Contairnmei'Request Isolation Valve

Compmok,__________" Tim es (BAW -2461)" ........ _____..... _' _" _

22 - uces... Revise TS Table 3.3.5-1:" 4th Caiiter 2017' 'No,.* Amendment to change the a

" A •... H. h Reactor 13i ,....kressure for Eniginered

Safeguards actuation to 5

23 Li.ense Revise TS 3.9.1 to adopt 4t Ouarter 2017 No- Amendment aTSTF -272 querttinge-

Request Boron ConcetrationClariiation to allowboron samng of FTC .in

________ _________Mods6 a.. ... K.~24 Lbcense Aflow Ocounee to seff- 4th Quarter 2017 No

Amendmnent approve quantitative risk-Request in? orr66d fire pobtechon

Proararn chanqe25 License 50.89 - Graded Qualty 4th Quarter 2017 NO Brunswick, Harris,

Amendment... Assurance Prograr .. . Catawta, McGuire,Request Oconee, Robinson

_combined submttal

Page 28: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 5RA-15-0005Page 5

2. Oconee Units 1, 2, and 3 plan to apply for a 1.84% power uprate measurement uncertainty recapture (MUR) in the next 5calendar years.

NOTE: Oconee previously submitted a MUR LAR in 9/2011 that was Indefinitely suspended due to NRC resource availability.A set of RAI items was received by Oconee in the Interim. The MUR LAR will. likely be supplemented In the 3rd quarter 2016.

o What percent Increase In power from the current licensed thermal power (CLTP) limit does the licensee plan to apply for?(Please write N/A in any unit that does not apply or that is not planned for a power uprate.)

Unit 1 .4% Unit 2 1.1% Unit 3 1.6% Unit 4 IVA%

o What is the planned Increase from the CLTP limit in megawatts thermal?

Unit 1 42MWt Unit 2 42MWt Unit 3 4MWt Unit 4 NAMWt

o What Is the expected schedule for fMig the application (onth/year)? (If the mnth is not known, please provide thequarter and/or year.)

Unit10•ML Unit2 MM. Unitt32017 Unit 4 NA

o What is the expected date for power ascension with uprated conditions (month/year)?

Unit 1 1!,18 Unit 2 11/2017 Unit 3 512-OI Unit 4 V

3. The NRC staff may make the above information public,

Page 29: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 6RA-15-0005

Atti" ment 6

Tabe Or E*maed Licesi Actions, H.S. Rbnsn Steam Eletc PNt

*1.

Page 30: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 6RA-15-0005Page 1

1. For all planned licensing actions expected to be submitted in the next 3 calendar years, Robinson Unit 2 is providing thefollowing information:

TABLE OF ESTIMATED UCENSING ACTIONSH. B, Robinson Stem Electric Plant

Unit 2Docket No. 50-261

uLCENSING LICENSING LICENSING ACTION PROJECTED OUTAGE COMMENTS (ASACTION ACTION TYPE DESCRIPTION SUBMITTAL RELATED? IF SO, NEEDED)

NUMBER ___. DATE DATE NEEDED1 License DPC-NE-2005 1st Quarter 2015 No Harris, Robinson

Amendment Thermal Hydraulics combined submittalRequest Statistical Core Design

Methodology Revision of ExistingFuels MethodologyReport Adoption into

.... ___ Tech Specs2 License Adpt TSTF-339, Rev. 2, 2nd Quarter 2015 No

Amendment "Relocate TS parametemrRequest to COLFr_

3 License DPC-NE-1008 2nd Quarter 2015 No Harris, RobinsonAmendment Nuclear Design combined submittalRequest Methodology using

CASMO-5/SIMULATE-3 New FuelsDPC-NE-3008 Methodology ReportsThermal-Hydraulic Adoption into TechTransient Analysis Specs

_____ ______ ~~Methodology _ _ _ _ _ _ _ _ _ _

Page 31: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 6RA-15-0005Page 2

4 License Merged Quality Assurance 2nd Quarter 2015 No Brunswick. Harris,Amendment Topical Report.- Catawba, McGuire,Request Oconee, Robinson

combined submittal5 License Revise Emergency Action 2nd Quarter 2015 No

Amendment Levels consistent withRequest NEI 99-01, Revision 6. _ _,

6 license Revise TS 3.1.4 and 3.1.7 2nd Quarter 2015 NoAmendment to credit ERFIS as aRequest means to monitor Rod

Position Indication - _

7 License Plant Transmission 3rd Quarter 2015 Yes, Spring 2017Amendment Interface UpgradesRequest ,....

8 License Adopt TSTF-427, - 3rd Quarter 2015 No Brunswick, Harris,Amendment "Alowance for Non- Catawba, McGuire,Request Technical Specification Oconee, Robinson

Barrier Degradation on combined submittalSupported SystemOp.erabilit? _......._..

9 License Adopt TSTF,522,•"Revise 3rd Quarter 2015 No Brunswick, Harris,Amendment Ventilation System Catawba, McGuire,Request Surveillance Requirements Oconee, Robinson

to.Operate for 10 hours per combined submittal_ _ Month"w _ _ _ _ _ _ _ _ _

Page 32: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 6RA-15-0005Page 3

10 LicenseAmendmentRequest

DPC-NE-3009UFSAR Chapter 15 STransient AnalysisMethodologyDPC-NF-2010NUclear•Physics .Methodology for ReloadDesignDPC-NE-201 1Nuclear DesignMethodology Report forCore Operating Limits ofWestinghouse Reactors

4th Quarter 2015 No Harris, Robinsoncombined submittal

New and RevisedFuels MethodologyReports Adoption intoTech Specs

11 License Extend Appendix J, Type A 4th Quarter 2015 Yes, Spring 2017Amendment (ILRT) and Type C (LLRT)Request Test Intervals

12 License Common Emergency 4th Quarter 2015 No Brunswick, Harris,Amendment Operations Facility Robinson combinedRequest, submittal

13 License Adopt new type of 2nd Quarter 2016 No Brunswick, Harris,Amendment respirator (Respirex) Robinson combinedRequest submittal

14 License DPC-NE-1003 2nd Quarter 2016 Yes, Spring 2018 Harris, RobinsonAmendment Rod Swap Methodology combined submittalRequest Report for Startup Physics

Testing Revision of ExistingFuels MethodologyReport

15 License 24-month fuel cycle 3rd Quarter 2016 Yes, Fall 2018Amendment conversionRequest I

Page 33: UN. ChdsWherNoAM Soug Shr..t £ ~~Ch•IkfNC 20X-0 · Randy Gideon Lee Grzeck ... Ben Waldrep Dave Corlett A! Cindy Hereford (For HNP Licensing/Nuclear Records Files) - ~ .. . . Mike

Attachment 6RA-15-0005Page 4

16 License Adopt TSTF-412, Provide 4th Quarter 2016 NoAmendment Actions for One SteamRequest Supply to Turbine Driven

AFWAEFW Pump_ _oVer_- _

17 License 50.69 - Graded Quality 4th Quarter 2017 No Brunswick, Harris,Amendment Assurance Program Catawba, McGuire,Request Oconee, Robinson

combined submittal

2. Robinson Unit 2 does not plan to apply for a power uprate in the next 5 calendar years

3. The NRC staff may make the above information public.