Serial: RA-15-0005 . .10 CFR 50.4February 5, 2015
U.S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555-0001
BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2DOCKET NOS. 50-325, 50-324/ RENEWED LICENSE NOS. DPR-71 AND DPR-62
CATAWBA NUCLEAR STATION, UNIT NOS. I AND 2DOCKET NOS. 50-413,50-414 / RENEWED LICENSE NOS. NPF-35 AND NPF-52
CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANTDOCKET NO. 50-302/ LICENSE NO. DPR-72'
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1DOCKET NO. 50-400/ RENEWED UCENSE NO. NPF-63
MCGUIRE NUCLEAR STATION, UNIT NOS. I AND 2DOCKET NOS. 50-369, 50-370/ RENEWED UCENSE NOS. NPF-9 AND NPF-17
OCONEE NUCLEAR STATION, UNIT NOS. 1, 2 AND 3DOCKET NOS. 50-269,50-270, AND 60-287 / RENEWED UCENSE NOS. DPR-38, DPR-47,AND DPR-55
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2DOCKET NO. 50-261 1 RENEWED UCENSE NO. DPR-23
Subject: RESPONSE TO NRC REGULATORY ISSUE SUMMARY 2014-13PLANNED LICENSING ACTION SUINITTALS FOR ALL POWER REACTORLICENSEES
On December 17,2014, the Nuclear Regulatory Commission issued Regulatory issue Summary(RIS) 2014-13, "Planned Licensing Action Submittals for All Power Reactor Licensees." TheRIS requests the voluntary submittal of licensees to provide Information regarding the licensingactions that they plan to submit to the NRC for review over the next 3 calendar years and poweruprate applications that they plan to submit to the NRC for review over the next 5 calendaryears. The Included attachments contain the estimated future licensing actions and poweruprate applications for the Brunswick Steam Electric Plant, Catawba Nuclear Station, ShearonHarris Nuclear Power Plant, McGulre Nuclear Station, Oconee Nuclear Station, and H.S.
AitoI
Serial: RA-15-0005February 5, 2015Page 2
Robinson Steam Electric Plant. Crystal River Unit 3 is not included due to its expected transitionfrom Nuclear Reactor Regulation (NRR) to Nuclear Material Safety and Safeguards (NMSS) inthe near future.
This sbrnmittal contains no new regulatory commitments or changes to previous commitments.Please direct any questions to Art Zaremba at (980) 373-2062.
Sincerely,
M. Christopher NolanDirectorNuclear Regulatory Affairs
Attachment(s)1. Table of Estimated Licensing Actions, Brunswick Steam Electric Plant2. Table of Estimated Licensing Actions, Catawba Nuclear Station3. Table of Estimated Licensing Actions, Shearon Harris Nuclear Power Plant4. Table of Estimated Licensing Actions, McGuire Nuclear Station5. Table of Estimated Licensing Actions, Oconee Nuclear Station6. Table of Estimated Licensing Actions, H.B. Robinson Steam Electric Plant
cc: Tracy Off, Division of Operating Reactor Licensing TechniCal AssistantU.S. Nuclear Regulatory CommissionMail Stop O-8C2Rockville, MD 20852-2738
USNRC Region IIUSNRC Senior Resident Inspector - SHNPPUSNRC Senior Resident Inspector - HBRSEPUSNRC Senior Resident inspector - MNSUSNRC Senior Resident Inspector - CNSUSNRC Senior Resident Inspector - ONSUSNRC Senior Resident Inspecor - BSEPUSNRC Senior Resident Inspector - CRNGP
M.C. Barillas, NRRProject Manager - SHNPP & HBRSEPG. E. Miller, NRR Project Manager - CNS & MNSJ. R. Hall, NRR Project Manager - ONSA. L. Hon, NRR Project Manager - BSEPM. D. Orenak, NRR Project Manager - CRNGP
Serial: RA-15-0005February 5, 2015Page 3
bcc: Chris NolanArt ZarembaLara NicholsDavid CummingsFile: (Corporate)Electronic Licensing Library (ELL)
Randy GideonLee GrzeckBill Murray (For BNP Licensing/Nuclear Records Files)
Ben WaldrepDave Corlett A!Cindy Hereford (For HNP Licensing/Nuclear Records Files)
- ~ .. . .
Mike GloverRichard HightowerHeidi Walters (For RNP Licensing/Nuclear Records Files)
Kelvin HendersonBentley JonesNorth Carolina Municipal Power Agency No. I (NCMPA)Piedmont Municipal Power Agency (PMPA)North Carolina Electric Membership Corporation (NCEMC)CNS Master File 801.01 - CN04DMT. K. Pasour (For CNS Licensing/Nuclear Records)
Steven CappsJeff RobertsonMNS Master File 801.01 - MG01DIMK. L. Crane (For MNS Licensing/Nuclear Records)
Scott BatsonChris WasikSandy SeveranceONS Master File 801.01 - ONO3DMJ. E. Smith (For ONS Licensing/Nuclear Records)
Attachment 1RA-15-0005
Attachment I
Tabl" of destimaed Licensing Actions, Brunswick Steam Electric Plant
Attachment 1RA-15-0005Page 1
1. For all planned licensing actions expected to be submitted in the next 3 calendar years, Brunswick Units I and 2.are providingthe following information:
TABLE OF ESTIMATED UCENSING ACTIONSBrunswick Steam Electric Plant
Units I and 2Docket Nos. 60-325 and 50-324
Rf Al nfns apply oW both units
UCENSING LICENSING LICENSING ACTION PROJECTED OUTAGE COMMENTS (ASACTION ACTION TYPE DESCRIPTION SUBMITTAL RELATED? IF SO, NEEDED)
NUMBER -DATE..' DATE NEEDEDI License Revise Emergency Action 1st Quarter 2015 No
Amendment Levels consistent with NEIRequest 9-01, Revision 6
2 License Adopt TSTF-523, 2nd Quarter 2015 No Brunswick, Harris,Amendment "Managing Gas Catawba, McGuire,Request Accumulation" Oconee combined:
.%"- submittal3 License Emergency Response 2nd Quarter 2015 No
Amendment Organization (ERO)Request ResponseT iunes _,
4 License Merged Quality Assurance 2nd Quarter 2015 No Brunswick, Harris,Amendment Topical Report Catawba, McGuire,Request Oconee, Robinson
_________"__combined submittal5 License Electrical Protection 3rd Quarter 2015 No
Amendment Assembly (EPA) Breaker___Reques . Voltag Allowable Value I_____ ...____ ______
Attachment 1RA-15-0005Page 2
6 License Adopt TSTF-427, 3rd Quarter 2015 No Brunswick, Harris,Amendment "Allowance for Non- Catawba, McGuire,Request Technical Specification Oconee, Robinson
Barrier Degradation on combined submittalSupported System_ Operabdity
7 License Adopt TSTF-52Z "Revise 3rd Quarter 2015 No Brunswick, Harris,Amendment Ventilation System Catawba, McGuire,Request Surveillance Requirements Oconee, Robinson
to Operate for 10 hours per combined submittalMonth"
8 License Common Emergency 4th Quarter 2015 No Brunswick, Harris,Amendment Operations Facility Robinson combinedRequest submittal
9 License Adopt TSTF-425, 1st Quarter 2016 NoAmendment "Relocate SurveillanceRequest Frequencies to Licensee
Control - RITSTFInitiative 5b"
10 License Adopt new type of 2nd Quarter 2016 No Brunswick, Harris,Amendment respirator (Respirex) Robinson combinedRequest submittal
11 License Adopt TSTF-505, 4th Quarter 2016 NoAmendment "Provide Risk-InformedRequest Extended Completion
Times - RITSTF Initiative4b"
12 License Extend Appendix J, Type A 1st Quarter 2017 Yes, Spring 2020Amendment (ILRT) and Type C (LLRT)Request Test Intervals
13 License 50.69 - Graded Quality 4th Quarter 2017 No Brunswick, Harris,Amendment Assurance Program Catawba, McGuire,Request Oconee, Robinson
combined submittal
Attachment IRA-15-0005Page 3
2. Brunswick Units 1 and 2 do not plan to apply for a power uprate in the next 5 calendar years,
3. The NRC staff may make the above Information public.
Attachment 2RA- 15-0005
Afttchmewnt 2
TWO of EstimatedLicensing Actions, Catawba Nuclear Station
:-'( ,
Attachment 2RA-15-0005Page 1
1. For all planned licensing actions expected to be submitted in the next 3 calendar years, Catawba Units 1 and 2 are providingthe following information:
TABLE OF ESTIMATED LICENSING ACTIONSCatawba Nuclear Station
U"Itsliand 2Docket NoM 50-413 and 50-414
Noft: Achd 10is zap tps fa VAN (IoZkxM, $0413) ouly. M ad m we v Wb. to both wnt
LICENSING LICENSING LICENSING ACTION PROJECTED OUTAGE COMMENTS (ASACTION ACTION TYPE DESCRIPTION SUBMITTAL RELATED? IF SO, NEEDED)NUMBER DATE -DATE NEEDED
1 License Reduce Reactor Coolant 1st Quarter 2015 NoAmendment (NC) flow on both Units toRequest Increase flow margin to
>1% ,2 License Extend the Completion 2nd Quarter 2015 No Catawba, McGuire
Amendment Tone for two trains of combined submittalRequest Control Area Chilled Water
,_______ ____,,___ _ System (YC) inoperable ...._,-
3 License Adopt .TSTF-510, t 2nd Quarter 2015 Yes, Fall 2016 Catawba, McGuire,Amendment 'Revision, to Steam , Oconee combinedRequest Generator Program submittal
Inspection Frequenciesand Tube SampleSelection"
4 License Adopt TSTF-523, 2nd Quarter 2015 No Brunswick, Harrs,,Amendment "Managing Gas Catawba, McGuire,Request Accumulation" Oconee combined
.. .. ___-_submittal
Attachment 2RA-15-0005Page 2
5 License Alternative Non-LOCA 2nd Quarter 2015 No Catawba, McGuire,Amendment Fission Product Gap Oconee combinedRequest Fractions submittal
Pre-submittal meetingheld on January 14,2015
6 License Merged Quality Assurance 2nd Quarter 2015 No Brunswick, Harris,Amendment Topical Report Catawba, McGuire,Request Oconee, Robinson
combined submittal7 License Revise Emergency Action 2nd Quarter 2015 No
Amendment Levels consistent with NEIR( ., 99-01, Revision 6
8 License Extend Appendix J, TypeA 3rd Quarter 2015 Yes, Fall2016Amendment (ILRT) and Type C (LLRT)Reus Test Intervals_______
9 License Adopt TSTF-522, -Revise 3rd Quarter 2015 No Brunswick, Harris,Amendment Ventilation System Catawba, McGuire,Request Surveillance Requirements Oconee, Robinson
to Operate for 10 hours per combined submittalMonth" ....
10 License Adopt TSTF-427, 3rd Quarter 2015 No Brunswick, Harris,Amendment "Allowance for Non- Catawba, McGuire,Request Technical Specification Oconee, Robinson
Barrier Degradation on combined submittalSupported SystemOperability"
11 License Administrative LAR to 4th Quarter 2015 No Catawba, McGuireAmendment delete the superseded TS combined submittalRequest- and Bases requirements
for the Source Range /Intermediate Range
________ - __replacement TS change
Attachment 2RA-15-0005Page 3
12 License Diesel Generator AOT 1st Quarter 2016 NoAmendment extension 72 hrs, to 14Request days using BTP-8.8.
13 License UFSAR Change - Request 1st Quarter 2016 No Catawba, McGuireAmendment review and approval of the combined submittalRequest TORMIS methodology to
resolve a non-conformance related to theReactor BuildingDoghouse openings.SSCs inside aresusceptible to tornadomissile damage. _ _
14 License Removal of the License 1st Quarter 2016 NoAmendment Condition that limits DoseRequest Equivalent Iodine to a
value less than TechnicalSpeicf tkons __
15 Lcense 50.69 - Graded Quality 4th Quarte 2017 No Brunswick, Harris,Amendment Assurance Program Catawba, McGuire,Request Oconee, Robinson
____combined submittal16 License Revise Reactor Coolant 1st Quarter 2018 No Applicable to Catawba
Amendment System (NC) Unit I (Docket 50-413)Request pressure/temperature only.
limits to extend beyond 34EFPY _..,
2. Catawba Units I and 2 do not plan to apply for a power uprate in the next 5 calendar years.
3. The NRC staff may make the above information public.
Attachment 3RA-15-0005
.1
Atachmet 3
Table otdEstimated Ucensing Actions, Shearon Haris Nuclear Power Plant
,. C
Attachment 3RA-15-0005Page I
1. For all planned licensing actions expected to be submitted in the next 3 calendar years, Harris Unit 1 is providing the followinginformation
TABLE OF ESTIMATED UCENSING ACTIONSSheaRon Harris Nuclear Power Plant
Unit 1Docket No. 50400
LICENSING UCENSING LICENSING ACTION PROJECTED OUTAGE COMMENTS (ASACTION ACTIONTYPE DESCRIPTION SUBMI'TAL DATE RELATED? IF NEEDED)
NUMBER SO, DATENEEDED
1 License DPC-NE-2005 1st Quarter 2015 No Harris, RobinsonAmendment Thermal Hydraulics combined submittalRequest Statistical Core Design
Methodology Revision of ExstingFuels MethodologyReport Adoption Into
_,___-__.___. ... _:_ _____ _ _"__ "__'Tech Specs-
2 Relief Request Generic approval of 1st Quarter 2015 Notemper bead weld processfor reactor vessel headrepaw' _ _ _ _ _ _
3 License Adopt TSTF-425, lt Quarter 2015 NoAmendment 'Relocate Surveillance..Request Frequencies to Licensee
Control - RITSTFInitiative 5b"
4 License Move Waste Gas 1st Quarter 2015 NoAmendment Explosive Limits TS toRequest program for consistency
with ITS
Attachment 3RA-15-0005Page 2
5 License DPC-NE-1008 2nd Quarter 2015 No Harris, RobinsonAmendment Nuclear Design combined submittalRequest Methodology using
CASMO-6/SIMULATE-3 New FuelsDPC-NE-3008 Methodology ReportsThermal-Hydraulic Adoption into Tech
. Transient Analysis SpecsMethodology __--
6 License Revise'Emergency Action 2nd Quarter'2015 NoAmendment Levels consistent withRequest NEI 99-01, Revision 6 .._•_..
7 License Revise FSAR to take • 2nd Quarter 2015 NoAmendment exception to RG 1.78,Request Rev. I regarding the 330
foot bulk chemicalexclusion to the ControlRoom_
8 License Adopt TSTF-523, 2nd Quarter 2015 No Brunswick, Harris,Amendment 'Managing Gas Catawba; McGuire,Request Accumulation" Oconee combined
submittal9 License Merged Quality Assurance 2nd Quarter 2015 No Brunswick, Harris,
Amendment Topical Report Catawba, McGuire,Request - Oconee, Robinson
.... ___ _____-_combined submittal10 License Adopt TSTF-427, 3rd Quarter 2015 No Brunswick, Harris,
Amendment "Allowance for Non- Catawba, McGuire,Request Technical Specification Oconee, .Robinson
Barrier Degradation on combined submittalSupported System
__ _ _ _- 'Operability" ....
Attachment 3RA-15-0005Page 3
Ventilation SystemSurveillance Requirementsto Operate for 10 hours perMonth"
Brunswick, Harris,Catawba, McGuire,Oconee, Robinsoncombined submittal
LicenseAmendmentRequest
DPC-NE-3009UFSAR Chapter 15TransientAnalysisMethodologyDPC-NF-2010Nuclear PhysicsMethodology for ReloadDesignDPC-NE-2011Nuclear DesignMethodology Report forCore Operating Limits ofWestinahouse Reactors
Harris, Robinsoncombined submittal
New and RevisedFuels MethodologyReports Adoption intoTech Specs
13 License Common Emergency 4th Quarter 2015 No Brunswick, Harris,Amendment Operations Facility Robinson combinedRequest submittal
14 License Adopt TSTF-505, 1st Quarter 2016 NoAmendment "Provide Risk-InformedRequest Extended Completion
Times - RITSTF Initiative4b"
15 License Adopt new type of 2nd Quarter 2016 No Brunswick, Harris,Amendment respirator (Respirex) Robinson combinedRequest submittal
16 License DPC-NE-1003 2nd Quarter 2016 Yes, Spring Harris, RobinsonAmendment Rod Swap Methodology 2018 combined submittalRequest Report for Startup Physics
Testing Revision of ExistingFuels MethodologyReport
Attachment 3RA-15-0005Page 4
17 License Revise Main Steam 2nd Quarter 2016 NoAmendment Safety Valve Setpoints inRequest Table &7-2 for
_consistency with ITS18 License Extend Appendix J, Type A 1st Quarter 2017 Yes, Spring
Amendment (ILRT) and Type C (LLRT) 2021Request Test Intervals
19 License 50.69 - Graded Quality 4th Quarter 2017. No Brunswick, Harris,Amendment Assurance Program Catawba, McGuire,Request Oconee, Robinson
combined submittal
2. Harris Unit 1 does not plan to apply for a power uprate In the next 5 calendar years
3. The NRC staff may make the above Information public.
Attachment 4RA-15-0005
Attachmnint 4
Tibleof EStiOmted Licensing Actions, McGuire Nuclear Station
Attachment 4RA-15-0005Page 1
1. For all planned lcensing actions expected to be submitted in the next 3 calendar years, McGuire Units 1 and 2 are providingthe following information:
TABLE OF ESTIMATED MCENSING ACTIONSMcGuire Nuclear Station
Unbt I and2Docket Nos. 50-369 and 50-370
o•t: Acion Ile applIOc toW -t 1 (00t 504.1Mony. 0* olAN 0eMS WO#a to both nits.
UCENSING LICENSING LICENSING ACTION PROJECTED OUTAGE COMMENTS (ASACTION ACTION TYPE DESCRIPTION SUBMITTAL RELATED? IF SO, NEEDED)
NUMBER DATE DATE NEEDED1 Relief Request A Relief Request to delay 1stQuarter2015 Yes, Fall 2015 Applicable to McGuire
inspection of Unit I Unit 1 (Docket 50-369)Reactor Coolant (NC) cold only.leg nozzle welds from1EOC24 (March-2016) to Precedents: Safetya later outage. Code Evaluations for IndianCase N-770-1 and MRP- Point Unit 3349, "PWR Reactor (ML14199A444); FarleyCoolant System Cold- Units 1 and 2Loop Dissimilar Metal Butt (ML-14262A317);Weld Reexamination Arkansas Nuclear OneInterval Extension, Unit 1 (ML14282A479)provlde the technical basisto support extension of thereexamination interval forlarge-diameter Alloy82/182 dissimilar metalbutt welds.
Attachment 4RA-15-0005Page 2
2 License Administrative LAR to 1st Quarter 2015 NoAmendment delete the supersededRequest Rated Thermal Power
definition footnote'on TSPage 1.1-5 within: 180days after implementationof the MUR uprate on thelast unit. MUR wasImplemented on the lastunit (Unit 1) on 9/24/14. ___.. ..
3 License Adopt TSTF-510, 2nd Quarter 2015 Yes, Fall 2016 (for Catawba, McGuire,Amendment "Revision to Steam Catawba) Oconee combinedRequest Generator Program submittal
Inspection Frequenciesand Tube Sample
4 Ucense Revise Emergency Action 2nd Quarter 2015 NoAmendment Levels consistent with NEIRequest 99-01, Revision 6S
5 License Alternative Non-LOCA 2nd Quarter 2015 No Catawba, McGuire,Amendment Fission Product Gap Oconee combinedRequest Fractions submittal
Pre-submittal meeting-. . . .held on January 14,
_ _ .- _ _ _. _ __. , _ _ _ _ _ _ _2015 .4.. ,
6 License, Extend the Completion 2nd Quarter 2015 No Catawba, McGuireAmendment Time for two trains of combined submittalRequest Control Area Chilled
Water System (YC)I inoperable
Attachment 4RA-1S-000SPage 3
7 License Adopt TSTF-493, "Clarify 2nd Quarter 2015 NoAmendment Application of SetpointRequest Methodology for LSSS
FunctionsW for TS Table3.3.1-1 Function 12,Setpoint forunderfrequency Reactor.
8 Licese Adopt TSTF-523, 2nd Quarter 2015 No Brunswick, Harris,Amendment "Managing Gas Catawba, McGuire,Request Accumulalton" Oconee combined
subittal9 License Merged Quality Assurance 2nd Quarter 2015 No Brunswick, Harris,
Amendment Topical Report Catawba, McGuire,Request Oconee, Robinson
combined submittal10 License Diesel Generator AOT 3rd Quarter 2015 No
Amendment extension 72 hrs. to 14Requestdays using BTP-8.8.
11 License Adopt TSTF-522, "Revise. 3rd Quarter 2015 No Brunswick, Harris,Amendment Ventilation System Catawba, McGuire,Request Sur"eillanrce . Oconee, Robinson
Requirements to. Operate combined submittalfor 10 hours per Month"
12 License Adopt TSTF-427, 3rd Quarter 2015 No Brunswick, Harris,Amendment "Allowance for Non- .. - Catawba, McGuire,Request , Technical Specification Oconee, Robinson
Barrier Degradation on combined submittalSupported System_OperabIiy
13 License Extend Appendix J, Type 4th Quarter 2015 Yes, Spring 2017Amendment A (ILRT) and Type CRequest (LLRT) Test Intervals
Attachment 4RA-15-0005Page 4
14 License Administrative LAR to 4th Quarter 2015 No Catawba, McGuireAmendment delete the superseded TS combined submittalRequest and Bases requirements
for the Source Rang, IIrdnermediate Rangereplacement TS change,
15 License UFSAR Change- Request 1stOuarter2016 No Catawba, McGuireAmendment review and approval of the combined submittalRequest TORMIS methodology to
resolve a non-conformance related tothe Reactor BuildingDoghouse openingsSSCs inside aresusceptible to tornadomissile damage._
16 License TS 3.6.13- Ice condenser st Quarter 2016 NoAmendment door alternate positionRequest monitoring. . ;
17 License RevIseTS3.6.14,iIvider 1st Quarter 2016 NoAmendment Barri Integrity,- to allowRequest an indMdual Steam
Generator manway.hatchto be open for up to sixhours.,
18 License Revise TS.3.&9, 1 st Quarter'2016 NoAmendment "Hydrogen MitigationRequest System," to allow more
than one inoperablehydrogen igniter while stillconsidering the trainoperable _.
Attachment 4RA-15-0005Page 5
19 License Refueling canal drain 1st Quarter 2016 NoAmendment surveillance change fromRequest a drain valve to a drain
flange.20 License Revise TS 3.8.9 to allow. 1st Quarter 2016 No
Amendment 1) adequate time toRequest respond to a single unit
fire event without initiatinga shutdown of theunaffected unit, 2) testmanual transfer of anessential MCC to a SSFMCC, and 3) performeffective PM on plantequiment.
21 License Re-submitting a revised 4th Quarter 2016 -NoAmendment version of the one-time TSRequest 3.7.7, Nuclear Service
Water System (RN),change to extend thecompletion time to recoveranything that might be inthe 'A' RN StandbyNuclear Service WaterPond (SNSWP) suctionheader.
22 License 50.69 - Graded Quality 4th Quarter 2017 No Brunswick, Harris,Amendment Assurance Program Catawba, McGuire,Request Oconee, Robinson
combined submittal
2. McGuire Units 1 and 2do not plan for apower uprate in the next 5calendar years.
3. The NRC staff may make the above Information public.
Attachment 5RA-15-0005
)
Attachment 5
TaWi. of Easniated Licensing Actions, Oconee Nuclear Station
.4o ;-
.h
Attachment 5RA-15-0005Page 1'
1. For all planned licensing actions, eWpcted to be submitted in the next 3 calendar years, Oconee Units, 1,2, and 3 are,-
providing the following informatlon.:.
TABLE OF ESTIMATED UCENSING ACTIONS*Ocone. Nuciow Station
Uni t t Zand3Docket Nos 50469v 504270, and W0287
us.. -Alwt mo me app.I. to aD ftw, imib
UCENSING LICENSING UCENSING ACTION PROJECTED OUTAGE COMMENTS (ASACTION ACTION TYPE DESCRIPTION SUBMITTAL RELATED? IF SO, NEEDED)
NUMBER DATE DATE NEEDED4 License Add High Flm Thp for 3 lot Quarter 2015 No
Amendmient Reactor Coolant Pump2 MM- Opertin
2 License Adopt TSTF-523- 2nd Quarter 2015 No Brunswick, Harris,Amendment -Managing Gas Catawba, McGuire,Request Accumulation. - ,.. . - Oconee combined
. .submittal3 Lwn Atemative Non-LOCA 2nd Quarter 2015 No Catawba, McGuire,
Amendment Fission:Product Gap Oconee combinedRequest Fractos submittal
rPr&-ubmfttal tmeeting.: .-- . ..... . . held on January 14,
_-__ _ _, _ _._ _ _ _ __..,_ _ _ _ __._ 20154 License Merged Quality 2nd Quarter 2015 No Brunswick, Harris,
Amendment Assunme Topical Report Catawba, McGuire,Request Oconee, Robinson
combined submittal
Attachment 5RA1 5-0005Page
5 License Adt" TSTF-510, 2nd-Quarter 2015 Yes, Fad12016 (for Catawba, McGuire,Amendment "Pevision to Steam Catawba) Oconee combined
equest Generator Program' . submittalInspection FrequenciesandTube SampleSele-tlor"
6 icense Revise Emergency Action 2fid-Quarter 2015 NoAmenditient Lvels consistent with NEI______ 99-01, Revision 6 _"____
7 License Adopt TSTF-448, Rl"', " 2ndQua~ter 2015 NoAmendment ",WoI Room
" Ucense Standby Shutdown 3rd uatb 2015 NoAmendment Facity (SSF) ThermalRest Margn LAR
9 License Correct Technical 3rdQuarter ,015 NbAmndme h m .... ReentlyReque"t Issued Amendment to TS
3.8.1 "AC Sources- .. d .... ,, ,NOper~t
10 Lcense TS3.8.1 "ACSources- 3rd uarter 2015 No.':Amendment Operating" CompletionRequest Time Extension to
Suppoit Keowes " ....Hydroelectric Statice.
, •:." ... -Stator W ork .:-,•',
11 License Adopt TSTF-522, "Revise 3rd Quarter 2015 No Buriswick, Harris,Amendment Ventilation System Catawba, McGuire,Request Surveillance Oconee, Robinson
Requirements to Operate , combined submittalfor 10 hours per Month"
Attachmeht 5RA-15-0005Page 3
12 License Adopt TSTF-427, 3rd lQuter 2015 No Brunswick, Harris,Amendment *Allowance for WlW Catawba, McGuire,Request Technical Specification Oconee, Robinson
Barrier Degradation on combined submittalSupported System- -". ",O e bi " : .- ":,'
13 ... ense..- DeletOTS3.7.18-Dryý Ist Quarter 2016 NoAmendment Spent Fuel StoragCaeskRequest Lobdi and Unloading
14 License Main FDW Contrd Valve -ý 4th Quarter 2016 NoAmendment Inadequate Air SupplyRequest
15 License SSF Sump Upgrade/ Kirk- 4th Quarter 2016 No
16 License Tormado Mfidigation lst Quarter 2017 No LAR was submittedAmendment Recostitution LAR previously but NRCRequest review has been
17 LIcense HELB MitigaionhtAR 1st Quarter 2017 No LAR was submittedAmendment ;" ,, previously but NRCRequest ... "-vi- has bednsuspended
t8 License MUR ReviewRestartafter 1st Quarter 2017 Yes, SeeNo. 2 To be subh*W -afterAmendment RAI response submittal below the HELB LAR - MURRequest LAR depends on the
safety analysis of theMFDW break in theHELB LAR.
19 License Extend Appendix J, Type 1st Quarter 2017 Yes, Spring 2024Amendment A (ILRT) and Type CRequest (LLRT) Test Intervals
20 License Atmospheric Dump Valve 4th Quarter 2017 NoAmendment Allowed Outage TimeRequest Extension (12 hour)
Attachment 5RA-M15-0005
Page4
21 License Adopt TSTF-498 "Risk- 4thQuarte 2017 NoAmendment Wormed Contairnmei'Request Isolation Valve
Compmok,__________" Tim es (BAW -2461)" ........ _____..... _' _" _
22 - uces... Revise TS Table 3.3.5-1:" 4th Caiiter 2017' 'No,.* Amendment to change the a
" A •... H. h Reactor 13i ,....kressure for Eniginered
Safeguards actuation to 5
23 Li.ense Revise TS 3.9.1 to adopt 4t Ouarter 2017 No- Amendment aTSTF -272 querttinge-
Request Boron ConcetrationClariiation to allowboron samng of FTC .in
________ _________Mods6 a.. ... K.~24 Lbcense Aflow Ocounee to seff- 4th Quarter 2017 No
Amendmnent approve quantitative risk-Request in? orr66d fire pobtechon
Proararn chanqe25 License 50.89 - Graded Qualty 4th Quarter 2017 NO Brunswick, Harris,
Amendment... Assurance Prograr .. . Catawta, McGuire,Request Oconee, Robinson
_combined submttal
Attachment 5RA-15-0005Page 5
2. Oconee Units 1, 2, and 3 plan to apply for a 1.84% power uprate measurement uncertainty recapture (MUR) in the next 5calendar years.
NOTE: Oconee previously submitted a MUR LAR in 9/2011 that was Indefinitely suspended due to NRC resource availability.A set of RAI items was received by Oconee in the Interim. The MUR LAR will. likely be supplemented In the 3rd quarter 2016.
o What percent Increase In power from the current licensed thermal power (CLTP) limit does the licensee plan to apply for?(Please write N/A in any unit that does not apply or that is not planned for a power uprate.)
Unit 1 .4% Unit 2 1.1% Unit 3 1.6% Unit 4 IVA%
o What is the planned Increase from the CLTP limit in megawatts thermal?
Unit 1 42MWt Unit 2 42MWt Unit 3 4MWt Unit 4 NAMWt
o What Is the expected schedule for fMig the application (onth/year)? (If the mnth is not known, please provide thequarter and/or year.)
Unit10•ML Unit2 MM. Unitt32017 Unit 4 NA
o What is the expected date for power ascension with uprated conditions (month/year)?
Unit 1 1!,18 Unit 2 11/2017 Unit 3 512-OI Unit 4 V
3. The NRC staff may make the above information public,
Attachment 6RA-15-0005
Atti" ment 6
Tabe Or E*maed Licesi Actions, H.S. Rbnsn Steam Eletc PNt
*1.
Attachment 6RA-15-0005Page 1
1. For all planned licensing actions expected to be submitted in the next 3 calendar years, Robinson Unit 2 is providing thefollowing information:
TABLE OF ESTIMATED UCENSING ACTIONSH. B, Robinson Stem Electric Plant
Unit 2Docket No. 50-261
uLCENSING LICENSING LICENSING ACTION PROJECTED OUTAGE COMMENTS (ASACTION ACTION TYPE DESCRIPTION SUBMITTAL RELATED? IF SO, NEEDED)
NUMBER ___. DATE DATE NEEDED1 License DPC-NE-2005 1st Quarter 2015 No Harris, Robinson
Amendment Thermal Hydraulics combined submittalRequest Statistical Core Design
Methodology Revision of ExistingFuels MethodologyReport Adoption into
.... ___ Tech Specs2 License Adpt TSTF-339, Rev. 2, 2nd Quarter 2015 No
Amendment "Relocate TS parametemrRequest to COLFr_
3 License DPC-NE-1008 2nd Quarter 2015 No Harris, RobinsonAmendment Nuclear Design combined submittalRequest Methodology using
CASMO-5/SIMULATE-3 New FuelsDPC-NE-3008 Methodology ReportsThermal-Hydraulic Adoption into TechTransient Analysis Specs
_____ ______ ~~Methodology _ _ _ _ _ _ _ _ _ _
Attachment 6RA-15-0005Page 2
4 License Merged Quality Assurance 2nd Quarter 2015 No Brunswick. Harris,Amendment Topical Report.- Catawba, McGuire,Request Oconee, Robinson
combined submittal5 License Revise Emergency Action 2nd Quarter 2015 No
Amendment Levels consistent withRequest NEI 99-01, Revision 6. _ _,
6 license Revise TS 3.1.4 and 3.1.7 2nd Quarter 2015 NoAmendment to credit ERFIS as aRequest means to monitor Rod
Position Indication - _
7 License Plant Transmission 3rd Quarter 2015 Yes, Spring 2017Amendment Interface UpgradesRequest ,....
8 License Adopt TSTF-427, - 3rd Quarter 2015 No Brunswick, Harris,Amendment "Alowance for Non- Catawba, McGuire,Request Technical Specification Oconee, Robinson
Barrier Degradation on combined submittalSupported SystemOp.erabilit? _......._..
9 License Adopt TSTF,522,•"Revise 3rd Quarter 2015 No Brunswick, Harris,Amendment Ventilation System Catawba, McGuire,Request Surveillance Requirements Oconee, Robinson
to.Operate for 10 hours per combined submittal_ _ Month"w _ _ _ _ _ _ _ _ _
Attachment 6RA-15-0005Page 3
10 LicenseAmendmentRequest
DPC-NE-3009UFSAR Chapter 15 STransient AnalysisMethodologyDPC-NF-2010NUclear•Physics .Methodology for ReloadDesignDPC-NE-201 1Nuclear DesignMethodology Report forCore Operating Limits ofWestinghouse Reactors
4th Quarter 2015 No Harris, Robinsoncombined submittal
New and RevisedFuels MethodologyReports Adoption intoTech Specs
11 License Extend Appendix J, Type A 4th Quarter 2015 Yes, Spring 2017Amendment (ILRT) and Type C (LLRT)Request Test Intervals
12 License Common Emergency 4th Quarter 2015 No Brunswick, Harris,Amendment Operations Facility Robinson combinedRequest, submittal
13 License Adopt new type of 2nd Quarter 2016 No Brunswick, Harris,Amendment respirator (Respirex) Robinson combinedRequest submittal
14 License DPC-NE-1003 2nd Quarter 2016 Yes, Spring 2018 Harris, RobinsonAmendment Rod Swap Methodology combined submittalRequest Report for Startup Physics
Testing Revision of ExistingFuels MethodologyReport
15 License 24-month fuel cycle 3rd Quarter 2016 Yes, Fall 2018Amendment conversionRequest I
Attachment 6RA-15-0005Page 4
16 License Adopt TSTF-412, Provide 4th Quarter 2016 NoAmendment Actions for One SteamRequest Supply to Turbine Driven
AFWAEFW Pump_ _oVer_- _
17 License 50.69 - Graded Quality 4th Quarter 2017 No Brunswick, Harris,Amendment Assurance Program Catawba, McGuire,Request Oconee, Robinson
combined submittal
2. Robinson Unit 2 does not plan to apply for a power uprate in the next 5 calendar years
3. The NRC staff may make the above information public.