un ece workshop rail transport corridors along …...baku‐tbilisi‐kars new railway link...
TRANSCRIPT
UN ECE workshop on “Road and Rail transport corridors along Europe and Asia”
7 of September 2015Geneva, Switzerland
Significant geoSignificant geo--strategic location of the MLA Partiesstrategic location of the MLA Parties
Silk Road Restoration
TRACECA Member States
STRATEGY OF THE IGC TRACECA for DEVELOPMENT of the INTERNATIONAL TRANSPORT CORRIDOR «EUROPE‐CAUCASUS‐ASIA» for the period up to 2015
Strengthening and Modernising the Institutional Dimensions of Transport: this is aimed at ensuring the
TRACECA IGC Strategy in brief:
existence of strong, competent and well-designed institutions in the various TRACECA countries that can guide,support and nurture the future progress and development of the regional transport system.
Integration and Cohesion of Infrastructure Networks: this is aimed at putting in place a modern, compatibled i t bl h i l i f t t t k th t i ll t d th diff t t t d dand interoperable physical infrastructure network that is well-connected across the different transport modes and
across the various TRACECA countries, and having good links to the trans-European transport network.
Sound Multimodal Freight Transport Chain: this is aimed at ensuring the smooth and uninterrupted flow oftrade for all types of freight across different modes of transport and across different countriestrade, for all types of freight, across different modes of transport and across different countries.
Exploiting the Full Potential of Air Transport and Boosting Air Passenger Traffic: this is aimed at enhancingthe movement of passengers between the EU and TRACECA countries and therefore focuses on air transport as thepredominant type of passenger travel in the region.p yp p g g
Making Transport Safer, Secure and Sustainable: this is aimed at ensuring that the regional transport systemhas both social and environmental faces, and that it actively promotes the safety, security and protection of users,property, general public and environment that might be involved in or affected by this system.
Secure Funding: this is aimed at tapping at different sources of financing to ensure that sustainable and sufficientfunds will be available to successfully initiate and complete the investments that are required in regional transportinfrastructure and other projects.
Dynamics of freight traffic through the TRACECA international transport corridory f f g ff g p
64 72 78
53
2007 2009 2011 2013
2007 2009 2011 20132007 2009 2011 2013
53млн. тонн/mln. tones
64млн. тонн/mln.tones
72млн.тонн/mln.tones
78млн. тонн/mln.tones
TRACECA PROJECTSTRACECA PROJECTS
14 Investment ProjectsProjects
82 Projects ‐178,5 million Euros
68 Technical A i t P j tAssistance Projects
On going TA projects
Transport Dialogue and Networks Interoperability
TRACECA Road Safety
TRACECA Civil Aviation Safety
Maritime Safety and Security
TRACECA International Investment Forum
Standing mechanism providing for direct and consistent interaction of TRACECA with investors
First and Second TRACECA Investment Forum in 2010 and 2012, Brussels:32 projects in the size of more than 6 billion Euros from 12 TRACECA countries
Projects covered all modes of transport including intermodal
More than 200 participants from 25 countries of the world More than 200 participants from 25 countries of the world During Forums 3 projects in the size of more than 600 million Euro received
financial support Other projects are negotiated between countries and investors Other projects are negotiated between countries and investors
International Convention on International Convention on theAGREEMENT on the International Carriage of Perishable Foodstuffs and onHarmonization and Simplification
of Customs Procedures, 1973 (amended and added in 1993).
International Convention on the Harmonization of Frontier Controls of Goods , 1982.
Carriage of Perishable Foodstuffs and on the Special Equipment to be Used for such Carriage (ATP)
Azerbaijan
Armenia
Bulgaria
Georgia
Iran
Kazakhstan
KyrgyzstanKyrgyzstan
Moldova
Romania
Tajikistan
Turkey
Uzbekistan
Ukraine
TRACECA PERMIT
In 2014 between China and Europe 308 block‐train trips
26070 TEU (increase 258%)
Chit
Shanghai
Hong KongBeijing
ShenzhenChita
Lanzhou
Xi’an
Ulan Ude
Xiangtang
Ulan Bator
Zabaikalsk
Urumqui
Reykjavik
Astana
Novosibirsk
Moscow
Saratov
Astana
Almaty
Teheran
Mumbai
Hamburg
PardubiceKiew
Warschau
WienKars
Baku
T’Bilisi
Saratov
Istanbul
Dostic st. PRC Boгder
ZHEZKAZGAN‐BEYNEU
AKTAU PORT EXTENSION
NEW PORT of ALYAT
BAKU‐TBILISI‐KARS
MARMARIS PROJECTMARMARIS PROJECT
Baku‐Tbilisi‐Kars Railway Link Construction
AZERBAIJAN‐GEORGIA‐TURKEYBaku‐Tbilisi‐Kars new railway link (completion –end of 2015, capacity ‐ 6 million tons per year) Reconstruction of rail network from Baku to Border of Georgia – 503 km. Construction of new rail line within Georgia – 30 km, Turkey ‐ 68 km.
First block-train from China “Nomad express”
KURIK
TRACECA Master Plan
D h 100 000 l i i 2010Accident Statistics
Deaths per 100 000 population in 2010
25,0025,0
22,0
15,00
20,00 18,0 17,015,0 15,0 14,0
12,0 11,0 10 0
5,00
10,00
, 10,0 9,4 9,2 9,0 8,9 8,0 7,5 6,9 6,7 6,4 6,0 6,0
0,00
Regional Road Safety Action Plan in the TRACECA countries
Implementation of the regional road safety Action Plan for the Neighbourhood East and Central Asia – TRACECA Road Safety II
Project funded by EU
TRACECA TRACECA ROAD SAFETY PROJECT IIROAD SAFETY PROJECT II
Six Action Areas have beenSix Action Areas have been defined:
1. Institutional
Improvements
2. Safer Infrastructure
3. Safer Vehicles
Now More than19 000 deaths / year
4. Safer Road Users;
5. Medical Care for Crash 19,000 deaths / year190,000 injuries / year $17billion losses/year(4% of annual regional GDP)
Victims
6. Changing Attitudes to Road (4% of annual regional GDP) g g
Safety
THANK YOU FOR ATTENTIONTHANK YOU FOR ATTENTION
Mr. Mircea Ciopraga / Secretary GeneralOur contact details:
f hPermanent Secretariat of theIntergovernmental Commission TRACECAAzerbaijan, Baku, General Aliyarbekov street 8/2, AZ 1005 tel. : ( 994 12) 598 27 18 ( 994 12) 498 64 26(+994 12) 598 27 18 (+994 12) 498 64 26 e‐mail: [email protected]‐org.orgwebsite: www.traceca‐org.org