Underground mining of U in northern
Bohemia
Vojtěch Vokál, Jiří Mužák
DIAMO, s. e., Stráž pod Ralskem, Czech Republic
Overview of U exploration and mining
activities in the Czech Republic 1946-2018
DIAMO, state enterprise, Stráž pod
Ralskem
Uranium exploration started in 1946
using geological, geochemical and
geophysical methods and drilling
technique.
Thousands of radiometric anomalies and
more than 15,000 uranium occurrences
were discovered by 1989. Evaluation of
186 uranium mineralized objects led to
mining at 86 uranium deposits.
Overview of U exploration and mining
activities in the Czech Republic 1946-2018
U mining technologies: underground mining, open pits and ISL.
Estimated total uranium production by 2018 > 132,000 t of U (metal).
Underground mining at the uranium deposits Hamr
and Břevniště, Czech Republic
Localization of the deposits
Děčín
Ústí n.L.
Teplice
Turnov
Praha
Kladno
Mladá Boleslav
Louny
Pardubice
Kolín
Brno
deposit Hamr - Stráž
POLAND
SLOVA
KIA
AUSTRIA
GERMANY
Stráž p.R.
Liberec
Regional geology and hydrogeology
• Cenomanian, Turonian a Coniac sandstone sediments – 150-400 m thick
• Block structure: Stráž and Tlustec block separated by stráž fault zone
• Tectonic structures often filled with neovolcanic veins
• Two main aquifers – upper Turonian (unconfined), lower Cenomanian
(confined) separated by aquitard
Source: Map portal ČGS, www.geology.cz
stráž faultlugikum fault
Clay limestones and
silty claystones (low turon)
Clay siltstones of the transistory
zone cenoman-turon
Bedrock
Sandy-clay conglomerat and
lake-mudde siltstones with
the ore bodies
Multi- and middlecorny sandstones –
layers of wash-out and
friable sandstones
Characteristics of the deposits
• U – Zr – P – Ti mineralization
• Uranium minerals:
Ningyoit, uraninit, hydrozirkon,
leukoxen, coffinit, brockit
• Classification according to U-bearing
minerals:
1. ningyoit-uraninit-hydrozirkon
2. ningyoit-hydrozirkon
3. hydrozirkon
4. ningyoit
Characteristics of the deposits
Brackish Cenomanian
Marine Cenomanian
Basement
simple type complex type
Uranium mineralization Freshwater Cenomanian
Complex type
• Poorly bounded ore bodies
• Freshwater, brackish and marine Cenomanian
• Ore grade ~ 0.035 wt. % U
• Strati form post-sedimentary deposit
• U – Zr – P – Ti mineralization
• Ningyoit-uraninit-hydrozirkon type
• Hydraulic conductivity ~ 0.5-20 m/d
K ~ 0.5 – 20 m/d
Simple type
• Well bounded ore bodies
• Brackish cenomanian
• Ore grade ~ 0.056 wt. % U
Schematic cross-section of the area
weak (0.5 - 20 g/l)strong (20 - 100 g/l)
contaminationturonianwater level
cenomanianpiezometric level
crystalineschists
cenomanianaquifer
low turoniansemiaquitard
turonianaquifer
Ham
r 1 m
ine
HB
Str
áž
leach
ing
field
s
Rals
ko
NESW
1959 start of exploration works in the
north-bohemian cretaceous basin
1962 1st exploration well HJ-1
1964 – 1967 finding of sites:
Hamr, Osečná, Stráž,
Křižany (Břevniště)
1971 end of exploration
Discovery of U deposit
DH I (shaft no. 1, 2, 3, 13) 1972-1993
DK I (shaft no. 4, 5) 1983-1989
DH II (shaft no. 6, 7, 9P) -
Length of shafts: 2,246 m
Length of crosscuts: 50.5 km
Length of corridors: 37 km
Lengthof chimneys: 8 km
Volume of the fill: 4,961,000 m3
Amount of extracted ore: 10,7 mil. t
Production of U: 11,740 t
History of underground mining - overview
History of DH I
1971 initiation of DH I, start of exploitation in the area
of shafts No. 1 (227.1 m) and No. 2 (237.2 m)
1971 - 1975 drilling of the shaft No. 3 (235.4 m), building
of the backfill centres
1973 – 1975 flooding of the mine after crossing of the
tectonic fault “Anežka”
1983 - 1985 drilling of the shaft No. 13 (technical shaft
with the diameter of 6.5 m, depth 256.1 m)
1985 – 1995 Hamer Lake was released into the
underground after the volcanic flue
plummeted
History of DH II
1980 - 1988 drilling of the shaft No. 6 (305.5 m) and shaft No. 7 (307.9 m)
of the new built Mine Hamr II, exploitation never started
History of DH I
Location of DH I and DH II
History of DK I
1973 - 1976 drilling of the shaft No. 4 (281.2 m) and shaft No. 5 (268.5 m) of the
new Mine Křižany I
1983 start of exploitation
History of DK I
Location of DK I
• The main mining method was „chamber and pillar“.
• In order I, II, III, IV are mined between directional contour corridors.
The width of the chambers is 5 m, the height 4-10 m and the length 80
to 120 m.
• The ore is transported by railless
transport to chimneys, then on the ground
of cross drifts by wagons. To the surface
it is transported through shaft from where
it is transported to the mill.
• Exploited chambers are backfilled.
Mining method
Four-chamber method
Mining method
Milling and Processing Facility
1973 start of building of the mill.
Parallel building of the I. stage (1978-1980) and II. stage (1988-1991) of tailings pond with the
total area of ca. 200 ha and capacity ca. 33 mil. m3.
1979 building of the main technological facilities finished, start of the delivery track operation, start
of the verification operation.
1980-1988 permanent operation of the mill, the final maximal capacity was 800,000 t of processed
ore per year.
Milling and Processing Facility
Uranium production
Underground Uranium Mining
year
tons
1971-1993
11,740 t of Uranium
Production of chemical mill
U production – chemical mill
tons
year
1979-1994
8,152 t of Uranium
Hydraulic barrier
Principle of hydraulic barrier
Leaching fields
Piezometric water level of
cenomanian aquifer
Concentrated solutions
Hyd
rau
lic
ba
rrie
r
Treatment
U separation
Stream
drainage
Min
e H
am
r I
Mine water treatment
1971 - 1987 simple deuranization method was in operation (so called spiractors)
1988 - 2001 operation of Central Decontamination Station with treatment
capacity 30 m3 mine water per minute
Technical support activities
• Transport and mechanization plant
• Plant of technical works and construction
• Technical-supply base plant incl. siding
• Social Services Plant
• Operational laboratories
Attenuation of underground mining
1987 FMPE decision to stop construction of Hamr II - Lužice Mine and liquidation of
realized investments
1990 Government resolution No. 94/1989, declaration of attenuation at the Křižany I
Mine, start of mine disposal
1993 Government resolution No. 429/1993, declaration of attenuation at the Hamr I
Mine, cessation of mining work
1995 Government resolution No. 244/1995, announcing the implementation of the
attenuation at the Hamr I Mine, start of mine disposal
Attenuation of underground mining
1988 – 2003 Disposal of the underground and shafts No. 6 and 7 of the Mine Hamr II - Lužice
1990 - 2003 Disposal of the underground and shafts No. 4 and 5 of the Mine Křižany I
1995 - 2002 Disposal of the underground and shafts No. 1, 2, 3 and 13 of the Mine Hamr I,
658,000 m3 of the mine works was backfilled in the underground of Mine Hamr I
2001 - 2003 Controlled flooding of the Hamr I mine by tailings pond water - a total of 4.7
million m3 of alkaline (pH 9 to pH 11) tailings pond water were injected into the
underground of Mine Hamr I
Disposal of surface objects
1991 – 2009 Sequential disposal of the surface objects of the Mine Hamr II - Lužice
1992 - 2012 Sequential disposal of the surface objects of the Mine Křižany I
1990 - 2013 Sequential disposal of the surface objects of the shafts No. 1, 2 and 13
of the Mine Hamr I
1990 - 2008 Sequential disposal of the backfill centres of the Mines Hamr I and Křižany I
2014 – 2015 Disposal of the surface objects of the shaft No. 3 of the Mine Hamr I ,
decommissioning of the Central Decontamination Station and Milling and
Processing Facility
Disposal of area of Mine Křižany I - numbers
48,026 t of construction debris were recycled using a shredder
5,568 t of construction debris contaminated by radionuclides were transported to the tailings pond
554 t of scrap iron were released into the environment (ecologicaly recycled)
460 t of scrap iron contaminated by radionuclides were transported to the tailings pond
3,491 tonnes of excavated soil contaminated by radionuclides were transported to the
tailings pond
Disposal of area of Mine Křižany I
Disposal of area of shaft No. 3 of Mine Hamr I -
numbers
166,026 t of material contaminated only by radionuclides were transported to the tailings pond
2,442 t of of material contaminated by radionuclides, which, moreover, contained petroleum
hydrocarbons C10 to C40 in quantities exceeding 3000 milligrams per kilogram of dry matter,
were deprived of oil pollution by biodegradation and then stored in tailings pond
108,210 t of uncontaminated materials were used for backfilling excavations
512,000,000 Kč (20,000,000 EUR) were the costs for disposal of the surface objects of the shaft
No. 3 of the Mine Hamr I (288 mil Kč were paid from EU funds)
Disposal of area of Mine Hamr I
Disposal of CDS
The mining period took 22 years and 11,740 t of U were produced.
The disposal of underground started 1988 and finished 2003. All mines had to be backfilled
and flooded.
The disposal of surface objects started 1990 and the works were finished 2015 – it wasn’t a
priority.
Paid from the state budget with a support from EU funds.
Conclusion