UNDP/GEF Project –
Decentralized Renewable Energy Power
Generation in Lebanon
UNDP/GEF Renewable Energy Portfolio
Overview
Lucas Black
Regional Technical Advisor – Energy, Infrastructure,
Transport and Technology (EITT)
UNDP – Global Environment Facility
United Nations Development Programme
1
This is a GEF (Global Environmental Facility) project –
What is GEF? • Financial mechanism of: UN Framework Convention on Climate Change Convention on Biological Diversity Stockholm Convention on Persistent Organic Pollutants Several other global environment conventions
• Six focal areas - Climate change, biodiversity, land degradation, international
waters, ozone depletion and persistent organic pollutants.
• 12 GEF agencies – UNDP, UNEP, WB, Regional Development Banks, FAO, IFAD, UNIDO. UNDP and World Bank have the largest share. Several new agencies have just been accredited.
• 142 GEF eligible countries
• Currently the largest global funder for global environment protection
• This project was funded under GEF V (2010-2014) Climate Change Mitigation (CCM) country allocation for Lebanon
Source: GEF
2
Overview of UNDP/GEF energy portfolio:
163 active projects - $ 558 m GEF + $ 4.6 b in co-financing
• $ 217m for 72 projects
• CleanStart; charcoal;
cook stoves
• Mini-grids
• New generation on-grid
Access to clean and
affordable energy 1
• $ 306m for 82 projects
• Next gen EEB projects
(enforcement and market
transformation)
• Green cities with incr.
climate resilience
Low emission urban and
transport infrastructure 2
GEF 6 and beyond:
Redefine focal area strategic priorities; focus on foundational work and innovation;
increased emphasis on scaling-up (link to GCF)
market transformation; public-private partnerships
• $35m for 9 projects
• More NAMA type projects
• Sector Wide Approaches
in Civil Aviation and
Maritime shipping
• Standardized Baselines
for CDM (and NAMAs)
Access to new financing
mechanisms 3
Emissions
(actual)
Em
issio
ns (
tCO
2e)
Emissions (Business as Usual)
Avoided
Emissions
3
Household
• E.g.
Promotion
of energy
efficient
cook
stoves
• E.g.
promotion
of PV in
rural and
peri-urban
Sudan
Village
• E.g. South
Africa
Wind
Energy
Program
National • E.g. Uzbek
gas
pipeline
MDG
Carbon
project
Regional /
Global
Focus of Small Grants Project –
2,554 projects and UNDP’s
Sustainable Energy Programme
GEF,NAMAs,
GCF
• E.g. City of
Varna,
Bulgaria:
issuing
green
municipal
bonds
Municipality
UNDP’s Approach - Promoting clean energy across a range of
scales
4
UNDP is supporting solar energy projects across a range of scales
Off-grid (single-site renewable energy & mini-grids) and on-grid (large- and small-scale, single-site) – Solar PV, SWH, Solar pumping and CSP
5
UNDP’s Market Transformation Approach
“Barrier Removal”
Approach “Derisking”
Approach
Objective: Create an enabled investment environment and
risk/return profile that catalyses private sector investment
Step 1: Identify priority
mitigation and
technology options
Step 2: Assess key
barriers and associated
risks to investment
Step 4: Select financing
options for public
measures
Step 3: Determine
appropriate mix of
public measures to
target barriers/risks
6
UNDP/GEF project implementation and M&E responsibilities
Project approval by
GEFSEC signifies
formal delegation of
authority to
implement the GEF
project
M&E responsibilities
Reporting
responsibilities
GEF Secretariat (DC)
UNDP/GEF (NY))
UNDP Country Office –
Lebanon
Project executing partner
PSC/PB Stakeholders
UNDP/GEF Regional
Center
7
Key UNDP/GEF rule for project management
• Project objective and outcomes are difficult to change…but
project outputs, activities and sub-activities can be adjusted.
• In fact, the project implementers should constantly monitor
them and adapt as necessary, after consultations with key
partners.
• Adaptive management is key, particularly as regards projects in
fast-moving, technology-based sectors where market conditions
and technology costs rapidly evolve.
8
Sectoral Trends - Key findings from IEA Technology Roadmap
Solar Photovoltaic Energy - 2014
• Since 2010, the world has added more solar photovoltaic (PV)
capacity than in the previous four decades.
• The geographical pattern of deployment is rapidly changing.
• PV system prices have been divided by three in six years in most markets, while module prices have been divided by five.
• IEA roadmap assumes that the costs of electricity from PV in different parts of the world will converge as markets develop, with an average cost reduction of 25% by 2020, 45% by 2030, and 65% by 2050.
9
Utlity-scale Solar PV LCOE have been drastically falling over
last five years….
Source: Lazard, 2014
Represents
unsubsidized
LCOE range of
utility-scale
crystalline solar
PV in Europe and
USD.
10
…and rooftop PV as well…
Source: Lazard, 2014
Rooftop solar has
benefited from the rapid
decline in price of both
panels and key balance-
of-system components
(e.g., inverters, racking,
etc.).
While the small-scale
nature and added
complexity of rooftop
installation limit cost
reduction levels (vs.
levels observed in utility-
scale applications), more
efficient installation
techniques, lower costs
of capital and improved
supply chains will
contribute to a lower
rooftop solar LCOE over
time
11
Commercial tariffs in MENA are still highly subsidized…
Source: RECREE staff/network, national energy utilities, AFEX 2014 (draft)
Commercial electricity prices and subsidies benchmarked to Palestine (2013)
12
… however fuel subsidy changes across MENA region are making
PV more cost-effective
• Egypt’s government embarked on a five-year plan to phase out subsidies in the
electricity sector. This plan was officially endorsed by the cabinet with the
passage of Prime Minister Decision No. 1257 on July 17th, 2014. This Decision
approved annual tariff hikes for most user segments on July 1 each year until
2018.
• A year earlier, Jordan embarked on a five-year program to reform electricity
pricing. Faced with growing debt of the national utility NEPCO, Jordan’s
Cabinet approved on June 19th 2013 a plan to increase electricity tariffs for
most segments until 2017. The biggest tariff increases fell on the industrial,
tourism and banking sectors with annual increases of 15%.
• In Tunisia, a program to increase the tariffs has been introduced and the latest
increase came in January 2014 when prices were raised by 8%. Another 10%
rise was announced in May 2014. Tariff structure reforms were done in
January 2014 to improve the effectiveness of the tariff system and better cover
the cost of electricity consumed at different times (time of use tariffs).
13
The Solar PV DG revolution – Power to the People
Germany has put in
place a long-term
target of having
between 2.5 and 3.5
gigawatts of solar
panels installed each
year…
California could see 15
gigawatts of
distributed energy
resources come on-
line this decade,
including 12 gigawatts
of distributed solar and
1 gigawatt of grid-scale
energy storage
14
Small-scale distributed generation – Jordan case study
• In Jordan the Renewable Energy and Efficiency Law 13 (REEL) of 2012 as well as
bylaws enable Independent Power Producers (IPP) to provide electricity from
renewable sources to NEPCO within long-term Power Purchase Agreements (PPA).
• High generation costs from conventional power plants in combination with
subsidized electricity rates for many small electricity consumers, which are down to
JD 0.033 [USD 0.05] per kWh, have led to a massive deficit for NEPCO. The current
policy for Jordan provides for further price increases of between 5% and 15% per
year until 2017 for many consumer categories.
• Private investors may also invest in their own PV system up to 5 MWp to directly
consume the electricity produced and offset it against their entire demand within a
net-metering scheme. The REEL even allows the generation of electricity at a
different site than where the actual consumer is located – “energy wheeling.”
• Apart from off-grid installations, around 3 to 4 MWp of solar PV systems under the
net-metering scheme had been realized by April 2014, with another 4 to 5 MWp
pending within the application process waiting list.
Source: Enabling PV in the MENA Region, The Emerging PV Market in Jordan, GIZ (2014)
15
Small-scale distributed generation – Jordan example #1
Example No. 1 displays a
plant on a warehouse in
Amman with a 90-kWp PV
system. The investment,
made in 2013, generates
around 162,000 kWh of
electricity per year.
The owner of the warehouse
saves around JD 27,216 per
year (USD 38K) over a 20-year
lifetime at current prices. The
payback period of the system
is 4.2 years. In 2014,
electricity consumers falling
in the “commercial tariff”
category usually pay between
JD 0.12 and JD 0.168 / kWh,
depending on the amount of
consumption. Source: Enabling PV in the MENA Region, The
Emerging PV Market in Jordan, GIZ (2014)
16
Distributed generation – Jordan example #2
Example #2 - This university housing
project in Maan is one of the biggest
systems in Jordan to date, totaling
1,028 kWp.
It was installed in April 2014 and will
produce around 1,900,000 kWh per
year. At current electricity rates, the
payback period is around 3 years,
since it will save approximately JD
500,000 (705k USD) / year over 20-year
grid connection contract.
The current electricity tariff for this
user category is up to JD 0.259 per
kWh.
Source: Enabling PV in the MENA Region, The Emerging PV Market in Jordan, GIZ (2014)
17
Pioneering Feed-in-Tariff Scheme for Small-Scale RETs
Prior to 2010, there was no framework in Mauritius that
allowed small independent power producers or households
to sell renewable energy back to the grid. With support from
a UNDP/GEF project, the GoM developed a small-scale
grid code to promote the connection of small-scale
independent auto-producers to the national grid.
The project supported the development of a Feed-in
Tariff (FiT) scheme for small-scale distributed generation
(SSDG) energy systems (up to 50 kilowatts)
The initial scheme attracted over 400 applications for
residential and commercial PV systems (totaling 3.8 MW
of installed capacity) and over 80 applications from
public, educational, non-governmental and religious
organizations.
As of Oct. 2014, 2.5 MW of these new green power
systems had been installed and commissioned in the
residential/commercial sector.
UNDP’s pioneering work on Clean DG FiT schemes
18
Tunisia: Private Sector-Led
Development of Wind $5m
Morocco: Energy efficiency in
buildings and transport , Solar
PV pumping $40m
Egypt: Waste-to-energy,
rooftop solar, energy efficiency
lighting, energy efficiency
transport $96m
Sudan: Solar PV pumping,.
Promoting Utility-Scale Power
Generation from Wind Energy
$210m
Lebanon: Solar water
heating, decentralized
renewables
Saudi Arabia: National Energy
Efficiency Programme $6m
UAE: LowCarbon Development
and CDM $1m
Yemen: Solar PV for
Productive Applications (new) -
$3 million
Selected UNDP Climate Mitigation/Energy
National Projects
Tunisia: De-Risking Solar
Investments - NAMA Support
for Tunisian Solar Plan $68m
Jordan: Solar water heating,
decentralized renewables $14m
Palestine: Decentralized solar
for schools and clinics $1m
Iraq: Rooftop solar PV and
distributed solar power $2.3m
(GEF only)
Solar applications are among the most popular
UNDP/GEF-funded projects in MENA
19
Grid-connected Small Scale Photovoltaic Systems
(Egypt) – approved in Jan. 2015
Implementing Agency: Industrial Modernization Centre of the Min. of Industry and Foreign Trade
Project budget: $3.54 million
Four outputs:
1. Installation of grid-connected PV systems (4 MWp target – estimated at approximately 1,500
PV systems of 2.5-3 kWp each) – largest component with $2.3 million of GEF funds allocated
for financial schemes
Builds on and complements the plans of EgyptERA to introduce a Guarantee of Origin (GoO)
(which will allow the sale of electricity from renewable energy sources at a premium price) and a
net-metering scheme to provide adequate financial incentives to the private sector to invest in
small decentralized PV power generation.
Financial incentive = price would consist of LE 0.67 (USD 0.095) per kWh from the net-metering
scheme (being the highest residential tariff category at the moment), the anticipated value of LE
0.40 (USD 0.06) per kWh of the RE GoO certificate, and an LE 0.27 (USD 0.04) per kWh premium
for 10 years to be paid by the UNDP-implemented, GEF-financed project as an upfront grant
equal to LE 4,000 (USD 570) per kWp.
20
Grid-connected Small Scale Photovoltaic Systems
(Egypt)
Output #1 (cont.) – eligibility requirements
- Eligible applicants: Residential electricity consumers and private-sector SMEs
- Amount of support: LE 4,000 (USD 570) per installed kWp to be paid as an upfront grant either
to the investor (i.e. the owner of the new PV system) or directly to the system supplier after the
commissioning test has been successfully passed (i.e. the quality of the installation has been
verified and the system has entered successfully into operation);
- Eligible size of the systems: From 2 kWp to 50 kWp
- A call for investment proposals to be renewed annually for the duration of the project – subject
to the availability of financial resources. In order to avoid damaging “stop and go” dynamics,
the support scheme will be subject to an annual review concerning its performance and the
related need for adaptive management.
2. Policy, institutional and regulatory framework
3. Strengthening the PV technology supply and maintenance chain
4. Create a financing framework to support the development of PV systems (and renewable
systems in general) – replication of NEEREA
21
• Support to Regional Center for Renewable Energy and Energy Efficiency (RCREEE) for
development of 2014 AFEX, first native Arab index dedicated to monitoring and analyzing
sustainable energy competitiveness. AFEX offers quantitative and qualitative analysis for
key renewable and energy efficiency dimensions. Countries are ranked under 20
indicators on policies, institutional capacities, strategies and investments.
22
Key findings AFEX Arab Future Energy Index™(AFEX)
Renewable Energy 2013
• Of 13 countries, five have no presence of private power producers. The supporting policies in most countries are still absent or ineffective. Less than half the countries provide policy instruments ensuring long-term power purchase agreements to private developers.
• Of 13 countries, only Morocco has so far been able to attract private RE investment
• On the positive side, almost all countries have adopted long-term technology-specific RE targets. More than half the countries have established dedicated agencies to promote renewables.
• Currently there are more than 15 large-scale projects under construction with total capacity exceeding 1,550 MW, which is more than double the current installed capacity in the region. Seven countries have identified over 5,000 MW of new generation for private development. Six countries have now established RE funds to mobilize funding and accelerate the deployment of renewables.
23
200 MW
385 MW
2016 2020 2030
630 MW
815 MW
180 MW
1,930 MW
1,545 MW
600 MW
585 MW
1,625 MW
4,075 MW
Onshore Wind
Solar PV
CSP 2030 TSP target: renewable energy at 30% of total power generation