Page 2: Uni-span Group Catalogue

Any safety provisions as directed by the appropriate governing agencies must be observed when using our products.

The pictures in this document are snapshots of situations at different stages of assembly, and therefore are not complete

images. For the purpose of safety, they should not be deemed as definitive.

The loads featured in this document, related to the parts of the product, are approximate.

Our equipment is designed to work with accessories and parts produced by our company only. Combining such equipment

with other brands is not only dangerous without having made all corresponding verifications, it also voids any or all of our

warranties.

The company reserves the right to introduce any modifications deemed necessary for the technical development of the

product.

ALL RIGHTS RESERVED.

Neither all nor part of this document may be reproduced or transmitted in any way by any electronic or mechanical

procedure, including photocopy, magnetic recording or any other form of information storage or retrieval system without the

written permission.

© Copyright by Uni-span Australia Pty Ltd 2016

© Copyright by Uni-span Formwork Solutions Pty Ltd 2016

© Copyright by Uni-span Height Safety Pty Ltd 2016

© Copyright by Uni-span Industrial Services Pty Ltd 2016

Version v160816

Date 16/08/2016

Page 3: Uni-span Group Catalogue

1GROUP

PROUD DISTRIBUTOR OF

Product Range

Project Showcase

Capabilities

GROUP

PROUD DISTRIBUTOR OF

Page 4: Uni-span Group Catalogue

2GROUP

PROUD DISTRIBUTOR OF

Page 5: Uni-span Group Catalogue

3GROUP

PROUD DISTRIBUTOR OF

Scaffolding

Uni-span Australia specialises in

Scaffolding. Our compliant systems

are globally accepted for access,

temporary strutting, edge protection

and handrail solutions. Our quality

accredited and innovative products

and systems, designed by our

in-house engineers, deliver safe

solutions every time. These products

and systems are available to hire or

purchase.

Formwork

Uni-span Formwork Solutions is

the exclusive Australian distributor

of ULMA Formwork Systems. We

provide in-house design and custom

engineered solutions to augment

these world-class quality and safety

accredited formwork systems,

available to hire or purchase.

We offer our customers the best

formwork solution, complimented

by exceptional service from our

professional and experienced team.

Page 6: Uni-span Group Catalogue

4GROUP

PROUD DISTRIBUTOR OF

UNI-SPAN Group: About Us

About

Uni-span commit to simplifying your

project experience by providing the

best solution and service within our

industry.

Solution. Service. Simple.

Our innovative and engineered

formwork and scaffolding solutions,

equipment and services see us

working among leaders in the

commercial, civil, infrastructure,

mining, energy and industrial sectors.

We are different in the way we do

things. Core principles support our

group’s culture and drive the team to

deliver solutions that not only meet

your project requirements but also far

exceed your expectations.

Uni-span trusts its employees who

have the capacity, commitment,

passion and versatility to achieve

outstanding outcomes for you.

We develop and maintain loyal

relationships with our customers,

which is indicative of the service

we provide. Uni-span’s integrity is

apparent in our dedication to safety,

in the quality we deliver and in our

accredited ISO 9001:2008, OHSAS

18001:2007 and ISO 14001:2004

products and systems.

Our project portfolio and associations

with many of Australia’s major

construction corporations is a

catalogue we are proud of.

We operate nationally from Yatala,

Beenleigh and Sydney, managing a

significant volume of both formwork

and scaffolding stock.

Page 7: Uni-span Group Catalogue

5GROUP

PROUD DISTRIBUTOR OF

Innovation

Uni-span are proud and exclusive

distributors of Ulma Formwork

equipment. Our high quality products

are innovative, cost effective and

labour efficient. Our containment

systems, Uni-mesh™ and Uni-grid™

are two of those innovative products

designed to improve efficiency of

operations and standard working

procedures.

We are members of the Scaffolding

Association of QLD, Master Builders,

Engineers Australia and the Zero

Harm at Work Leadership Program.

People

Our team consists of highly

experienced project managers,

in-house engineers, designers and

a committed admininistration unit

ensure every step experienced

with Uni-span is concise, clear and

simple. This committed group has a

fundamental understanding of site

specific requirements, construction

principles and safety compliance

and maintains a high standard of

professionalism and passion.

Accreditations

Uni-span has achieved satisfactory

compliance to:

ISO 9001:2008 (Quality),

OHSAS 18001:2007 (Health & Safety)

and ISO 14001:2004 (Environmental).

With this certification, Uni-span

commits to adhering to ISO

(International Organisation of

Standardisation) regulations and

standards and the satisfactory

completion of ongoing surveillance

programs for Occupational Health

& Safety, Quality and Environmental

Management within the organisation.

Page 8: Uni-span Group Catalogue

6GROUP

PROUD DISTRIBUTOR OF

UNI-SPAN Group: About Us

Formwork

Uni-span Formwork Solutions design

and engineer, hire and sell formwork

systems and solutions for the civil,

infrastructure, commercial, mining,

energy and industrial sectors, both in

Australia and internationally.

Our formwork systems are adaptable

and versatile, and can be custom

engineered for a wide range of

projects including tunnels, bridges,

roads, towers, walls and mines.

Customers can choose to hire or buy

our system components and work

with our trained formwork engineers

to develop a purpose-built solution for

your project.

Scaffolding

Uni-span Australia delivers

comprehensive scaffolding solutions

for construction and demolition

projects nationwide. Our skilled

engineers, designers and industry

professionals deliver safe, effective

and innovative scaffold products and

services to commercial and industrial

sites.

Uni-span Australia hires and sells

100% hot dip galvanized Quickstage

scaffolding systems, that are fully

compliant with AS1576. Our range

includes our patented containment

system, Uni-mesh™, LVL scaffold

boards, tubing and stair systems for

access, temporary strutting, edge

protection and handrail solutions.

Our Industrial supply team has

high levels of experience and skill

in customizing a solution to meet

your industrial project needs.

We understand the stringent

Occupational, Health and Safety

obligations in this sector and ensure

that our products, systems and

procedures meet these.

Engineering

Engineered solutions form part of

our service offering. Our team of

engineers and designers sets the

bar in providing specialised solutions

to client project challenges across

Australia. This consultancy service

can be paired with or without the

supply of Uni-span’s scaffolding and/

or formwork systems.

With MIE(Aust) CPEng (Member of

the Institution of Engineers (Australia)

Chartered Professional Engineers)

qualified engineers and team leaders,

we are dedicated to adding value

to our client’s needs through the

intelligent application of innovative

methods and engineering excellence.

We partner with our clients in

sourcing the solution that will result

in exceeding their expectations and

delivering the required outcome on

time and within budget.

We understand the importance of a

third party sign off on designs and can

recommend firms that provide this

service.

Page 9: Uni-span Group Catalogue

7GROUP

PROUD DISTRIBUTOR OF

BRISBANE/GOLD COAST(Head Office)

SYDNEY

UNI-SPAN LOCATIONS

SATELLITE OFFICES/

DEPOTS

Uni-span Locations

BRISBANE/GOLD COAST

Head Office

28 Computer Road

Yatala, QLD 4207

National Phone: 1300 882 825

Phone: +61 7 3442 4000

Fax: +61 7 3807 0546

Email: [email protected]

SYDNEY

Uni-span Sydney

11 Huntingwood Drive

Huntingwood, NSW, 2148

Phone: +61 2 9672 7122

Fax: +61 2 9831 2945

Email: [email protected]

Uni-span Beenleigh

22A Spanns Road

Beenleigh, QLD 4207

Phone: +61 7 3442 4000

Fax: +61 7 3807 0546

Email: [email protected]

SATELLITE OFFICES/DEPOTS

Servicing all national locations. Uni-span will set up the required facilities to service any National project, not already

supported by a depot or satellite operation.

Page 10: Uni-span Group Catalogue

8GROUP

PROUD DISTRIBUTOR OF

Lady Cilento Children’s Hospital

DESCRIPTION

The Lady Cilento Children’s Hospital (formerly

known as Queensland Children’s Hospital) will

be Queensland’s Primary Specialist Paediatric

Hospital offering 12 clinical levels, 4 basement

levels and a remote energy plant to supply

energy needs of the hospital precinct that is over

110000 m2 in total. This purpose-built facility

will incorporate the history, skills and expertise

of the staff of the Royal Children’s hospital and

Mater Children’s hospital.

UNI-SPAN SOLUTION

The package amounted to supplying and

erecting around 44,000m2 of edge protection

and 3650 tonnes of scaffolding for the duration

of the 130-week program. Over 40 Uni-span

personnel worked at the QCH site, including

skilled scaffolding labour, supervisors,

engineers, draftsmen, contract administrators,

WHS personnel and contract managers.

Uni-span also dedicated a WPHS representative

to the project, who undertook safety audits

in conjunction with the client and Uni-span

Site Supervisor to ensure all contracted

requirements, due diligence requirements and

applicable safety standards were met. Solving

the access to these work fronts, with a safe,

smart and accurate design was essential.

Other complex design solutions were the

helideck, QCHEP Cantilevered eastern façade

and Core 3 suspended special bracket scaffold.

RESULT

For the length of this contract, Uni-span had a

remarkable safety record. Despite unforeseen

general project delays, Uni-span met every

required stage of completion. Another challenge

Uni-span was successful in was the co-

ordination of scaffolding to satisfy various trades

needing access to the work face, within the

design and also within the location constraints,

due to the site’s proximity to the Mater Special

School and Stanley and Raymond Terrace road

fronts.

UNI-SPAN Group: Scaffold Project

Page 11: Uni-span Group Catalogue

9GROUP

PROUD DISTRIBUTOR OF

Page 12: Uni-span Group Catalogue

10GROUP

PROUD DISTRIBUTOR OF

UNI-SPAN Group: Scaffold Project

QCLNG

DESCRIPTION

Queensland Curtis LNG (QCLNG) will be the

world’s first project to turn gas from coal seams

into liquefied natural gas, or LNG.

This major, integrated US$20.4 billion project,

located from Western Downs to Curtis Island,

involves:

u Expanding QGC’s existing natural gas

production in the Surat Basin of southern

Queensland.

u Building a 540km buried natural gas

pipeline network linking the gas fields to

Gladstone.

u Constructing a natural gas liquefaction plant

on Curtis Island, near Gladstone, where the

gas will be converted to LNG for export.

UNI-SPAN SOLUTION

Approximately 900 tonnes of access scaffolding

solutions has been supplied to the Southern

Region (4+1), demonstrating Uni-span’s

industrial capabilities by highlighting that

Uni-span:

u Has a large quantity of stock and labour

resources to supply major industrial

construction projects.

u Doesn’t have the need to cross hire stock or

labour.

u Has a very competitive pricing structure.

u Has ongoing supply of maintenance and

support services.

u Has the support for commissioning trades

and services.

Another advantage is that logistically, Uni-span’s

yard is situated in close proximity to the site.

Order management system BizSync, also allows

Uni-span to manage the project remotely and

accurately.

RESULT

The project will draw on QGC’s extensive natural

gas expertise and BG Group’s international

experience in liquefied natural gas, at a time of

rising demand for cleaner, more efficient energy.

Importantly, QCLNG will also help to address

climate change by allowing natural gas, which

has the lowest carbon emissions of all fossil fuels,

to be transported economically around the world.

Page 13: Uni-span Group Catalogue

11GROUP

PROUD DISTRIBUTOR OF

Page 14: Uni-span Group Catalogue

12GROUP

PROUD DISTRIBUTOR OF

UNI-SPAN Group: Scaffold Project

North QLD Line Crossings

DESCRIPTION

To ensure the continued reliability of electricity

supply to Far North Queensland, the existing

50-year-old 132kV transmission line between

the substations required replacement. This

replacement line will cater for future growth

in electricity demand. After all the necessary

environmental and planning approvals were

received, construction of the replacement

transmission line commenced over a two stage

approach, to allow one line to be kept in service

at all times so as to maintain a reliable supply of

high voltage electricity to the surrounding grids.

UNI-SPAN SOLUTION

The Uni-span solution which secured the

contract, was cost-effective and created the

safety measures expected for a project of this

nature.

272 tonnes of scaffold was supplied for

this project. 40m long x 12m wide birdcage

scaffolds, supported by Uni-beams were

situated either side of the highway, ensuring

that all vehicles travelling on this route were well

protected, should any of the power lines have

accidentally fallen during the transfer process.

There were a few project challenges to

overcome that the Uni-span team worked

through with our client BBUGL (Balfour Beatty

UGL), namely:

u Liaison with Main Roads.

u Consistently update and liaise with

BBUGL and the Traffic Coordination team all

while working safely and efficiently around

the highway and power line upgrades.

RESULT

The result was a protection system that ensured

safety for motorists using this highway and a

spectacular looking scaffold formation.

Page 15: Uni-span Group Catalogue

13GROUP

PROUD DISTRIBUTOR OF

Page 16: Uni-span Group Catalogue

14GROUP

PROUD DISTRIBUTOR OF

Trackstar

DESCRIPTION

The Stage 2 Richlands to Springfield Project will

provide key public transport infrastructure to

support the expected population growth in the

western corridor. The project will deliver a 9.5km

dual track passenger rail line between Richlands

and Springfield, extending the city rail network

to this rapidly growing area.

UNI-SPAN SOLUTION

Uni-span Formwork Solutions secured this

contract by providing a cost effective and time

saving solution to create the 22m wide x 12m

high arch forms which will become the support

structures for the elevated bridge. Tony Pepe,

Director of Niepe Construction Pty Ltd had this

to say, “Uni-span’s MK system has ensured

the fast assembly of a very complex structure.

Further, Niepe are concreting the arches in

one pour. Uni-span’s solution was the only one

which allowed that sequence.”

RESULT

Uni-span Formwork Solutions was able to

provide a “one pour” solution by using the

skillfully designed travelling MK system.

On completion, the $475 million project built:

u Two train stations — Springfield and

Springfield Central.

u A 9.5 km dual track rail line from Richlands

to Springfield.

u Safety and capacity improvements on the

Centenary Highway.

u Changes to the local road network with two

crossings under the Centenary Highway

from Springfield Central station to the Orion

Shopping Centre.

u A cycle path from Johnson Road, Carole

Park to the Springfield Link Bridge.

u A pedestrian and cycle path between

Springfield station and Springfield Central

station.

UNI-SPAN Group: Formwork Project

Page 17: Uni-span Group Catalogue

15GROUP

PROUD DISTRIBUTOR OF

Page 18: Uni-span Group Catalogue

16GROUP

PROUD DISTRIBUTOR OF

WICET

DESCRIPTION

Increasing demand for coal is driving Australia’s

coal export market and worldwide demand

is expected to continue to grow significantly.

In order to meet this demand, greater export

capacity is required and WICET will provide a

valuable boost to existing and future coal export

capacity for Queensland’s coal producers in the

Bowen and Surat Basins.

This $2.5 billion project will provide more than

800 jobs on site and employ approximately 120

personnel during operation.

Main components included in this project’s

scope are:

u Rail receiver dump station, handling 7600

tonnes per hour

u 5.5km long overland conveyor

u Stockyard area for 1.9 million tonnes of coal

u 2km long jetty conveyor

u Single berth with travelling ship loader

(8250 tonnes per hour)

u Channels and wharf (accepting

40000dwt – 220000dwt)

u 132kV substation, access roads,

workshops, admin offices and amenities

Once fully commissioned the export terminal

will effectively double coal export capacity at the

Port of Gladstone, exporting 80 million tonnes

per annum.

UNI-SPAN SOLUTION

Uni-span was approached to offer their expertise

on how best to form the coal conveyor tunnels,

with each tunnel measuring 950 metres in

length. Many factors needed to be considered,

not least the integrity of the waterproofing,

but also the changes in direction and safety

constraints that is of paramount importance to

the project.

The MK System Civil Engineering Kit was

chosen as the optimal system solution best

suited to overcome the obstacles presented

through varying gradients and interfaces

of square to curved junctions of discharge

chambers throughout. The high moment

connections between the MK Walers allowed

generally less equipment to be used and larger

than usual pouring platforms to be incorporated.

AGJV (Abi-group Golding Joint Venture) concluded that the versatility offered with

the MK system, jointly supplied with wall formwork systems Orma and Enkoform

VMK as well as slab formwork system Enkoflex, would best address these issues.

RESULT

The tunnels were poured in varying lengths from 15.00m up to 30.00m sections

to enable the construction sequence to best meet the gradient change points.

120Lm of MK tunnel form were supplied in total. Coupled with hydraulics to

enable a smooth strike and Ulma’s electric driving motors, the tunnel forms were

easily moved into the next position at travelling speeds of 6.2m/minute. The

tunnels internal diameter of 6.50m was consistent, with the wall thickness varying

externally from 375mm at the highest point to 700mm at the stub sides.

Uni-span were also engaged to engineer and supply formwork on the remaining

global works structures including a Barge Wharf and a 2km jetty as well as supply

the projects scaffolding needs.

UNI-SPAN Group: Formwork Project

Page 19: Uni-span Group Catalogue

17GROUP

PROUD DISTRIBUTOR OF

Page 20: Uni-span Group Catalogue

18GROUP

PROUD DISTRIBUTOR OF

UNI-SPAN Group: Formwork Project

Legacy Way – Smoke Duct Corbels

DESCRIPTION

Two TBM’s (tunnel boring machines), each

12.4 metres in diameter and 110 metres in

length were used to excavate Brisbane City

Council’s Legacy Way tunnel. It took each TBM

approximately 10 months to complete this

stage of the project, which will connect the 4.6

kilometre road tunnel from the Western Freeway

at Toowong to the Inner City Bypass at Kelvin

Grove. Each 2,800 tonne TBM excavated spoil

from the tunnel while lining the tunnel with

precast concrete segments forming the tunnel

wall.

Along with the TBM’s, Transcity used cut and

cover structures to construct the tunnels entry

and exit portals. In order to move to the next

stage of construction, the mechanical and

electrical fit out, Transcity was looking for an

innovative solution to assist with the installation

of corbels and smoke ducts for the tunnels.

UNI-SPAN SOLUTION

Uni-span was engaged at the beginning of

the project in the planning, procurement and

construction of the ventilation smoke duct

corbels in the Legacy Way twin 4.6km road

tunnels. A first for an Australian road tunnel, the

pre-stressed precast concrete slabs are simply

supported by cast in situ corbels. Erecting the

precast slabs post corbel construction poses

considerable challenges in terms of logistics,

geometry (space) and safety. This meant the

corbels had minimal tolerance to ensure the

critical airtight seal was achieved.

Uni-span took on the challenge by designing

and offering the MK System motorised traveller

with custom made retractable steel forms. The

MK system was selected to form the corbels in

two 50m hit and miss travellers, each traveller

had 20 hours to be lowered, driven 100m,

raised and the next section poured. Due to the

speed of this system, Uni-span also supplied

two additional advancing travellers per tunnel to

ensure that both the safe drilling of the starter

bars and also the placement of the 8m long

reinforcement cages would not hold up the

progress of the Smoke Duct Corbel traveller.

The MK System therefore created a seamless

motorised production line to ensure the

programmed 50m pour per 20-hour shift from

start to finish was achieved.

The whole solution revolved around a 700mm height difference halfway along the

tunnel. The versatility of the MK System ensured that this was a smooth transition,

demonstrating its market leading edge over all other formwork systems.

RESULT

This traveller in motion is a vision of impeccable engineering, demonstrating how

early engagement between Uni-span and our client will assist in meeting tight

project programmes and deadlines. We believe we have raised the standard and

set the bar for all future civil projects on how to solve a complex road tunnel fit out

challenge in Australia.

Page 21: Uni-span Group Catalogue

19GROUP

PROUD DISTRIBUTOR OF

Page 22: Uni-span Group Catalogue

20GROUP

PROUD DISTRIBUTOR OF

UNI-SPAN Group: Formwork Project

Ichthys Project Onshore LNG CVL-3

DESCRIPTION

The $923 million Ichthys Project Onshore LNG

Facilities Main Civil Works (CVL-3) is a segment

of the US$34 billion Ichthys Project which is a

Joint Venture between INPEX group companies

(the Operator), major partner TOTAL group

companies and the Australian subsidiaries of

Tokyo Gas, Osaka Gas, Chubu Electric Power

and Toho Gas.

The onshore LNG processing plant is being

constructed by engineering, procurement,

construction contractor JKC Australia LNG Pty

Ltd (JKC) at Bladin Point, in Darwin. The Ichthys

LNG Project is expected to produce 8.4 million

tonnes of LNG and 1.6 million tonnes of LPG

per annum, along with approximately 100,000

barrels of condensate per day at peak.

Leighton Contractors will be constructing the

main civil works package, which is critical

infrastructure required for the building of the

onshore LNG facilities that will ensure the first

gas supplies are delivered to INPEX by July

2016.

Scheduled for completion in July 2016, at

peak, the CVL-3 project is expected to create

approximately 900 jobs.

UNI-SPAN SOLUTION

Through early stage servicing and previous

project relations, Uni-span has supplied various

formwork systems to construct the following

areas in a highly cost efficient way:

u Compressor bases and columns

u Manholes

u Bases to circular tank

u LER and shelter foundation

u General single sided and double sided

walls

u Hanging platforms for pile access and stab

joints

u Bund wall forms

u Impoundment ponds

u Nanogen slabs

u Holding basin – C600

u Dodecagon-shaped Tank Flare Foundation

u Transformer Blast Walls

u Corrugated Plate Interceptor Pit &

Recovered Oil Pit

RESULT

Adhering to the Leighton guidelines of Safety First, Uni-span were able to deliver

unique solutions that ensured structures were formed on time and without

incident, including 84 x (1.2m x 1.2m) 12m high columns without through ties.

50% completion was achieved in mid 2014 with all structures involving Uni-

span’s involvement completed. This achievement has seen our equipment and

additional engineered solutions now being involved in other areas of the project.

Page 23: Uni-span Group Catalogue

21GROUP

PROUD DISTRIBUTOR OF

Page 24: Uni-span Group Catalogue

22GROUP

PROUD DISTRIBUTOR OF

Sunshine Coast University Hospital

DESCRIPTION

Sunshine Coast Public University Hospital will

revolutionise healthcare on the Coast when

it opens its doors in 2016. Built as part of the

20 hectare Kawana Health Campus that will

also incorporate the hospital’s SARC (Skills,

Academic & Research Centre), a co-located

private hospital, all amongst the 6 storey

140,000 sqm MHB (Main Hospital Building),

FMC Building (Facilities Maintenance Centre),

the single storey 4,500 sqm MHU (Mental

Health Unit), the 80,000 sqm Car Park 1 and

14,000 sqm Car Park 2, let alone the roads

and infrastructure and other project wide

developments.

UNI-SPAN SOLUTION

Uni-span Formwork Solutions were proud to be

associated with a project of this significance.

The 10,000 sqm FMC Building will house the

facilities management services, loading dock

and central energy plant. The FMC is connected

to the MHB via an underground corridor and an

overhead link bridge.

Uni-span provided a solution for our client

Bosform that met the strict regulations of

main contractor Lend Lease and their Global

Minimum Requirements (GMR).

The solution: CC-4 Falsework light enough to

be erected from below over the varying prop

heights ranging from 1.8m to 6.7m high.

The perimeter downstand beams were also

formed using the CC-4 quick strike system.

RESULT

CC-4 offers a unique yet simple cantilever

solution allowing edge beams to be formed

whilst also allowing the perimeter scaffold to be

erected ahead.

Production rates of 10 sqm per man hour were

achieved on this project.

UNI-SPAN Group: Formwork Project

Page 25: Uni-span Group Catalogue

23GROUP

PROUD DISTRIBUTOR OF

Page 26: Uni-span Group Catalogue

24GROUP

PROUD DISTRIBUTOR OF

UNI-SPAN Group: Formwork Project

Legacy Way – Ventilation Tunnel& Buildings

DESCRIPTION

The Legacy Way Tunnel features a longitudinal

ventilation tunnel to manage in-tunnel air quality.

These ventilation tunnels connect to a ventilation

building, which acts as a high-level ventilation

outlet for the tunnel air.

Uni-span’s outstanding service, product

differentiation and strong relationship building

skills stood us above the rest when it came time

for Silverstrand Developments to select the right

formwork supplier to assist them with works on

the Legacy Way Western Ventilation Building.

UNI-SPAN SOLUTION

With the project location in Mount Coot-tha, Uni-

span assisted Silverstrand by supplying over

1800m2 of the ORMA Vertical formwork system.

RESULT

Uni-span’s ORMA system played a vital role in

achieving the Class 2 concrete finish, where

most standard formwork systems would only be

able to achieve a Class 3 finish.

Page 27: Uni-span Group Catalogue

25GROUP

PROUD DISTRIBUTOR OF

Page 28: Uni-span Group Catalogue

26GROUP

PROUD DISTRIBUTOR OF

UNI-SPAN Group: Scaffold Products

Scaffolding

Uni-span Australia hires and sells scaffolding

systems compatible for all commercial and

industrial projects throughout Australia. Our fleet is

fully compliant with AS1576. Uni-span Australia is

ISO 9001:2008 and AS/NZS 4801:2001 accredited,

meeting all relevant Australian Standards and

codes.

Our range includes Quickstage scaffolding, our

patented containment system, Uni-mesh™, LVL

scaffold boards, tubing and stair systems for

access, temporary strutting, edge protection and

handrail solutions.

Our scaffold products are 100% hot dipped

galvanized and manufactured from high tensile

steel, enhancing safety standards and extending

product life span. It is rust-resistant, reducing

maintenance expenses, and is also much lighter

than many other scaffold systems, which means

lower freight costs.

Using Uni-span scaffold means better productivity,

which means a faster construction programme

and healthier profit margins.

Containment systems

Uni-mesh™

u The original Uni-mesh™.

u 50mm x 50mm grid with shade element.

u Ties required on every standard (2.4m

max) & at each floor (4m max).

u Uni-mesh™ may extend 2m above last

tie provided inside standard is erected &

top transom installed.

u Uni-mesh™ remains unimpaired in wind

speeds up to 100kph.

u Sizes: 0.95mx15m (12.5kg) & 1.9m x 15m

(27.5kg).

COMMON SYSTEM ADVANTAGES

u Durable u Repairable u Multiple uses u Aesthetically pleasing u Ready to install u Saves time, money & labour u Rolls up after use u Full test results & certificates available

Page 29: Uni-span Group Catalogue

27GROUP

PROUD DISTRIBUTOR OF

Uni-grid™

u 25mm x 25mm grid, no shade element.

u Reduction in wind load.

u Up to 50% less wall ties required to secure scaffold.

u Ties required on every 2nd standard (4.8m max) & at each

floor (4m max) OR

u Ties required at every 3rd standard (7.2m max) & at each

floor (3m max).

u Uni-grid™ is not to extend more than 2m above last tie

position (raker or slab tie).

u Uni-grid™ remains unimpaired in wind speeds up to 100kph.

u Sizes: 0.95mx10m (17kg) & 1.9mx10m (34kg).

COMMON SYSTEM DESCRIPTION

u Versatile product for use in all sectors.

u Prescribed lining is steel wire reinforced. (Uni-meshTM & Uni-

gridTM)

u Tested & certified to all Australian standards & WHS

regulations.

u Easy & economical installation & removal

u Can be attached to scaffolding with cable ties/KwikAz clips.

Disclaimer: This document is issued for the purpose of marketing/product awareness only, and is not provided as, or to support,

technical advice. For verification of designs incorporating Uni-

mesh™ & Uni-grid™, please seek certifying engineer advice.

Page 30: Uni-span Group Catalogue

28GROUP

PROUD DISTRIBUTOR OF

UNI-SPAN Group: Scaffold Products

LVL Scaffold Boards

SPECIFICATIONS

u Individually proof tested and compliant in accordance with AS 1577 for Stiffness, Strength, Sliding & Slipu Available in various lengths & can be cross cut to exact lengthsu Stamped as Scaffold plank with AS compliance marku High strengthu Chamfered edgesu Suitable for PETROCHEMICAL & GAS industriesu Meets industry standardsu Enhanced durability & safety (AS)u Competitively priced

Size: 230mm (w) x 40mm (d)

Dimensions & Compositions:

Normal Thickness 40mm

Width 230mm

Lengths 1.2m - 6.0m

Number of Piles 13

Thickness of Piles 3.1mm

Scaffolding Tube

SPECIFICATIONS

u Hot Dipped Galvanised Tubeu Zinc coating min. 180g/m2u Can be cut to a required length

DImensions & details:

Grade Wall

Thickness

O/D

Q345 3.25 mm 48.3 mm

Q235 4.0 mm 48.3 mm

Temporary & Public Access Stair System

SPECIFICATIONS

u Manufactured from high quality light

weight aluminiumu Stair rises are bent forming the

aluminium stair treadsu Unique design allows for a single

individual to install & transport without

the aid of trucks & secondary labouru Elimination of open cavities between

treadsu Complies with AS/NZS 1577, AS/NZS

1657-1992 & EN 12811-1:2003

BENEFITS

u Suitable for both PUBLIC & TEMPORARY

scaffold access requirementsu Tread stacks neatly into a scaffold

stillageu Can be installed safely by a single

scaffolder u Several stair units can be transported in

utility vehicles without the need for

larger vehiclesu Sturdy & lightweight, reducing personal

injury & site accidentsu Stair risers are positively attached to

the standard eliminating the need for

additional transomu No under sling required, no cavity for

material to fall between treads

Page 31: Uni-span Group Catalogue

29GROUP

PROUD DISTRIBUTOR OF

Right Angle Coupler Slim Soldier Handrail Standards

Ledger Truss Transom Steel Board

3 Board Hop-Up Bracket Access Ladder Adjustable Swing Gate

Page 32: Uni-span Group Catalogue

30GROUP

PROUD DISTRIBUTOR OF

UNI-SPAN Group: Formwork Products

Civil Engineering Systems

MK System

The MK System is a versatile system that has been designed for a variety of applications

requiring high load-bearing capacity in all forms of Civil Engineering. The core item for

all these solutions is the MK waler. Its elaborated design and compatibility with other

systems and various accessories, enables the MK System to be the all-rounder for

heavy-duty structures providing solutions to:

u Gantry structures.

u Form carriers for bridges & tunnels.

u Shoring for the support of formwork or other structures.

u Horizontal & vertical formwork, climbing structures & perimeter protection screens.

u Single-sided formwork support, facade retention & other special applications.

Enkoform HMK

ENKOFORM HMK is a horizontal beam-based formwork system adaptable to various

geometries in civil engineering projects. This system is an advanced design to suit the

different sections of bridge decks, overpasses and underpasses and other horizontal

structures of reinforced concrete.

u Versatility for the construction of bridges.

u Excellent fit to the shape of section with connectors & adaptable to different

configurations:

- Bridges of constant & variable cross section (solid or hollow)

- Bridges of variable deck depth (solid or hollow)

- Bridges with superelevation

u Sets of high stiffness necessary for handling & transport.

u Fast stripping of formwork units.

H-33 Truss

This system is designed to bear high loads in large span applications.

u Simplicity in erection and modification.

u Modular structure made up of standard elements that are joined in different ways

according to the project’s requirements.

u Adjustable to bridge shape for the construction of super elevation and gradients.

u Normally used together with high load capacity shoring systems

(T-500 Shoring System, MK Shoring System).

u Due to its flexibility, H-33 Truss can work as a bi-supported beam or

cantilever beam.

CVS Cantilever Form Carrier

Suitable for the construction of bridge decks and bridge arches with large spans or

where the ground shoring is complex.

u Technology for spans between piers of up to 200 m: riverbeds, road junctions,

railroad crossings, etc.

u Advisable for pier heights exceeding 50 m.

u Construction works at bridge decks in small areas. Global safety.

u Variable distances between spans possible.

u Variable deck depths possible.

u Hydraulic drive. Repeated movements.

u Radii of curvature greater than 750-1000 m.

u The bridge must be designed to withstand the loads arising from the construction.

Page 33: Uni-span Group Catalogue

31GROUP

PROUD DISTRIBUTOR OF

System advantages of MK System

u Highest versatiity with only standard parts.

u Manual & easy assembly - crane assissted for moving entire

structures only.

u With a limited number of system parts to highly complex

structures.

u Quick work cycles – easy to use and repetitive movements.

u Working platform and other built-in safety items.

u Accuracy for operations.

u Compatible with Uni-span’s (ULMA) formwork product

portfolio.

Page 34: Uni-span Group Catalogue

32GROUP

PROUD DISTRIBUTOR OF

UNI-SPAN Group: Formwork Products

Vertical Formwork

ORMA

The ORMA modular formwork suits any type of vertical structure, i.e. walls, columns,

piers, abutments and foundations in both building and civil engineering. ORMA

contributes effectively to savings by minimising labour costs and assembly time, thereby

increasing performance considerably. This is a highly versatile system due to lateral

holes that allow quick adaption to typical shapes such as bulkheads and columns.

The system is designed to withstand high concrete pressures. ORMA has a range of

panels with the option of placing them vertically and horizontally. The plywood skin

enables excellent concrete finishes.

ENKOFORM VMK

ENKOFORM VMK Vertical Formwork system provides solutions for the execution of any

type of vertical structure in building and civil engineering such as walls, columns, piers

and abutments. The features of the product guarantee high performance rates and

excellent concrete finishes.

Panels are custom formed with standard items, namely steel MK walers, timber beams

and plywood, depending on the required performance and dimensions.

u Versatile and flexible system for any vertical geometry.

u Provides excellent concrete finishes thanks to its adaptability to the pre-designed

drawings.

u Optimization of the formwork according to the concrete pressure.

u The plywood board, easily replaceable, facilitates the reuse of the panels and

enables excellent concrete finishes.

u This system uses common standard accessories to other Uni-span vertical

formworks, e.g. push-pull props, tying system, and climbing brackets.

u Sending the material disassembled to the job site means smaller transportation

volume.

u The panel connections are simple and adjustable. Minimal use of filler elements

between panels.

BIRA

BIRA is a metal formwork for circular walls. The desired radius is obtained by means

of an adjustable curving mechanism. The compatible ORMA clamp joins the panels

longitudinally. The minimum curvature radius is 2.2 m. BIRA formwork is also available

in imperial measurements and has a permissible concrete pressure of 1650 psf.

u Industry leading minimum curvature radius of 2.2m.

u High-strength steel shuttering face.

u Panels with only 2 ties.

u A wide range of panel heights (intervals of 25cm possible) connected vertically.

u Different width for internal and external panels.

u Simple curvature blocking.

u Compatible with ORMA formwork.

u Reduced number of accessories.

u Built-in components for lifting, vertical panel connection & levelling.

u Safe assembly.

u Quick joining of panels with clamps.

Page 35: Uni-span Group Catalogue

33GROUP

PROUD DISTRIBUTOR OF

ORMA Applications and Solutions

1. Climbing systems

2. Single-sided formwork support

3. Columns

4. Plaster

5. Corners at 90°

6. Articulated corners

7. Bulkheads

8. 90° wall intersections

9. Fillers

10. ORMA-scaffolding working bracket

11. Working bracket

12. ORMA Platform

13. Front handrail

Other types of Vertical Formwork:

u Universal Column Platform

u LGR Column

u Circular Column Formwork (CLR)

u SMK Single-sided Formwork System

Page 36: Uni-span Group Catalogue

34GROUP

PROUD DISTRIBUTOR OF

UNI-SPAN Group: Formwork Products

ENKOFLEX – Timber Beam Slab Formwork

ENKOFLEX is a horizontal formwork

system designed for the construction

of any slab type, whether solid or

lightened. The independent beams

provide great versatility. It’s adjustable

to irregular geometries and to other

formwork systems for concrete

pouring solutions.

u Easy & quick to erect.

u Few items: timber beams, heads,

plywood & shoring system.

u Highest concrete finishing quality.

u Great versatility for different slabs

and heights depending on beams,

grid and shoring system used.

u Possible to support with prop

or shoring, depending on height.

u VM20 timber beams:

Cap protected edges against

wear & tear and humidity.

CC-4 – Ply/Panel

CC-4 is a recoverable horizontal

formwork system for both solid and

lightened slabs, resulting in a superior

concrete finish. This system allows for

quick erection and dismantling times

due to its aluminium structure and

because it is a fast striking system.

This ensures the highest safety

standards for formwork assemblers.

There are two shuttering types

available: with panel (aluminium

frame with incorporated board) or with

standard plywood.

u Lightness – all components <15kg.

u Quick strike drophead enables

faster cycle times.

u Stripping & material retrieval can

be completed safely without the

risk of falls.

u High assembly efficiency – allows

for the assembly of the grid before

placing panels or plywood.

u The formwork face provides

superior concrete finishing.

u Slabs up to 90cm thick.

MK Table – Pre-assembled Slab Formwork

The MK Table system has been

designed to be used for both solid

and lightened slabs. This pre-

assembled slab formwork system is

typically used in building construction

with demanding requirements in terms

of performance, safety and finishes.

u Movable from one place

to another without dismantling,

thus minimising possible risks

during assembly and dismantling.

u Quick erection, stripping and

movement.

u Less labour, great efficiency.

u Easy installation to dimension &

levelling.

u Flexible system.

u Safe system.

Horizontal Formwork

DESCRIPTION DESCRIPTION DESCRIPTION

BENEFITS

BENEFITS

BENEFITS

Page 37: Uni-span Group Catalogue

35GROUP

PROUD DISTRIBUTOR OF

MK Shoring

DESCRIPTION

MK Shoring systems are structures

designed for load support in civil

engineering applications. These

systems consist of standard MK

beams (walers).

The module sizes in top view are:

0.75m, 1m, 1.5m, 2m, 2.5m and 3 m

(in all combinations).

They are designed for the construction

of inclined walls with working

platforms in a horizontal position

fulfilling all safety requirements.

u Load bearing capacity of up to 36

tons per prop.

u Quick & safe on-site erection.

u Very versatile modular system.

u Erection as independent or chain-

linked towers.

u Tower base can be anchored to the

ground.

u Different stripping options

available.

u Platforms, handrails & access

ladders assists safe working

conditions.

Aluprop

The ALUPROP system consists

of aluminium props and bracing

frames designed for the shoring of

horizontal (i.e. slab) formwork. The

ALUPROP system can be used as

an independent propping system or

combined with bracing frames to form

shoring towers.

The versatility of these aluminium

props offers many project

applications.

u Light weight aluminium prop.

u Long durability & high load-bearing

capacity (up to 13 tons per prop)

u Inner tube is protected against

unintentional disengagement to

assure it cannot slide out of the

outer tube.

u Easy & quick length adjustment.

u Maximum prop height is 7m.

u Prop can be braced.

u Possibility of installing working

platforms.

u Enables ergonomic and safe

working conditions.

EP Certified Steel Prop

The EP – Certified Steel Prop

system is designed for the shoring

of slab formwork and other diverse

applications on site. Certified product

according to European standard EN-

1065.

u Full protection of workers’ hands

when handling inner tube.

u Inner tube, pin and nut protected

against unintentional

disengagement.

u Outer thread prop with slots in the

threaded area and self-cleaning

thread.

u Hot dip galvanising provides

excellent anti-corrosive protection.

u Fast prop striking with pin.

u Each prop has a load bearing

capacity of up to 4 tons.

Props & Shoring Formwork

DESCRIPTION

BENEFITS

DESCRIPTION

BENEFITS

BENEFITS

Page 38: Uni-span Group Catalogue

36GROUP

PROUD DISTRIBUTOR OF

UNI-SPAN Group: Formwork Products

KSP – Internal Shaft

Platform

The KSP Internal Shaft Platform

system is used for lift and staircase

shafts, hollow piers and other types of

gaps where it is necessary to support

formwork panels. This system is

typically combined with conventional

climbing systems on the outside of

the wall. The KSP system consists

mainly of MK walers and gravity pawl

brackets.

u Covers any distance with

completely standard and modular

material

u Versatile Gravity Pawl Bracket

adaptable to all waler types and

lengths.

u Easily adjustable.

u Two solutions by anchor type:

1. Gravity Pawl Bracket with GP

Box-out

2. Folding Bracket with adjustable

bracket.

RKS – Rail Climbing

System

It enables panel climbing without

separating the structure from the wall.

This makes lifting operations safe

under any weather conditions. Lifting

of the entire structure by crane with

the option of incorporating a hydraulic

system for lifting without the use of a

crane, is part of the system.

u Safe climbing to great heights,

guided climbing along the wall.

u Versatile and adjustable (based on

the MK System).

u Large and safe platforms,

customised configurations

possible.

u Formwork stripping distance:

70 cm

u Hydraulic lifting, without crane.

u Lifting of all platforms with a

single hydraulic power unit and two

cylinders.

u Lifting under adverse weather

conditions.

u Optimised for straight constructions

or with repetitive geometries.

HWS – Hydraulic Windshield System

The HWS Hydraulic Windshield System is a safety item for the perimeter of buildings at great heights. This system covers the floor under construction and the floors immediately below. It is based on the MK system, providing great versatility when configuring different types of structures, easily adapting to any geometry.

u Prevents falls from the slab edge.u Excellent protection against adverse weather conditions.u Reduces the visual height effect.u Provides a working platform at the slabs edge.u Hydraulic self-climbing elevation, without crane.u Can be anchored to slab or wall.u Adapts well to the geometry of irregular slabs, including geometries varying in height.u Encloses the entire perimeter without leaving any gaps.u Provides large vertical surfaces for promotional messages.u Material lifting platforms can be part of the windshield panels.u Provides access between the last floors of the building.

Climbing Systems

BENEFITS

BENEFITS

DESCRIPTION DESCRIPTION DESCRIPTION

BENEFITS

Page 39: Uni-span Group Catalogue

37GROUP

PROUD DISTRIBUTOR OF

Page 40: Uni-span Group Catalogue

38GROUP

PROUD DISTRIBUTOR OF

Head Office, QLD

28 Computer Road

Yatala, QLD 4207

National Phone: 1300 882 825

Phone: +61 7 3442 4000

Fax: +61 7 3807 0546

Email: [email protected]

Contact Us

Uni-span Beenleigh, QLD

22A Spanns Road

Beenleigh, QLD 4207

National Phone: 1300 882 825

Phone: +61 7 3442 4000

Fax: +61 7 3807 0546

Email: [email protected]

Uni-span Sydney, NSW

11 Huntingwood Drive

Huntingwood, NSW 2148

National Phone: 1300 882 825

Phone: +61 2 9672 7122

Fax: +61 2 9831 2945

Email: [email protected]

GROUP

PROUD DISTRIBUTOR OF

Page 41: Uni-span Group Catalogue
Page 42: Uni-span Group Catalogue

GROUP

PROUD DISTRIBUTOR OF

Uni-span Australia Pty Ltd ABN 84 099 939 287

Uni-span Formwork Solutions Pty Ltd ABN 72 158 121 361

Uni-span Height Safety Pty Ltd ABN 48 122 411 198

Uni-span Industrial Services Pty Ltd ABN 94 121 764 663

28 Computer Road Yatala QLD 4207

PHONE 1300 882 825

FAX +61 7 3807 0546

[email protected]

www.uni-span.com.au

formworkscaffoldingengineering