UNITED STATES * 0 ~ NUCLEAR REGULATORY COMMISSION Z WASHINGTON, D.C. 20555 September 1, 1992 Docket Nos. 50-390 and 50-391 LICENSEE: Tennessee Valley Authority (TVA) FACILITY: Watts Bar Nuclear Plant, Units 1 and 2 SUBJECT: MEETING SUMMARY - August 26, 1992, ROUTINE CONFERENCE ON LICENSING STATUS (TAC M72494, M72495, M83948 AND M83949) Reference: Meeting notice by P. S. Tam, August 13, 1992 On August 26, 1992, NRC and TVA representatives met at the Watts Bar site to discuss the status, needed actions, priorities and schedules of various licensing issues. These include all unresolved outstanding issues, confirmatory issues, proposed license conditions, corrective action programs (CAPs), special programs (SPs), TVA's response to generic letters and bulletins, and upcoming NRR-led team inspections. The discussion was based on the latest licensing status as published in the Watts Bar Safety Evaluation Report Supplement 9 (NUREG-0847, Supp. 9). The Office of Nuclear Reactor qzRegulation (NRR) issues the Safety Evaluation Report (NUREG-0847) and supplements (SSERs) as its principal licensing basis documents for Watts Bar. Section 1 of the latest SSER (SSER 9) officially documents the issues that NRR considers needing resolution before an operating license can be granted. Enclosure 1 is the list of meeting participants. Schedular information and other comments were exchanged between TVA and NRR personnel, agreed upon, and subsequently used to update the NRR staff's work control system, Workload Information and Scheduling Program (WISP, Enclosure 2). Updated schedular information regarding the CAPs and SPs is documented in Enclosure 3. TVA participants described the status of TVA's top 10 actions. These are flagged by appropriate indicators in Enclosure 2. 9209080087 920901 L ~' PDR ADOCK 05000390 A PDR p

Upload: others

Post on 09-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UNITED STATES * 0 NUCLEAR REGULATORY COMMISSION Z …Reference: Meeting notice by P. S. Tam, August 13, 1992 On August 26, 1992, NRC and TVA representatives met at the Watts Bar site

UNITED STATES* 0 ~ NUCLEAR REGULATORY COMMISSION

Z WASHINGTON, D.C. 20555

September 1, 1992

Docket Nos. 50-390and 50-391

LICENSEE: Tennessee Valley Authority (TVA)

FACILITY: Watts Bar Nuclear Plant, Units 1 and 2

SUBJECT: MEETING SUMMARY - August 26, 1992, ROUTINE CONFERENCE ONLICENSING STATUS (TAC M72494, M72495, M83948 AND M83949)

Reference: Meeting notice by P. S. Tam, August 13, 1992

On August 26, 1992, NRC and TVA representatives met at the Watts Bar site todiscuss the status, needed actions, priorities and schedules of variouslicensing issues. These include all unresolved outstanding issues,confirmatory issues, proposed license conditions, corrective action programs(CAPs), special programs (SPs), TVA's response to generic letters andbulletins, and upcoming NRR-led team inspections. The discussion was based onthe latest licensing status as published in the Watts Bar Safety EvaluationReport Supplement 9 (NUREG-0847, Supp. 9). The Office of Nuclear ReactorqzRegulation (NRR) issues the Safety Evaluation Report (NUREG-0847) andsupplements (SSERs) as its principal licensing basis documents for Watts Bar.Section 1 of the latest SSER (SSER 9) officially documents the issues that NRRconsiders needing resolution before an operating license can be granted.

Enclosure 1 is the list of meeting participants.

Schedular information and other comments were exchanged between TVA and NRRpersonnel, agreed upon, and subsequently used to update the NRR staff's workcontrol system, Workload Information and Scheduling Program (WISP,Enclosure 2). Updated schedular information regarding the CAPs and SPs isdocumented in Enclosure 3.

TVA participants described the status of TVA's top 10 actions. These areflagged by appropriate indicators in Enclosure 2.

9209080087 920901 L ~'

PDR ADOCK 05000390A PDR p

Page 2: UNITED STATES * 0 NUCLEAR REGULATORY COMMISSION Z …Reference: Meeting notice by P. S. Tam, August 13, 1992 On August 26, 1992, NRC and TVA representatives met at the Watts Bar site

-2-

TVA provided a handout summarizing the status of actions being undertaken atWatts Bar as a result of Bulletin 92-01, and Information Notices 91-41 and91-79, all regarding Thermo-Lag 330 fire barrier materials. The handout isincluded in this summary as Enclosure 4. By copy of this summary, the PlantSystems Branch (Pat Madden) is provided with a copy of TVA's handout.

Original signed by

Peter S. Tam, Senior Project ManagerProject Directorate 11-4Division of Reactor Projects - I,'IlOffice of Nuclear Reactor Regulation

Enclosures:1. Participant list2. WISP report3. Charts showing CAP and SP4. TVA Handout on Thermo-Lag

milestones330 fire barriers

cc w/enclosures:See next page

OFFICE P011-4/LA P011-4/PM PDll 4/0D

INAME M~aners Pj1Iis/dwfI( FTZ77o'p__DATE 9/0I /92 9/ [ /92 19/ 1 /92

Page 3: UNITED STATES * 0 NUCLEAR REGULATORY COMMISSION Z …Reference: Meeting notice by P. S. Tam, August 13, 1992 On August 26, 1992, NRC and TVA representatives met at the Watts Bar site

Watts Bar Nuclear Plant

cc:Mr. John B. Waters, ChairmanTennessee Valley AuthorityET 12A400 West Summit Hill DriveKnoxville, Tennessee 37902

Mr. 0. E. Nunn, Vice President38 Lookout Place1101 Market StreetChattanooga, Tennessee 37402-2801

Mr. W. J. Museler, Vice PresidentWatts Bar Nuclear PlantTennessee Valley AuthorityP.O. Box 2000Spring City, Tennessee 37381

Mr. M. J. Burzynski, ManagerNuclear Licensing and Regulatory AffairsTennessee Valley Authority5B Lookout PlaceChattanooga, Tennessee 37402-2801

Mr. G. L. Pannell, Site Licensing ManagerWatts Bar Nuclear PlantTennessee Valley Authority38 Lookout PlaceSpring City, Tennessee 37381

The Honorable Robert AikmanCounty JudgeRhea County CourthouseDayton, Tennessee 37321

The Honorable Johnny PowellCounty JudgeMeigs County CourthouseRoute 2Decatur, Tennessee 37322

Regional AdministratorU.S.N.R.C. Region II101 Marietta Street, N.W.Suite 2900Atlanta, Georgia 30323

Senior Resident InspectorWatts Bar Nuclear PlantU. S.N. R.C.Route 2, Box 700Spring City, Tennessee 37381

Dr. Mark 0. Medford, Vice PresidentNuclear Assurance, Licensing & Fuels3B Lookout Place1101 Market StreetChattanooga, Tennessee 37402-2801

TVA RepresentativeTennessee Valley Authority11921 Rockville PikeSuite 402Rockville, Maryland 20852

Mr. Michael H. Mobley, DirectorDivision of Radiological Health3rd Floor, L and C Annex401 Church StreetNashville, Tennessee 37243-1532

General CounselTennessee Valley AuthorityET 11H400 West Summit Hill DriveKnoxville, Tennessee 37902

Page 4: UNITED STATES * 0 NUCLEAR REGULATORY COMMISSION Z …Reference: Meeting notice by P. S. Tam, August 13, 1992 On August 26, 1992, NRC and TVA representatives met at the Watts Bar site

ENCLOSURE 1

LIST OF PARTICIPANTS

ROUTINE LICENSING STATUS MEETING

August 26. 1992

Affiliation

Becky MaysVic NersesPaul PacePeter TamJohn VoreesGlenn Walton (part-time)

TVA Watts Bar Site LicensingNRC/NRR/Project Directorate 11-4TVA Watts Bar Site LicensingNRC/NRR/Project Directorate 11-4TVA Watts Bar Site LicensingNRC Senior Resident Inspector

Name

Page 5: UNITED STATES * 0 NUCLEAR REGULATORY COMMISSION Z …Reference: Meeting notice by P. S. Tam, August 13, 1992 On August 26, 1992, NRC and TVA representatives met at the Watts Bar site

Poset Report Date 08/31/92 Condensed Project Manager ReportLicensi'ng

MPA Age Rev AppI RAI RAI A ,tin License.Taskifl Numn (Mo~n) Mth Pri Actyp Title Date issued R~e. nonsmesI!i onet---............................................................ ........................

...................................*..................... Active Actions................................................ ....

65031 S 2 R LITST.RI-CRRCIEATINPORM (05/22/89) (08/16/90) (11/07/90C) (12/31/92T ) (10/31/92T ) Submilttal to moidifysoey 9/2 (TOp )

&03591

153595

1*3597

M63632

M63647

163648

163649

Wi3656

U63657

M66624

MI 1917

'..TTS BAA 1 - SPECIAL PROGRAM: EQUIPM~ENT(IJALIFICATICN~ OPEN ISSUE 4

VATTS BAA I - SPECIAL PROG;RAM: NIOERATEENERGY LINE BREAK FLOOING (SECTION3.6.1)

`%RlS BAA I - OITA INAENT I SOLATION1REVIEW

"OTTS BAR I - ILB CUJTS IDEOCTAI NMENT(SECT 3.11.3.3)-

"MTT1S BAA I HEALTH PHYSICS PROGRAM(SECT 12.6)"

VATTS BAA I CORRECTIlVE ACTION1 PROG3RAM:FIRE PROTECTION., OPEN ISSUE 12, OOF.ISSUE 38, LIC. CND, 20

lWAflS BAR I - POER SYSTEM CONCERNS,

l'AflS BAR I -EMIERGENCY PLANNING LIC.CON. 27

"WlTFS BAR I PHYSICALSECIRITY PLAN(SECT 13.6)'

'MTTS BAR 1 IMPLEME1(ATICyE OF THESTATION BLAOCI)CT RULE, 1OCFRSO.63-

"YATrS BAA I - CORIRECTIVE ACT ICi PROGRAM(CAP) FORI CABLE ISSUES'

'WkTTS BAR I COR.RECTIVE ACTICI PROGRAM(CAP) FORI QA RECORDS"

*MflS BAR I - CORECTIVE ACTION PROGRAM(CAP) FOR WAELDING ISSUES-

1AATTS BAR I - BULLETIN 86-11PRESSURIZER SURGELINE THERMALSTRATIFICATION'

'WhTTS BAR I -THIMBLE THINNING IN PIARS(BULLETIN 68809)-

"MATTS BAR I- INDIVIDUAL PLANTEVALUATIONS (CL 88 20)"

"VRTT BAR I1 ACCEPTABLE ISTPROGRA1.G(GL 89 04)"

"MATTS BAR I -RESPONSE TO NRCB 90-01LOSS OF FILL OIL IN ROSEMNUINTTRANSMI TIER'

WA~TTS BAR I -TECHINICAL SPECIFICATIONREV I I'w

WMllS BAR I INSElVICE INSPECTION(LICENSE COM)I1 ION 4)

(05/01/92) (09/30/92T) (03/31/93T ) (03/31/93T RAMI response by 9/92.

(/.-.)(06/30/92C) (12/31/93T ) (05/31/93T )6/30/92 submnittal under review.

(03/15/69)

(06/04/90)

(10/19/90)

(0S/12/89C)

(11/30/92T)

(01/03/91IC)

(06/15/92C)

(04/30/91)

(03/22/89)

(10/20/66)

(05/04/90)

(06/15/90)

(02/05/92)

(02/06/85)

(07/24/90)

(04/22/92)

(05/22/69)

(../- /..)

(06/17/92C)

(11/21/9 IC)

(05/22/69) (04/10/91) (05/15/92C)

(05/22/89) (./ / )(07/31/90C)

(01/31/92)

(.4..,--)

( / I- )

( / / )

( / I)

(09/30/92T)

(12/29/89)( / )C / /

(03/31/93T ) (06/30/93T ) 1/93 tentative date for Kadrick site visit.

(12/30/92T )(.-/

(06/30/93T )(--/

(05/31/93T )(08/30/93T

(08/31/92T

(06/30/93T

(09/30/93T)

(12/31/92T

(12/30/92T)

(03/31/93T)

(10/30/92T-)

(10/31/92T)

(12/31/93T

(06/30/93T)

(09/30/93T)

(12/31/92T

(I I/ 30/92T

(12/31/92T

I 12/31/93T

T VA: submittal by 11/92.

)PSAR to be updated by Amend. 74 (?) per Horning.

)6/15 submittal under review. MoIre submnittals byBs To

)Draft PSAA pages received. Expect to close several Issues.

)TVA submnittal app. 12/92.

)SSER 10 will eliminate PLC 38. Review of 6/17 ltr. ongoingý

)Submnittal by 8/92 using coping approach.

)NRR action conmplete in SSER 9. Will moinitor impi. (Top 4)

(09/30/93T ) NRA action complete lin SSER 9. (Top 8)

(09/30/92T ) Closeout itrs. on CAP and Welding Project by 9/92.

/-/ ) Submnittal on Item 2.a under review by H. Shaw, aipp. 8/92.

( //

( / /

C / /

( / /

(06/30/93T

(09/30/931 1C

)No need for submnittal until after plant start.£

)IPE submittal 9/92; IPEEE has separate TAC number.

Per GI 89 04. Relief requests by 7/93.

Supplemental bulletin being prepared, date uncertain,

Detailed review schedule will be developed in 9/92.

Submnitlal by 7/93.

A022

(06/20/91) (06/18/92C)

MI1923

M72106

W42181

W42693

W44 88

W44801

W46631

W6(74 2

M79HM 1

X811

Page 6: UNITED STATES * 0 NUCLEAR REGULATORY COMMISSION Z …Reference: Meeting notice by P. S. Tam, August 13, 1992 On August 26, 1992, NRC and TVA representatives met at the Watts Bar site

Palo 2 Report Date 08/31/92 CnesdPoethngrRpr

Yeah IDMIA AgeNam (lwbn) Pri Actyp Title

W6972 ( 321 TS 2 RN VATrS BAR UN IT I QU(IAL ITY ASSURANCE

W6974 ( 161 TS 2 RN 'nArrS BAR UNIT I SPECIAL PROG3RAMwMECHANICAL EQUJIPMwENT QUJALIF ICATION1

IM132 ( 831 TS 2 RN VATTS BAR I - 1TMI I I F 2 ON INADEQUATECORIE COLING INSTRikkiTifICN, L IC.OON. 3

1117222 1251 TS 2 RN VIRTTS BAR UNIT I - SEVERE ACIDENTMdITIGATION DESIGN ALTERNATIVES (SND)A)IN IME FES

1147543 (91) TS 2 RN WATTS BAR I - PROCEDURE TO ESTIMATE COREDAMAGE, (SECTION 9.3.2)

M77553 10) TS 2 RN WATTS BAR I - OPFSITE DOSE CALCULATIONMANUAL (WCNC)

107560 1 951 TS 3 RN WATTS BAR I -HEAVY LOADS (LICENSECXIDITION 39)

OU7569 ( 891 TS 2 BIN WATTS BAR I - STEAM! GENERATOR TUBERUPTURE ANALYSIS PER VCAP - 11698

107861 ( 261 TS 2 RN WsTTS BAR I - PROPOSED LICENSECOITIONS 28 AND 29

W07896 A021 ( 261 TS 2 LL WATTS BAR I PRESSURIZED THERMAL SHOCK,10 CFR 50.61

M79692 ( 191 TS 2 RN WATTS BAR I -P IPE BREAK SPECTRA USED ASRESULT OF LLB APPROVAL

109717 1191 FM. 2 RN WARTTS BAR I -SEISMIC DESIGN CONERNSORIGINATING FROM PSAR AMEND 64 OPENISSUE 19

M79718 1161 TS 2 RN WATTS BAR I - MECHAN ICAL SYSTEMwSCONCERNS ORIGINATING FROMl FSAR AMEND.64, OPEN ISSUE 20

M79992 1 171 TS 2 RN WATTS BAR I SAFETY AND RELIEF VALVETESTING3 (MInt I.D.I)

b=0143 1 161 TS 2 RN WARTTS BAR 1 . SAR PAMEN[IENT NO. 65REVIEW

160152 1221 TS 3 RN WATTS BAR I -CONTAINMwENT EFFECTS DUE TOREMOVAL OF BORON INJECTION TANK(

161063 161 TS 2 RN WATTS BAR I - USE OF EAGLE 21 PROCESSPROTECT ION SYSTEM

161887 1 01 TS 2 RN WATTS BAR UNIT I - USE OF VANTAGE - SHFUEL DESIGN

1.1959 I101 TS 2 LL WATTS BAR I ASME COD)E CASE N-491

W.2032 ]I)1 TS 2 RN W&T`TS BAR I FIFTH DIESEL GENERATORNON- ELECTRICAL ISSUES

M862065 I 123 TS 2 R0 WATTS BAR I -THIRD ANNUAL REPOR1T ONEMbPLOYEE CONCERN SPEC- IAL PROGRAM

P.62367 I101 TS 2 RA WATTS BAR 1 SIIALLOWV UNDER ANCHORS

M.82644 I71 TS 2 RN WATTS BAR I FSAR ANTINI)vIENT 69.

Apri RAIDoae Issued

(G4/30/91) (04/09/92)

(09/19/85) (08/16/90)

RAIRestouae

(01/24/92C)

(12/0/92

(12/30/92)

(04/30/94)

Condensed Project Manager Report

Licensee

(12/31/92T

(09/30/92T

LicensingAcIt ion

I 2/30/92T

(12/31/92T

(04/30/94T

(07/30/90) (01/29/91) (07/31/92L) (04/30/93) (12/31/92T ) -I-- ) Awiting TVA response to 1/2"/91. at fit* by Jas

(01/31/85)

(09/24/84)

(03/31/85)

(06/26/90)

(06/26/90)

(01/29/91)

(01/31/93T)

(12/31/92T)

(07/27/92C)

(07/13/92C)

(09/20/91C)

(01/04/91) (08/22/91) (04/06/92C)

(06/30/93)

(09/30/92)

(12/31/92)

(09/30/92)

(10/31/92)

(08/31/92)

(12/31/92)

(06/30/93T

(1I2/30/92T

(03/31/93T

(12/31/92T

(09/30/92T

010/31/92T

(09/15/02T

(12/31 /92T

) (--/../--

) (--/. /-.

) (--/--/--

) (09/30/93T

) (../.-/-.

I (--/- /

) (-./../.

)SSER S. TVA submittal by 1/93.

) l muntowic: is reviewer. Submittal by.8/92.

)TVA submittal by 1/93.

)See SSER S. 15.6.3. TVA submittal by 4/ t P

)Expect to delete PLC 28 sad 29 In SSER 10.

)7/13/92 letter under review, target late 1992.

)Under review by Fair and DAugfelo. SE by 8/92.

)Outstanding Issue 19 e and 8 to be resolved doni

(04/18/91) (01/04/91) (08/04/92C) (01/31/93) (01/31/93T ) (/ -. ) 8/4/92 letter on FW check valve elm under revel

(03/21/91)

(04/10/91)

(10/18/90)

(02/26/92)

(08/24/92)

(10/23/91)

(09/24/91)

(08/27/91)

(10/16/91)

(01 /2 1/92)

(10/10/91)

(07/11/9 1)

(.-/.-/- -)

(-./ ./ )

(.-/ ./ )

( / -I *)

( / / .)

(07/14/92)

(07/I11/91C)

(09/13/91C)

(01/21/92C)

(12/31/92)

(09/30/92)

( 9/.7&92)

.. /. )(09/30/92)

(/./ )(05/31/93)

//.)(05/31/92)

(04/30/92C) (09/30/92)

(09/30/92T) (10/31/92)

(12/31/92T ) (12/31/92T

(09/30/92T )

(tOI/X792Tr)(-//

(12/31/92T )(.//-

(12/31/92T )(./-

(10/30/92T ) .I-/

(05/31/93T ) *

(08/31/92T)C//

(10/31/92T)(//

(10/31/92T N~

Response to 10/10/91 RAI by 10/92.

SSER 10 has See. 4.2 review. Only Chap. 12 realm

Started by TVA 5/2/84 letter. Amened. 69 Info, us

More info.by 10/92. No site review planned. (Top

Under review.0

Per McLellan, SE by 9/92, if not sooner.

SSER 10. Address tornado damage to air intake by

T. Ross has lead on this joint TVA submnittal.

Awaiting revised information per 8/25 telecon.

A) Despite 15 page RAI, staff sees no fatal flaw sv'

M8 7 U/2/2 i 103/2 103/2 (// )Slni earn y89.I61 TS 2 I.L WATIS BAR 1 ALTERNATIVE TO AMF III,S(IIISEC(1 ION NC/M) PARA7 153

Caseets

)Response to SSER 5 by Amndmet 72. app. 10/92.

) E ubmittal by 9/92, as part of response to ELQ

)SSERIO accepts 1/24/92 submittal. Need ImpI. let

MR2878 (02/25/92) ( - / / I ( / / 1 (10/30/92) (10/30/92-r ) ( / / ) Sutwnit revision bv. 8/92.

Page 7: UNITED STATES * 0 NUCLEAR REGULATORY COMMISSION Z …Reference: Meeting notice by P. S. Tam, August 13, 1992 On August 26, 1992, NRC and TVA representatives met at the Watts Bar site

Page

Task ID

3Report Date 08/31/92

WPA Age RevNtm (Man) hith Pri Actyp Title

163202 1 41

163261 ( 41

133222 ( 31

W3352S 1120 111

163693 B118 8 1

163637 (21

163946 X201 (01

M64234 1241

164249 11I

R00514 1391

2 RO iATTS BAR 1 [DOCUMENTATION4 OF STAPP

VATTS BAR 1 TVA NUCLEAR POKERCROANIZATIGI REVISION 3

VIATTS BAR UNIT I - PSAR PAMENDMNT 70

V~rlS BAR I -GENERIC LETTER 92-01REACTOR VESSEL STRUCIIJRALINTEGRITY.

%RTTS ARM 1 - IPERE FOR EX(TERNAL EVENTS(GL 86.20) SUPPLE- hfEfl 4

VIRTTS 3MR I-APPLICATION OFLEAK- BEPGIE -BREAK 70 PRESSUR IZER SURGELINE.

`%RTS BAR I THEBRMO-LAG (BULLETIN92-01)

ViflS BAR I -S SARMENDMENT 721.

WilTS BAR I CONiTROL ROD DRIVEMWECHANISM SEISMIC (QIALlFlC- ATION.

"V1TS 3MR UNIT 1: CORRECTIVE ACTIONPROGRAM JCAP) PLAN FOR SEISMICANALYSIS AND CIVIL CALC. PROGRAMI

Condensed Project Manager ReportLicealg

Appi RAI RAI Act is.'Date Iogged R.e. Be r C.u~ee

(04/30.1)

(04/17/92)

(05/06/92)

(07/07/92)

(12/20/9 1)

(06/22/92)

(00/06/90)

(07/30/92)

(05/22/89) (01AN191)

) (12/30/92T

) (09/30/92T

) (12/30/92T)

) (12/31/93T

) (12/31/95T)

) (06/30/93T

Licrens ee

(12/31/93T

(01/3 1/93T

Cmttneflte

NR1 staff activities only. SO IVA IsaOvoivinSt.

Under review by Mary-Ans Dismouts, target 6/15/92.

Under review.

7/7/92 submaittal uinder review.

Awiting 1994 subimnttal.

S. Shang to begin review 11/92. O with TVA?

Bulleti Is I for Iafo. only for CP holders.

Under review by 8 NRA branches.

Am Aiting inier. in Amed. 7270

7/27/92 letter an Civil Colc. Program under review.

0

) (10/31/92T

) (011/31/93T

(07/27/9W) (32/21/92T

" i.,

Page 8: UNITED STATES * 0 NUCLEAR REGULATORY COMMISSION Z …Reference: Meeting notice by P. S. Tam, August 13, 1992 On August 26, 1992, NRC and TVA representatives met at the Watts Bar site

WATTS BAR UNIT 1: MAJOR MILESTONES TO LOW POWER (LP) LICENSE

(Not to scale)I I

Plant Pre-startActivities

Safety Evaluation(Open Issues, Confirma-tory Issues, Bulletins,Generic Letters,CAPs, SPs etc.)

FSAR Review

Tech. Spec. Review(TAC M76742)

Environmental Review(TAC M77222)

Special Activites:CAP and SIPImplementation

Routine InspectionsPer Manual Chap. 2513

License Issuance

SSER 6

Amend. 65A

- I -

Amend. 66A

;,091 5/20/9

- I

- q

CAT

3/91 Coueof Vertical Slice

C

Pre-Op.SeurtyCold Hot Tess

Impose Hydro functional CILRIComplet Load Fuel

M3 5% Power Operaio2A93 9/93 11/93 129 Commences

ACRSSubcommittee SSER 13SSER 7 SSER 8 SSER 9 SSER 10 SSER 11 SSER 12 Meetting iQWg

9/91 /92 692 1(92 l CommitteeReview & Letter

Amend. Amend. Amend. Amend. Amend. Amend. Amend. Amend.67 68 69 70 71 72 73 74 1/94

5 All Amend. Review,5/1 /9 1 11/5/91 1/21/92 5/6/92 8/5/92TVCetfs

8/92Issud Fial raft"Froen"TS Issued asA Appendix A toTS CerifiedLicense

Env. Prot. Plan Issued asAppendix B to License

Period Ends Reot 9M3t)0morandum

A Issuance ofLP License

I] = NRC Milestones A= IVA Milestones Q = Meetings 4. = Date not defined

Dated? W92

Page 1

1/94

0 = Meebngs ,L = Date not definedn = NRC Milestones Zý= TVA Milestones

Page 9: UNITED STATES * 0 NUCLEAR REGULATORY COMMISSION Z …Reference: Meeting notice by P. S. Tam, August 13, 1992 On August 26, 1992, NRC and TVA representatives met at the Watts Bar site

WATTS BAR UNIT 1 CAPS(See SSER 9 for offical listing of accomplished milestones)

ACTMITY 3-901j 4-90 1 1-91 12-91 1 -9 4-91 1 1-92 1 2-92 -1 3-92 14-92 11-93 1 2-933- 9 3 4 - 9*1*

A -

1/31/U IA ~AA6

ILA FEMMN55OGUIAI WtYF1OCM A.N2AE524 23215 EIW 613

~1A 11 METview * ~ m~lREV55 2 WD E

mlA sam sxc

1/1211 311W 2/2411

m m m5S11TE 5 RE" 1 A" S21211

5655155 PKS55322IT

*-M1 Z .01 RxE 1wm122 liZE Ci

U COW CAP 5552 WIT

w wmm-a IRTl -59 12

'-a.CAP NATOFIIW26A25

EC 2

aVITYRS.15%'

FIEl

IVA 70 11512 1I 51 155922QO OU i&. -

OF PROORRFsawaIOf~nI1nhsm

2245551 24USWSUEW112--- 2 0-"IT ARIEOV

CAP

23. CAM. TRAY A CAKE TRAY

(TADC =I006)

A A 1.mmw1%%SAAI4N 5595 51 O 5X2551 20215 2

LA 1165F# 0 M IGS1u

NOR1 mc-RI

14v 522525252

SU-O-SIMCMAU556W IA1

a W

55551a

TWA1 TO 2cu I, u rmmC --ET

110MMtOFPF0WAK2

REaSOUINOF SELECTED OPEN62WWI

X0. ELECTRIC CONDUIT & CONDUITSUPPORTS(TAC R00S501)

AUG 0 NO sa sjVIIA 1111

VM'c- v"51111111 A

FM -WW Wr- =. O SIT -UI

msE$LUsM CLASS

iUmm MW I/3Y1W

SFONSFIM5 2251 fITREOCLA 555a2d556 525152

ouuSIclif

'r6 1-.-mZ -- )-

WOI55LE21A OF CAP £I126155511

I/

I

555555125515

7 65aeCERTIFW TO1111 TOCRTF ISE1 OI211 CAP COMFE21OSURI SAW5 6am16ý75 -OF~ PRWAI ISMUluOCOWEm

21222522125222111115OF PF5555P1691562W31555CLOSEOUT5 PROW 15255CT15

20. DESIGN SASELINE & VERIFICATIONPROGRAM LICENSINGIVERIFICATI01N

(TIC M635%9)

1/31WA A

013.F TIM15511PS55MMM 2161 CAP 0

20% COWFTEr- O215522

8,511615E SFCT5MOIS555212121555515552555522555

FD2155 ml91

1w -tU-1116W55& 5526

FV" 5291-M5R1[~12t1PH 5505

Fr" SIVAEScIM 55661

PROGRAM5 05521

51115565 21 5291-1525555652115 CApKOW 71302 SPN15 CTi

CERTIFY5 Ka AkC 151 T O FITV.0W115175%Y1 ETI~C ISE 5551 15212155551W S

C-aERE -F 5212 IDWI5M M551LU

55SM5 ROPM 21WVlSPROO15 PaWIS 1621222 P1IND

CLOSEOUT2 M"W55AM

2E. ELECTRICAL ISSUES(1AC 74502

6155OCT 0235

co is 75% FC6WMFl1 552521021522 0S6216OF

PRO0MAM5

REV"AWOv2525 31155CAP 5W 21916155C111115220262612.525 226116612121551155115512

SELEC211525515

Pml112l 656550212555

M*. CABLE M~hE(TAdC 719tT)

Dated'9/92

PNge 2

EVARMlAIMIOaRANJ

LEGEND A-TVAMutSIoNE E] =NR2LICENiSING MILESTONE (7) mSPECIIONMILISTOtdE Q) -tEAM INSPECIIOI4 e HLAIIOUARIERS INSPECTION (D =RESIDENT INSPECTOR INSPECTION (R EGO AlRSEO INSPECTION e VERTICAL SLICE REVIEWNOTE IF N n dale is shownlot ao5miste, Is locabon alone does n1 o[ * i sdlceuhdia Imomlno

A A AL 111111

D

Page 10: UNITED STATES * 0 NUCLEAR REGULATORY COMMISSION Z …Reference: Meeting notice by P. S. Tam, August 13, 1992 On August 26, 1992, NRC and TVA representatives met at the Watts Bar site

WATTS BAR UNIT 1 CAPS(See SSER 9 for offical listing of accomplished milestones)

ACTIVITY I 3-90 1 4-90 1-91 2-91 13-91 1 4-91 1 1-92 2-92 13-92 1 -9 1-93 12-93 1 3-9 1-9

2F. EQUIPMENT SEISMICWMLIFICATION - ALSOOIETSMANING ISSUE 44s)(TAC 11919)

It. FU PROTETO(TAO 6311,11),

DL HANGER A ANALTUM UPDATEPROGAM NdD

MAUG1 VRAR 14,21 AP ,R 5",)A 111111 A

111111 - I 11TVAARVIW AND FSAR RNWWS COMLEERElIN5 55R C LETERMWAI DOD2 EVIALATAE RAND EAPPWEA OF TAR SEC!OE 3 1MAIMEIAIREMS ER M UaAA0aE CMGE AMOISSUEA SER

OF RSSUES IEMAW

C.A<A) 2/2EV 151Nw 1 i11V

-- - -SRSArIOI/PAPSI

INSACUA91

ANALSSADFPROGRAMIAA

SCARA 084)1 C1CjCC

CI 92

A/WI 11fG /5.1

CAGAIER

PROGRAMCtU$U) A cA o

WA AND .1,

PRE-lP. IEPECIRSE 15C) T TVAIOACACROFY lrAWINER06KCTIM fRTHAIIR CAPES SCANRISA

MArECAPU MAENEIATIONAIVAECARIEH7"9IARI-14

NW9 OSO IMfLUIMSARWC

I-- Mc - wI RAEOIND &SUIMIT (15AR11w 10 WEA LLE COMPLETEl WA

I OFAE A ERIS l PL IES)9

AC

IVA TOCOMICEAMU

AL i rAIN ASu9

amR so"A1MRUEEII IA SR SPECTIO

SWEAAAAISCICU

~Immlo

CERRA AMAE COAEYE SURATA/

L. KWlE OMam DCIF-caNTO

K. NITIUMENIF UNES(WA 111171111)

- SE1OG&6

71U WEd1110 o 0 i 4w3m A

rATRN7Com~ mwRw1 PILMOON OF UUES-

OECU 80 AM M -T

- - 1584)

RIWTOIPhl EWIJIIATOF0

A21,U fEW))

PRPSD W FP -PS3M FmUiMOWIMU

vwKMiETTEDMIIAPPIOEOIAGES

AL-.7 .F~EEmum"

CLARM 11* TVNA TO CARAY ISSUECAP A.?)) COMh¶IE1CLOSAtA *SEACOMPLET OfA PROGRAM

.Ed;

CLOSEOUT911PECADIO

AACART~y RIE IWA TO CEATIFY MWE COMMRCAP6.7A) cCME11R OEA AMA "SICOMPLETE SRARANASAR KACWCIR

IL PIEE M aUNIEJIT

(KA M71IB?

FIRM APRL ,NVI1

A IMM rAP. K A00iiiMAERS AISUIAES1,)

CALIMUPREW

710MRe

2,)) I/CA) 7/27M SEPIA LMATE 92 ýts

PET PEl ATIEWI COMPLETE, PROGRAcMCLATA CLOSU4RE

LEEII ~=ASIESDOC l-9 IFCICENIISBGMItESIOEE Q -INSPECTION MILESTONE ( =TEAM INSPECTIONI E)IfHAOUUABTERSINSPECTIONi ®=)RESID[WT IMSMECIORINSPECIIOW tý REGIONALEBASEDINSPECTION 4 =V[RTICAL SLCKE REVIEW

Date 9/92

Page 3

I tEGIEND A-TVAMILESTOME

ITM 1w"M AI6 -

0

Twl

Page 11: UNITED STATES * 0 NUCLEAR REGULATORY COMMISSION Z …Reference: Meeting notice by P. S. Tam, August 13, 1992 On August 26, 1992, NRC and TVA representatives met at the Watts Bar site

WATTS BAR UNIT 1 CAPS(See SSER 9 for offical listing of accomplished milestones)

ACTMATY I 3-90 4-901 1-911 2-911 3- 911 4- 911 1 -92 2 2-921 3-921 4-92 1 1-93 2-93 3-93 4-93

5Ru go E ANNgo 141 52111 Tel rlES &5"1 ISII

'RIME-U

SUE M& RR`~ SMMA

LETTERMRS PRSM-CO m'CACTEION

%=MASe WOSIRSEERW AidA

1244; 525*A -

MSIR. ONA REVRS

SIS /l 555 SF

ASARANDRFES 5

GEIA

Ma;EWSIFIER PU9050UFIY / EREISIS WAS WSMISING (SUR A'E Sl ECA

OF (ReCIPE ACOMOf FMTE MISSMUPRGPMU051OUTAMCMN115

AUDO SN 17AD E ql l~ww CAP, ORR immaIEWE (MURTE .F1141

AES. 3 u 31MU4 -R TO03&0K MNcVmAMR mooU ~COCMEVA ACEIM

RESPONE

12/27IT OC7 921MAR52

BYY ISAMSEIC PEROGRAMCOMeFTE MSE (SILUSTb CI5*(Et

ESoAIITERIAMILA1EOESIM6

l Ango TOR IVE 1V17

& 1111 1111-lTVA ESUETVYLERREEIS111, 1 AMER swa* W1" I

ReSElil' MI FLARI1MU S

A

CIAW

Lam'

El/AR ERIEA -

mWEalFGAORS

04TH)

An/i/ IRE SIEE

RESPOMM AM CiAR. AMU CARtIDGa;O CALC CALILREPERIS ovRAIUw"OFI

pAavemuman)ubSCMii ASPI~eS 0Rollal-

ACRT n1-TA T7E PDRA 5CAPMý75% PROGAM(IJ OL06L CLSURESUCOVETE IRSICIU

milAl y I 4,14,11 "Go"

A - - AwliM TI/911

- AISA eTw m o E LETTE SE (LAC 10,41

COMMA am~u Al!" l~RU11"~jLE1Tti RACiMS011

(SAC01141)

TO NOLIRE "aC

3&6 LETTEROANWE OF PROGA14N I

VIMU MrVA OAMSPMtREcm EI3Mm ocukSIR-P pals

LFBPO A iw MlESTW I*1 0~t~EI~DWMIIETO0EC) W-A~CTlON MILESTONE (-) =IEAUINSPECTI05 <H)=HIlE LADRl1AERSlNSPfCT1DN -)RESIDENT INSPECTOR INSPECTION H)RGIA ASHD INSPfC [ION 1 ER0) A St ICE REVIEW

(SACIMPIREI

Dated 9/92

Page 4

MQaLWt(wA M63U"Ibwi*eIwh

(TMR1111114)

CIV. CAIC.REVIwI(NOT MROF THI CAP)

JIM~

(11AC 72106)

OVA

"'A MOTO "I"E o"ME

I "no"v~.11E.ftAMNID

0

amER Eam amEawv ILEvETESVORM99i13014APi

ADEQUACYOm TEN10113111l

cow

ARISSAXUTE

IZAV91 1,21M

LFumn A-TvAmiLfsTaw

Page 12: UNITED STATES * 0 NUCLEAR REGULATORY COMMISSION Z …Reference: Meeting notice by P. S. Tam, August 13, 1992 On August 26, 1992, NRC and TVA representatives met at the Watts Bar site

WATTS BAR UNIT 1 SPs(See SSER 9 for offical listing of accomplished milestones)

ACTIVTY I 3-90___I_4-90 1 1-911 2-911 3-91 1 -9 1 1-921 2-921 3-921 4-92 1 1-931 2-931 3-931 4-93

OEC 92n'

A% (990VOL 4 MR TINIiONHOTfliNWVS COLDWXMI

EVALUATESi ipmawMy MIVALTISOlv -

'A1

TVA cSRIFV 6UMCommE SURWIMNIAaiOF FI450RAMAMQMons

X. MIII CUROMi. MwDO -VE (WA)%(TAC 6365))

RTAC SM66)

IL MnUM FM uFruakI iNRIuiMMo=T 7365

-1 =

A AAN M umiw

FUR IA1MOIMkmagm

@-i-ill

SM.RDCO TMOWN 406"T0 &

REUXAIMOFi DWERR UNC1AMISOFSMR #MK6400n

WA MIUiRFVE.

ERR0iIIS f M A am "I~m muIllm WAI-

Newm

m. .m.

1IONTFOW weR il NPI M1901 F ASERRU*1 aECW"MALCUaA.A1RMIOAAM MCDINIFROGRMTlyM

g4U --

- mCow CALL iONKM O(StWAMEW AiEWY

IT2 "93 ALIG 9

TVA TO y NOTIF OF TVA TO CERivREAM SFORI ýfa 100% 3"MOTT ~COIE

REVOKE 7%7 Cwm~i TVACEMD MD) Ea SE"EAM

TOTiM TONgl IJSKCTIONOFP iOfTW

!!MAI "M~ 4mwi 1

KhM 84146F TVA TO EMTV

CAM Eli AE

~-19liMEF

SUR rumiI UsasiMN

pmOOU9a6EmION

3F. NECUAWAL EIIUWUIEUT01AM IT-1

huM SiAMA A

=M =.WMDIM YmijcoamsmWAMAML hg

WAOOM wRM M ma0 SATTAiiLEECJI miummINNECTION M(awm~

WliED

OF CERlTYO OF R iAf

MIGA EbC Al,

LECH f\-IVA ILESTONT MIETN 0 -IN SPECTKIONMILESTONE 0 -tEMIIfMCTIIN ®=HEADOUIARTIF65INSPECTION (D =RESIENT INSPECTOR INSPECTION ®zR[EGIONAIBASED INSPECIION ýR -V[R1ICAtSIC dVF

(TAC 77266

Dated 9/92

Page 5

r.)

' IWIN A"

LwEw A-TvA wisTow

75% COWLE TE

Page 13: UNITED STATES * 0 NUCLEAR REGULATORY COMMISSION Z …Reference: Meeting notice by P. S. Tam, August 13, 1992 On August 26, 1992, NRC and TVA representatives met at the Watts Bar site

Dated 9/92

WATTS BAR UNIT 1 SPs Page 6(See SSER 9 for off ical listing of accomplished milestones)

ACTIVTY I-3-90 14-90 11-91 j2-91 1 3-1 14 9 1-92 12-192 1 3-2f 4-92 1 1 -93 12-93k 1 -314 9

WIT LBO"',C 1F21T

m - - .m~ -

MEAM lAA'AA1t EvAJIANTEM =F111MVIO 11FAnMORM PRGAMMA WhFECPMS-" WPAM..A RANKMT! R

MatIm B-AMqA

EVAUAFf I OVSAAF UKAFECIAMFS

OF MIC PRORAM ANDMANMIRE MAMATONS

M1 92 NOV 92 'AtFA MAR MA 01C'

u"9 AS CERTIFY GM IMACERTIFY PROAGRAM -MM9RIF CAP AMED cowl IFTE51 'AOGANF SUR6.75% EVALUFATIO I AFWNUTICft FMKCN.ACR45515 INSUFR 1 OAF F

SK MODEPATE SEM LNK111MFLUOI)M(GM630)

-- - - -- -~~lFFf6 MAOR IMEMHTATIOAF CETATY EVALATEI NA 1515119 AFF

FNALYM INMARTS OF COFICTIV ACIARM THE CAP ARTS O M TSUREMLASAM EFFECTIVENESSOF a.?"A MREAT CLOSURE OF"OOM 04UTNATIlA COMM POGA

K MMIMit Manomff s(KA M7515

F.______________________________

EIIALUAT OECRIENOS OF

A f-,%

AAMM1' It M MCLO~SnCIMMCnIOM

A -ACAAIWF REf VA CERTIFY"CAP IS.N% COAWtEFE

PAORAM O R

1aL LUWIOTOa Mw P15095 AJ'7A1

- A - "I'MT "'1M

-, I -=- ICIIMOMCb TI =D AEzf .:LRAA

OFATFEAS KcnwtzCAM

EVALUATE EVALATION F'GEAIEGRAAAL FSAM0MCIA2.5CAIC "MROF AL RPAORTOF2 'ABOVE.)

mu-F, .u.aU A.

N1A TO0CERTIFCOMPETES 1505MMOF PRORA

LEOBS /~\-IV UIEESTOIELICE061163 MLESTOME Q -UNPSPECTIN)NMILESTONE (D)-TEAMINSPEI'TTN E -IIEADIIUAREM ISPECTION (0) RESTDENT INSPECIOR INSPECTION e -REGIOAL BASED INPECTION e -WRTICAL S IE REVEW

(MA 639M0

AUIK-U45--CAMM"54%S0LAIIONM

TWA M CEFRTFPROOMA4005wM7

V ------ <M

LMM A-IVAIKESTM

Page 14: UNITED STATES * 0 NUCLEAR REGULATORY COMMISSION Z …Reference: Meeting notice by P. S. Tam, August 13, 1992 On August 26, 1992, NRC and TVA representatives met at the Watts Bar site

WATTS BAR NUCLEAR PLANT (WBN) - ELECTRICAL ENGINEERING EVALUATION OF IEBULLETIN 92-01

References: 1. Nuclear Regulatory Commission (NRC) Information Notice91-47: Failure of Thermo-Lag Fire Barrier Material to PassFire Endurance Test

2. NRC Information Notice 91-79: Deficiencies in the Proceduresfor Installing Thermo-Lag Fire Barrier Material datedDecember 6, 1991

References 1 and 2 provided information (1) about the failure of the fireendurance test performed by Gulf States Utility Company of Thermo-Lag 330systems and (2) on the deficiencies in installation procedures for Thermo-Lagbarrier material manufactured by Thermal Science, Incorporation (TSI). NRC,in Reference 2, indicated that "The vendor (TSI) stated that it had notincluded several essential application steps and precautions in itsinstallation procedures manual because the information was presented duringthe TSI certification training for installers." Reference 2 also states "thatstress skin must be placed over panel joints to ensure a continuous outerlayer of stress skin for three-hour barriers and a recent procedure, TSITechnical Note 20684-AL, of October 1989, provides updated installationprocedures . . . and requires that each butt joint be covered by an additionallayer of stress-skin and trowel-grade material." These statements werediscussed by telephone between TSI and TVA-WBN on December 30, 1991. Noadditional verbal or written installation instructions were provided by TSIfor their three-hour fire barrier installed on steel cable trays.Accordingly, TSI Technical Note 20684, Installation Procedures Manual (forsteel cable trays), Revision V, is still the installation instruction forsteel raceways.

The three-hour rated TSI fire barrier material is not currently installed onaluminum cable trays at WBN. If aluminum trays require protection in thefuture, it will be installed in accordance with the latest procedure.

Based on TVA's review and evaluation, the installation problems described inNRC Information Notices 91-47 and 91-79 do not exist at WBN.

Presently, WBN has installed one-hour fire barrier material manufactured byMinnesota Mill and Mine (3M) and three-hour fire barrier material manufacturedby TSI. The existing TSI three-hour material was installed (1) on conduitsonly and (2) in accordance with TSI installation procedures and (3) byinstallers certified by TSI. Our review of current installation proceduresfor TSI fire barrier material identified no discrepancies between TSI and TVAprocedural requirements. The three-hour wrap installed is on the below listedconduits.

Page 15: UNITED STATES * 0 NUCLEAR REGULATORY COMMISSION Z …Reference: Meeting notice by P. S. Tam, August 13, 1992 On August 26, 1992, NRC and TVA representatives met at the Watts Bar site

Conduit Number Size

lPM6420ODlPM6399DlPM6398RDlPM63 88FlPM6 38 9FlPM6 39 OF1M4 5561M45 55lPM6385FlPM636 OFlPM6470OD1NM3066D1NM3 064D1NM3062D1NM3 060ODlPM5660DlPM6 365 D

Location/Elevation

Az 198 - 265/770Az 198 - 145/770Az 145/770 - 728Az 198/730 - 740Az 198 - 265/740Az 265 - 275/740XA4/737XA4/737Az 198 - 265/744Az 280/754Az 265/773Az 205/733Az 205 - 220/730Az 220/730 - 754Az 220 - 230/754Az 155 - 265/744Az 240/750

Building

Reactor Building AnnulusReactor Building AnnulusReactor Building AnnulusReactor Building AnnulusReactor Building AnnulusReactor Building AnnulusAuxiliary BuildingAuxiliary BuildingReactor Building AnnulusReactor Building AnnulusReactor Building AnnulusReactor Building AnnulusReactor Building AnnulusReactor Building AnnulusReactor Building AnnulusReactor Building AnnulusReactor Building Annulus

Additionally, one-hour fire barrier material was purchased from TSI forinstallation prior to Unit 1 operation. Certification of training forinstaller will be required prior to incorporating design change notices (DCNs)which add the one-hour rated TSI material. Future installation will be inaccordance with the latest TSI and TVA procedures.

WBN Engineering, in cooperation with TVA Corporate Engineering, Browns Ferry

Nuclear Plant (BFN), Sequoyah Nuclear Plant (SQN), and TSI, is developing a

fire endurance test program based on actual and anticipated plantconfigurations of Thermo Lag 330. Some test articles will be assembled usingcurrent TSI/TVA installation procedures, and others will be assembled usingenhanced construction methods being developed by TVA. The purpose of the testprogram is to demonstrate adequacy of the installed configurations and toqualify enhanced installation methods for future installation at WBN.

Also, results from the WBN fire endurance test will be used to reevaluate theadequacy of the existing TSI installed system.

-2-

5125G

Page 16: UNITED STATES * 0 NUCLEAR REGULATORY COMMISSION Z …Reference: Meeting notice by P. S. Tam, August 13, 1992 On August 26, 1992, NRC and TVA representatives met at the Watts Bar site

DISTRIBUTrIONDocket FileNRC PORLocal PORS. Varga 14-E-4G. Lainas 14-H-3F. HebdonV. NersesB. Wilson RIIK. Barr RIIG. Walton RIIE. Merschoff RIIP. Madden 8-D-1P. TamM. SandersOGC 15-B-18ACRS (10)WBN Rdg. File