United States Environmental Protection Agency EPA New England One Congress Street, Suite 1100 Boston, MA 02114-2023 August 09, 2004 To: J. Kilborn, EPA H. Inglis, EPA R. Howell, EPA D. Moore, USACE K.C. Mitkevicius, USACE S. Steenstrup, MA DEP (2 copies) S. Peterson, CT DEP A. Silfer, GE J. Novotny, GE J.R. Bieke, Esquire, Shea & Gardner S. Messur, BBL D. Young, MA EOEA K. Munney, US Fish and Wildlife R. Cataldo, ENSR R. Nasman, The Berkshire Gas Company Mayor Ruberto, City of Pittsfield Commissioner of Public Works and Utilities, City of Pittsfield Public Information Repositories RE: July 2004 Monthly Report 1.5 Mile Reach Removal Action GE-Pittsfield/Housatonic River Site Enclosed please find the July 2004 Monthly Report for the 1.5 Mile Reach Removal Action. In accordance with the Consent Decree for the GE-Pittsfield/Housatonic River Site, the United States Environmental Protection Agency (EPA) is performing the 1.5 Mile Reach Removal Action, with General Electric funding a portion of the project through a cost sharing formula. The EPA has entered into an agreement with the United States Army Corps of Engineers (USACE) to assist in the design and construction of the Removal Action. The USACE subsequently awarded a design-construct contract to Weston Solutions, Inc. (Weston). Weston, with several subcontractors, will be performing the design and construction activities for the 1.5 Mile Reach Removal Action. If you have any questions, please contact me at (413) 236-0969. Sincerely, Dean Tagliaferro 1.5 Mile Reach Removal Action Project Manager

Upload: others

Post on 31-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

United States Environmental Protection Agency EPA New England

One Congress Street, Suite 1100 Boston, MA 02114-2023

August 09, 2004 To: J. Kilborn, EPA

H. Inglis, EPA R. Howell, EPA D. Moore, USACE K.C. Mitkevicius, USACE S. Steenstrup, MA DEP (2 copies) S. Peterson, CT DEP A. Silfer, GE J. Novotny, GE J.R. Bieke, Esquire, Shea & Gardner S. Messur, BBL D. Young, MA EOEA K. Munney, US Fish and Wildlife R. Cataldo, ENSR R. Nasman, The Berkshire Gas Company Mayor Ruberto, City of Pittsfield Commissioner of Public Works and Utilities, City of Pittsfield Public Information Repositories

RE: July 2004 Monthly Report

1.5 Mile Reach Removal Action GE-Pittsfield/Housatonic River Site

Enclosed please find the July 2004 Monthly Report for the 1.5 Mile Reach Removal Action. In accordance with the Consent Decree for the GE-Pittsfield/Housatonic River Site, the United States Environmental Protection Agency (EPA) is performing the 1.5 Mile Reach Removal Action, with General Electric funding a portion of the project through a cost sharing formula. The EPA has entered into an agreement with the United States Army Corps of Engineers (USACE) to assist in the design and construction of the Removal Action. The USACE subsequently awarded a design-construct contract to Weston Solutions, Inc. (Weston). Weston, with several subcontractors, will be performing the design and construction activities for the 1.5 Mile Reach Removal Action. If you have any questions, please contact me at (413) 236-0969. Sincerely,

Dean Tagliaferro 1.5 Mile Reach Removal Action Project Manager

Page 2: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

G:\1_5 Mile\Monthly Reports\2004\2004 July\July_04_Monthly_Rpt.docPAGE PAGE 1 OF 9

1. Overview

During July 2004, the Environmental Protection Agency (EPA), the United States Army Corps of Engineers (USACE), the USACE’s contractor, Weston Solutions, Inc., and Weston’s subcontractors continued remediation activities on the 1.5 Mile Reach Removal Action. The primary work included excavation and riverbed power washing activities in Cells 16 and 17. Backfilling activities in Cells 16 and 17 continued. Excavation activities were initiated in Cell 18. In addition, transfer of TSCA and non-TSCA materials from the stockpile management areas to the GE On Plant Consolidation Areas (OPCAs) was performed. Also, transfer of non-TSCA and NAPL-impacted materials from the stockpile management areas to approved off-site facilities was continued.

2. Chronological description of tasks performed

Refer to Figure 1 for an orientation of the excavation cells and their respective locations.

By the end of June 2004, excavation activities in Cell 16W were completed and backfilling activities in Cells 16W were ongoing. Also by the end of June 2004, the majority of excavation activities in Cell 17W were completed and backfilling in the upstream end of Cell 17W was initiated. During the first week in July, the last of NAPL-impacted riverbank material was removed from the downstream end of Cell 17W and transported to the Building 65 stockpile management area. (See Table 1 for quantities of material generated in the month of July 2004 and Table 2 for quantities of material generated to date). Backfilling activities in Cells 16W and 17W continued. Due to the presence of bedrock within the entire riverbed of Cells 16 and 17, excavation depths varied. Therefore, various backfill configurations were developed to meet the design requirements. Twelve inch riprap was placed in low lying areas and depressions in the bedrock to bring the excavated surface up to grade. Areas of the riverbed where the excavation depth was greater than 3 feet were backfilled with a layer of common fill, filter material, and 12-inch riprap. Areas of the riverbed where the excavation depth was less than 2.5 feet were backfilled with a layer of filter material and 12-inch riprap. Areas of the riverbed where bedrock was encountered at very shallow depths were either backfilled with filter material or were left with the bedrock exposed. The riverbank was backfilled with common fill or structural fill, a six inch layer of filter material and an 18-inch layer of 12-inch riprap up to an elevation ranging between 971 feet and 972 feet. The riverbank above those elevations was backfilled with common fill and a 6-inch layer of top soil.

Other activities during the first week of July included general site maintenance activities. Blind flanges were fabricated and installed as drainage ports onto the 54-inch river diversion pipe for dewatering purposes.

During the second week in July, backfilling activities in the riverbed and riverbank up to an elevation ranging between 971 feet and 972 feet in Cells 16W and 17W were completed. The

Page 3: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

G:\1_5 Mile\Monthly Reports\2004\2004 July\July_04_Monthly_Rpt.docPAGE PAGE 2 OF 9

riverbank backfilling activities above elevations 971 and 972 continued. Once backfill was placed in the riverbed and on the riverbank up to elevation 971 and 972, activities associated with 54-inch HDPE pipe relocation were initiated. All construction equipment and supplies were removed from the riverbed, stop logs were removed from the temporary dam and the river channel downstream of the temporary dam was flooded with enough water to float the pipe across the river channel. The two 54-inch HDPE pipes were relocated from the east side to the west side of the river channel. Once the relocation was completed the pipes were then reconnected to the pipe restraint system. The steel plate energy dissipater at the 54-inch pipe outfall located one hundred feet upstream of the Dawes Avenue Bridge became dislodged during the pipe move requiring it to be reset.

Surveying activities continued in Cells 16 and 17. Final restoration verification surveying activities were initiated in Cell 16W and 17W along with staking out final topsoil grades on riverbanks above elevation 971 and 972. The delineation of the excavation limits as well as the delineation of the TSCA and non-TSCA excavation limits in Cells 16E and 17E was completed.

Once the relocation of the 54-inch pipes to the west side of the river channel and the survey activities in Cells 16E and 17E were completed the river channel was dewatered by pumping the water down to 6 inches in depth downstream of the excavation areas and the water below 6 inches in depth was diverted to the water treatment system. A temporary sand bag dam was built on the downstream end of Cell 17 to prevent water backing up into the excavation areas. Once the dewatering process was complete, the TSCA and non-TSCA riverbank excavation activities in Cells 16E and 17E were initiated. The excavated riverbank material from Cell 16E was placed into a roll-off box located in the river channel in Cell 16E. The material was then loaded into dump trucks by a long stick excavator located on the load out area on the riverbank of Cell 16E and hauled to the appropriate stockpile management area. Once the majority of Cell 16E riverbank was excavated, the roll-off box was relocated to the Cell 17E river channel and Cell 17E riverbank excavation was initiated. The excavated riverbank material from Cell 17E was placed into the roll-off box mentioned above. The material was then loaded into dump trucks by a long stick excavator located on the Deming Street load out area and hauled to the appropriate stockpile management area. The non-TSCA riverbank material pre-characterized for offsite disposal was transported to Area 64D; the non-TSCA riverbank material uncharacterized for offsite disposal was transported to Area 64C; and the TSCA riverbank material was transported to Area 64A stockpile management area.

Also, during the second week in July the installation of a riprap swale on the riverbank in Cell 16W was completed. The swale was necessary to repair and prevent riverbank erosion caused by storm water coming from Deming Street. During the swale construction, approximately 20 CY of riverbank material was excavated from the Cell 16W riverbank and transported to Area 64C stockpile management area.

Other activities during the second week in July included placement of hay bails along the Root Place swale to prevent erosion. Maintenance work was performed on the 8-inch force main. The force main was also relocated above the work limits of Cells 16W and 17W. Maintenance work was also completed on all the access ramps to the river channel. The installation of the 4-foot security fence along Parcel I7-21-4 was completed.

Page 4: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

G:\1_5 Mile\Monthly Reports\2004\2004 July\July_04_Monthly_Rpt.docPAGE PAGE 3 OF 9

During the third week in July, the riverbank excavation activities in Cell 16E and 17E were nearly completed and the TSCA and non-TSCA riverbed excavation activates were initiated. The non-TSCA riverbank material pre-characterized for offsite disposal was excavated and transported to Area 64D; the non-TSCA riverbed material uncharacterized for offsite disposal was transported to Area 64C; the riverbed cobble material was transported to Area 64E; the TSCA material was transported to Area 64A stockpile management area.

A substantial quantity of NAPL-impacted material was encountered during the riverbed excavation in both Cell 16E and 17E. NAPL-impacted material was also encountered at the toe of the riverbank in Cell 16E. Due to the large quantity of NAPL-impacted material generated during the excavation of Cells 16W and 17W, the Building 65 stockpile management area was filled to capacity. Therefore, the Cell 16E and 17E NAPL-impacted material was transported to the Building 63 stockpile management area. In some riverbed areas, the NAPL material overlapped into the TSCA areas. This material was excavated and transported to the Building 68 stockpile management area. All of the water and the free flowing NAPL from the excavation areas were diverted to the water treatment system.

Bedrock was encountered in the entire river bottom of Cell 16E and 17E. In addition to the standard excavation equipment, a small track excavator was used to access and remove the NAPL-impacted material from the areas of the river bottom where crevasses and depressions in the weathered bedrock were numerous. In most areas, there was less than 2-feet of sediment above the bedrock. Most of the bedrock within the riverbed was stained with NAPL. The high pressure power washing of bedrock to remove any loose sediment and NAPL staining was initiated. High pressure power washing of bedrock was supplemented with a vacuum truck to remove any residual sediment and NAPL from the bedrock. All water generated during the power washing was diverted to the water treatment system. All the residual sediment material was collected into roll off boxes located in the riverbed and subsequently transferred to the water treatment system modutank. In areas of the riverbed in Cell 16E and 17E where NAPL-impacted material was removed and where fractures in the underlying bedrock were encountered, the bedrock was encapsulated with a concrete mixture.

Most of the depressions in the underlying bedrock in Cells 16E and 17E were two to three feet below the original grade. However, in one twenty-five by fifteen foot area in Cell 16E, bedrock was not encountered within the top three feet of the original grade. Due to the presence of NAPL-impacted material, the excavation depth was extended to eight feet below grade, where bedrock was encountered. All the NAPL impacted material was excavated from this depression and the area was power washed and prepared for the installation of grout and backfill materials. It was observed that the depression had several bedrock fractures, therefore, there was the potential for NAPL to seep out into the restored riverbed in the future. Therefore, a layer of 12-inch riprap was installed on the bottom of the depression followed by a layer of filter stone. Next, a 6-inch PVC pipe was installed into the area for possible recovery of any seeping NAPL in the future. The depression was then encapsulated with a concrete grout mixture. This concluded the excavation activities in Cell 16E.

During the fourth week in July, the riverbed and riverbank excavation activities in Cell 17E were completed. The non-TSCA riverbank material pre-characterized for offsite disposal was excavated and transported to Area 64D. Additional NAPL-impacted material was encountered

Page 5: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

G:\1_5 Mile\Monthly Reports\2004\2004 July\July_04_Monthly_Rpt.docPAGE PAGE 4 OF 9

during the riverbed excavation in Cell 17E. The small track excavator was continuously used to access and remove the NAPL-impacted material from the areas of the river bottom where the weathered bedrock contained crevasses and depressions. All excavated NAPL material was transported to the Building 63 stockpile management area. Once the excavation activities were completed the riverbed power washing and vacuuming were initiated.

In one area twenty-five by fifty foot area of the riverbed in Cell 17E (directly opposite of the NAPL deep hole in Cell 17W) the NAPL extended six feet into the riverbed. There appeared to be remnants of a timber dam in this area. This area required the concrete grout encapsulation and the NAPL recovery system had to extent from the Cell 17W into this area. (The details of the NAPL recovery write up can be found in the June 2004 monthly report. Note that the June monthly report contained an error. The depth of excavation in the deep hole in Cell 17W was reported as eighteen feet below original grade. The actual excavation depth was 11 feet below original depth)

Also, during the fourth week of July, the riverbed power washing activities in Cell 16E were completed. The survey contractor completed the final excavation verification survey in Cell 16E and backfilling activities were initiated. Due to the presence of bedrock within the entire riverbed of Cells 16 and 17, excavation depths varied. Therefore, various backfill configurations were developed to meet the design requirements. Where there were low lying areas and depressions in the bedrock 12-inch riprap was utilized to bring the excavated surface up to grade. Areas of the riverbed where the excavation depth was greater than 3 feet were backfilled with a layer of common fill, filter material and then 12-inch riprap. Areas of the riverbed where the excavation depth was less than 2.5 feet were backfilled with a layer of filter material followed by 12-inch riprap. Areas of the riverbed where bedrock was encountered at very shallow depths were either backfilled with filter material or were left with the bedrock exposed. The riverbank was backfilled with common fill or structural fill, a six inch layer of filter material and an 18-inch layer of 12-inch riprap up to an elevation ranging between 971 feet and 972 feet. The riverbank above those elevations was backfilled with common fill and a minimum 6-inch layer of top soil.

Also, riverbank backfilling activities continued in Cells 16W and 17W above elevations 971 and 972. Common fill was installed in twelve inch horizontal lifts and compacted to meet the 95% compaction requirement. Then, an eight inch layer of topsoil, erosion control blankets and herbaceous seed mix were installed.

Other activities completed during the fourth week in July included the completion of the construction of the wood façade roof over the wale on the return section of the anchored sheetpile retaining wall. Also, power washing of the large boulders excavated from Cell 16 and 17 was initiated. The large boulders will be re-used as aquatic enhancement boulders in future riverbed restoration activities.

In addition, the work associated with resetting the steel plate energy dissipater at the 54-inch pipe outfall located one hundred feet upstream of the Dawes Avenue Bridge was completed. The dissipater became dislodged during the pipe relocation at the beginning of the month.

Activities associated with tree clearing and grubbing were initiated on Parcel I7-21-3.

Page 6: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

G:\1_5 Mile\Monthly Reports\2004\2004 July\July_04_Monthly_Rpt.docPAGE PAGE 5 OF 9

During the last week of July, the bedrock power washing activities in Cell 17W were completed. Activities associated with the installation of the extension of the NAPL interceptor system into the Cell 17E NAPL hole were completed. The survey contractor completed the final excavation survey in the upstream end of Cell 17E and backfilling activities were initiated in Cell 17E in both the riverbed and riverbanks. Backfilling of Cell 17E was initiated in accordance with the backfill configurations described above.

Riverbed and riverbank backfilling activities in Cell 16E were completed. The survey contractor initiated the final restoration survey.

Also, riverbank backfilling activities continued in Cells 16W and 17W above elevations 971 and 972. Common fill was installed in twelve inch horizontal lifts and compacted to meet the 95% compaction requirement. Then, an eight inch layer of topsoil, erosion control blankets and herbaceous seed mix were installed.

Also during the last week in July, the installation of two riprap swales on the riverbank in Cell 16E and 17E was completed. The swales were necessary to prevent riverbank erosion caused by storm water coming from High Street and Harold Street. During the swale construction approximately 20 CY of riverbank material was excavated from the Cell 16E and 17E riverbank and transported to Area 64B stockpile management area. Also, during the swale construction it was noticed that the actual Harold Street outfall pipe was old and damaged. The portion of the pipe that was damaged was replaced with a new outfall pipe.

Activities associated with preparation of Cell 18 for excavation activities were initiated. Dewatering of Cell 18E was completed. Installation of sumps and trenches in Cell 18 was completed. The roll-off box (for excavated material) was moved to Cell 18E riverbed. Construction of a load out area on the Cell 18W riverbank was initiated. During the construction of the load out area, approximately 30CY of non-TSCA riverbank material pre-characterized for offsite disposal was excavated and transported to Area 64D.

Activities associated with tree clearing and grubbing on Parcel I7-21-3 continued. Drainage weep holes were installed approximately twenty feet apart with one-inch diameter holes on the walers of the anchored sheetpile retaining wall located on Parcel I8-10-4. Maintenance work on tightening the anchors for the 54-inch pipe restraint system was performed.

During the month of July, the water treatment system treated water from Cells 16, 17 and 18. Sampling of the water treatment system for parameters included in the NPDES exclusion permit was performed on July 16, 2004. An additional two samples were collected from the water treatment system, one sample between the modutank and the oil/water separator and the other between the sand and carbon filter. Also, due to the presence of NAPL in Cells 16 and 17, the analytical parameters for the water treatment system sampling were expanded to include volatiles and semi-volatiles. Air monitoring for particulate matter (PM10 sampling) and surface water turbidity monitoring were performed on a daily basis during the month of July. Surface water sampling for total suspended solids (TSS) and PCBs was performed on July 07, 2004 and July 22, 2004. The monthly PCB air-monitoring event was performed on July 10, 2004. Confirmatory PCB wipe samples were collected on decontaminated equipment. Four eight-point composite off-site disposal characterization samples were collected from NAPL-impacted

Page 7: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

G:\1_5 Mile\Monthly Reports\2004\2004 July\July_04_Monthly_Rpt.docPAGE PAGE 6 OF 9

material from Cells 16W and 17W (currently stockpiled in Building 65) on July 06, 2004. In addition, four more eight-point composite off-site disposal characterization samples were collected from the NAPL-impacted material in Building 65 on July 22, 2004 for PCB analysis only. Two eight-point composite off-site disposal characterization samples were collected on July 15, 2004 from the previously uncharacterized soils and sediments excavated from Cells 16 and 17 (currently stockpiled in Area 64C). One eight-point composite off-site disposal characterization sample was collected from NAPL-impacted material from Cells 16E and 17E (currently stockpiled in Building 68) on July 22, 2004. In addition, two more eight-point composite off-site disposal characterization samples were collected from the NAPL-impacted material in Building 68 on July 28, 2004 for PCB analysis only. Three eight-point composite off-site disposal characterization samples were collected from NAPL-impacted material from Cells 16E and 17E (currently stockpiled in Building 63) on July 26, 2004. Sampling of Common Fill for chemical parameters was performed on July 22, 2004 and topsoil sampling was performed on July 27, 2004.

Geotechnical samples were collected for common fill, filter stone, 12-inch rip rap and topsoil. The results of the geotechnical testing are not included in the monthly report but are contained in other submittals and are available upon request.

The transfer of TSCA materials from the Building 63 and Area 64A stockpile management area to the Building 71 OPCA was performed on July 06, 2004 and July 15, 2004. The transfer of non-TSCA cobble materials from the Area 64E stockpile management area to the Hill 78 OPCA was performed on July 16, 2004. (See Table 3 for a summary of material transported to the OPCAs during the month of July 2004 and Table 4 for a summary of material transported to the OPCAs for the project through July 2004.)

Also, Cell 16 and 17 pre-characterized non-TSCA riverbank materials from Area 64D, the non-TSCA post excavation characterized riverbank and riverbed materials from Area 64C north and the NAPL impacted non-TSCA post excavation characterized riverbank and riverbed materials from Building 68 and Building 65 were transported to the Waste Management of New Hampshire-TREE, Rochester, NH from July 01, 2004 to July 30, 2004. (See Table 5 for a summary of material transported to the Waste Management of New Hampshire-TREE, Rochester, NH during the month of July 2004.)

Stockpile management area activities continued throughout the month of July. Daily inspections, operation, and maintenance activities were performed within Buildings 63, 65, Area 64 (the outside stockpile area) and Building 68. A vacuum truck was utilized to collect the water runoff from the stockpiled material. The water was then transported to the water treatment system. Dust control procedures continued for access roads, parking areas, and material storage areas.

Traffic control was conducted on Lyman Street, High Street, Deming Street and Elm Street during the month of July.

Page 8: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

G:\1_5 Mile\Monthly Reports\2004\2004 July\July_04_Monthly_Rpt.docPAGE PAGE 7 OF 9

3. Sampling/test results received

Table 6 contains a summary of the PCB samples collected for the water treatment system sampling program on July 16, 2004, the non-PCB data associated with the water treatment system sampling on July 16, 2004 is presented in Table 6a. The results of the daily particulate air monitoring program are summarized in Table 7. Table 8 is a summary of daily turbidity monitoring results. Results for PCB and TSS samples and water column monitoring data collected on July 09, 2004, are presented in Table 9. The PCB and TSS sample data for the water column samples collected or July 22, 2004 are not yet available. Analytical results for the PCB air sampling conducted on July 10, 2004 are provided in Table 10. Analytical results for the SVOC air sampling conducted in Building 65 stockpile management area on June 24, 2004 are provided in Table 11. Table 12 presents confirmatory PCB wipe sample results collected on decontaminated equipment. Analytical results for post-excavation characterization samples collected on July 15, 2004, from the Cells 16 and 17, (Area 64C soil and sediment stockpile) are presented in Table 13. Post-excavation characterization sample results for NAPL-impacted material (Building 65, Building 68 and Building 63 stockpile management areas) collected on July 06, 2004, July 22, 2004, July 26, 2004 and July 28, 2004 are summarized in Table 14. Table 15 presents data associated with NAPL-impacted sediment collected in Cell 17W on June 17, 2004 and June 23, 2004. Additional PCB sample results associated with the in-situ disposal characterization sampling collected on June 23, 2004, June 24, 2004 and June 29, 2004 are summarized in Table 16. Analytical data associated with sampling of Common Fill performed on July 22, 2004 and topsoil performed on July 27, 2004 is not yet available.

4. Diagrams associated with the tasks performed

Figure 1 is a map of Phase 1, the Transition Phase and Phase 2 and includes the layout of all excavation cells, temporary dam, water monitoring locations, air sampling locations, access road locations, excavation load out locations, staging area locations, fence line location, the water treatment system pad location, and the utility trench location.

5. Reports received and prepared

Vibration monitoring activities were not performed during the month of July.

Page 9: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

G:\1_5 Mile\Monthly Reports\2004\2004 July\July_04_Monthly_Rpt.docPAGE PAGE 8 OF 9

6. Photo documentation of activities performed

See attached photos.

7. Brief description of work to be performed in August 2004

Complete backfill activities in Cells 16E and 17E.

Complete excavation activities in Cell 18E and 19E.

Initiated backfill activities in Cell 18E and 19E.

Initiate backfill activities in Cell 18W and 19W.

Continue stockpile management activities at Buildings 63, 65, 68 and Area 64 (outside contaminated material stockpile area).

Continue transfer the non-TSCA materials from the stockpile management areas to approved off-site facilities.

Continue to transfer TSCA and non-TSCA cobble material to the OPCAs.

Continue daily air and turbidity monitoring.

Continue PCB air sampling (once a month), water column sampling (twice a month), water treatment system sampling (once a month) and backfill material sampling (as needed).

8. Attachments to this report

Table 1. Quantity of Bank and Sediment Material Excavated during the Month of July

Table 2. Quantity of Bank and Sediment Material Excavated to Date

Table 3. Quantity of Material Transferred to OPCAs during the Month of July

Table 4. Quantity of Material Transferred to OPCAs to Date

Table 5. Quantity of non-TSCA Material Transferred to Waste Management of New Hampshire TREE in Rochester, NH during the Month of July

Page 10: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

G:\1_5 Mile\Monthly Reports\2004\2004 July\July_04_Monthly_Rpt.docPAGE PAGE 9 OF 9

Table 6. NPDES PCB Sampling Results for Water Treatment System

Table 6a. NPDES non-PCB Sampling Results for Water Treatment System

Table 7. Daily Air Monitoring Results

Table 8. Daily Water Column Turbidity Monitoring Results

Table 9. Summary of Turbidity, PCB, and TSS Water Column Monitoring Results

Table 10. PCB Air Sampling Results

Table 11. SVOC Air Sampling Results from Building 65

Table 12. Equipment Confirmatory Wipe Sample Results

Table 13. Post-Excavation Soil/Sediment Stockpile Characterization Analytical Results

Table 14. Cell 16/17 NAPL-Impacted Material Characterization Analytical Results

Table 15. NAPL-Impacted Sediment from Cell 16W Analytical Results

Table 16. Additional In-situ Riverbank Characterization Sampling Analytical Results

Figure 1- 1.5 Mile Removal Action Site Map

Photodocumentation

Page 11: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Date Location non-TSCA TSCA NAPL impacted

7/1/2004 Cell 17W 0 0 907/2/2004 Cell 17W 0 0 257/6/2004 Cell 16W 20 0 07/7/2004 Cell 16E 60 0 07/8/2004 Cell 16E 360 40 07/9/2004 Cell 16E&17E 370 0 0

7/10/2004 Cell 17E 90 180 07/12/2004 Cell 16E 0 120 1207/13/2004 Cell 16E&17E 170 20 2007/14/2004 Cell 17E 150 20 1807/15/2004 Cell 16E&17E 60 20 507/16/2004 Cell 16E 0 0 907/20/2004 Cell 17E 53 0 107/22/2004 Cell 17E 0 0 307/23/2004 Cell 17E 0 0 307/28/2004 Cell 16E&17E 20 0 07/30/2004 Cell 18W 30 0 0

Monthly total from bank soil and sediment 1,383 400 825

Note:All quantities are in compacted or “in-place” cubic yards. All loads are estimated at 10cy per truck.

Approximate Quantity of Excavated Bank and Sediment Material

Bank Soil and Sediment

(Results are reported in cubic yards)

Table 1 - Quantity of Bank and Sediment Material Generated During the Month of JulyJuly 2004 Monthly Report

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List .xls Page 1 of 29 8/10/2004

Page 12: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Date Location non-TSCA TSCA NAPL impacted Total09/26/02 to 10/02/02 Cell 1A 101 0 53 15410/02/02 to 10/04/02 Cell 1B 60 0 110 17010/18/02 to 10/29/02 Cell 2 874 175 0 1,04911/11/02 to 11/15/02 Cell 3 183 0 200 38311/18/02 to 11/25/02 Cell 4 2,283 198 0 2,48112/03/02 to 12/10/02 Cell 5 1,629 369 0 1,99801/07/03 to 01/15/03 Cell 6 832 658 0 1,49001/10/03 to 01/29/03 Cell 6A 2,611 68 0 2,67902/03/03 to 02/10/03 Cell 7&7A 1,114 636 0 1,75002/20/03 to 02/24/03 Cell 5A 899 0 0 89902/25/03 to 03/07/03 Cell 8&8A 1,245 90 0 1,33503/14/03 to 03/18/03 Cell 9 603 307 0 91003/27/03 to 04/07/03 Cell 10&10A 1,730 133 0 1,86304/14/03 to 04/16/03 Cell 12 668 1,354 0 2,02204/30/03 to 05/09/03 Cell 11 1,713 341 10 2,06405/27/03 to 06/12/03 Cell 11A 957 166 462 1,58506/25/03 to 07/18/03 Cell 12A 1,656 805 656 3,11709/04/03 to 10/22/03 Cell 13 3,580 298 1,129 5,00701/08/04 to 03/24/04 Cell 14&15 4,462 288 257 5,0075/25/04 to 07/30/04 Cell 16&17 4,392 820 3,191 8,403

Total 31,592 6,706 6,068 44,366

Note:All quantities determined by pre- and post- excavation surveying.

Approximate Quantity of Bank and Sediment Material Excavated to Date

Table 2 - Quantity of Bank and Sediment Material Excavated to DateJuly 2004 Monthly Report

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

(Results are reported in cubic yards)

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List.xls Page 2 of 29 8/10/2004

Page 13: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Date # of truckloads Hill 78 (non-TSCA) Bldg. 71 (TSCA)

7/6/2004 45 0 4957/15/2004 31 0 3417/16/2004 36 396 0Monthly totals 112 396 836

Note:All quantities are in compacted or “in-place” cubic yards.(1) Estimated at 11 cy per truck

Bank Soil and Sediment

(Results are reported in cubic yards)

Approximate Quantity Transported to OPCAs

Table 3 - Quantity of Material Transferred to OPCAs During the Month of JulyJuly 2004 Monthly Report

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List.xls Page 3 of 29 8/10/2004

Page 14: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Date Location Hill 78 (non-TSCA) Bldg. 71 (TSCA)

09/11/02 Building 65 Stockpile Management Area 225

12/05/02 to 12/19/02 Stockpile Management Area/Excavation Cells 4,718 (1) 910 (1)02/11/03 to 02/28/03 Stockpile Management Area/Excavation Cells 5,137 (2) 539 (2)03/03/03 to 03/14/03 Stockpile Management Area/Excavation Cells 1,749 (2) 1,353 (2)04/07/03 to 04/18/03 Stockpile Management Area/Excavation Cells 2,710 (3) 1,698 (3)04/07/03 to 04/18/03 Stockpile Management Area/Cleanup Material 370 (3) 40 (3)05/12/03 to 05/14/03 Stockpile Management Area/Excavation Cells 1,826 (3) 005/12/03 to 05/14/03 Stockpile Management Area/Cleanup Material 220 (3) 006/11/03 to 06/12/03 Stockpile Management Area/Excavation Cells 0 704 (3)06/16/03 to 06/17/03 Stockpile Management Area/Excavation Cells 712 (3) 006/16/03 to 06/17/03 Stockpile Management Area/Cleanup Material 146 (3) 007/07/03 to 07/11/03 Stockpile Management Area/Excavation Cells 1,188 (3) 748 (3)09/15/03 to 09/30/03 Stockpile Management Area/Excavation Cells 2,090 (3) 308 (3)10/28/03 to 10/30/03 Stockpile Management Area/Excavation Cells 1,623 (3) 33 (3)10/28/03 to 10/30/03 Stockpile Management Area/Cleanup Material 181 (3) 0

11/18/03 Demolition Debris from Parcels I8-10-2 and I8-10-3 200 (4) 01/12/04 Stockpile Management Area/Excavation Cells 77 (3) 0

04/28/04 to 4/30/04 Stockpile Management Area 0 825 (3)

05/12/04 to 05/27/04 Stockpile Management Area/Excavation Cells/Outfall Repair on Parcel I8-23-6 1,518 (3) 484 (3)

06/03/04 to 06/22/04 Stockpile Management Area 0 528 (3)07/06/04 to 07/16/05 Stockpile Management Area 396 (3) 836 (3)

25,086 9,006

Note:All quantities are in compacted or “in-place” cubic yards.(1) Estimated at 14cy per truck, loaded with excavator.(2) Estimated at 11cy per truck due to loading out frozen material.(3) Estimated at 11cy per truck, loaded with front end loader.(4) Estimated at 8cy per truck

Table 4 - Quantity of Material Transferred to OPCAs to DateJuly 2004 Monthly Report

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

Project Totals

Bank Soil and Sediment

(Results are reported in cubic yards)

Approximate Quantity Transported to OPCAs

Site Preparation Activities

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List.xls Page 4 of 29 8/10/2004

Page 15: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

07/01/04 0217WMNH Cell 16/17 Area 64CNorth 32.2507/01/04 0218WMNH Cell 16/17 Area 64CNorth 30.8407/01/04 0219WMNH Cell 16/17 Area 64CNorth 28.1707/01/04 0220WMNH Cell 16/17 Area 64CNorth 29.6407/01/04 0221WMNH Cell 16/17 Area 64CNorth 28.8407/01/04 0222WMNH Cell 16/17 Area 64CNorth 30.0407/01/04 0223WMNH Cell 16/17 Area 64CNorth 28.9007/02/04 0224WMNH Cell 16/17 Area 64CNorth 28.7507/02/04 0225WMNH Cell 16/17 Area 64CNorth 28.1807/02/04 0226WMNH Cell 16/17 Area 64CNorth 31.2207/02/04 0227WMNH Cell 16/17 Area 64CNorth 30.5707/02/04 0228WMNH Cell 16/17 Area 64CNorth 28.9807/02/04 0229WMNH Cell 16/17 Area 64CNorth 31.2607/02/04 0230WMNH Cell 16/17 Area 64CNorth 28.6707/02/04 0231WMNH Cell 16/17 Area 64CNorth 32.8907/02/04 0232WMNH Cell 16/17 Area 64CNorth 32.1207/02/04 0233WMNH Cell 16/17 Area 64CNorth 31.4507/02/04 0234WMNH Cell 16/17 Area 64CNorth 29.0707/07/04 0235WMNH Cell 16/17 Area 64CNorth 31.4907/07/04 0236WMNH Cell 16/17 Area 64CNorth 29.8307/07/04 0237WMNH Cell 16/17 Area 64CNorth 28.6407/07/04 0238WMNH Cell 16/17 Area 64CNorth 28.6407/07/04 0239WMNH Cell 16/17 Area 64CNorth 31.2707/07/04 0240WMNH Cell 16/17 Area 64CNorth 34.2007/07/04 0241WMNH Cell 16/17 Area 64CNorth 33.0607/07/04 0242WMNH Cell 16/17 Area 64CNorth 29.5107/07/04 0243WMNH Cell 16/17 Area 64CNorth 30.0207/07/04 0244WMNH Cell 16/17 Area 64CNorth 31.4107/08/04 0245WMNH Cell 16/17 Area 64CNorth 31.1407/08/04 0246WMNH Cell 16/17 Area 64CNorth 29.6807/08/04 0247WMNH Cell 16/17 Area 64CNorth 28.4307/08/04 0248WMNH Cell 16/17 Area 64CNorth 29.6007/08/04 0249WMNH Cell 16/17 NAPL Building 68 29.1107/08/04 0250WMNH Cell 16/17 Area 64CNorth 31.4607/08/04 0251WMNH Cell 16/17 NAPL Building 68 32.04

Table 5 - Quantity of non-TSCA Material Transported to Waste Management of New Hampshire-TREE, Rochester, N.H.

July 2004 Monthly Report During the Month of July

Date Shipped Doc. Number

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

Net Weight (Tons) (1)Stockpile Area

(Results are reported in tons)

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List.xls Page 5 of 29 8/10/2004

Page 16: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Date Shipped Doc. Number Net Weight (Tons) (1)Stockpile Area

07/08/04 0252WMNH Cell 16/17 NAPL Building 68 29.4507/08/04 0253WMNH Cell 16/17 NAPL Building 68 31.9407/08/04 0254WMNH Cell 16/17 Area 64CNorth 31.8307/08/04 0255WMNH Cell 16/17 Area 64CNorth 32.4107/09/04 0256WMNH Cell 16/17 NAPL Building 68 30.3607/09/04 0257WMNH Cell 16/17 NAPL Building 68 28.5307/09/04 0258WMNH Cell 16/17 NAPL Building 68 32.0707/09/04 0259WMNH Cell 16/17 NAPL Building 68 30.8307/09/04 0260WMNH Cell 16/17 NAPL Building 68 31.8307/09/04 0261WMNH Cell 16/17 NAPL Building 68 30.2907/09/04 0262WMNH Cell 16/17 NAPL Building 68 30.8707/09/04 0263WMNH Cell 16/17 NAPL Building 68 31.7607/09/04 0264WMNH Cell 16/17 NAPL Building 68 31.9207/12/04 0260/275WMNH Cell 16/17 NAPL Building 68 30.9207/12/04 0261/276WMNH Cell 16/17 NAPL Building 68 31.7107/12/04 0262/277WMNH Cell 16/17 NAPL Building 68 30.0007/12/04 0263/278WMNH Cell 16/17 NAPL Building 68 31.5707/12/04 0264/279WMNH Cell 16/17 NAPL Building 68 31.2407/12/04 0265WMNH Cell 16/17 NAPL Building 68 29.5407/12/04 0266WMNH Cell 16/17 NAPL Building 68 28.7407/13/04 0267WMNH Cell 16/17 NAPL Building 68 31.6907/13/04 0268WMNH Cell 16/17 NAPL Building 68 30.2807/13/04 0269WMNH Cell 16/17 NAPL Building 68 30.1407/13/04 0270WMNH Cell 16/17 NAPL Building 68 29.2207/13/04 0271WMNH Cell 16/17 NAPL Building 68 31.4507/13/04 0272WMNH Cell 16/17 NAPL Building 68 29.5907/13/04 0273WMNH Cell 16/17 NAPL Building 68 31.4307/13/04 0274WMNH Cell 16/17 NAPL Building 68 29.7407/14/04 0280WMNH Cell 16/17 NAPL Building 68 30.8107/14/04 0281WMNH Cell 16/17 NAPL Building 68 28.5807/14/04 0282WMNH Cell 16/17 NAPL Building 68 28.1407/14/04 0283WMNH Cell 16/17 NAPL Building 68 28.4107/14/04 0284WMNH Cell 16/17 NAPL Building 68 29.2307/14/04 0285WMNH Cell 16/17 NAPL Building 68 29.5207/14/04 0286WMNH Cell 16/17 NAPL Building 68 31.4707/14/04 0287WMNH Cell 16/17 NAPL Building 68 31.6207/14/04 0288WMNH Cell 16/17 NAPL Building 68 31.9107/14/04 0289WMNH Cell 16/17 NAPL Building 68 30.1807/14/04 0290WMNH Cell 16/17 NAPL Building 68 34.3207/14/04 0291WMNH Cell 16/17 NAPL Building 68 31.2407/14/04 0292WMNH Cell 16/17 NAPL Building 68 29.6307/14/04 0293WMNH Cell 16/17 NAPL Building 68 31.5107/14/04 0294WMNH Cell 16/17 NAPL Building 68 30.2907/15/04 0295WMNH Cell 16/17 NAPL Building 68 30.5607/15/04 0296WMNH Cell 16/17 NAPL Building 68 28.16

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List.xls Page 6 of 29 8/10/2004

Page 17: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Date Shipped Doc. Number Net Weight (Tons) (1)Stockpile Area

07/15/04 0297WMNH Cell 16/17 NAPL Building 68 28.2007/15/04 0298WMNH Cell 16/17 NAPL Building 68 30.4607/15/04 0299WMNH Cell 16/17 NAPL Building 68 29.8207/15/04 0300WMNH Cell 16/17 NAPL Building 68 32.4607/15/04 0301WMNH Cell 16/17 NAPL Building 68 27.4707/15/04 0302WMNH Cell 16/17 NAPL Building 68 27.4507/15/04 0303WMNH Cell 16/17 NAPL Building 68 29.3307/15/04 0304WMNH Cell 16/17 Pretest Area 64D 29.4107/15/04 0305WMNH Cell 16/17 Pretest Area 64D 30.5407/16/04 0306WMNH Cell 16/17 Pretest Area 64D 30.9507/16/04 0307WMNH Cell 16/17 Pretest Area 64D 29.8807/16/04 0308WMNH Cell 16/17 Pretest Area 64D 29.2307/16/04 0309WMNH Cell 16/17 Pretest Area 64D 33.1807/16/04 0310WMNH Cell 16/17 Pretest Area 64D 32.1307/16/04 0311WMNH Cell 16/17 Pretest Area 64D 28.9707/16/04 0312WMNH Cell 16/17 Pretest Area 64D 32.6307/16/04 0313WMNH Cell 16/17 Pretest Area 64D 32.2107/16/04 0314WMNH Cell 16/17 Pretest Area 64D 31.3407/16/04 0315WMNH Cell 16/17 Pretest Area 64D 32.5707/19/04 0316WMNH Cell 16/17 Pretest Area 64D 29.3107/19/04 0317WMNH Cell 16/17 Pretest Area 64D 28.8207/19/04 0318WMNH Cell 16/17 Pretest Area 64D 29.7607/19/04 0319WMNH Cell 16/17 Pretest Area 64D 31.3407/19/04 0320WMNH Cell 16/17 Pretest Area 64D 31.6207/19/04 0321WMNH Cell 16/17 Pretest Area 64D 31.7007/19/04 0322WMNH Cell 16/17 Pretest Area 64D 32.9907/19/04 0323WMNH Cell 16/17 Pretest Area 64D 31.6607/19/04 0324WMNH Cell 16/17 Pretest Area 64D 29.7007/20/04 0325WMNH Cell 16/17 Pretest Area 64D 30.8507/20/04 0326WMNH Cell 16/17 Pretest Area 64D 28.9607/20/04 0327WMNH Cell 16/17 Pretest Area 64D 25.2307/20/04 0328WMNH Cell 16/17 Pretest Area 64D 32.0207/20/04 0329WMNH Cell 16/17 Pretest Area 64D 32.2907/20/04 0330WMNH Cell 16/17 Pretest Area 64D 31.9307/20/04 0331WMNH Cell 16/17 Pretest Area 64D 32.4807/20/04 0332WMNH Cell 16/17 Pretest Area 64D 33.4607/20/04 0333WMNH Cell 16/17 Pretest Area 64D 32.2307/20/04 0334WMNH Cell 16/17 Pretest Area 64D 30.4307/21/04 0335WMNH Cell 16/17 Pretest Area 64D 31.5607/21/04 0336WMNH Cell 16/17 Pretest Area 64D 30.0307/21/04 0337WMNH Cell 16/17 Pretest Area 64D 29.4807/21/04 0338WMNH Cell 16/17 Pretest Area 64D 30.43*07/21/04 0339WMNH Cell 16/17 Pretest Area 64D 30.9307/21/04 0340WMNH Cell 16/17 Pretest Area 64D 32.9207/21/04 0341WMNH Cell 16/17 Pretest Area 64D 29.00

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List.xls Page 7 of 29 8/10/2004

Page 18: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Date Shipped Doc. Number Net Weight (Tons) (1)Stockpile Area

07/21/04 0342WMNH Cell 16/17 Pretest Area 64D 30.5107/21/04 0343WMNH Cell 16/17 Pretest Area 64D 31.6607/21/04 0344WMNH Cell 16/17 Pretest Area 64D 32.5007/23/04 0345WMNH Cell 16/17 NAPL Building 65 28.65*07/23/04 0346WMNH Cell 16/17 NAPL Building 65 31.74*07/23/04 0347WMNH Cell 16/17 NAPL Building 65 29.43*07/23/04 0348WMNH Cell 16/17 NAPL Building 65 30.84*07/23/04 0349WMNH Cell 16/17 NAPL Building 65 31.01*07/23/04 0350WMNH Cell 16/17 NAPL Building 65 29.40*07/23/04 0351WMNH Cell 16/17 NAPL Building 65 33.12*07/23/04 0352WMNH Cell 16/17 NAPL Building 65 31.61*07/23/04 0353WMNH Cell 16/17 NAPL Building 65 31.42*07/23/04 0354WMNH Cell 16/17 NAPL Building 65 31.21*07/23/04 0355WMNH Cell 16/17 NAPL Building 65 31.11*07/23/04 0356WMNH Cell 16/17 NAPL Building 65 29.81*07/26/04 0357WMNH Cell 16/17 NAPL Building 65 30.30*07/26/04 0358WMNH Cell 16/17 NAPL Building 65 29.32*07/26/04 0359WMNH Cell 16/17 NAPL Building 65 30.48*07/26/04 0360WMNH Cell 16/17 NAPL Building 65 30.10*07/26/04 0361WMNH Cell 16/17 NAPL Building 65 31.65*07/26/04 0362WMNH Cell 16/17 NAPL Building 65 34.03*07/26/04 0363WMNH Cell 16/17 NAPL Building 65 30.13*07/26/04 0364WMNH Cell 16/17 NAPL Building 65 30.16*07/26/04 0365WMNH Cell 16/17 NAPL Building 65 28.37*07/26/04 0366WMNH Cell 16/17 NAPL Building 65 30.89*07/26/04 0367WMNH Cell 16/17 NAPL Building 65 33.66*07/26/04 0368WMNH Cell 16/17 NAPL Building 65 32.11*07/27/04 0369WMNH Cell 16/17 NAPL Building 65 28.95*07/27/04 0370WMNH Cell 16/17 NAPL Building 65 29.70*07/27/04 0371WMNH Cell 16/17 NAPL Building 65 29.96*07/27/04 0372WMNH Cell 16/17 NAPL Building 65 31.62*07/27/04 0373WMNH Cell 16/17 NAPL Building 65 30.53*07/27/04 0374WMNH Cell 16/17 NAPL Building 65 31.44*07/27/04 0375WMNH Cell 16/17 NAPL Building 65 30.76*07/27/04 0376WMNH Cell 16/17 NAPL Building 65 32.57*07/27/04 0377WMNH Cell 16/17 NAPL Building 65 34.03*7/28/2004 0378WMNH Cell 16/17 NAPL Building 65 31.88*7/28/2004 0379WMNH Cell 16/17 NAPL Building 65 28.22*7/28/2004 0380WMNH Cell 16/17 NAPL Building 65 29.76*7/28/2004 0381WMNH Cell 16/17 NAPL Building 65 31.39*7/28/2004 0382WMNH Cell 16/17 NAPL Building 65 30.16*7/28/2004 0383WMNH Cell 16/17 NAPL Building 65 30.94*7/28/2004 0384WMNH Cell 16/17 NAPL Building 65 31.71*7/28/2004 0385WMNH Cell 16/17 NAPL Building 65 33.06*7/28/2004 0386WMNH Cell 16/17 NAPL Building 65 31.30*

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List.xls Page 8 of 29 8/10/2004

Page 19: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Date Shipped Doc. Number Net Weight (Tons) (1)Stockpile Area

7/28/2004 0387WMNH Cell 16/17 NAPL Building 65 32.07*7/29/2004 0388WMNH Cell 16/17 NAPL Building 65 28.74*7/29/2004 0389WMNH Cell 16/17 NAPL Building 65 28.31*7/29/2004 0390WMNH Cell 16/17 NAPL Building 65 32.58*7/29/2004 0391WMNH Cell 16/17 NAPL Building 65 30.72*7/29/2004 0392WMNH Cell 16/17 NAPL Building 65 31.01*7/29/2004 0393WMNH Cell 16/17 NAPL Building 65 30.47*7/29/2004 0394WMNH Cell 16/17 NAPL Building 65 28.79*7/29/2004 0395WMNH Cell 16/17 NAPL Building 65 31.25*07/30/04 0396WMNH Cell 16/17 NAPL Building 65 29.42*07/30/04 0397WMNH Cell 16/17 NAPL Building 65 31.02*07/30/04 0398WMNH Cell 16/17 NAPL Building 65 28.43*07/30/04 0399WMNH Cell 16/17 NAPL Building 65 32.56*07/30/04 0400WMNH Cell 16/17 NAPL Building 65 31.01*

5,637.26

Notes:

* - Net weights established onsite during the load out of material.

Total of Material Disposed

Net weights from the disposal facility not yet available.

(1) Net weights established at the disposal facility

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List.xls Page 9 of 29 8/10/2004

Page 20: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Preliminary analytical dataSubject to verification

Sample ID LocationDate

CollectedAroclor 1016, 1221,

1232, & 1242 Aroclor 1248 Aroclor 1254 Aroclor 1260 Total PCBsFiltered PCBs

H2-WW000001-0-4L16 Influent 16-Jul-04 ND(0.065) ND(0.065) 0.33 0.40 0.73 ND(0.013)H2-WW000004-0-4L16 Modutank Effluent 16-Jul-04 ND(0.065) ND(0.065) 0.34 0.38 0.72 ND(0.013)H2-WW000005-0-4L16 Sand Filter Effluent 16-Jul-04 ND(0.013) ND(0.013) 0.094 0.076 0.17 NSH2-WW000002-0-4L16 Intermediate 16-Jul-04 ND(0.013) ND(0.013) 0.13 0.079 0.21 NSH2-WW000003-0-4L16 Effluent 16-Jul-04 ND(0.013) ND(0.013) 0.079 0.063 0.14 NS

Action Level Effluent 0.50 0.50 0.50 0.50 0.50 N/A

Notes:ND(0.013) - Analyte was not detected. The value in parentheses is the associated detection limit.Modutank Effluent- Sample collected between the modutank and the oil/water separator.Sand Filter Effluent - Sample collected between the sand and carbon filter.Intermediate - Sample collected between carbon units which are being operated in series.NS - Not SampledN/A - Not Available

(Results are presented in part per billion, ppb)

Table 6- NPDES Sampling Results for Water Treatment SystemJuly 2004 Monthly Report

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List.xls Page 10 of 29 8/10/2004

Page 21: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Preliminary analytical dataSubject to verification

Sample ID H2-WW000001-0-4L16 H2-WW000004-0-4L16 H2-WW000005-0-4L16 H2-WW000002-0-4L16 H2-WW000003-0-4L16Sample type Influent Modutank Effluent Sand Filter Effluent Intermediate Effluent

Date Collected 07/16/2004 07/16/2004 07/16/2004 07/16/2004 07/16/2004Analyte

ACENAPHTHENE 39.0 29.0 21.0 ND ND 100ACENAPTHYLENE 8.0 J 2.9 J 0.66 J ND ND 100ACETOPHENONE 1.6 J 3.2 J 9.6 J ND ND 100ANTHRACENE 11.0 5.0 J 3.5 J ND ND 100BENZO(A)ANTHRACENE 3.4 J 2.0 J 1.4 J ND ND 100BENZO(A)PYRENE 2.4 J 1.2 J 0.51 J ND ND 100BENZO(B)FLUORANTHENE 1.3 J 0.97 J ND ND ND 100BENZO(GHI)PERYLENE 1.1 J 0.56 J ND ND ND 100BENZO(K)FLUORANTHENE 1.5 J 0.85 J ND ND ND 100BIS(2-ETHYLHEXYL) PHTHALATE 0.92 J 0.82 J 0.98 J 0.66 J 0.49 J 100CHRYSENE 3.2 J 2.2 J 1.3 J ND ND 100DIBENZOFURAN 4.7 J 3.0 J ND ND ND 100DI-N-BUTYL PHTHALATE 4.5 J 1.2 J ND ND ND 100FLUORANTHENE 17.0 14.0 18.0 ND ND 100FLUORENE 26.0 13.0 2.2 J ND ND 100INDENO(1,2,3-C,D)PYRENE 0.96 J ND ND ND ND 100PHENANTHRENE 0.96 J 0.64 J ND ND ND 100PYRENE 20.0 14.0 22.0 ND ND 100

1,2,4-TRICHLOROBENZENE 0.34 J ND ND ND ND 70ACETONE 5.7 12.0 12.0 3.6 J 3.5 J 100CARBON TETRACHLORIDE ND ND ND 0.29 J ND N/ACHLOROFORM ND ND ND 0.63 J 0.34 J 100CHLOROMETHANE 0.24 J ND ND ND ND N/ACIS-1,2-DICHLOROETHENE 0.30 J ND ND 0.37 J ND N/AETHYL BENZENE 3.2 1.2 ND ND ND N/AM,P-XYLENE (SUM OF ISOMERS) 5.0 2.3 ND ND ND *NAPHTHALENE 14.0 1.7 0.49 J 0.94 J 0.39 J 100O-XYLENE 2.9 1.6 ND ND ND *TERT-BUTYL METHYL ETHER 0.55 J 0.40 J 0.24 J 4.5 7.2 70TOLUENE 1.1 0.67 J ND ND ND *XYLENES (TOTAL) 8.2 4.1 ND ND ND *Notes:Modutank Effluent- Sample collected between the modutank and the oil/water separator.Sand Filter Effluent - Sample collected between the sand and carbon filter.Intermediate - Sample collected between carbon units which are being operated in series.Only detected constituents are summarizedND - not detectedJ - Indicates an estimated value* Total BTEX (Benzene, Toluene, Ethyl Benzene and Xylene) can not exceed 100 ppb

APP IX SEMIVOLATILES

NPDES Permit Regulatory

Effluent Limits

APP IX VOLATILES

(Results are presented in part per billion, ppb)

Table 6a - NPDES non-PCB Sampling Results for Water Treatment SystemJuly 2004 Monthly Report

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List.xls Page 11 of 29 8/10/2004

Page 22: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Preliminary analytical dataSubject to verification

N/A - not available

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List.xls Page 12 of 29 8/10/2004

Page 23: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Date Collected Sample Location

Average Site Concentration

(mg/m3)Average Period

(Hours:Min)Upwind 0.002 8Downwind 0.008 7Background 0.106 21Upwind NA NADownwind NA NABackground NA NAUpwind NA NADownwind NA NABackground NA NAUpwind NA NADownwind NA NABackground NA NAUpwind 0.000 9Downwind 0.009 9Background 0.001 9Upwind NA NADownwind NA NABackground NA NAUpwind 0.001 8Downwind 0.000 8Background 0.000 15Upwind NA NADownwind NA NABackground NA NAUpwind NA NADownwind NA NABackground NA NAUpwind 0.012 7Downwind 0.002 2Background 0.000 7Upwind NA NADownwind NA NABackground NA NAUpwind NA NADownwind NA NABackground NA NAUpwind NA NADownwind NA NABackground NA NA7/19/2004

7/13/2004

7/14/2004

7/15/2004

7/16/2004

7/7/2004

7/8/2004

7/9/2004

7/12/2004

7/1/2004

7/2/2004

7/5/2004

7/6/2004

Table 7 - Daily Air Monitoring ResultsJuly 2004 Monthly Report

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

G:/1.5 Mile/Monthly Reports/2004 July/July Table Master List.xls Page 13 of 29 8/10/2004

Page 24: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Date Collected Sample Location

Average Site Concentration

(mg/m3)Average Period

(Hours:Min)Upwind 0.049 7Downwind 0.008 7Background 0.000 7Upwind 0.011 8Downwind 0.056 8Background 0.000 8Upwind 0.083 10Downwind -- --Background 0.000 10Upwind NA NADownwind NA NABackground NA NAUpwind 0.007 31Downwind 0.001 20Background 0.000 27Upwind NA NADownwind NA NABackground NA NAUpwind NA NADownwind NA NABackground NA NAUpwind -- --Downwind -- --Background -- --Upwind -- --Downwind -- --Background -- --

notification level 0.120action level 0.150

Notes:N/A - Not available due to precipitation--- - No reading due to technical difficulties with monitoring equipment

7/30/2004

7/29/2004

7/23/2004

7/26/2004

7/27/2004

7/28/2004

7/20/2004

7/21/2004

7/22/2004

G:/1.5 Mile/Monthly Reports/2004 July/July Table Master List.xls Page 14 of 29 8/10/2004

Page 25: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Average High LowDownstream of Lyman Street Bridge 3.8 4.6 3.1 19.9Downstream of Pomeroy Avenue Bridge 23.7 43.7 3.9 19.57Downstream of Lyman Street Bridge 10.9 20.2 5.3 20.3Downstream of Pomeroy Avenue Bridge 10.2 27.7 2.2 19.89Downstream of Lyman Street Bridge 4.6 6.3 3.1 20.7Downstream of Pomeroy Avenue Bridge 2.6 6.5 0.9 20.4Downstream of Lyman Street Bridge 4.9 6.2 3.7 20.4Downstream of Pomeroy Avenue Bridge 1.8 5.4 1.1 20.2Downstream of Lyman Street Bridge 11.0 73.8 4.6 19.91Downstream of Pomeroy Avenue Bridge 12.9 43.6 0.8 19.8Downstream of Lyman Street Bridge 13.8 24.5 7.0 18.74Downstream of Pomeroy Avenue Bridge 18.7 64.4 10.2 19.1Downstream of Lyman Street Bridge 4.6 5.3 3.7 20.18Downstream of Pomeroy Avenue Bridge 2.7 3.8 1.1 20.2Downstream of Lyman Street Bridge 5.6 6.4 4.5 21.13Downstream of Pomeroy Avenue Bridge 1.6 3.9 0.7 21.0Downstream of Lyman Street Bridge 5.4 7.1 3.8 20.07Downstream of Pomeroy Avenue Bridge 2.2 3.1 1.2 20.3Downstream of Lyman Street Bridge 4.7 6.1 3.0 19.66Downstream of Pomeroy Avenue Bridge 2.0 2.8 0.5 19.5Downstream of Lyman Street Bridge 4.2 5.9 2.7 20.51Downstream of Pomeroy Avenue Bridge 2.7 6.6 0.2 20.1Downstream of Lyman Street Bridge 4.3 6.1 2.6 20.20Downstream of Pomeroy Avenue Bridge 1.2 2.4 0.4 20.3Downstream of Lyman Street Bridge 4.4 5.9 2.7 18.51Downstream of Pomeroy Avenue Bridge 1.5 2.2 0.6 18.7Downstream of Lyman Street Bridge 4.7 5.8 3.5 18.51Downstream of Pomeroy Avenue Bridge 2.1 4.5 0.9 18.36Downstream of Lyman Street Bridge 190.8 669.6 4.6 18.51Downstream of Pomeroy Avenue Bridge 3.5 4.7 1.8 19.78Downstream of Lyman Street Bridge 100.8 544.2 9.2 18.51Downstream of Pomeroy Avenue Bridge 6.3 18.9 3.5 19.80Downstream of Lyman Street Bridge 245.6 818.4 4.9 18.51Downstream of Pomeroy Avenue Bridge 4.5 9.5 2.1 20.35Downstream of Lyman Street Bridge 133.0 718.1 4.0 18.51Downstream of Pomeroy Avenue Bridge 2.0 4.6 0.8 20.50Downstream of Lyman Street Bridge 83.7 342.0 5.9 18.51Downstream of Pomeroy Avenue Bridge 3.6 6.7 1.9 19.90Downstream of Lyman Street Bridge 53.3 136.0 3.7 18.51Downstream of Pomeroy Avenue Bridge 5.3 13.8 1.9 20.61

7/19/2004 27

7/20/2004 28

7/17/2004 30

7/18/2004 26

7/15/2004 32

7/16/2004 33

7/13/2004 29

7/14/2004 31

7/11/2004 29

7/12/2004 28

7/9/2004 39

7/10/2004 33

7/7/2004 80

7/8/2004 49

7/5/2004 27

7/6/2004 180

7/3/2004 34

7/4/2004 28

7/1/2004 30

7/2/2004 46

Temperature Average (oC)Date

Flow at Coltsville

(cfs) Location

Turbidity

Table 8 - Daily Water Column Turbidity Monitoring ResultsJuly 2004 Monthly Report

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

G:/1.5 Mile/Monthly Reports/2004July/JulyTable Master List.xls Page 15 of 29 8/10/2004

Page 26: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Average High LowTemperature Average (oC)Date

Flow at Coltsville

(cfs) Location

Turbidity

Downstream of Lyman Street Bridge 4.4 9.2 3.2 18.51Downstream of Pomeroy Avenue Bridge 8.1 33.6 0.6 19.11Downstream of Lyman Street Bridge 9.1 18.4 6.1 18.5Downstream of Pomeroy Avenue Bridge 3.0 6.0 2.0 22.15Downstream of Lyman Street Bridge 14.2 47.0 4.4 18.5Downstream of Pomeroy Avenue Bridge 12.5 59.2 3.1 21.97Downstream of Lyman Street Bridge 6.7 9.1 5.2 18.5Downstream of Pomeroy Avenue Bridge 5.3 9.2 3.2 21.7Downstream of Lyman Street Bridge 8.9 17.7 5.7 18.51Downstream of Pomeroy Avenue Bridge 3.0 8.4 1.2 20.6Downstream of Lyman Street Bridge 10.6 22.0 6.8 18.51Downstream of Pomeroy Avenue Bridge 2.5 4.0 1.5 21.1Downstream of Lyman Street Bridge 12.2 49.4 4.4 18.51Downstream of Pomeroy Avenue Bridge 3.6 10.7 2.4 20.1Downstream of Lyman Street Bridge 34.7 336.2 6.2 18.51Downstream of Pomeroy Avenue Bridge 8.6 18.4 4.4 17.9Downstream of Lyman Street Bridge 7.3 8.7 5.3 18.51Downstream of Pomeroy Avenue Bridge 3.4 8.5 0.7 19.51Downstream of Lyman Street Bridge 6.1 7.6 3.9 18.51Downstream of Pomeroy Avenue Bridge 7.9 74.8 0.7 21.29Downstream of Lyman Street Bridge 8.1 10.1 6.1 18.51Downstream of Pomeroy Avenue Bridge 1.7 4.7 0.7 21.63

Notes:Turbidity Action Level - Average Downstream (Pomeroy Avenue) > Average Downstream(Lyman Street) + 50 ntucfs - Cubic feet per secondntu - nephelometric turbidity unitsMeasurements collected using YSI 6200 Data Acquisition System using 600 OMS sonde with a 6136 Turbidity ProbeFlow data was obtained from the USGS Station 01197000 in Coltsville, MA at approximately midday.Negative values are attributed to +/- 2ntu accuracy of the turbidity probeTurbidity readings from 7/15/04 to 7/20/04 on the Lyman Street lacation appear slightly higher than usual.The Turbidity probe will be removed for cleaning and calibration in August 2004.

7/31/2004 30

7/29/2004 52

7/30/2004 36

7/27/2004 27

7/28/2004 74

7/25/2004 27

7/26/2004 24

7/23/2004 32

7/24/2004 34

7/21/2004 27

7/22/2004 45

G:/1.5 Mile/Monthly Reports/2004July/JulyTable Master List.xls Page 16 of 29 8/10/2004

Page 27: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Preliminary analytical dataSubject to verification

High LowDaily

AverageUpstream of Newell St. Bridge 07/07/04 80 NS NS NS NS NS NS H0-SW000054-0-4L07 NS NS NSDownstream of Lyman St. Bridge 07/07/04 80 5.3 3.7 4.6 20.18 NS NS H2-SW000055-0-4L07 0.024 ND(0.013) 5.6Downstream of Pomeroy Ave. Bridge 07/07/04 80 3.8 1.1 2.7 20.20 141.1 119.2 H2-SW000052-0-4L07 0.076 ND(0.013) 11.8Downstream of Pomeroy Ave. Bridge

(duplicate) 07/07/04 80 3.8 1.1 2.7 20.20 141.1 119.2 H2-SW000052-1-4L07 0.11 NS NSUpstream of Newell St. Bridge 07/22/04 45 NS NS NS NS NS NS H0-SW000054-0-4L22 NR NR NRDownstream of Lyman St. Bridge 07/22/04 45 18.4 6.1 9.1 18.50 NS NS H2-SW000055-0-4L22 NR NR NRDownstream of Pomeroy Ave. Bridge 07/22/04 45 6.0 2.0 3.0 22.15 36.0 44.4 H2-SW000052-0-4L22 NR NR NR

Notes:PCB Action Level - Downstream (Pomeroy Avenue) > Downstream (Lyman Street) + 5 ug/LND(0.013) - Analyte was not detected. The value in parentheses is the associated detection limit.cfs - Cubic feet per secondntu - nephelometric turbidity unitsNS - Not SampledTemperature measured YSI 600 oms system.Flow data was obtained from the USGS Station 01197000 in Coltsville, MA at approximately midday.Water column samples were collected as 4 grab composite samples. Two flow values calculated, one at the beginning of the sampling event and one at the end of sampling event. NR - Not yet reported

TSS (mg/l)

Turbidity (ntu) Calculated Flow

Beginning (cfs)

Filtered PCB Concentration

(ug/l)

Calculated Flow End

(cfs)

Total PCB Concentration

(ug/l)Date

Water Temp.

(oC)Location Sample IDEstimated Flow (cfs)

Table 9 - Summary of Turbidity, PCB, and TSS Water Column Monitoring ResultsJuly 2004 Monthly Report

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List.xls Page 17 of 29 8/10/2004

Page 28: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Preliminary analytical dataSubject to verification

Sample ID Location (1) Date CollectedAroclor 1016, &

1242Aroclor 1221, 1232, & 1248 Aroclor 1254 Aroclor 1260 Total PCBs

H2-AR000007-0-4L10 background 10-Jul-04 ND(0.00267) ND(0.00267) 0.00401 ND(0.00267) 0.00401H2-AR000028-0-4L10 AR000028 10-Jul-04 ND(0.00267) ND(0.00267) 0.00533 ND(0.00267) 0.00533H2-AR000032-0-4L10 AR000032 10-Jul-04 ND(0.00271) ND(0.00271) 0.00433 ND(0.00271) 0.00433H2-AR000035-0-4L10 AR000035 10-Jul-04 ND(0.00470) ND(0.00470) 0.02493* ND(0.00470) 0.02493*H2-AR000036-0-4L10 AR000036 10-Jul-04 ND(0.00290) ND(0.00290) 0.00406 ND(0.00290) 0.00406

H2-AR000036-1-4L10 (duplicate) AR000036 10-Jul-04 ND(0.00264) ND(0.00264) 0.00344 ND(0.00264) 0.00344

Notes:Notification Level: 0.05µg/m3

Action Level: 0.1µg/m3

* - Reported value may be biased high due to the instrument clock indicating instrument ran for only 17.9 hours1- See Figure 1 for locations

(Results are presented in µg/m3)

Table 10 - PCB Air Sampling Results July 2004 Monthly Report

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List.xls Page 18 of 29 8/10/2004

Page 29: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Preliminary analytical dataSubject to verification

Sample ID H2-AR000037-0-4U24Date Collected 7/24/2004

AnalytePhenol ND(22.22)bis(2-Chloroethyl) ND(4.44)2-Chlorophenol ND(22.22)1,3-Dichlorobenzene ND(4.44)1,4-Dichlorobenzene ND(4.44)1,2-Dichlorobenzene ND(4.44)2-Methylphenol ND(22.22)bis(2-Chloroisopropyl) ND(4.44)N-Nitroso-di-n-propylamine ND(4.44)4-Methylphenol/3-Methylphenol ND(22.22)Hexachloroethane ND(4.44)Nitrobenzene ND(4.44)Isophorone ND(4.44)2-Nitrophenol ND(22.22)2,4-Dimethylphenol ND(22.22)Benzoic ND(133.33)bis(2-Chloroethoxy) ND(4.44)2,4-Dichlorophenol ND(22.22)1,2,4-Trichlorobenzene ND(4.44)Naphthalene 255.564-Chloroaniline ND(44.44)Hexachlorobutadiene ND(4.44)4-Chloro-3-methylphenol ND(22.22)2-Methylnaphthalene 155.56Hexachlorocyclopentadiene ND(88.89)2,4,6-Trichlorophenol ND(22.22)2,4,5-Trichlorophenol ND(22.22)2-Chloronaphthalene ND(4.44)2-Nitroaniline ND(44.44)Dimethylphthalate ND(22.22)Acenaphthylene 20.002,6-Dinitrotoluene ND(22.22)3-Nitroaniline ND(44.44)Acenaphthene 54.442,4-Dinitrophenol ND(88.89)4-Nitrophenol ND(88.89)2,4-Dinitrotoluene ND(22.22)Dibenzofuran 20.00Diethylphthalate ND(22.22)Fluorene 30.004-Chlorophenyl-phenyl ND(4.44)

(Results are presented in µg/m3)

Table 11 - SVOC Air Sampling Results from Building 65July 2004 Monthly Report

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List.xls Page 19 of 29 8/10/2004

Page 30: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Preliminary analytical dataSubject to verification

Sample ID H2-AR000037-0-4U24Date Collected 7/24/2004

Analyte4-Nitroaniline ND(44.44)4,6-Dinitro-2-methylphenol ND(44.44)N-Nitrosodiphenylamine ND(44.44)4-Bromophenyl-phenyl ND(4.44)Hexachlorobenzene ND(4.44)Pentachlorophenol ND(88.89)Phenanthrene 16.67Anthracene ND(4.44)di-n-Butylphthalate ND(22.22)Fluoranthene ND(4.44)Pyrene ND(4.44)Butylbenzylphthalate ND(22.22)3,3'-Dichlorobenzidine ND(88.89)Chrysene ND(4.44)Benzo(a)anthracene ND(4.44)bis(2-Ethylhexyl)phthalate ND(22.22)Di-n-Octylphthalate ND(22.22)Benzo(b)fluoranthene ND(4.44)Benzo(k)fluoranthene ND(4.44)Benzo(a)pyrene ND(4.44)Indeno(1,2,3-c,d)pyrene ND(4.44)Dibenz(a,h)anthracene ND(4.44)Benzo(g,h,i)perylene ND(4.44)

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List.xls Page 20 of 29 8/10/2004

Page 31: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Preliminary analytical dataSubject to verification

Sample ID Date CollectedAroclor 1016, 1221, 1232, 1242, & 1248 Aroclor 1254 Aroclor 1260 Total PCBs

H2-XI000167-0-4L02 02-Jul-04 ND(1.5) 4.8 16.0 21.0*H2-XI000168-0-4L07 07-Jul-04 ND(0.5) ND(0.5) ND(0.5) ND(0.5)H2-XI000169-0-4L07 07-Jul-04 ND(0.5) ND(0.5) ND(0.5) ND(0.5)H2-XI000167-0-4L12 12-Jul-04 ND(0.5) ND(0.5) ND(0.5) ND(0.5)

Notes:PCB Action Level - 10.0 µg/100 cm2

ND(0.5) - Analyte was not detected. The value in parentheses is the associated detection limit.* - Sample results exceeded the PCB Action Level, the equipment was re-decontaminated and another sample was collected on 12-Jul-04.

(Results are presented in µg/100 cm2 )

Table 12 - Equipment Confirmatory Wipe Samples July 2004 Monthly Report

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List.xls Page 21 of 29 8/10/2004

Page 32: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Preliminary analytical dataSubject to verification

Sample ID H2-OT000157-0-4L15 H2-OT000158-0-4L15

Sample typestockpile material characterization

stockpile material characterization

Date Collected 07/15/2004 07/15/2004Stockpile Location Area 64C Area 64C

AnalytePCBSAROCLOR-1254 29.0 15.0AROCLOR-1260 7.6 4.0PCB, TOTAL 21.0 11.0

all Non-Detects all Non-Detects

BARIUM, TCLP LEACHATE (mg/l) .332 .32 CADMIUM, TCLP LEACHATE (mg/l) .0019 .0019 CHROMIUM, TCLP LEACHATE (mg/l) .0027 .0028

all Non-Detects all Non-Detects

all Non-Detects all Non-Detects

all Non-Detects all Non-Detects

CORROSIVITY BY PH 8.1 7.9IGNITABILITY (deg f) >150 >150PAINT FILTER LIQUIDS (ml) ABSENT ABSENT PERCENT SOLIDS (%) 83.0 86.4SULFIDE ND NDCYANIDE ND ND

Notes:Only detected constituents are summarizedND - not detected--- not sampled

(Results are presented in part per million, ppm)

TCLP HERBICIDES

TCLP PESTICIDES

Table 13 - Post Excavation Soil/ Sediment Stockpile Characterization Analytical ResultsJuly 2004 Monthly Report

Pittsfield, MAGE-Pittsfield/Housatonic River Project 1.5 Mile Removal Action

TCLP SEMIVOLATILES

TCLP VOLATILES

TCLP METALS

INORGANICS

G:/1.5 Mile/Monthly Reports/2004 July/July Table Master List Page 22 of 29 8/10/2004

Page 33: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Preliminary analytical dataSubject to verification

Sample ID H2-OT000153-0-4L06 H2-OT000154-0-4L06 H2-OT000155-0-4L06 H2-OT000156-0-4L06

Sample typestockpile material characterization

stockpile material characterization

stockpile material characterization

stockpile material characterization

Date Collected 07/06/2004 07/06/2004 07/06/2004 07/06/2004Stockpile Location Building 65 Building 65 Building 65 Building 65

Analyte

PCB, TOTAL 14.0 4.8 7.3 24.0AROCLOR-1254 2.4 J .73 J 1.1 J 6.1 JAROCLOR-1260 12.0 4.1 6.2 18.0

2-METHYLNAPHTHALENE 10 950 210 470 4-METHYLPHENOL .32 J ND ND ND ACENAPHTHENE 57 550 150 290 ACENAPTHYLENE 24 J 130 J 34 J 68 J ACETOPHENONE .72 J ND .42 J 1 J ANTHRACENE 80 360 110 190 BENZO(A)ANTHRACENE 82 240 J 80 130 J BENZO(A)PYRENE 59 180 J 62 J 110 J BENZO(B)FLUORANTHENE 40 J 94 J 34 J 66 J BENZO(GHI)PERYLENE 17 J 69 J 26 J 51 J BENZO(K)FLUORANTHENE 53 110 J 39 J 66 J CHRYSENE 66 220 J 67 120 J DIBENZO(A,H)ANTHRACENE 8.5 J 19 J 8.8 J 16 J DIBENZOFURAN 45 96 J 30 J 49 J FLUORANTHENE 180 470 160 270 FLUORENE 97 330 100 180 INDENO(1,2,3-C,D)PYRENE 21 J 60 J 22 J 40 J NAPHTHALENE 10 J 2000 370 910 PHENANTHRENE 260 1100 350 630 PHENOL .3 J ND ND ND PYRENE 160 550 180 320

ETHYL BENZENE ND 25 J 5.6 J 10 J M,P-XYLENE (SUM OF ISOMERS) .13 J 25 J 5.6 J 10 J NAPHTHALENE 11 2200 450 820 O-XYLENE ND ND 2.6 J ND XYLENES (TOTAL) .14 J 26 J 8.6 J 11 J

all Non-Detects all Non-Detects all Non-Detects all Non-Detects

BARIUM, TCLP LEACHATE (mg/l) .214 .218 .275 .422 CADMIUM, TCLP LEACHATE (mg/l) .0011 ND .001 .003 CHROMIUM, TCLP LEACHATE (mg/l) .0034 .0014 .0015 NDSILVER, TCLP LEACHATE (mg/l) .0028 ND ND ND

all Non-Detects all Non-Detects all Non-Detects all Non-Detects

all Non-Detects all Non-Detects all Non-Detects all Non-Detects

CORROSIVITY BY PH 8.2 8.3 8.2 8.0IGNITABILITY (deg f) >150 >150 >150 >150 PAINT FILTER LIQUIDS ABSENT ABSENT ABSENT ABSENTPERCENT SOLIDS (%) 89.6 84.8 88.2 84.3SULFIDE 8.9 11.8 8.9 ND(9.4)CYANIDE ND(0.43) ND(0.52) ND(0.54) 0.98Notes:Only detected constituents are summarizedND - not detected--- - not sampled

TCLP SEMIVOLATILES

TCLP VOLATILESINORGANICS

(Results are presented in part per million, ppm)

Table 14 - Cell 16/17 NAPL-Impacted Material Characterization Analytical ResultsJuly 2004 Monthly Report

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

TCLP HERBICIDES

TCLP METALS

TCLP PESTICIDES

APP IX VOLATILES

APP IX SEMIVOLATILES

PCBS

G:/1.5 Mile/Monthly Reports/2004 July/July Table Master List Page 23 of 29 8/10/2004

Page 34: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Preliminary analytical dataSubject to verification

Sample ID H2-OT000159-0-4L22a H2-OT000159-0-4L22b H2-OT000159-0-4L22c H2-OT000159-0-4L22d

Sample typestockpile material characterization

stockpile material characterization

stockpile material characterization

stockpile material characterization

Date Collected 07/22/2004 07/22/2004 07/22/2004 07/22/2004Stockpile Location Building 65 Building 65 Building 65 Building 65

Analyte

PCB, TOTAL 5.1 5.6 7.7 11.0AROCLOR-1254 1.1 1.4 1.7 2.5AROCLOR-1260 4.0 4.2 6.0 8.7

2-METHYLNAPHTHALENE --- --- --- ---4-METHYLPHENOL --- --- --- ---ACENAPHTHENE --- --- --- ---ACENAPTHYLENE --- --- --- ---ACETOPHENONE --- --- --- ---ANTHRACENE --- --- --- ---BENZO(A)ANTHRACENE --- --- --- ---BENZO(A)PYRENE --- --- --- ---BENZO(B)FLUORANTHENE --- --- --- ---BENZO(GHI)PERYLENE --- --- --- ---BENZO(K)FLUORANTHENE --- --- --- ---CHRYSENE --- --- --- ---DIBENZO(A,H)ANTHRACENE --- --- --- ---DIBENZOFURAN --- --- --- ---FLUORANTHENE --- --- --- ---FLUORENE --- --- --- ---INDENO(1,2,3-C,D)PYRENE --- --- --- ---NAPHTHALENE --- --- --- ---PHENANTHRENE --- --- --- ---PHENOL --- --- --- ---PYRENE --- --- --- ---

ETHYL BENZENE --- --- --- ---M,P-XYLENE (SUM OF ISOMERS) --- --- --- ---NAPHTHALENE --- --- --- ---O-XYLENE --- --- --- ---XYLENES (TOTAL) --- --- --- ---

--- --- --- ---

BARIUM, TCLP LEACHATE (mg/l) --- --- --- ---CADMIUM, TCLP LEACHATE (mg/l) --- --- --- ---CHROMIUM, TCLP LEACHATE (mg/l) --- --- --- ---SILVER, TCLP LEACHATE (mg/l) --- --- --- ---

--- --- --- ---

--- --- --- ---

CORROSIVITY BY PH --- --- --- ---IGNITABILITY (deg f) --- --- --- ---PAINT FILTER LIQUIDS --- --- --- ---PERCENT SOLIDS (%) 93.0 87.9 88.9 89.1SULFIDE --- --- --- ---CYANIDE --- --- --- ---Notes:Only detected constituents are summarizedND - not detected--- - not sampled

TCLP HERBICIDES

TCLP METALS

TCLP PESTICIDES

TCLP SEMIVOLATILES

TCLP VOLATILESINORGANICS

Table 14 - Cell 16/17 NAPL-Impacted Material Characterization Analytical ResultsJuly 2004 Monthly Report

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

(Results are presented in part per million, ppm)

PCBS

APP IX SEMIVOLATILES

APP IX VOLATILES

G:/1.5 Mile/Monthly Reports/2004 July/July Table Master List Page 24 of 29 8/10/2004

Page 35: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Preliminary analytical dataSubject to verification

Sample ID H2-OT000160-0-4L22 H2-OT000161-0-4L26 H2-OT000162-0-4L26 H2-OT000163-0-4L26 H2-OT000164-0-4L28A H2-OT000164-0-4L28B

Sample typestockpile material characterization

stockpile material characterization

stockpile material characterization

stockpile material characterization

stockpile material characterization

stockpile material characterization

Date Collected 07/22/2004 07/26/2004 07/26/2004 07/26/2004 07/28/2004 07/28/2004Stockpile Location Building 68 Building 63 Building 63 Building 63 Building 68 Building 68

AnalytePCB, TOTAL 18.0 2.6 4.9 11.0 26.0 19.0 AROCLOR-1254 7.1 .65 1.1 1.8 6.9 9.0AROCLOR-1260 11.0 1.9 3.8 9.4 19.0 10.0APP IX SEMIVOLATILES2-METHYLNAPHTHALENE 5.7 53 32 7.4 J --- ---ACENAPHTHENE 13 44 26 J 24 --- ---ACENAPTHYLENE 11 J 38 J 28 12 J --- ---ACETOPHENONE .45 J ND ND ND --- ---ANTHRACENE 41 76 44 33 --- ---BENZO(A)ANTHRACENE 41 60 33 30 --- ---BENZO(A)PYRENE 30 43 25 J 21 --- ---BENZO(B)FLUORANTHENE 26 27 J 14 J 13 J --- ---BENZO(GHI)PERYLENE 11 J 18 J 11 J 9.1 J --- ---BENZO(K)FLUORANTHENE 26 32 J 17 J 17 J --- ---CHRYSENE 35 50 27 J 25 --- ---DIBENZO(A,H)ANTHRACENE 5.3 6.9 J 3.4 J 3.2 J --- ---DIBENZOFURAN 19 21 J 8.8 J 8.5 J --- ---FLUORANTHENE 88 110 64 59 --- ---FLUORENE 42 57 35 25 --- ---INDENO(1,2,3-C,D)PYRENE 12 J 18 J 9.6 J 8.5 J --- ---NAPHTHALENE 4.6 J 14 J 32 6.8 J --- ---PHENANTHRENE 110 220 140 95 --- ---PYRENE 72 150 84 64 --- ---APP IX VOLATILES1,2,4-TRICHLOROBENZENE .0037 J ND ND ND --- ---1,3-DICHLOROBENZENE .0024 J ND ND ND --- ---2-BUTANONE .029 ND ND ND --- ---ACETONE .14 ND ND ND --- ---BENZENE .0078 ND ND ND --- ---CARBON DISULFIDE .0046 J ND ND ND --- ---CHLOROBENZENE .0031 J ND ND ND --- ---CHLOROFORM .0013 J ND ND ND --- ---CIS-1,2-DICHLOROETHENE .0013 J ND ND ND --- ---DIBROMOMETHANE .004 J ND ND ND --- ---ETHYL BENZENE .0057 .27 J .13 J ND --- ---M,P-XYLENE (SUM OF ISOMERS) .0099 .45 J .21 J ND --- ---METHYLENE CHLORIDE .0011 J ND ND ND --- ---NAPHTHALENE NA 15 13 2.8 --- ---

(Results are presented in part per million, ppm)

Table 14 - Cell 16/17 NAPL-Impacted Material Characterization Analytical ResultsJuly 2004 Monthly Report

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

G:/1.5 Mile/Monthly Reports/2004 July/July Table Master List Page 25 of 29 8/10/2004

Page 36: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Preliminary analytical dataSubject to verification

Sample ID H2-OT000160-0-4L22 H2-OT000161-0-4L26 H2-OT000162-0-4L26 H2-OT000163-0-4L26 H2-OT000164-0-4L28A H2-OT000164-0-4L28B

Sample typestockpile material characterization

stockpile material characterization

stockpile material characterization

stockpile material characterization

stockpile material characterization

stockpile material characterization

Date Collected 07/22/2004 07/26/2004 07/26/2004 07/26/2004 07/28/2004 07/28/2004Stockpile Location Building 68 Building 63 Building 63 Building 63 Building 68 Building 68

AnalyteO-XYLENE .0072 .17 J ND ND --- ---STYRENE ND .24 J ND ND --- ---TETRACHLOROETHYLENE(PCE) .006 ND ND ND --- ---TOLUENE .014 .18 J ND ND --- ---TRICHLOROETHYLENE (TCE) .0063 ND ND ND --- ---TRICHLOROFLUOROMETHANE .0011 J ND ND ND --- ---XYLENES (TOTAL) .017 .65 .22 J ND --- ---INORGANICSCORROSIVITY BY PH (ph) 7.9 8.2 8.6 8.1 --- ---IGNITABILITY (deg f) >150 >150 >150 >150 --- ---PAINT FILTER LIQUIDS (ml) ABSENT ABSENT ABSENT ABSENT --- ---PERCENT SOLIDS (%) 87.6 83.1 81.6 82.3 87.4 86.2 SULFIDE (mg/kg) ND ND ND ND --- ---CYANIDE (mg/kg) ND ND ND ND --- ---TCLP HERBICIDES

all Non-Detects all Non-Detects all Non-Detects all Non-Detects --- ---TCLP METALSBARIUM, TCLP LEACHATE (mg/l) .189 .216 .44 .463 --- ---CADMIUM, TCLP LEACHATE (mg/l) .00092 .00083 .00077 .00092 --- ---CHROMIUM, TCLP LEACHATE (mg/l) .0014 .0014 .0024 .0022 --- ---SELENIUM, TCLP LEACHATE (mg/l) .0068 .004 .0083 .0054 --- ---SILVER, TCLP LEACHATE (mg/l) .0029 ND ND ND --- ---TCLP PESTICIDES

all Non-Detects all Non-Detects all Non-Detects all Non-Detects --- ---TCLP SEMIVOLATILES

all Non-Detects all Non-Detects all Non-Detects all Non-Detects --- ---TCLP VOLATILES

all Non-Detects all Non-Detects all Non-Detects all Non-Detects --- ---

Notes:Only detected constituents are summarizedND - not detected--- - not sampled

G:/1.5 Mile/Monthly Reports/2004 July/July Table Master List Page 26 of 29 8/10/2004

Page 37: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Preliminary analytical dataSubject to verification

Sample ID H2-SE001547-0-4U17 H2-SE001548-0-4U23

Sample typeCell 17W, NAPL-impacted

sedimentCell 17W, NAPL-impacted

sedimentDate Collected 06/17/2004 06/23/2005

AnalyteAPP IX SEMIVOLATILES2-METHYLNAPHTHALENE 27000 23000 ACENAPHTHENE 14000 12000 ACENAPTHYLENE 2600 J 2800 ANTHRACENE 7000 J 6700 BENZO(A)ANTHRACENE 4700 J 4400 BENZO(A)PYRENE 4100 J 3800 BENZO(B)FLUORANTHENE 1800 J 1800 BENZO(GHI)PERYLENE 2000 J 1400 J BENZO(K)FLUORANTHENE 2300 J 2100 J CHRYSENE 4000 J 3800 DIBENZO(A,H)ANTHRACENE 240 340 J DIBENZOFURAN 1500 J 1500 FLUORANTHENE 9100 J 7700 J FLUORENE 7300 J 6100 INDENO(1,2,3-C,D)PYRENE 1400 J 1200 J NAPHTHALENE 79000 66000 PHENANTHRENE 25000 22000 PYRENE 11000 J 11000 SPECIFIC GRAVITY 1.0875 1.8608 APP IX VOLATILESETHYL BENZENE 650 5300 M,P-XYLENE (SUM OF ISOMERS) 460 4200 NAPHTHALENE 7800 79000 O-XYLENE 180 J 1700 J TOLUENE ND 1100 J XYLENES (TOTAL) 660 6000 PCBSPCB, TOTAL 13.0 4.0AROCLOR-1260 13.0 4.0

Notes:Only detected constituents are summarizedJ - Indicates as estimated valueND - not detected

(Results are presented in part per million, ppm)

Table 15 - NAPL-Impacted Sediment from Cell 17W Analytical ResultsJuly 2004 Monthly Report

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

G:/1.5 Mile/Monthly Reports/2004 July/July Table Master List.xls Page 27 of 29 8/10/2004

Page 38: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Preliminary analytical resultsSubject to verification

Field Sample ID H2-OT000141-0-4U24 H2-OT000142-0-4U24 H2-OT000143-0-4U23 H2-OT000144-0-4U23 H2-OT000145-0-4U29 H2-OT000146-0-4U29

Sample typeinsitu characterization

sampling (1)insitu characterization

sampling (1)insitu characterization

sampling (1)insitu characterization

samplinginsitu characterization

samplinginsitu characterization

sampling (1)Date Collected 06/24/2004 06/24/2004 06/23/2004 06/23/2004 06/29/2004 06/29/2004

Analyte

AROCLOR-1254 7.5 7.0 ND 2.0 ND 12.0AROCLOR-1260 57.0 47.0 57.0 14.0 18.0 55.0PCB, TOTAL 65.0 54.0 57.0 16.0 18.0 67.0

Notes:(1) Area represented by this sample is classified as TSCA material. Material to be transported to GE's Building 71 OPCAOnly detected constituents are summarizedND - not detected

Table 16 - Addititonal In-situ Riverbank Characterization Sampling Analytical ResultsJuly 2004 Monthly Report

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

PCBS

(Results are presented in part per million, ppm)

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List.xls Page 28 of 29 8/10/2004

Page 39: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

Preliminary analytical resultsSubject to verification

Field Sample ID H2-OT000147-0-4U24 H2-OT000148-0-4U24 H2-OT000149-0-4U24 H2-OT000150-0-4U24 H2-OT000151-0-4U29

Sample typeinsitu characterization

samplinginsitu characterization

sampling (1)insitu characterization

sampling (1)insitu characterization

samplinginsitu characterization

sampling (1)Date Collected 06/24/2004 06/24/2004 06/24/2004 06/24/2004 06/29/2004

Analyte

AROCLOR-1254 ND 11.0 7.3 3.8 8.9AROCLOR-1260 32.0 41.0 55.0 19.0 67.0PCB, TOTAL 32.0 52.0 62.0 23.0 76.0

Notes:(1) Area represented by this sample is classified as TSCA material. Material to be transported to GE's Building 71 OPCAOnly detected constituents are summarizedND - not detected

Table 16- Addititonal In-situ Riverbank Characterization Sampling Analytical ResultsJuly 2004 Monthly Report

GE-Pittsfield/Housatonic River Project 1.5 Mile Removal ActionPittsfield, MA

(Results are presented in part per million, ppm)

PCBS

G:/1.5 Mile/Monthly Reports/2004July/July Table Master List.xls Page 29 of 29 8/10/2004

Page 40: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

G:\1_5 Mile\Monthly Reports\2004\2004 July\July 2004 Monthly Report Photos.doc Page 1 of 3

Photograph 1 – Cell 16E, Excavated Riverbed ready for Power Washing

Photograph 2 – NAPL Excavation Activities in Deep Hole, Cell 16E

Page 41: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

G:\1_5 Mile\Monthly Reports\2004\2004 July\July 2004 Monthly Report Photos.doc Page 2 of 3

Photograph 3 – Cell 17E Completed Riverbed and Riverbank Excavation

Photograph 4 – High Pressure Washing/Vacuuming of NAPL-Stained Bedrock

Page 42: United States Environmental Protection Agency EPA New England … · 2020-03-17 · Surveying activities continued in Cells 16 and 17. ... the riverbed cobble material was transported

G:\1_5 Mile\Monthly Reports\2004\2004 July\July 2004 Monthly Report Photos.doc Page 3 of 3

Photograph 5 – Topsoil Placement in Cell 17W

Photograph 6 – Restored Riverbank in Cell 17W