university of california. web job order samantha brown co-developed with jennifer fish february 2014
TRANSCRIPT
![Page 1: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014](https://reader033.vdocuments.net/reader033/viewer/2022042821/56649d0d5503460f949e214b/html5/thumbnails/1.jpg)
Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation
UNIVERSITY OFCALIFORNIA
![Page 2: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014](https://reader033.vdocuments.net/reader033/viewer/2022042821/56649d0d5503460f949e214b/html5/thumbnails/2.jpg)
Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation
Web Job Order
Samantha Brown
Co-developed with Jennifer Fish
February 2014
![Page 3: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014](https://reader033.vdocuments.net/reader033/viewer/2022042821/56649d0d5503460f949e214b/html5/thumbnails/3.jpg)
Web Job Order | October 30th, 2012Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation
WJO - Introduction
The WJO is an integral part of the Engineering process flow as it bridges the gap between the design phases and the actual installation of components.
It requires integration with the Document Control Center upstream and procurement downstream. This tool allows engineers and designers a way of realizing their designs.
![Page 4: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014](https://reader033.vdocuments.net/reader033/viewer/2022042821/56649d0d5503460f949e214b/html5/thumbnails/4.jpg)
Web Job Order | October 30th, 2012Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation
WJO - Brief History
The precursor to the Web Job Order stems from a paper based form that engineers/designers would fill out prior to handing off to a procurement liaison.
Back in the late 1990s, an effort was made to convert the process to the digital realm by our centralized IT staff. This system, as it exists today, closely mimics the original paper form.
![Page 5: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014](https://reader033.vdocuments.net/reader033/viewer/2022042821/56649d0d5503460f949e214b/html5/thumbnails/5.jpg)
Web Job Order | October 30th, 2012Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation
WJO – Redevelop Decision
Core users identified need to replace existing interface
Cited reasons for upgrade:
• User interface dated and input mechanisms were tedious
• Attachments were prone to transfer failures• Document Control integration was wanting• Enables better tracking for projects, procurements,
fabrication, assembly, and installation• Better support since original development team in IT
dissolved• Opportunity to integrate the process better with our
workflow
![Page 6: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014](https://reader033.vdocuments.net/reader033/viewer/2022042821/56649d0d5503460f949e214b/html5/thumbnails/6.jpg)
Web Job Order | October 30th, 2012Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation
WJO – Unique Capabilities
• Tight integration with WBS of Engineering Fabrication projects through category codes
• Capture all labor and PO/Pcard costs under a single account number
• Enables better project accounting• Future project estimations generated from
WJO data• Utilize one interface for onsite or offsite fabrication• Extensive integration with Engineering’s Document
Control Center (a CAD neutral release repository) in addition to being an important hub in the design process
![Page 7: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014](https://reader033.vdocuments.net/reader033/viewer/2022042821/56649d0d5503460f949e214b/html5/thumbnails/7.jpg)
Web Job Order | October 30th, 2012Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation
WJO – Logistics
Both systems (the old & new interface) are currently live and running in parallel
![Page 8: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014](https://reader033.vdocuments.net/reader033/viewer/2022042821/56649d0d5503460f949e214b/html5/thumbnails/8.jpg)
Web Job Order | October 30th, 2012Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation
WJO - Demo
Live DemonstrationOf new WJO interface
![Page 9: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014](https://reader033.vdocuments.net/reader033/viewer/2022042821/56649d0d5503460f949e214b/html5/thumbnails/9.jpg)
Web Job Order | October 30th, 2012Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation
WJO – Current Status
• The new WJO is accessible at wjo2.lbl.gov• Both systems will continue to run in parallel for the
next month• Any JO started on either system requires completion
in the same system
• Beginning in October this year, the new WJO and all of the lab’s financial infrastructure will have significant changes (known as F$M)
Old WJO New WJO
UC12xxx UC20xxx
![Page 10: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014](https://reader033.vdocuments.net/reader033/viewer/2022042821/56649d0d5503460f949e214b/html5/thumbnails/10.jpg)
Web Job Order | October 30th, 2012Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation
WJO – Yet to be implemented
• Short Term Deliverables• Date Promised By (from Procurement)• RFQs• Clone JO
• Long Term Direction• Deeper integration with JobBOSS via the
B77 Shops• Management of QA documentation• Possible tie in with LBNL’s delivery
tracking system
![Page 11: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014](https://reader033.vdocuments.net/reader033/viewer/2022042821/56649d0d5503460f949e214b/html5/thumbnails/11.jpg)
Web Job Order | October 30th, 2012Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation
WJO – Q & A Session
Questions
old interface: wjo.lbl.govnew interface: wjo2.lbl.gov
Samantha Brown (x5640)Jennifer Fish (x2320)