University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration Vice President Plant Operations

Upload: raphael-masse

Post on 31-Mar-2015

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

University of HoustonFirst Annual

HUB/MWBE Construction Networking Event

July 24, 2007

Presenter:Dave IrvinVice Chancellor for Finance & AdministrationVice President Plant Operations

Page 2: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

2

Outline

1. UH System Campuses2. Plant Operations Website3. Advertising of Projects4. HUB (MBE, WBE, DBE) Participation5. Contractors6. Delivery Methods7. Professional Services8. Selection Process9. Campus Master Plan10. Recently Completed Projects11. Current Projects12. Upcoming Projects

Page 3: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

3

UH-System Groups

Page 4: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

4

Plant Operations Website

www.uh.edu/plantops

Page 5: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

5

Advertising of Projects Advertisements for design services ,

contractors and other services are posted on the Texas Market Place which is a part of the Texas Building and Procurement website.

The website address is http://esbd.tbpc.state.tx.us/

On the pull down menu, select : “University of Houston 730” for the Main campus “University of Houston – Clear Lake 759” “University of Houston – System 783” “University of Houston – Downtown 784” or “University of Houston – Victoria 765”

The Texas Market Place is a bid website for all of the Texas state agencies.

Page 6: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

6

HUB Participation

The University has a goal of 40% HUB participation on all construction projects and a HUB mix that reflects the cultural diversity of our city.

The University can provide assistance with getting state HUB certification, however certification is not required.

We accept certifications of other state and local agencies.

Outreach to HUB contractors, vendors and professional service providers is made through contact with HUB professional organizations, plan rooms and special events.

Page 7: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

7

Upcoming Special HUB EventA special HUB/MWBE networking event targeting architects, engineers and other construction related consultants will take place in October at the UH Hilton Hotel located on the Main campus. The date is still to be determined. Opportunities to work on future projects will be discussed.

Page 8: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

8

HUB Participation Contacts Dilip Anketell

Executive DirectorFacilities Planning & Construction

Allison E. Bell Director of Capital Projects AdministrationFacilities Planning & Construction

William P. McKinney HUB Project Manager Facilities Planning & Construction

Diedra Sutton Consultant Procurement Technical Assistance CenterUH Small Business Development Center

Sandra Webb HUB Program ManagerUH Main Campus

Page 9: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

9

Job Order Contractor Program

UH uses JOCs to complete projects under $1,000,000. Projects generally range in size from a few thousand to a few hundred thousand dollars.

Some JOCs are used as general contractors and other are for special projects only.

Contracts are issued on a 1-year basis with an option for renewal for an additional year.

We currently have 9 general JOCS and 3 specialty JOCs.

Page 10: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

10

Delivery Methods

Design Build

Design – Bid – Build (Traditional)

CM – @ Risk

Page 11: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

11

Contractors for Major Projects

Design/Build The contractor/design firm is chosen by a two step

RFQ then RFP process.

Design – Bid – Build Competitive Sealed Proposal The contractor is chosen using a “best value” method

based on published criteria and on its ranking evaluation.

Construction Manager at Risk The contractor may be chosen by a two step RFQ

then RFP process OR by a one step RFP process.

Page 12: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

12

A/E and Other Professional Services for Minor Projects

The several design firms are chosen by an RFQ process.

As projects become available, firms are chosen from an approved list as needed.

Page 13: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

13

A/E and Other Professional Services for Major Projects

Design/Build The contractor/design firm is chosen by a

two step RFQ then RFP process.

Other Delivery Methods The design firm is chosen by an RFQ.

Page 14: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

14

Selection Process

The criteria for selection are included in each RFQ or RFP.

A committee of FPC staff reviews the submissions and makes recommendations to a project building committee.

The project building committee interviews a short-listed group of responders and forwards its recommendations to the Vice Chancellor.

Page 15: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

15

Campus Framework Plan

A link to the framework plan is on the Plant Operations website. These items can be viewed from there.

UH Framework Plan Lecture Hall Presentation Calhoun Lofts Presentation

Framework Plan Update BOR Approved Framework Plan

Framework Plan Executive Summary Video Presentation

Page 16: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

16

Page 17: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

17

Open Space

Page 18: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

18

Open Space Framework Preserve and enhance the existing Open

Space Framework of courtyards, lawns, and groves

Respect and extend pedestrian corridors and paths to enhance wayfinding

Utilize existing courtyard scale to develop new campus places

Link the University with the surrounding neighborhood

Extend the Brays Bayou Park System into the campus

Continue Lighting/Security Program

Page 19: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

19

Transportation Framework Develop a loop road connecting

Calhoun Road and Elgin Street Extend the campus core by

closing Cullen Boulevard Accommodate growth through

conveniently located parking structures

Integrate Metro Light Rail, BRT, and buses into campus with an inter-modal station on Scott Street

Incorporate the University Shuttle to link all transportation framework elements

Page 20: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

20

Parking Garage Data

Page 21: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

21

Development Framework

Increase on-campus residential population to 24% and distribute across campus

Allow for growth to 41,000 students and 12.2M SF

Provide limited infill opportunities integrated in the inner campus core

Develop four perimeter precincts for current and future initiatives

Construct mixed use development

unique to each precinct

Page 22: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

22

Arts Precinct

Page 23: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

23

Professional Precinct

Page 24: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

24

Wheeler Precinct

Page 25: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

25

Stadium Precinct

Garage 2

Garage 1

Page 26: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

26

Recently Completed ProjectsUH Main

Welcome Center & Parking Garage (2006) Bayou Oaks Student Housing Expansion (2006) Bayou Oaks Student Housing (2005) Science & Engineering Building (2005) M.D. Anderson Library Expansion (2004) Cullen Oaks Student Housing (2004)

UH Downtown Commerce Street Building (2004) Academic Building & Garage (2007)

UH Clear Lake Student Services & Classroom Building (2004)

Page 27: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

27

Recent major projects

Recently Completed Projects

Page 28: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

28

Current ProjectsUH Sugar Land – Academic Building Architect: Archi*Technics/3 + PageSoutherlandPage Contractor: Skanska USA Building $35M Expected construction start – September 2007

UH Main – Calhoun Lofts Design/Build - Pepper Lawson & Kirksey $100M Expected construction start – September 2007

UH Main – Cemo Lecture Hall & Academic Center Architect: RFQ responses due August 15, 2007 Contractor: RFQ will be posted in August $9M Expected construction start – TBD

Page 29: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

29

Current Projects

Page 30: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

Upcoming Major Projects

UH Main Campus Renovation to Science Buildings - $57.6M New Art Museum - $16M Parking Garage - $12M

UH Victoria Economic Coalition – $8M Allied Health - $2M

UH Clear Lake Renovation of Arbor Building – $11.5 M Pearland Campus – $10.8 M

Page 31: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

Potential Major Projects

UH Main Engineering Building Optometry Addition College of Business Addition Music Building Cougar Walk Scott Place

UH Victoria Economic Coalition Allied Health

UH Clear Lake Renovation of Arbor Building Pearland Campus

UH Sugar Land Economic Development Building

Page 32: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

32

Facilities Planning & Construction, better known as FPC, is located at 4211 Elgin on the second floor of the General Services Building.

Page 33: University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration

33

Questions

?