Update of master schedule and report from SLAC
G. Riddone2008.10.08
Master Schedule
• See EDMS#844300, v3- Status- Master schedule by test station and by types- Rf components
T18 - Alignment
• Optical measurement (from two sides) ex. T18#4 (OD 45 mm)
T18 - Bonding
T18_vg2.4_disk_4Before bonding- OD 45 mm- 2 tuning holes per cell only
Then - Brazing of the couplers- Brazing of the studs
Tuning C10 – KEK drawing
Tuning C10
2. stud: the disk is systematically equipped with studs3. The tube ends at the tread part of the stud. TK of the tube is not defined
Tuning C10
Test set-up for tuningPosition for “pulling”
Sliding hammer to push and pullDisks with
tuning studs
Structure cell with 45° WG
Symmetrical disk
No tuning was implemented
NLCTA – T18 reverse and T26