Update on Rail Projects Boineelo Shubane Acting Director Engineering

Upload: others

Post on 08-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers

Update on Rail Projects

Boineelo Shubane

Acting Director Engineering

Page 2: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers

Background

Botswana Railways (BR) is agovernment enterprise establishedthrough an act of parliament (BR Act1986; Amended in 2004)

Mandated to provide transportation ofgoods and passengers withinBotswana, efficiently, safely and cost-effectively, along sound commerciallines.

Amendment of the Act provides for BRto form Joint Ventures, Subsidiarycompanies and to exploit otherbusiness opportunities

Page 3: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers

Current Infrastructure

Track Infrastructure• Total network 900 km

• Mainline 640 km

• Cape gauge (1067 mm)

• Capacity: 4.5 million tons per annum

• Branch lines 260 km

• Sua branch line 174 km

• Selibe-Phikwe branch line 56 km

• Morupule branch line 16 km

• Tshele branch line (heavy haul) 14 km

Page 4: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers

Continued…

Motive Power

LOCO ROAD ID # IN FLEET HORSEPOWER

BD 1 4 2150

BD 2 20 2250

BD 3 10 1800

BD 5 8 3300

BD 6 3 3300

45

Page 5: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers

Continued…Carriage & Wagon

WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS

BCV Covered Van 88 General goods

BOH Coal Hoppers 35 Coal

BPT Petroleum Tankers 79 Diesel/Petrol

BHS High Sided 197 General Goods

BDS Drop sided 284 General Goods

BSA Soda Ash 128 Soda Ash

BSO-1 Salt Wagons 290 Salt/coal

BOH-1 Open Hoppers 34 Coal

BDS-1 Drop sided 34 General goods

BHS-1 High Sided 204 Salt/coal

Page 6: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers

Development Projects

Mosetse-Kazungula Rail Line

B O T S W A N A

Mosetse-Kazungula: 367 km- Provides a line from Mosetse, connecting to Zambia and beyond

through the Kazungula bridge.

- Rail line is part of the North South Corridor (NSC)

Project Benefits

- Gate-way to North African markets promoting inter regional trade

- Connects North African region to maritime ports in South Africa

- Reduction of haulage traffic on roads

- Opportunity for tourism industry – Tourist trains

- Alternative transport mode for Agricultural products from Pandamatenga Farms in Botswana

Project Characteristics

Project Status

- Feasibility study tender floating

Page 7: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers

Development ProjectsMmamabula-Lephalale Rail Line

B O T S W A N A

Mmamabula-Lephalale: 56 km

Project Benefits

Project Status

Project Characteristics

- Over 200 billion tons coal deposits found in Botswana (at least two thirds of Africa’s coal resource)

- Project aims to link these coal deposits to South African heavy haul lines ( Limpopo Province)

- Line connects Mmamabula/Dibete in Botswana to Lephalale in South Africa

- Need to build a bridge across Limpopo River

- Feasibility study tender floating

- Gate way to South African ports for the coal market

- Shortest route for NSC if coupled with Mosetse-Kazungula line

- Employment opportunities for region.

- Alternative route into South Africa from BR line, which is a single line with a capacity of 4.5 million tons per annum.

Page 8: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers

Projects cont… Rail lines comparison

Page 9: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers

Development Projects Ponte Techobanine Rail Line

1,100 kmProject Benefits

Project Characteristics

- Botswana, Zimbabwe and Mozambique governments intend to construct an alternative route to the deep sea port of Techobanine.

- The project is aimed at assisting Botswana to evacuate the coal resources to the port

- The missing link will take off from Selibe Phikwe in Botswana and connect to Rutenga in Zimbabwe and proceed to Techobanine through the Chicualacuala line.

- First 600 km to Rutenga is a new line while the rest of the line is an upgrade to a heavy haul line.

- The line will facilitate export of coal from Botswana

- Alternative route for Botswana on import of petroleum products

- Line forms part of the NSC if coupled with Mosetse-Kazungula rail line

Page 10: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers

Ponte Techobanine Rail Line

Project Status

- Discussions between the three states are on-going

Page 11: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers

Development Projects Rolling Stock Maintenance & Refurbishment Facility

Project Benefits

Project Status

Project Characteristics

- The purpose of the facility is to undertake running maintenance, out of course repairs as well refurbishment programs for rolling stock

- The project is also aimed to help eliminate maintenance backlog

- The estimated required area 34,000 m2

- Acquisition of land to be concluded this month

- PMO working on a business plan

- Maintenance cost reduction

- Improved asset/equipment availability

- Employment creation

- Skills development/transfer

Page 12: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers

Thank you