Page 1: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

Update on Results of Long-term Traffic Noise

Measurements for Pavement Overlay Projects

James A. Reyff

Illingworth & Rodkin, Inc.

2006 Summer Meeting TRB ACD40

Williamsburg, VA

Page 2: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

Study Results Summarized

• I-80 Davis OGAC – 8 years

• State Route 138, Los Angeles County –

3+ years

• ADOT Pilot Studies – 2+ years

Page 3: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

I-80 Pavement Project

Location: I-80 just east of Davis and west of Sacramento, CA

Traffic: 1998 - 120,000 ADT (almost 10% trucks)2004 - 135,000 ADT

• Existing - Aged AC surfacing• DGAC (60mm) applied in June 1998• OGAC (25 mm) applied in July 1998

Page 4: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

I-80 Environment

Page 5: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

Existing AC Pavement

Page 6: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

6 Year Old OGAC

Page 7: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

I-80 Davis 8yr Findings

65

70

75

80

85

Measurement Condition

No

ise L

evel (d

BA

)

Meas WB Leq TNM Modeled

Page 8: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

I-80 Davis 7yr Findings

Seasonal Effect

65

70

75

80

Age of Pavement

Ave

rag

e M

easu

red

No

ise

Lev

el,

(dB

A)

Summer 78.6 72.8 73.3 73.7 73.3 73.7 74.6 74.8 75.1

Winter 74.2 73.9 74 74.6 75.1 75.1 75.7

Old AC

New 0.5yr 1 yr 1.5yr 2 yr 2.5yr 3 yr 3.5yr 4 yr 4.5yr 5 yr 5.5yr 6 yr 6.5yr 7 yr

Page 9: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

I-80 Davis 8yr FindingsCalculated Reduction from Baseline

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Age of Pavement

De

cre

as

e in

No

ise

Le

ve

l fr

om

Ba

se

lin

e C

on

dit

ion

, (d

BA

)

WB Reference 78.6 6.1 6.4 6.0 5.9 5.9 5.9 4.5 5.1 4.3 4.7

New OGAC

1 Mo. Aug

1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year

Page 10: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

I-80 Davis 8yr FindingsTire/Pavement Sound Intensity

96

98

100

102

104

106

108

Sep 02 Apr 03 Jun 04 Dec 04 Apr 05 Jun 05 Dec 05 Apr 06 Jun 06

So

un

d In

ten

sity

Lev

el, d

BA

Page 11: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

Frequency Spectra – 20m

7 Year Baseline

45

50

55

60

65

70

75

1/3rd Octave Center Frequency (Hz)

Noi

se L

evel

(d

BA

)

Baseline

1-Month

1-Year

2-Year

3-Year

4-Year

5-Year

6-Year

7-Year

8-Year

Page 12: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

35

40

45

50

55

60

65

No

ise L

ev

el

(d

B)

35

40

45

50

55

60

65

1/3rd Octave Center Frequency (Hz)

No

ise L

ev

el

(d

B)

Baseline 1-month 1 Year 2 Year 3 Year 5 Year 6 Year 7 Year 8 Year

Frequency Spectra – 145m

8 Year

BaselineDOWNWIND

UPWIND8 Year Baseline

Page 13: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

LA 138 Pavement Research• Research Site est. 2002• Two Measurement Techniques

– Statistical Passby– Onboard Tire/Pavement Sound

Intensity

• 5 Pavements types– DGAC– Thick OGAC (75mm)– Thin OGAC (30mm)– RAC– BWC

Page 14: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

LA 138 Results

• Initial results documented by Volpe and Caltrans (Illingworth & Rodkin)

• Initial levels up to 4 dBA lower than DGAC with Thick OGAC and RAC quietest

• Regular testing of Tire/pavement sound intensity – spring and fall

Page 15: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

LA 138 Results

0

1

2

3

4

5

6

7

8

OGAC - 75mm OGAC - 30mm RAC BWC

Red

uct

ion

in

No

ise

Lev

el,

dB

re

DG

AC

Passby at 25 ftPassby at 50 ftTire Intensity

Page 16: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

LA 138 Results

SI Level – Eastbound SR 138

94

95

96

97

98

99

100

101

102

103

DGAC OGAC (75mm) OGAC (30mm) RAC BWC

Ove

rall

So

un

d In

ten

sity

Lev

el, d

BA

94

95

96

97

98

99

100

101

102

103

DGAC OGAC (75mm) OGAC (30mm) RAC BWC

Oct-02 Mar-03

Jul-03 Oct-03

Apr-04 Jan-05

Apr-05 Jun-05

Oct-05

Page 17: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

Results of the Arizona Quiet Pavement Program – Sites 3D and 3E

Page 18: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

Site 3D – AZ Route 202

 

Random Transverse Tined PCC

ARFC

Page 19: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

250ft x 5ft50ft x 12ft & 5ft

100ft x 5ft

Site 3D Measurements

Page 20: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

Site 3D Results – Leq

 

55

60

65

70

75

80

85

90

10:0

0

10:3

0

11:0

0

11:3

0

7:25

7:55

8:25

8:55

9:05

9:35

10:0

5

10:3

5

9:00

9:30

10:0

0

10:3

0

Time of Day

So

un

d P

ress

ure

Lev

el, d

BA

50ft/12ft

50ft/5ft

100ft/5ft

250ft/5ft

Oct. 16, 2004 Oct. 17, 2004Oct. 05, 2003

Post Overlay

Oct. 06, 2003

Pre Overlay

Downwind

Downwind Downwind

Downwind

AM Rush Hour

Page 21: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

3D Results – Normalized for Traffic

Position

Measured Modeled

ChangePre Post Pre Post

50 ft/12ft 84.3 70.9 75.1 74.1 -12.4

50ft / 5ft 83.2 70.9 75.2 74.2 -11.3

100ft / 5ft 76.8 65.6 72.8 71.8 -10.1

250ft / 5ft 68.9 59.7 68.0 66.9 -8.1

Page 22: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

3D Results – Leq Data

60

65

70

75

80

85

90

10:0

0

11:2

0

7:40

8:45

10:0

5

9:25

9:30

10:5

0

9:55

9:00

10:2

0

9:40

9:00

10:2

0

9:40

Time of Day

Sou

nd P

ress

ure

Leve

l, dB

A

50ft/12ft 50ft/5ft 100ft/5ft 250ft/5ft

October 2004 March 2006

April 2004

Post Overlay

October 2005

Pre Overlay

March 2005

Page 23: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

Site 3E – AZ Route 101

 Uniform Transverse Tined PCC

ARFC

Page 24: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

Site 3E – Measurements

 

100ft x 5ft

50ft x 12ft & 5ft

100ft x 5ft

Page 25: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

Site 3E Results – Leq

 

60

65

70

75

80

85

90

9:00

9:30

10:0

0

10:3

0

9:25

9:55

10:2

5

10:5

5

9:20

9:50

10:2

0

10:5

0

9:30

10:0

0

10:3

0

11:0

0

Time of Day

So

un

d P

ress

ure

Lev

el, d

BA

50ft/12ft

50ft/5ft

100ft/5ft

Oct. 19, 2004 Oct. 20, 2004April 06, 2004

Post Overlay

April 07, 2004

Pre Overlay

Downwind Downwind DownwindDownwind

Page 26: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

3E Results – Normalized for Traffic

Position

Measured Modeled

ChangePre Post Pre Post

50 ft/12ft 84.2 74.9 80.2 79.8 -9.0

50ft / 5ft 81.6 73.2 79.9 79.8 -8.3

100ft / 5ft 78.6 69.8 76.9 76.8 -8.7

Page 27: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

3E Results – Leq Data

60

65

70

75

80

85

90

9:00

9:20

9:40

10:0

0

10:2

0

10:4

0

9:00

9:20

9:40

10:0

0

10:2

0

10:4

0

9:00

9:20

9:40

10:0

0

10:2

0

10:4

0

9:15

9:35

9:55

10:1

5

10:3

5

10:5

5

9:15

9:35

9:55

10:1

5

10:3

5

10:5

5

9:00

9:20

9:40

10:0

0

10:2

0

10:4

0

9:00

9:20

9:40

10:0

0

10:2

0

10:4

0

9:00

9:20

9:40

10:0

0

10:2

0

10:4

0

Time of Day

So

un

d P

ress

ure

Lev

el,

dB

A

50ft/8.7ft

50ft/5ft

100ft/5ft

October 2004 March 2006

April 2004

Post Overlay

October 2005

Pre Overlay

Page 28: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

Sound Level vs. DistanceMeasured PCC and ARFC

55

60

65

70

75

80

85

10 100

Distance from Near Travel Lane (meters)

Sou

nd P

ress

ure

Leve

l, dB

A

Measured ARFC Measured PCC

Page 29: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

Sound Level vs. DistanceMeasured and Modeled

55

60

65

70

75

80

85

10 100

Distance from Near Travel Lane (meters)

Sou

nd P

ress

ure

Leve

l, dB

A

Measured ARFC Modeled (Hard Ground) Modeled (Field Grass) Measured PCC

Page 30: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

250ft x 5ft50ft x 12ft & 5ft

100ft x 5ft

Site 3D Measurements

Page 31: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

Equivalent Noise Barrier Performance

Site at 100 ft

Measured Noise

ReductionNoise Barrier

Height

Site 3D 10 dBA 3.6m (12 ft)

Site 3E 9 dBA 3.0m (10 ft)

Page 32: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

I-280 San Mateo

• Existing PCC surface

• PCC and Rubberized Open Grade

• Onboard Tire/Pavement Sound Intensity

Page 33: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

Initial Results for I-280

0

1

2

3

4

5

6

7

Reduction by OGRA Reduction by TexturedGrinding PCC

Reduction by RegularGrinding PCC

Re

du

cti

on

in

So

un

d I

nte

nsi

ty L

ev

el,

dB

Page 34: Update on Results of Long- term Traffic Noise Measurements for Pavement Overlay Projects James A. Reyff Illingworth & Rodkin, Inc. 2006 Summer Meeting

Results for I-280 after 3 yrs

92

94

96

98

100

102

104

106

SB RAC(0) SB PCC SB PCC NB PCC NB PCC NB RAC(0)

So

un

d In

ten

sit

y L

ev

el,

dB

A

Existing PCC

2002

2005