update pi-swerl sampling on owens lake maarten schreuder, air sciences inc. 3/17/2010 maarten...

18
Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010

Upload: arthur-owen

Post on 04-Jan-2016

223 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010 Maarten Schreuder, Air Sciences Inc. 3/17/2010

UpdatePI-SWERL Sampling on

Owens Lake

UpdatePI-SWERL Sampling on

Owens Lake

Maarten Schreuder, Air Sciences Inc.3/17/2010

Maarten Schreuder, Air Sciences Inc.3/17/2010

Page 2: Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010 Maarten Schreuder, Air Sciences Inc. 3/17/2010

OutlineOutline

• Background• Updates to Sampling Plan

Field Sampling Calibration

• Schedule for Current Dust Season

• Background• Updates to Sampling Plan

Field Sampling Calibration

• Schedule for Current Dust Season

Page 3: Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010 Maarten Schreuder, Air Sciences Inc. 3/17/2010

Background - TimelineBackground - Timeline

07/08 - PI-SWERL first discussed with Panel05/09 - First test on Owens Playa09/09 - Field demonstration with Panel and

District11/09 - Panel§ recommended development of

PI-SWERL sampling plan12/09 - Draft sampling plan presented to

Panel and District

1/10 - Updated sampling plan distributed to Panel and District

07/08 - PI-SWERL first discussed with Panel05/09 - First test on Owens Playa09/09 - Field demonstration with Panel and

District11/09 - Panel§ recommended development of

PI-SWERL sampling plan12/09 - Draft sampling plan presented to

Panel and District

1/10 - Updated sampling plan distributed to Panel and District

§ Expert Panel Position Statement, Nov. 10, 2009

Page 4: Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010 Maarten Schreuder, Air Sciences Inc. 3/17/2010

Updates to Sampling Plan-Field Measurements-

Updates to Sampling Plan-Field Measurements-

Page 5: Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010 Maarten Schreuder, Air Sciences Inc. 3/17/2010

Field Sampling ApproachesField Sampling Approaches

• Routine sampling• Event sampling• Instrument comparison

• Routine sampling• Event sampling• Instrument comparison

Page 6: Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010 Maarten Schreuder, Air Sciences Inc. 3/17/2010

Routine SamplingRoutine Sampling

• Study Area 1 and Study Area 3• Monthly sampling• Sampling time: 1 day per area• Up to 25 sampling points per

area• Approx. one sample per 15

acres (~250x250 m)• Co-locate several points with

District Sensits

• Study Area 1 and Study Area 3• Monthly sampling• Sampling time: 1 day per area• Up to 25 sampling points per

area• Approx. one sample per 15

acres (~250x250 m)• Co-locate several points with

District Sensits

Page 7: Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010 Maarten Schreuder, Air Sciences Inc. 3/17/2010

Routine SamplingRoutine Sampling

Study Area 1

Study Area 3

Page 8: Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010 Maarten Schreuder, Air Sciences Inc. 3/17/2010

Event SamplingEvent Sampling

• Sampling across borders of delineated areas

• Sampling within 5 days of wind event• Sampling time: 1 day per area• Up to 25 sampling points per area• Two or three transects per area• Co-locate several points with District

Sensits (where possible)

• Sampling across borders of delineated areas

• Sampling within 5 days of wind event• Sampling time: 1 day per area• Up to 25 sampling points per area• Two or three transects per area• Co-locate several points with District

Sensits (where possible)

Page 9: Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010 Maarten Schreuder, Air Sciences Inc. 3/17/2010

Event SamplingEvent Sampling

Page 10: Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010 Maarten Schreuder, Air Sciences Inc. 3/17/2010

Instrument ComparisonInstrument Comparison

PI-SWERL District wind tunnel

MRI wind tunnel

Page 11: Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010 Maarten Schreuder, Air Sciences Inc. 3/17/2010

Instrument ComparisonInstrument Comparison

• Recommended by Panel• Two or three sampling locations,

representing different soil/surface types• Main criteria:

Surface emissivity (high/intermediate/low) Accessibility

• Sampling time: up to 1 day per site• Instruments:

MRI tunnel (N=4) District tunnel (N=4) PI-SWERL (N=8)

• Recommended by Panel• Two or three sampling locations,

representing different soil/surface types• Main criteria:

Surface emissivity (high/intermediate/low) Accessibility

• Sampling time: up to 1 day per site• Instruments:

MRI tunnel (N=4) District tunnel (N=4) PI-SWERL (N=8)

Page 12: Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010 Maarten Schreuder, Air Sciences Inc. 3/17/2010

Updates to Sampling Plan-Calibration-

Updates to Sampling Plan-Calibration-

Page 13: Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010 Maarten Schreuder, Air Sciences Inc. 3/17/2010

Calibration of OGSCalibration of OGS

• Need: Conversion of Optical Gate Sensors (OGS) output to a mass-based sand flux

• Several options available: Use recent progress by DRI/DustQuant in

calibrating OGS output to total sand mass Calibrate OGS in PI-SWERL to mass-based

sand flux in MRI tunnel Place OGS devices inside the MRI tunnel for

real-time calibration

• Preferred option to be determined

• Need: Conversion of Optical Gate Sensors (OGS) output to a mass-based sand flux

• Several options available: Use recent progress by DRI/DustQuant in

calibrating OGS output to total sand mass Calibrate OGS in PI-SWERL to mass-based

sand flux in MRI tunnel Place OGS devices inside the MRI tunnel for

real-time calibration

• Preferred option to be determined

Page 14: Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010 Maarten Schreuder, Air Sciences Inc. 3/17/2010

Calibration of DustTrakCalibration of DustTrak

• Need: Calibration factor(s) for DustTrak specific to Owens Lake material

• Two or three representative soil types

• 1O option: Procedure proposed by Jack Gillies§

• 2O option: Compare DustTrak filter mass with real-time output

• Need: Calibration factor(s) for DustTrak specific to Owens Lake material

• Two or three representative soil types

• 1O option: Procedure proposed by Jack Gillies§

• 2O option: Compare DustTrak filter mass with real-time output

§ Expert Panel Position Statement, March 12, 2010

Page 15: Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010 Maarten Schreuder, Air Sciences Inc. 3/17/2010

Schedule for Current Dust Season

Schedule for Current Dust Season

Page 16: Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010 Maarten Schreuder, Air Sciences Inc. 3/17/2010

Original Time ScheduleOriginal Time Schedule

Task Planning Data Collection

Data Analysis

Report Preparation

Routine Sampling

3/2010

Through 8/2010

10/2010 12/2010

Event Sampling

Through 6/2010

Instrument Cross Comparison

6/2010

PI-SWERL Calibration

Through 7/2010

Page 17: Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010 Maarten Schreuder, Air Sciences Inc. 3/17/2010

Updated ScheduleUpdated Schedule

• Utilize remainder of current dust season for planning and coordination.

• Realistic schedule: Instrument calibration: starting Fall

2010 Cross comparison: 2010-2011 dust

season Field sampling: 2010-2011 dust season

• Collaboration with the District would speed the process and lead to a more acceptable end product.

• Utilize remainder of current dust season for planning and coordination.

• Realistic schedule: Instrument calibration: starting Fall

2010 Cross comparison: 2010-2011 dust

season Field sampling: 2010-2011 dust season

• Collaboration with the District would speed the process and lead to a more acceptable end product.

Page 18: Update PI-SWERL Sampling on Owens Lake Maarten Schreuder, Air Sciences Inc. 3/17/2010 Maarten Schreuder, Air Sciences Inc. 3/17/2010