updated cv 2016

5
CRUZ RUEL MAGTANGOL DELA CRUZ Position ARCHITECTURAL COORDINATOR Educational Background June 1982-March 1987 FAR EASTERN UNIVERSITY Bachelor of Science in Architecture June 1978-March 1982 ST. PAUL COLLEGE Secondary June 1971-March1978 ST. PAUL SCHOOL Primary Personal Profile Nationality: Filipino Birth Date: 19 April 1965 Birth Place: Manila, Philippines Height: 5’7” Weight: 185 lbs Gender: Male Civil Status: Separated Singapore Address: 10 Rivervale Link #10-19 Singapore 545044 Tel : +65 98304324 E-mail : [email protected]

Upload: ruel-magtangol-cruz

Post on 14-Apr-2017

146 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: updated CV 2016

CRUZ RUEL MAGTANGOL DELA CRUZ Position ARCHITECTURAL COORDINATOR Educational Background June 1982-March 1987 FAR EASTERN UNIVERSITY Bachelor of Science in Architecture June 1978-March 1982 ST. PAUL COLLEGE Secondary June 1971-March1978 ST. PAUL SCHOOL Primary Personal Profile Nationality: Filipino Birth Date: 19 April 1965 Birth Place: Manila, Philippines Height: 5’7” Weight: 185 lbs Gender: Male Civil Status: Separated

Singapore Address: 10 Rivervale Link #10-19 Singapore 545044 Tel : +65 98304324 E-mail : [email protected]

Page 2: updated CV 2016

Experience 3 November 2014 to present Daewoo E&C Architectural Coordinator The Scotts Tower Assist project manager and architectural managers in implementing finishing works for high end condominium. Attend technical meeting to resolve issues on site specially finishes for landscaping, glazing facade, stone claddings, doors and windows schedules, painting works, cutting lists for marble, common area, termination of finishes and resolve discrepancies on site Check shop drawings done by sub-cons for submission and approval by the consultants. Submit samples of finishes for approval. Prepare planning schedule on when to execute the architectural finishes. Coordinate with the QS regarding the quantities and schedule of deliveries of finishes. May 2013 to present Yong Xing Construction Pte Ltd Sr Architectural Coordinator Indian Heritage Centre Assist Project Manager, Site Managers, M&E Coordinator and Site Supervisors in implementing architectural finishing works Attend technical meeting to resolve issues on site specially finishes for landscaping, glazing façade, aluminum cladding, external stone cladding using mechanical fixing brackets, doors and windows schedules, painting works, cutting lists for natural stones such as granites and marbles. Check shop drawings done by sub-cons for submission and approval by the consultants. Submit samples of finishes for approval. Prepare planning schedule on when to execute the architectural finishes using primavera software. Coordinate with the QS regarding the quantities and schedule of deliveries of finishes. May 2012 to May 2013 SEF Construction Pte Ltd Senior Architectural Coordinator/ QAQC Westin Hotel Singapore Review all materials as per consultants specification and requirements for ID works for Hotel Ballroom, Hotel Guest Lounge, Hotel spa ant treatment rooms, Guest Rooms, etc. Attend technical meetings regarding project issues such as discrepancies, termination of finishes for stone works, joineries, ceiling works, lighting designs, wall coverings furniture, tiling works, glazing works, etc. Raise RFI regarding the details, plans, setting out headroom clearance (MEP issue).

Page 3: updated CV 2016

Submit shop drawings and materials for approval. Implementing finishing works. Prepare Method of statements to different trades. March 2010 to May 2012 Sembawang Engineers & Constructors Pte Ltd Architectural Coordinator Resort World Sentosa Singapore (MC06) Assist Architectural and Zone Managers in implementing finishing works in Hotel and resort project including dry experience and life support system buildings. Attend technical meeting to resolve issues on site specially finishes for landscaping, hotel façade, rockworks, external stone and glass claddings, doors and windows schedules, painting works, cutting lists for tiles, natural stones such as granites and pebble wash finishes. Check shop drawings done by sub-cons for submission and approval by the consultants. Submit samples of finishes for approval. Prepare planning schedule on when to execute the architectural finishes using primavera software. Coordinate with the QS regarding the quantities and schedule of deliveries of finishes. May 2008 to August 2010 Tenwit Engineering Consultants Planning Engineer Singapore Coordinate the completion of construction activities and assist the turnover coordinator in preparation of turnover documentation; Monitor and inspect construction activities to ensure compliance with design documents; Liaise with the design engineer or owners representative to schedule and coordinate the release of construction design documentation to support the construction schedule; Prepare work packages and work scopes for preparation of contract and procurement packages; Coordinate and maintain vendor and shop drawings; Coordinate and control the preparation of as-built drawings; Investigate and resolve engineering and technical related problems. August 2007 to April 2008 Pohlian Const. Pte. Ltd. Site Draftsman Singapore Ardmore Park 2 Condominium Revised and update Architectural, Structural and M&E shop drawings. Prepare presentation drawings for client submission. Coordinate with the clients, consultants and sub-cons Revise the design based on input from the client Prepare drawing documentation after signing final design development by client

Page 4: updated CV 2016

Present the design concept to the client. Coordinate with the M&E consultant and other project consultants Coordinate with the CAD team to prepare construction documentation for both architectural, interior and M&E work including details and specification. March 2005 to May 2007 SAUDI ELECTRICITY COMPANY Architect / Interior Designer Facilities Management Department Jeddah, KSA Designing new building offices and interior design of existing and proposed offices in headquarter, sub-station power plants including landscaping, transmission lines, turbines, HVAC, workshops. Estimate bill of quantities and prepare scope of work at ongoing and proposed projects. Site inspection of on going projects and coordinate with the contractors, subcon and government officials. August 2000 to March 2005 NPC BUILDERS Project Manager Marikina City, Phil. Carissa Housing Dev. Project Coordinate with the owner of the proposed projects including interior design proposals of the said projects. Prepare paper work including bill of materials, scoop of works, manpower update. Participate bidding invitations on private sectors and government agencies such as Department of Public Works and Highways, Philippine Port Authorities, National Housing Agency May 1998 to July 2000 KWAN SING CONST. CORPORATION Project Coordinator Sual Power Plant, Philippines

Supervision of dredging works along Jetty at Sual Power Plant, Sual, Pangasinan. Prepare paper works such as daily accomplishment reports, change orders, as-built plans, manpower and equipment update. Transact and negotiate with the main contractors and government officials. Visit site to inspect the implementation to ensure compliance with the design intent. Maintain a register of all contractor communications Coordinate with the client’s cost consultant /QS to develop and finalize budget details Visit the site to take site measurements, digital photographs and investigate the area.

Page 5: updated CV 2016

Nov. 1995 to Jan. 1998 AL-HAMRA ENG’G. CONSULTANT CO., INC. Draftsman Sharjah, UAE Prepare shop drawings such as buildings, villas, warehouse, flats, etc. Coordinate with the owners and contractors. Prepare paper works such as specifications, time table, scoop of work and cost estimates. Site inspection together with the project engineers and contractors. Prepare sketch designs including perspectives material selections etc. Revise the design based on input from the client Prepare drawing documentation after signing final design development by clients. Present the design concept to the client Visit the site to take site measurements, digital photographs and investigate the area Co-ordinate with the M&E consultant or other project consultants Coordinate with the CAD team to prepare construction documentation for both architectural, interior and M&E work including details and specification January 1988 to June 1994 F.F. Cruz & Co., Inc. Architectural Draftsman 800 EDSA, Quezon City,

Prepare the required drawings, as-built plans on roads, field office laboratory, bridges, building, staff house, ect. Coordinate with the project engineers on finishes as per specification. Prepare daily accomplishment report.