Building Material Prices for Pahang No Description Credit Term Dec-11 Cement Unit (Days) Del or Ex (RM) 1 Ordinary Portland Cement, 50kg bag bag 60 Delivered 16.70 2 Ordinary Portland Cement in bulk MT 60 Delivered 317.1 3 White Cement 40kg per bag, MT 60 Delivered 769 collection in MT No. Description Credit Term Dec-11 Granite Unit (Days) Del or Ex (RM) 4 Granite Aggregate 3/4" MT 60 Ex- 24.5 Factory No. Description Credit Term Dec-11 Sand Unit (Days) Del or Ex (RM) 5 Normal River Sand- Ex MT 30 Ex- 15.8 Factory 6 Fine River Sand for Plastering- Ex MT 30 Ex- 25.2 Factory 7 Normal Mining Sand MT 30 Ex- 16.1 Factory 8 Fine Mining Sand for Plastering MT 30 Ex- 23.1 Factory No. Description Credit Term Dec-11 Mild Steel Round Bar Unit (Days) Del or Ex (RM) 9 Mild Steel Round Bar R10, MS146 MT 60 Delivered 2362.5 10 Mild Steel Round Bar R12, MS146 MT 60 Delivered 2362.5 11 Mild Steel Round Bar R16, MS146 MT 60 Delivered 2264.5 12 Mild Steel Round Bar R20, MS146 MT 60 Delivered 2334.5 13 Mild Steel Round Bar R22, MS146 MT 60 Delivered 2334.5

Upload: ntah84

Post on 11-Nov-2014

28 views

Category:

Documents


6 download

DESCRIPTION

material cost

TRANSCRIPT

Page 1: Updated Material Prices

Building Material Prices for Pahang

No Description Credit Term Dec-11 Dec-12 Dec-13Cement Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang1 Ordinary Portland Cement, 50kg bag bag 60 Delivered 16.70 17.60 18.50

2 Ordinary Portland Cement in bulk MT 60 Delivered 317.1 333.00 349.70

3 White Cement 40kg per bag, MT 60 Delivered 769 807.50 847.90collection in MT

No. Description Credit Term Dec-11 Dec-12 Dec-13Granite Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang4 Granite Aggregate 3/4" MT 60 Ex- 24.5 25.80 27.10

Factory

No. Description Credit Term Dec-11 Dec-12 Dec-13Sand Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang5 Normal River Sand- Ex MT 30 Ex- 15.8 16.60 17.50

Factory

6 Fine River Sand for Plastering- Ex MT 30 Ex- 25.2 26.50 27.90Factory

7 Normal Mining Sand MT 30 Ex- 16.1 17.00 17.90Factory

8 Fine Mining Sand for Plastering MT 30 Ex- 23.1 24.30 25.60

Factory

No. Description Credit Term Dec-11 Dec-12 Dec-13Mild Steel Round Bar Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang9 Mild Steel Round Bar R10, MS146 MT 60 Delivered 2362.5 2480.70 2604.80

10 Mild Steel Round Bar R12, MS146 MT 60 Delivered 2362.5 2480.70 2604.80

11 Mild Steel Round Bar R16, MS146 MT 60 Delivered 2264.5 2377.80 2496.70

12 Mild Steel Round Bar R20, MS146 MT 60 Delivered 2334.5 2451.30 2573.90

13 Mild Steel Round Bar R22, MS146 MT 60 Delivered 2334.5 2451.30 2573.90

Page 2: Updated Material Prices

Building Material Prices for Pahang

No. Description Credit Term Dec-11 Dec-12 Dec-13Mild Steel Round Bar Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang14 Mild Steel Round Bar R25, MS146 MT 60 Delivered 2334.5 2451.30 2573.90

15 Mild Steel Round Bar R32, MS146 MT 60 Delivered 2334.5 2451.30 2573.90

No. Description Credit Term Dec-11 Dec-12 Dec-13High Tensile Deformed Bar Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang16 High Tensile Deformed Bar-Y10, MS146 MT 60 Delivered 2369.5 2488.00 2612.40

17 High Tensile Deformed Bar-Y12, MS146 MT 60 Delivered 2369.5 2488.00 2612.40

18 High Tensile Deformed Bar-Y16, MS146 MT 60 Delivered 2264.5 2377.80 2496.70

19 High Tensile Deformed Bar-Y20, MS146 MT 60 Delivered 2264.5 2377.80 2496.70

20 High Tensile Deformed Bar-Y25, MS146 MT 60 Delivered 2264.5 2377.80 2496.70

21 High Tensile Deformed Bar-Y32, MS146 MT 60 Delivered 2264.5 2377.80 2496.70

No. Description Credit Term Dec-11 Dec-12 Dec-13BRC Fabric Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang22 BRC A6, MS145 m2 30 Delivered 6.8 7.20 7.60

23 BRC A7, MS145 m2 30 Delivered 9.24 9.80 10.30

24 BRC A8, MS145 m2 30 Delivered 12.6 13.30 14.00

25 BRC A9, MS145 m2 30 Delivered 15.5 16.30 17.20

26 BRC A6, MS145 m2 30 Delivered 18.8 19.80 20.80

No Description Credit Term Dec-11 Dec-12 Dec-13Ready Mix Concrete - Granite Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang27 Ready Mix Concrete - Normal Mix - m3 30 Delivered 183.4 192.60 202.30

Page 3: Updated Material Prices

Grade10, Granite

Building Material Prices for Pahang

No Description Credit Term Dec-11 Dec-12 Dec-13

Ready Mix Concrete - Granite Unit(Days) Del or Ex (RM) (RM) (RM)

Pahang28 Ready Mix Concrete - Normal Mix - m3 30 Delivered 183.4 192.60 202.30

Grade15, Granite

29 Ready Mix Concrete - Normal Mix - m3 30 Delivered 191.1 200.70 210.80Grade20, Granite

30 Ready Mix Concrete - Normal Mix - m3 30 Delivered 206.1 216.50 227.40Grade25, Granite

31 Ready Mix Concrete - Normal Mix - m3 30 Delivered 207.9 218.30 229.30Grade30, Granite

32 Ready Mix Concrete - Normal Mix - m3 30 Delivered 221.6 232.70 244.40Grade35, Granite

33 Ready Mix Concrete - Normal Mix - m3 30 Delivered 234.5 246.30 258.70Grade40, Granite

No Description Credit Term Dec-11 Dec-12 Dec-13Brick Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang34 Common Clay Bricks - Pallet piece 30 Delivered 0.4 0.50 0.60

35 Cement Sand Brick - Pallet piece 30 Delivered 0.23 0.30 0.40

36 Smooth Face Facing Brick, Red piece 30 Delivered 1.1 1.20 1.30

No Description Credit Term Dec-11 Dec-12 Dec-13Concrete Roof Tiles Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang37 Interlock concrete Tiles - Standard piece 60 Delivered 1.8 1.90 2.00

Duotone Colour (Monier Elabana)

No Description Credit Term Dec-11 Dec-12 Dec-13

Page 4: Updated Material Prices

Metal Sheet Decking Unit (Days) Del or Ex (RM) (RM) (RM) Pahang

38 MS Decking - Lysaght Colourbond - m2 30 Delivered 55.3 58.10 61.10Spandek Hi - Ten 0.47mm TCT

Building Material Prices for Pahang

No Description Credit Term Dec-11 Dec-12 Dec-13Metal Sheet Decking Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang39 MS Decking - Lysaght Colourbond - m2 30 Delivered 60.5 63.60 66.80

Kliplok Hi - Ten 0.53mm TCT

No Description Credit Term Dec-11 Dec-12 Dec-13Roofing Sheet Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang40 Corrugated Roofing Sheet - 76mm sheet 60 Delivered 29.1 30.60 32.20

Double Width, 1065 x 2440mm x 4mm(Hume/Malex/UAC)

No Description Credit Term Dec-11 Dec-12 Dec-13Floor Tiles Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang41 Glazed Ceramic Floor Tiles, Standard Piece 60 Delivered 1 1.10 1.20

Light Colour 200mm x 200mm x 8mm Grade 1

42 Glazed Ceramic Floor Tiles, Standard Piece 60 Delivered 1.9 2.00 2.10Light Colour 300mm x 300mm x 8mm Grade 1

43 Plain Homogeous Floor Tiles, Standard Piece 60 Delivered 1.5 1.60 1.70Light Colour 200mm x 200mm x 8mmGrade 1

44 Plain Homogeous Floor Tiles, Standard Piece 60 Delivered 2.4 2.60 2.80Light Colour 300mm x 300mm x 8mmGrade 1

No Description Credit Term Dec-11 Dec-12 Dec-13Paver Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang45 Uni-Espave - 200mm x 190mm Piece 60 Delivered 0.9 1.00 1.10

Page 5: Updated Material Prices

46 Uni-Pave/ Sunpave, 225mm x 112.5mm Piece 60 Delivered 0.9 1.00 1.10

Building Material Prices for Pahang

No Description Credit Term Dec-11 Dec-12 Dec-13Plain Cellulose Fibre Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang47 Plain Cellulose Fibre Ceiling Sheet Sheet 60 Delivered 4.5 4.80 5.10

610mm x 1220mm x 3.2mm (UAC/HUME/MALEX)

48 Plain Cellulose Fibre Ceiling Sheet Sheet 60 Delivered 7.2 7.60 8.00610mm x 1220mm x 4.5mm (UAC/HUME/MALEX)

No Description Credit Term Dec-11 Dec-12 Dec-13Gypsum Ceiling Board Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang49 Plain Gypsum Ceiling Board Sheet 60 Delivered 5.3 5.60 5.90

610mm x 1220mm x 9.5mmBoral/Amrstrong

No Description Credit Term Dec-11 Dec-12 Dec-13Timber Door Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang50 Solid decorative Timber Door Piece 60 Delivered 205.1 215.40 226.20

3' x 7' (Branded), Certificated by SIRIM

No Description Credit Term Dec-11 Dec-12 Dec-13Pipes Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang51 Galvanised Iron Class A- 20mm Diameter 6m 60 Delivered 38.1 40.10 42.20

(Maruici) , MS863 run

52 PVC Pressure Pipes Class D, Grey Colour, 4m 60 Delivered 26.4 27.80 29.2050mm Diameter (Paling), MS628 run

53 HDPE Pipe PN 10 - 50mm Diameter, 100m 60 Delivered 408.5 429.00 450.50

Page 6: Updated Material Prices

MS1058 roll

54 ABS Pipe PN 15 Class E - 20mm, 5.8m 60 Delivered 25 26.30 27.70MS1419 run

Building Material Prices for Pahang

No Description Credit Term Dec-11 Dec-12 Dec-13Polytank Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang55 Polyethelene Water Tank (Polytank), No. 60 Delivered 120.1 126.20 132.60

circular, 100 Gallons, MS1225Weida Equivelant

No Description Credit Term Dec-11 Dec-12 Dec-13Hand Wash Basin Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang56 Wash Hand Basin - 560mm x 406mm, Set 60 Delivered 77.4 81.30 85.40

White Colour, Jacqueline WB 142,Claytan

No Description Credit Term Dec-11 Dec-12 Dec-13Water Closets Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang57 Water Closet Western Type - WC 644 Item 60 Delivered 120.4 126.50 132.90

White Colour Without CisternClaytan

58 Water Closet Eastern Type Item 60 Delivered 58.3 61.30 64.40Bengal ACBL-000, Without CisternWhite Colour, Johnson-Suisse

No Description Credit Term Dec-11 Dec-12 Dec-13Stainless Steel Sink Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang59 Single Bowl Single Drainer Item 60 Delivered 88.9 93.40 98.10

Lay On Type, 42" x 18"

Page 7: Updated Material Prices

No Description Credit Term Dec-11 Dec-12 Dec-13Nippon Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang60 Paint - Nippon Standard Colour 5 60 Delivered 103.2 108.40 113.90

Gloss Oilbase, 9000 Gloss Finish Liters

Building Material Prices for Pahang

No Description Credit Term Dec-11 Dec-12 Dec-13Nippon Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang61 Paint - Nippon Standard Colour 5 60 Delivered 95.6 100.40 105.50

Internal Emulsion, Luxury, Waterbase, LitersSatin Glo

62 Paint - Nippon - Internal Emulsion 7 60 Delivered 33 34.70 36.50Waterbase, Finish, Standard Colour, LitersSuper Matex

63 Paint - Nippon Standard Colour 5 60 Delivered 102.34 107.50 112.90External Acrylic Emulsion, LitersWeatherbond

No Description Credit Term Dec-11 Dec-12 Dec-13Hollow Sections Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang64 Square Hollow Section MT 60 Delivered 3328.5 3495.00 3669.80

50mm x 50mm x 3.0mm (4.38kg/m)

65 Rectangular Hollow Section MT 60 Delivered 3391.5 3561.10 3739.20150mm x 100mm x 4.5mm (16.9kg/m)

No Description Credit Term Dec-11 Dec-12 Dec-13Beams Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang66 Universal Beams MT 60 Delivered 3280.9 3445.00 3617.30

356mm x 368mm x 13.33mm(162.2kg/m)

Page 8: Updated Material Prices

67 Structural Sections and Beams MT 60 Delivered 0 2384.21 2503.50

No Description Credit Term Dec-11 Dec-12 Dec-13Equal Angles Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang67 Equal Angles MT 60 Delivered 2717.1 2853.00 2995.70

50mm x 50mm x 4mm(3.06kg/m)

Building Material Prices for Pahang

No Description Credit Term Dec-11 Dec-12 Dec-13Plywood Unit (Days) Del or Ex (RM) (RM) (RM)

Pahang68 Plywood - Shuttering Board Piece 60 Delivered 53 55.70 58.50

4' x 8' x 12mm

69 Plywood - Shuttering Board Piece 60 Delivered 137 143.90 151.104' x 8' x 25mm1st Grade

Page 9: Updated Material Prices

54

Page 10: Updated Material Prices

405

422

455

459

489

517

Oil & Gas Price

Page 11: Updated Material Prices

84.4

58.4

901

Page 12: Updated Material Prices

55.4

Page 13: Updated Material Prices

Oil & Gas Price

7235

Page 14: Updated Material Prices

5007