Updates on CENF SB WG CENF Project Meeting 3 rd October 2013. M. Calviani for the CENF SB WG team. Updates/progress. Progresses in the CE drawings based on latest discussions about ventilation system and safety aspects Trench integration progressing taking into account RP constraints - PowerPoint PPT PresentationTRANSCRIPT
Updates on CENF SB WGCENF Project Meeting 3rd
October 2013
M. Calviani for the CENF SB WG team
2 M. Calviani - CENF PTM 3rd October 2013
Updates/progress
Progresses in the CE drawings based on latest discussions about ventilation system and safety aspects
Trench integration progressing taking into account RP constraints Discussions on-going with HE to maximize vertical
movement of the shielding blocks and apply ITER Code of Practice
First proposition based on this new design will come during next few weeks
3rd October 2013
3 M. Calviani - CENF PTM 3rd October 2013 3rd October 2013
4 M. Calviani - CENF PTM 3rd October 2013 3rd October 2013
5 M. Calviani - CENF PTM 3rd October 2013
CV aspects
EN/CV provided a first pre-design of the ventilation systems of the various sectors composing the installation This will be fed into RP/SEE
calculations for the total release into atmosphere (expected ~1 uSv/y)
Lacking a complete risks assessment (see later), conservative assumptions have been used to start design of the ventilation system
3rd October 2013
6 M. Calviani - CENF PTM 3rd October 2013
RP and safety aspects
RP aspects are well under control, and no major showstopper is to be foreseen Preparation of a summary document note
foreseen for the next few weeks Sky shine effect to be followed
PPS and risks assessment A small working group will be created (S. Hutchins
will lead it) to prepare by end of the year a risks assessment table
Document to be prepared by end of the year
3rd October 2013
7 M. Calviani - CENF PTM 3rd October 2013
On-going and critical
Target (pre)design is on-going – preliminary results at the next SBWG meeting (+ shielding thermo mechanical analysis)
Possibilities to avoid emptying the He-vessel under consideration online filtering
Horns design discussions still pending (critical for the powering part, for which people are ready contributing in the design)
ISR evaporator experience will be addressed during next SBWG meeting