URD Cable Rehabilitation Program. SWEDE 2009 Tulsa, OK May 7, 2009. B. Shawn Cobb, P.E. Presentation Objective. Update on URD System Performance URD System History URD System & Performance Statistics Current Status Action Plan Answer Questions. What is a URD System?. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: URD Cable Rehabilitation   Program

URD Cable Rehabilitation Program

SWEDE 2009

Tulsa, OK

May 7, 2009 B. Shawn Cobb, P.E.

Page 2: URD Cable Rehabilitation   Program

2

Presentation Objective

Update on URD System Performance URD System History URD System & Performance Statistics Current Status Action Plan Answer Questions

Page 3: URD Cable Rehabilitation   Program

3

What is a URD System?

Underground Residential Distribution Single-phase underground electric distribution

system Provides electric service to residential

customers in subdivisions Typically utilizes a loop feed design (two

sources) feeding many sections of cables in between transformers

Page 4: URD Cable Rehabilitation   Program

4

URD System History

1939 – Earliest URD system in Danvers Subdivision 1964 – Installed first direct-buried URD systems 1984 – Initiated a cable replacement program based on

failure rate 1986 – Began installing cable in conduit for new URD

primary cable installations 1993 – Cable injection was introduced for 13kV cables 1999 – Cable injection was developed for 35 kV cables

Page 5: URD Cable Rehabilitation   Program

5

URD System&

Performance Statistics

Page 6: URD Cable Rehabilitation   Program

6

Direct-buried URD

The total amount of direct-buried URD cable installed between 1964 and 1986 is 1,628 miles

The oldest remaining direct-buried cable is 38 years old

Direct-buried URD cable was not performing well (high failure rates), so a cable rehabilitation program was initiated in 1984.

Page 7: URD Cable Rehabilitation   Program

7

URD Direct-buried Cable

DIRECT-BURIED URD CABLEREHABILITATED vs REMAINING

96

396 455

681

13KV REHABILITATED MILES

13KV REMAINING MILES

35KV REHABILITATED MILES

35KV REMAINING MILES

Page 8: URD Cable Rehabilitation   Program

8

URD Direct-buried Cable

DIRECT-BURIED URD CABLEALL REMAINING CABLE by VOLTAGE

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

19

84

19

85

19

86

19

87

19

88

19

89

19

90

19

91

19

92

19

93

19

94

19

95

19

96

19

97

19

98

19

99

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

YEAR

MIL

ES

35KV Cable Injection (Sum)

35KV Non-Rehab

13KV Cable Injection (Sum)

13KV Non-Rehab

Page 9: URD Cable Rehabilitation   Program

9

URD Direct-buried Cable

DIRECT-BURIED URD CABLEREMAINING NON-REHABILITATED CABLE by VOLTAGE

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

19

84

19

85

19

86

19

87

19

88

19

89

19

90

19

91

19

92

19

93

19

94

19

95

19

96

19

97

19

98

19

99

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

MIL

ES

35kV

13KV

Page 10: URD Cable Rehabilitation   Program

10

URD Direct-buried Cable

DIRECT-BURIED URD CABLEREHABILITATED CABLE by VOLTAGE

0

20

40

60

80

100

120

140

19

84

19

85

19

86

19

87

19

88

19

89

19

90

19

91

19

92

19

93

19

94

19

95

19

96

19

97

19

98

19

99

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

YEAR

MIL

ES

35KV Cable Injection

35KV Replacement

13 KV Cable Injection

13KV Replacement

Page 11: URD Cable Rehabilitation   Program

11

URD Direct-buried CableDIRECT-BURIED URD CABLE

CABLE REPLACEMENT by VOLTAGE

0

20

40

60

80

100

120

19

84

19

85

19

86

19

87

19

88

19

89

19

90

19

91

19

92

19

93

19

94

19

95

19

96

19

97

19

98

19

99

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

MIL

ES 35KV Replacement

13KV Replacement

Page 12: URD Cable Rehabilitation   Program

12

URD Direct-buried Cable

DIRECT-BURIED URD CABLEINJECTED CABLE by VOLTAGE

0

5

10

15

20

25

30

35

40

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

YEAR

MIL

ES

35kV

13KV

Page 13: URD Cable Rehabilitation   Program

13

URD Direct-buried System Failures

DIRECT-BURIED URD SYSTEM FAILURESTOTAL FAILURES

by TYPE

0

200

400

600

800

1,000

1,200

1,400

1966

1968

1970

1972

1974

1976

1978

1980

1982

1984

1986

1988

1990

1992

1994

1996

1998

2000

2002

2004

2006

2008

No.

of F

ailu

res TOTAL MISC

TOTAL CONNECTIONS

TOTAL TRANSFORMERS

TOTAL CABLE

Page 14: URD Cable Rehabilitation   Program

14

URD Direct-buried System Failures

13KV DIRECT-BURIED URD SYSTEM FAILURES

0

50

100

150

200

250

300

350

400

450

1966

1968

1970

1972

1974

1976

1978

1980

1982

1984

1986

1988

1990

1992

1994

1996

1998

2000

2002

2004

2006

2008

No.

of F

ailu

res 13KV MISC

13KV CONNECTIONS

13KV TRANSFORMERS

13KV CABLE

Page 15: URD Cable Rehabilitation   Program

15

URD Direct-buried System Failures

35KV DIRECT-BURIED URD SYSTEM FAILURES

0

100

200

300

400

500

600

700

800

900

1000

1100

1966

1968

1970

1972

1974

1976

1978

1980

1982

1984

1986

1988

1990

1992

1994

1996

1998

2000

2002

2004

2006

2008

No.

of F

ailu

res 35KV MISC

35KV CONNECTIONS

35KV TRANSFORMERS

35KV CABLE

Page 16: URD Cable Rehabilitation   Program

16

URD Direct-buried System Failures

DIRECT-BURIED URD SYSTEMTOTAL FAILURE PERCENTAGES

TOTAL MISC1%

TOTAL TRANSFORMERS42%

TOTAL SPLICES5%

TOTAL CONNECTIONS12%

TOTAL CABLE40%

Page 17: URD Cable Rehabilitation   Program

17

URD Direct-buried System Failures

DIRECT-BURIED URD SYSTEM13KV FAILURE PERCENTAGES

13KV SPLICES3%

13KV MISC0%

13KV CONNECTIONS10%

13KV TRANSFORMERS36%13KV CABLE

51%

Page 18: URD Cable Rehabilitation   Program

18

URD Direct-buried System Failures

DIRECT-BURIED URD SYSTEM35KV FAILURE PERCENTAGES

35KV MISC1%

35KV SPLICES5%

35KV CONNECTIONS13%

35KV TRANSFORMERS47%

35KV CABLE34%

Page 19: URD Cable Rehabilitation   Program

19

URD Direct-buried System Failures

DIRECT-BURIED URD SYSTEM FAILURESTOTAL FAILURES

by VOLTAGE

0

200

400

600

800

1,000

1,200

1,400

19

66

19

68

19

70

19

72

19

74

19

76

19

78

19

80

19

82

19

84

19

86

19

88

19

90

19

92

19

94

19

96

19

98

20

00

20

02

20

04

20

06

20

08

No

. of

Fa

ilure

s

35KV TOTAL

13KV TOTAL

Page 20: URD Cable Rehabilitation   Program

20

URD Direct-buried System Failures

DIRECT-BURIED URD SYSTEMCABLE FAILURES

by VOLTAGE

0

100

200

300

400

500

600

700

1966

1968

1970

1972

1974

1976

1978

1980

1982

1984

1986

1988

1990

1992

1994

1996

1998

2000

2002

2004

2006

2008

No.

of F

ailu

res

35KV CABLE

13KV CABLE

Page 21: URD Cable Rehabilitation   Program

21

URD Direct-buried System Failures

DIRECT-BURIED URD SYSTEMTRANSFORMER FAILURES

by VOLTAGE

0

100

200

300

400

500

19

66

19

68

19

70

19

72

19

74

19

76

19

78

19

80

19

82

19

84

19

86

19

88

19

90

19

92

19

94

19

96

19

98

20

00

20

02

20

04

20

06

20

08

No

. of

Fa

ilure

s

35KV TRANSFORMERS

13KV TRANSFORMERS

Page 22: URD Cable Rehabilitation   Program

22

URD Direct-buried System Failures

FAILURE RATES(Total Failures)

0.62

0.50

0.75

1.11

0.54

0.30

0.00

0.20

0.40

0.60

0.80

1.00

1.20

Failu

re R

ate

(fai

lure

s/m

ile)

Failure Rate

Page 23: URD Cable Rehabilitation   Program

23

URD Direct-buried System Failures

FAILURE RATES(by Voltage)

0.46

1.21

0.91

0.73

0.47

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Failu

re R

ate

(fai

lure

s/m

ile)

35 kV

13 kV

Page 24: URD Cable Rehabilitation   Program

24

Through the Cable Rehabilitation Program, we have replaced 884 miles of direct-buried cable with cable in conduit and have injected 251 miles with the injection process. This leaves us with 493 miles of direct-buried cable that still need to be addressed.

The current contractor cost to replace direct-buried cable with cable in conduit is $160,000 per mile.

The current cost for cable injection is $75,000 per mile.

Current Status

Page 25: URD Cable Rehabilitation   Program

25

With an annual budget of $4.5 Million, the recommendation is to continue replacing direct-buried cable with cable in conduit and injecting cable with silicon. The proposed plan is to replace 15 miles with cable in conduit and to inject 30 miles.

1. This recommendation will maximize the use of our annual budget. 2. Cable injection will address and reduce our cable failure rate. 3. Cable replacement will address and reduce transformer failures. 4. Injection contractor has one full time crew which maximizes their

efficiency and productivity by injecting 30 miles of direct-buried cable per year.

Action Plan

Page 26: URD Cable Rehabilitation   Program

26

At a rate of 45 miles per year, it will take

approximately 11 years to rehabilitate all of the remaining direct buried cable. At the completion of the program, there will be about 390 miles of injected cables. The remainder will be cable in conduit.

The recommendation was not based solely on financial calculations. The cable replacement also addresses the transformers, while the cable injection process does not.