Zeroth Review on
DESIGN AND CONSTRUCTION OF PEDESTRAIN SUBWAY BY ULTRA RAPID UNDERPASS (URUP) METHOD
By M.RAJASEKARAN - 5011110028 K.RAMALINGAM - 5011110025 S.GANESH KUMAR - 5011110036 S.PRAVEEN KUMAR - 5011110038
Under the Guidance of
Mr. N.GANAPATHY RAMASAMY,M TechASST. PROFESSOR/CIVIL
SRM UNIVERSITY
FACULTY OF ENGINEERING AND TECHNOLOGYDEPARTMENT OF CIVIL ENGINEERING
S.No. MONTH DESCRIPTION
WORK IN
PROGRESS
COMPLETED
(in %)
01 July ’14Selection of Project title, Introduction, Need, Objective and Scope of work.
YES 100%
02 Aug ’14Design stage-collection of data, preparing Architectural, Structural drawings, Estimation, Project Execution Scheduling etc..,
Yes 10%
03 Sep ’14Design Review and Quality and Safty Audit and final review.
NO 0%
04 Oct ’14 Report Submission NO 0%
SCHEDULE OF WORKS
INTRODUCTION
� “URUP”, Ultra Rapid Under Pass, An innovative shield tunneling technology.
� URUP tunneling, developed by Obayashi in Japan, it is an innovative shaft-less shield technology.
� This is the world’s first tunneling technology that uses a shield machine to tunnel underground through the entire length of tunnel from entrance to exit.
� It enables rapid construction of road and railway underpasses by using Tunnel Boring Machine (TBM) which launches and arrives at ground level.
� The project involves circular TBM with diameters ranging from 2.1m up to 13.6m.
� The finest paradigm for this technology used is in “Central Circular Shinagawa Route Oi Area Tunnel Construction Project” in Japan.
contd…
Objectives� To the need for tunnel construction in congested areas, challenging ground
conditions and stringent physical and environmental constraints.
� This method eliminates the need for shafts so that it occupies less requirement of land and makes fast underpass.
� To get result in significant cost savings, reduced construction time and reduced environmental impact.
Advantages� The URUP method shortens the construction period by roughly 2/3rd and
significantly in cost also.
� It substantially alleviates traffic congestion associated with the construction work.
� The URUP method is environmental friendly by reduction in CO2 level and minimizes the noise and vibrations by equipment that arises from the works.