![Page 1: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/1.jpg)
US 74 Widening ProjectRocky River Road to Secrest Shortcut Road
June 25, 2018
![Page 2: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/2.jpg)
AgendaUS 74 Widening Project
• Introductions• Project Overview and Background• Project Resources• Traffic Conditions and Alternatives• Synchronized Streets• Traffic Analysis• Next Steps• Questions
2
![Page 3: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/3.jpg)
OverviewUS 74 Widening Project
3
• NCDOT State Transportation Improvement Program (STIP) Project U-5764– Widen US 74 from Rocky River
Road to Dickerson Boulevard from a 4-lane, median-divided facility to a multi-lane, median-divided facility.
• NCDOT STIP Project U-5931– Improve the intersection of US
74 and Secrest Shortcut Road
![Page 4: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/4.jpg)
OverviewUS 74 Widening Project
4
• Heavily traveled corridor• Commercial, social, and
recreational uses• Major commuter route• Pedestrian
accommodation issues
![Page 5: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/5.jpg)
Project BackgroundUS 74 Widening Project
• The Union County 2025 Comprehensive Plan (2010) noted the need to revitalize this portion of US 74.
• The Union County Multimodal Transportation Plan (2014) listed among its priorities the need to increase densities along the US 74 corridor and provide streetscapes to promote a more active, mixed-use environment and to provide intersection improvements along the corridor.
• The Charlotte Regional Transportation Planning Organization (CRTPO) 2040 Metropolitan Transportation Plan (MTP) (2014) includes the project.
• The project is included in the current (2018) North Carolina STIP.
5
![Page 6: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/6.jpg)
Project Resources
US 74 Widening Project
6
![Page 7: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/7.jpg)
Project ResourcesUS 74 Widening Project
7
![Page 8: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/8.jpg)
Traffic ConditionsUS 74 Widening Project
• Existing Daily Volumes = 40,000 to 54,000• Future (2040) Daily Volumes = 44,000 to 59,000
8
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
Rocky Rive
r Rd
Wilson
Ave
John
Moo
re Rd
Wellness Blvd
Carroll S
t
Roland
Dr
Williams Rd
Han
over Dr
Dicke
rson
Blvd
Secrest S
hortcu
t Rd
DAILY TR
AFFIC VO
LUME
US 74 Daily Traffic Volumes
Existing Future
![Page 9: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/9.jpg)
Alternatives StudiedUS 74 Widening Project
• Alt 1: Six-Lane Conventional
• Alt 2: Four-Lane Synchronized Street– Dismissed based on
forecasted volumes• Alt 3: Six-Lane
Synchronized Street
9Source: Federal Highway Administration (FHWA)
44,000
59,000US 74
Signalized Synchronized Street
UnsignalizedSynchronized Street
![Page 10: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/10.jpg)
Synchronized Street ConceptUS 74 Widening Project
10
FHWA uses the term RCUT (Restricted Crossing U-Turn).Some states use the term J-Turn, Reduced Conflict Intersection, or Superstreet.
![Page 11: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/11.jpg)
Synchronized Street BenefitsUS 74 Widening Project
• Safety!!– 15 to 46 percent total crash reduction– 22 to 63 percent injury and fatal crash reduction
• Improved Pedestrian Accommodations– Shorter crossings– Opportunity for more crossings
• Reduced delay• Improved Signal Coordination
– Can use signal progression to control speeds
11
![Page 12: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/12.jpg)
Synchronized Street BenefitsUS 74 Widening Project
12
Conventional Intersection32 points
Synchronized Street Intersection14 points
Reduction in Conflict Points
![Page 13: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/13.jpg)
Synchronized Street BenefitsUS 74 Widening Project
13
Mid-block Pedestrian CrossingsIntersection Pedestrian Crossing
Improved Pedestrian Accommodations
![Page 14: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/14.jpg)
Synchronized Street BenefitsUS 74 Widening Project
14
Synchronized Street
Conventional
Signal Phases Two EightSpeeds Controlled by
signal progression
“Controlled” by posted speed
limitQueues Moderate Long
Overall Improved Traffic Operations
![Page 15: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/15.jpg)
Synchronized Streets in NCUS 74 Widening Project
15
Becoming the State’s Default Design for Arterials
![Page 16: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/16.jpg)
Traffic Analysis ResultsUS 74 Widening Project
16
No‐Build 6‐Lane Conventional
6‐Lane Synchronized
StreetAM PM AM PM AM PM
US 74 Eastbound 8:33 8:16 8:52 7:40 6:42 6:14US 74 Westbound 7:37 8:20 7:26 7:53 6:31 6:29
Peak Hour Travel Times
6‐Lane Synchronized Street Design ProvidesAverage Travel Time Savings of
01:32 or 18% in the AM Peak Hour and 01:25 or 19% in the PM Peak Hour
Compared to 6‐Lane Conventional Design.
![Page 17: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/17.jpg)
Traffic SimulationUS 74 Widening Project
17
6‐Lane Conventionalbetween Dickerson Blvd and Secrest Shortcut Rd
![Page 18: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/18.jpg)
Traffic SimulationUS 74 Widening Project
18
6‐Lane Synchronized Streetbetween Dickerson Blvd and Secrest Shortcut Rd
![Page 19: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/19.jpg)
Crash Analysis ResultsUS 74 Widening Project
19
Total Crashes
Total Crash Rate
Statewide Crash Rate
Critical Crash Rate*
Total 1,177 425.61 231.78 247.02Fatal 2 0.72 0.91 2.03
Non‐Fatal Injury 364 131.62 67.50 75.81Night 209 75.68 55.65 63.21Wet 188 67.98 42.17 48.77
Red Values Exceed Critical Crash Rates* Critical crash rate is based on other roads with similar characteristics.
Corridor Crash Statistics Over Previous 5 Years
![Page 20: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/20.jpg)
Crash Analysis ResultsUS 74 Widening Project
20
TotalCrashes at
Intersections
No. of Potentially Preventable Crashes
PotentialCrash Reduction
Percentage
571 115 20%
Intersection Crash Statistics Over Previous 5 Years
Potential crash reduction of 20%is in line with 15 to 46 percent total crash reduction found in
other synchronized street corridors.
![Page 21: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/21.jpg)
Next Steps and ScheduleUS 74 Widening Project
21
• Small Group Meetings – week of 6/25 followed by two-week comment period
• Right of Way – FY 2019• Let for Construction – FY 2021
![Page 22: US 74 Widening Project - ncdot.gov...Crash Analysis Results US 74 Widening Project 19 Total Crashes Total Crash Rate Statewide Crash Rate Critical Crash Rate* Total 1,177 425.61 231.78](https://reader033.vdocuments.net/reader033/viewer/2022043002/5f7dbdf77913ce345b3d6263/html5/thumbnails/22.jpg)
Questions?
US 74 Widening Project
22