us army garrison fort meade brac update - maryland's base

9
Committee on Base Realignment and Closure UNCLASSIFIED 1 [email protected]/GC-FGGM/301-677-4844 US Army GarrisonFort Meade BRAC Update COL Daniel L. Thomas Garrison Commander

Upload: others

Post on 03-Feb-2022

6 views

Category:

Documents


0 download

TRANSCRIPT

Committee on Base Realignment and Closure

UNCLASSIFIED1

[email protected]/GC-FGGM/301-677-4844

US Army Garrison—Fort MeadeBRAC Update

COL Daniel L. ThomasGarrison Commander

Committee on Base Realignment and Closure

UNCLASSIFIED2

[email protected]/GC-FGGM/301-677-4844

• BRAC in Perspective• Buildings• People• Impact - Transportation

AGENDA

Committee on Base Realignment and Closure

UNCLASSIFIED3

[email protected]/GC-FGGM/301-677-4844

BRAC in Perspective

- While BRAC growth garners the most attention, it is only a

part of expansion.

- FGGM Base Population 2009: appx 35k

- FGGM Base Population 2010: appx 42k

- FGGM Base Population BRAC “Closure:” appx 48k

- FGGM Projected Growth 2012+: Cyber

- Growth 2009 – 2010: appx 13k

- BRAC 2011: 6k

- Mission: 7k

Committee on Base Realignment and Closure

UNCLASSIFIED4

[email protected]/GC-FGGM/301-677-4844

704th MI 2010 2011 2012

Military 1,117 1,336 1,432

Civilian 32 35 145

Contractors 0 0 0

Total 1,149 1,371 1,577

AOG 2010 2011 2012

Military 5 5 5

Civilian 156 189 204

Contractors 28 32 36

Total 189 226 245

902nd MI 2010 2011 2012

Military 58 57 57

Civilian 73 84 114

Contractors 26 26 26

Total 157 167 197

MISSION GROWTH

Committee on Base Realignment and Closure

UNCLASSIFIED5

[email protected]/GC-FGGM/301-677-4844

BRAC POPULATION

DISA 2010 2011 2012

Military 20 339 339

Civilian 272 2,348 2,348

Contractors 0 1,585 1,585

Total 292 4,272 4,272

Adjudications 2010 2011 2012

Military 0 56 56

Civilian 0 603 603

Contractors 0 108 108

Total 0 767 767

DMA 2010 2011 2012

Military 0 217 217

Civilian 0 314 314

Contractors 0 132 132

Total 0 663 663

-Three activities directed to

relocated to Fort Meade by

September 2011.

-Defense Information

Systems Agency (DISA)

-Defense Media Activity

(DMA)

-Defense Adjudications

- Majority of personnel flow to

begin Jan 2011.

- Facility delivery should occur

on time.

- Foresee no complications with

relocation of workforce.

Committee on Base Realignment and Closure

UNCLASSIFIED6

[email protected]/GC-FGGM/301-677-4844

BRAC CONSTRUCTION STATUS

- DISA: New facility 99% complete

vs 97% scheduled (+).

- DMA: New facility 89% complete

vs 66% scheduled (+).

- Adjudications: 89% complete vs

74% scheduled (+).

Committee on Base Realignment and Closure

UNCLASSIFIED7

[email protected]/GC-FGGM/301-677-4844

NSA

IMPACT - TRANSPORTATION

Committee on Base Realignment and Closure

UNCLASSIFIED8

[email protected]/GC-FGGM/301-677-4844

PROJECTS - TRANSPORTATION

Committee on Base Realignment and Closure

UNCLASSIFIED9

[email protected]/GC-FGGM/301-677-4844 21 Jul 2010