US Environmental Protection Agency Federal On-Scene Coordinator Report. Regional Response Team /Northwest Area Committee (RRT/NWAC) Meeting Coeur d’Alene, ID. Cherry Point Refinery Fire. On 02/18/2012, fire broke out in the crude processing unit; cause of the fire remains under investigation - PowerPoint PPT PresentationTRANSCRIPT
US Environmental Protection Agency Federal On-Scene Coordinator
Report
Regional Response Team /Northwest AreaCommittee (RRT/NWAC) Meeting
Coeur d’Alene, ID
Cherry Point Refinery FireOn 02/18/2012, fire broke out in the crude processing
unit; cause of the fire remains under investigation
Ecology requested assistance of EPA to conduct ambient air monitoring
Cascade Petroleum TankTruck Rollover
On 03/12/12, a tanker truck with trailer overturned on US Highway 58 releasing about 4,200 gallons of diesel and gasoline into a tributary of the Middle Fork of the Willamette River
Incident affected soil, surface water, and groundwater
Responsible party performed cleanup action with federal and state oversight
Repsol Q2 Pad – Gas and Mud Release On 02/15/12, an exploratory well being drilled on Alaska's North Slope
experienced a blowout when drillers encountered a gas pocket approximately 2500 feet below the surface
Approximate 42,000 gallons drilling mud and an undetermined volume natural gas was expelled from the well onto the gravel pad and nearby tundra
The well was abandoned on 03/15/12
Stubblefield Salvage and RecyclingFormer metals salvage facility
10/09 EPA initiated Phase I of a multi-phase removal action
- 21 55-gallon drums containing hazardous substances and/or oil, 40 yd3 of PCB contaminated debris, 75 yd3 of lead contaminated soil, and 150 yd3 of asbestos contaminated materials were removed
04/12 EPA returned to complete Phase I- 61 55-gallon drums containing hazardous
substances and/or oil were removed
11th Street Chemical Fire NW Chemical Recycling repackaged bulk chemicals for purchase on eBay, including
explosives, flammable liquids, oxidizers, radioactive materials, and reactive metals
- On 03/28/12, a fire and explosion erupted due to tenant repackaging sodium chlorite from a bulk container to a smaller container
EPA conducted a removal action between 03/29 /2012 and 04/18/2012
- 7,000 to 10,000 laboratory grade chemicals in more than 1600 various sized containers were overpacked
- Approximately 320 cubic yards of burnt building debris and containers with chemical residue
Jimmy Creek RanchThe Jimmy Creek Ranch treated fence posts with pentachlorophenol (PCP).
- Oil-stained soil and residual wood-treating product burn pits
At the request of ODEQ, EPA conducted a multi-phase removal action
- 11/2011. Oversight of RP excavation of contaminated soil and sampling activities
- 03/2012. Oversight of additional RP excavation of contaminated soil and sampling activities
Bend Chemical Storage LockerNumerous totes and pails of assorted lab chemicals and waste were
found in a storage locker and industrial unit at a storage facility
EPA conducted a removal action between 03/12 – 15/2012
- Approximately 400 different laboratory grade chemicals in different sized containers were overpacked
McCuthchen ContainersAbandoned chemicals left on the street corner of a private
business near Seattle, Washington
Requested by the State and City Utility to assess and dispose of the unknown substances
Chemicals were assessed and, in cooperation with the County, were taken to the local household hazardous waste collection area for disposal