user guide 980 displayport link layer sink compliance tests · 980 user guide – dp llct 2.2...

61
980 User Guide DP LLCT 2.2 Compliance Rev. A1 Page 1 March 24, 2017 User Guide 980 DisplayPort Link Layer Sink Compliance Tests Rev: A1

Upload: others

Post on 15-Aug-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 1 March 24, 2017

User Guide

980 DisplayPort Link Layer Sink Compliance Tests

Rev: A1

Page 2: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 2 March 24, 2017

Table of Contents

1 Overview 3

1.1 Scope of this User Guide 3

1.2 Changes to this User Guide 4

1.3 What options are available with the 980? 4

1.4 980 User Interface 6

2 Getting Started 7

3 DP LLC 1.2 Sink Compliance Tests 8

3.1 Workflow for running the DP 1.2 Link Layer Sink Compliance Tests 8

3.2 Making the DisplayPort connections 8

3.3 Running the Link Layer Sink Test 9

3.4 Selecting the Link Layer Sink series tests 17

3.5 Executing the DP Link Layer Sink Compliance Tests – Aux Ch. Proto. 25

3.6 Viewing Details of Link Layer Sink Compliance Test Results 35

3.7 Canceling and Resuming the DP LLC Sink Compliance 38

3.8 Viewing the DP Link Layer Sink Compliance HTML test report 42

3.9 Accessing the DP LLC Sink Compliance Test Results from the Navigation View 50

3.10 Exporting the DP LLC Sink Compliance Test Results from the Navigation View 52

3.11 Viewing the DP LLC Sink ACA Traces 56

Page 3: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 3 March 24, 2017

1 Overview

1.1 Scope of this User Guide

This User Guide provides descriptive and procedural information on the DP Link Layer sink compliance test option.

Although you can run the compliance tests through the 980 DisplayPort Video Generator / Protocol Analyzer’s

“embedded GUI,” all the examples used in the procedures in this document are taken from the external standalone

PC 980 GUI Manager. The procedures are identical between the embedded GUI running through the 980 front

panel display and the external standalone PC application but the look and feel is slightly different.

The following is a list of the User Guides available for the 980 systems:

980 HDMI Protocol Analyzer Gen 3 System – Covers source analysis testing for HDMI and MHL source

devices as well as various transmitter features. This user guide is specifically for the functions of the 980 DP

Video Generator / Analyzer Gen 3 system sold through 2012.

980 Advanced Test Platform Quick Start Guide – This Quick Start Guide covers startup procedures for the

980/980B platform. Used in conjunction with the 980 DP Video Generator / Analyzer Module User Guide for

purchases in 2013.

980 HDMI Protocol Analyzer module – Covers source analysis testing for HDMI and MHL source devices as

well as various transmitter features. This user guide is specifically for the functions of the 980 DP Video

Generator / Analyzer module equipped in one of the 980 Advanced Test Platform slots (980 Gen 3 or 980B).

Used in conjunction with the 980 Advanced Test Platform Quick Start Guide.

980 HDMI Protocol Analyzer HDMI/MHL Source Compliance Test – Covers source compliance testing for both

MHL and HDMI sources. These compliance test applications are provided by the 980 DP Video Generator /

Analyzer module or the 980 DP Video Generator / Analyzer Gen 3 system. Used in conjunction with the 980

Advanced Test Platform Quick Start Guide.

980 HDMI Protocol Analyzer HDMI/MHL Sink Compliance Test – Covers sink compliance testing for both MHL

and HDMI sinks (and MHL dongles). These compliance test applications are provided by the 980 DP Video

Generator / Analyzer module or the 980 DP Video Generator / Analyzer Gen 3 system. Used in conjunction

with the 980 Advanced Test Platform Quick Start Guide.

980 MHL CBUS Compliance Test Module - Covers MHL CBUS compliance testing for both MHL sources as

well as sinks and dongles. This compliance test applications are provided by the 980 CBUS Compliance Test

module. Used in conjunction with the 980 Advanced Test Platform Quick Start Guide.

980 HDMI Video Generator module – Covers the features and functions offered by the 980 HDMI Video

Generator module. Used in conjunction with the 980 Advanced Test Platform Quick Start Guide.

980 HDMI Protocol Analyzer HDMI HDCP Source Compliance Test – Covers HDMI HDCP compliance tests

on source devices. These compliance test applications are provided by the 980 HDMI Protocol Analyzer

module.

980 HDMI Protocol Analyzer HDMI HDCP 2.2 Compliance Test - Covers HDMI HDCP compliance tests on

source and sink devices. These compliance test applications are provided by the 980 HDMI Protocol Analyzer

module.

980 DisplayPort Video Generator / Protocol Analyzer - DisplayPort HDCP 2.2 Compliance Test – Covers DP

HDCP 2.2 compliance tests on source and sink and repeater devices.

Page 4: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 4 March 24, 2017

980 DisplayPort Video Generator / Protocol Analyzer - DisplayPort Link Layer Sink Compliance Test – (This

User Guide) Covers DP Link Layer compliance tests on sink devices.

1.2 Changes to this User Guide

This is a new User Guide.

Note: Please be sure to check the quantumdata website for updates to this User Guide.

1.3 What options are available with the 980?

You can determine what options the 980 is provisioned with by looking at the label on the bottom of the 980 or by

accessing the Instrument Information screen on either the built-in or external 980 GUI manager. You will need to

access the Instrument Information panel through embedded 980 GUI Manager as shown below.

The information is then displayed in a separate window. The information on the Instrument Information window

will provide you with the information about what options are supported and will also be helpful if you call Quantum

Data customer support during an upgrade process.

Page 5: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 5 March 24, 2017

Page 6: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 6 March 24, 2017

1.4 980 User Interface

The 980 and its module’s provide a graphical user interface for operation. This GUI can run both on the 980 itself

through the built-in color touch screen display or as a standalone application running on a PC. The look and feel

and functions are similar but not identical.

1.4.1 External 980 GUI Manager

The external 980 GUI Manager provides easy access to the captured data on your PC for sharing with others. Also

the external 980 GUI Manager enables you to operate the 980 DP Video Generator / Analyzer through a larger

interface which allows you to use multiple panels at the same time.

1.4.2 Embedded 980 GUI Manager

Page 7: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 7 March 24, 2017

You can operate the 980 DP Video Generator / Analyzer module fully through the built-in color touch screen

display. In addition to the basic operation of the 980 DP Video Generator / Analyzer module the touch screen

display GUI there are two key features that are only available in the embedded 980 GUI Manager GUI: 1) viewing

the video in real time, 2) viewing the DP video/audio metadata and Aux Channel transactions in real time using the

Real Time mode. You can view the incoming video from a source even when encrypted with HDCP content

protection. The ability to view the incoming video also enables you to control the menus of the DP source device to

ensure that it is in the correct mode. The built-in GUI also enables you to view the DisplayPort video metadata and

Aux Channel transactions in real time, as they are being captured, using the Real Time mode.

You can transfer data captures taken from the built-in touch display to your PC where they can be viewed through

the external 980 GUI Manager and also disseminated to others for analysis.

2 Getting Started

Please refer to the 980 Advanced Test Platform Quick Start Guide for detailed Getting Started Procedures. This

Quick Start Guide is available on the quantumdata Downloads page or the 980 product pages.

Page 8: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 8 March 24, 2017

3 DP LLC 1.2 Sink Compliance Tests

This chapter describes how to use the optional DP Link Layer sink compliance test feature of the 980 DP Video

Generator / Analyzer module. Please note you will have to purchase the DP Link Layer Compliance Test for Sinks

license in order to run these tests.

The 980 supports the following test sections in the DP Link Layer Sink Compliance Test specification:

5.2.1 - Aux Channel Protocol

5.3.1 – Link Training

5.3.2 – Link Maintenance

5.4.1/5.4.2 – Main Video

5.4.3 – Power Management

5.4.4 – Main Audio

7.2.1 – DPCD

3.1 Workflow for running the DP 1.2 Link Layer Sink Compliance Tests

The following is the high level workflow for running the DP Link Layer Sink Compliance Tests. This workflow

assumes that you have powered up the 980 and established an Ethernet session with the 980 as described in

Connection for 980 GUI Manager and 980.

The following is the high level workflow for running the DP Link Layer Sink Compliance Tests.

1. Connect the sink device under test to the 980 DP Video Generator / Analyzer Rx port via a DisplayPort cable.

2. Complete a (or load an existing) Capabilities Declaration Form (CDF) for the device under test using the CDF

Entry panel.

3. Select the tests that you wish to run from the Test Selection panel.

4. Initiate the tests through the Test Options / Review panel.

5. View the detailed data for test failures if failures occur.

6. View the results in the Test Results panel under the Navigator panel.

3.2 Making the DisplayPort connections

This procedure describes how to establish a DisplayPort connection between the DP sink device under test and

the 980. This procedure assumes that you have assembled the 980 and sink device under test and applied power

to all these devices. Refer to the procedures and diagram below.

1. Connect your DisplayPort display device under test to the DP Tx connector Tx2 on the 980 DP Video

Generator / Analyzer module.

2. (Optional) If you are going to run the tests from the external 980 GUI Manager which is recommended, you will

connect your host PC running the External 980 GUI Manager to the 980B through a network (Ethernet) cable.

Refer to the 980B Quick Start Guide for details on connecting a host PC running the External 980 GUI

Manager to the 980B.

Page 9: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 9 March 24, 2017

DisplayPort connection for sink compliance test – 980B

3.3 Running the Link Layer Sink Test

Use the following procedures to complete the CDF for the DisplayPort sink compliance tests.

To complete the CDF:

1. From the Compliance Tests page of the Apps panel, enable viewing of the DP Link Layer Sink Compliance

Test (Receiver).

Page 10: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 10 March 24, 2017

Page 11: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 11 March 24, 2017

2. Select the CDF Entry panel as shown below.

Page 12: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 12 March 24, 2017

3. To create a new CDF, click on the New activation button as can be seen in the screen example above.

You will be prompted with a confirmation that you want to start a new CDF and reset the values. Click OK to

proceed.

4. To open an existing CDF, click on the Open activation button.

You will be prompted with a dialog box that enables you to open a CDF. Select a CDF and then OK to proceed.

Page 13: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 13 March 24, 2017

5. Complete the items in the Products tab of the CDF Entry panel shown below.

Page 14: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 14 March 24, 2017

6. Save the CDF. A confirmation box with a default name will appear as shown below. Edit the name if necessary

and click OK.

CDF name in use is shown on panel.

7. Complete the items in the Video and Audio tabs of the CDF Entry panel; examples below.

Page 15: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 15 March 24, 2017

Page 16: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 16 March 24, 2017

Page 17: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 17 March 24, 2017

3.4 Selecting the Link Layer Sink series tests

Use the following procedures to select the tests to run. There are multiple tabs which correspond to each section in

the CTS.

To select the tests to run:

1. Select the Test Selection panel as shown below.

2. If you have an existing Test Selection option file saved you can recall that for use in your testing. Simply click

on the Open activation button.

3. A dialog box will appear as follows. Simply select the file and click on the OK activation button.

4. Complete the items in the DP Sink LLC Core R1.1 Tests of the Test Selection panel shown below.

For convenience you can Select All Tests or Deselect All Tests for both tabs or for group selection over each

page Select All on Page or Clear All on Page tests using the activation buttons provided.

The following screen examples show the tests selected for each tab.

Page 18: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 18 March 24, 2017

Page 19: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 19 March 24, 2017

Page 20: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 20 March 24, 2017

Page 21: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 21 March 24, 2017

Page 22: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 22 March 24, 2017

Page 23: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 23 March 24, 2017

5. You can save the Test Selection options using the Save activation button.

A dialog box will appear as follows. Simply assign a name and click on the OK activation button. Click Cancel

to exit.

Page 24: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 24 March 24, 2017

Page 25: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 25 March 24, 2017

3.5 Executing the DP Link Layer Sink Compliance Tests – Aux Ch. Proto.

Use the following procedures to initiate the execution of a DP Link Layer Sink Compliance test series.

Note that you select only a subset of tests in the entire suite to run. This example runs the entire suite of tests

supported by the 980 DisplayPort module.

To initiate a test series:

1. Select the Test Options / Preview panel as shown below.

Page 26: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 26 March 24, 2017

2. (Optional) Review the list of tests for each category. If you wish to skip some of the tests. You can skip tests by

clicking on the Check mark on the right side of the Test Options / Preview panel.

The screen shot below shows some of the tests that have been skipped (highlighted in yellow with a red X).

Page 27: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 27 March 24, 2017

3. Select the 980 Test Instrument from the pull-down menu of the LLC Test Options / Preview tab shown below.

Click on the Execute Tests activation button to initiate the test suite. You will be prompted for a

name for the tests. This dialog box is shown below.

Page 28: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 28 March 24, 2017

During the tests a Sink Test Configuration dialog box will appear which requires that you to verify that the

sink device under test is connected properly. The following screen shot depicts this. Press Continue when you

have the sink device connected properly. You can cancel the test using the Cancel Compliance Test button.

Page 29: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 29 March 24, 2017

4. Click Continue after verifying that the connections have been made. You will be prompted with a dialog box

that instructs you on what to expect during the tests. Refer to the sample screen shot below.

There is a green progress arrow which points to the test that is currently being run.

Refer to the following screen examples to see how the test progresses in the test window.

Page 30: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 30 March 24, 2017

Page 31: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 31 March 24, 2017

You can scroll through the test results windown even during the test as shown on the following screen

example.

Page 32: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 32 March 24, 2017

Page 33: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 33 March 24, 2017

The lower panel Test Log shows the testing activity as it occurs.

You can cancel the compliance test or pause at any time. If you pause the test you can resume later at any

time even if you exit the 980 GUI Manager application. Refer to the following screen examples.

When the tests are complete the test window will indicate Test Complete and show the results of each Test ID.

Refer to the screen example below.

Page 34: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 34 March 24, 2017

When you close the test execution window, the Compliance Test Viewer window will appear showing the

results of the test. Please refer to the following section for details on viewing the compliance test results.

Page 35: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 35 March 24, 2017

3.6 Viewing Details of Link Layer Sink Compliance Test Results

When you have completed the test series you will have an opportunity to view the detailed data for a particular

failure or a test that passed. Use the following procedures to view the details of a test that passes or fails.

To view the details of the test results:

1. Expose the detailed results of a test result and highlight a results record. Refer to the screen examples below.

Page 36: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 36 March 24, 2017

Note that you can view the reason for each failure as depicted on the screen example below.

Page 37: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 37 March 24, 2017

Page 38: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 38 March 24, 2017

3.7 Canceling and Resuming the DP LLC Sink Compliance

You can complete or resume a test series that was canceled earlier. The test results are saved in a directory that is

accessible through the 980 GUI Manager interface. Use the following procedures below.

To view the details of the test results:

1. Click on the Cancel the Compliance Test activation button to cancel the test. Refer to the screen example

below.

The Test Log will indicate that the test has been canceled as shown below.

Page 39: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 39 March 24, 2017

2. You can resume a test through the Compliance Tests Results window. You can access the Compliance

Tests Results through the Navigation window either by double clicking on the results or from the right click

menu and selecting Open.

Page 40: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 40 March 24, 2017

The Compliance Test Results window appears as shown below.

Page 41: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 41 March 24, 2017

The test window reopens and the tests resume as shown below.

Page 42: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 42 March 24, 2017

3.8 Viewing the DP Link Layer Sink Compliance HTML test report

After you have completed the tests, you can view an HTML report. Use the procedures below.

To view the HTML report of the test results:

1. Click on the HTML activation button on the upper right to initiate the HTML report. Refer to the screen example

below.

Page 43: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 43 March 24, 2017

A dialog box appears asking if you want the CDF to appear in the report (below).

Page 44: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 44 March 24, 2017

The following screen examples show the HTML report. The first and second screen examples shows a summary of

the test results and the CDF. The third and fourth screen examples show detailed results of specific tests. The last

screen sample shows the details of the 980B system hardware and software. This is useful for cases where you

have test results that seem inconsistent; you can pass this on to Teledyne LeCroy customer support.

Page 45: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 45 March 24, 2017

Page 46: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 46 March 24, 2017

Page 47: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 47 March 24, 2017

Page 48: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 48 March 24, 2017

Page 49: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 49 March 24, 2017

You can save the HTML report to a location on your PC for easy access (below) using the Save As button on the

bottom of the window indicated above. The file can be email to others. You can view the HTML report through any

standard browser.

Page 50: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 50 March 24, 2017

3.9 Accessing the DP LLC Sink Compliance Test Results from the Navigation

View

You can access the results of any test at any time through the Navigation view. If the test results are on your PC

you can view the results without connecting to a 980 system.

Note: If you ran the test on the 980 system (rather than the PC) you will have to transfer the results files to your PC.

These procedures are described further below.

Use the procedures below to access the test results from the Navigator Window:

To access the test results:

1. Double click on the test results you wish to open in the Navigator view as shown below.

Page 51: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 51 March 24, 2017

The Compliance Test Results Viewer window opens up as shown below.

Page 52: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 52 March 24, 2017

3.10 Transferring Test Results Files from the 980 to the Host PC

If you ran the DP LLC tests from the embedded 980 GUI, then you may wish to transfer the results to your PC

which is hosting the external 980 GUI Manager. You will need to do this if you want to disseminate the results to

other colleagues, subject matter experts or Teledyne LeCroy customer support.

To transfer the test results from the 980 to the PC:

1. Right click on the test results you wish to export as shown below.

Page 53: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 53 March 24, 2017

A dialog box may appear asking you to select a 980. Select the specific 980 system that you wish to transfer files

from.

Once you connect to a device the Data Transfer Results window will appear as shown below. Select the Local

Files directory and you will notice that the Copy and Move buttons will be highlighted.

Page 54: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 54 March 24, 2017

Select either Copy or Move to transfer the files. The following screen example shows the results.

You can now export the files for dissemination to others as described in the next procedure.

Page 55: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 55 March 24, 2017

3.11 Exporting the DP LLC Sink Compliance Test Results from the Navigation

View

You can export the results to a zip file for dissemination to colleagues and other subject matter experts for further

analysis.

To export the test results for dissemination:

1. Right click on the test results you wish to export as shown below.

Page 56: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 56 March 24, 2017

A Window browser window appears enabling you to select a location (below).

3.12 Viewing the DP LLC Sink ACA Traces

After you have completed the tests, you can view an Auxiliary Channel Analyzer (ACA) traces taking during the

test. These traces are very useful in troubleshooting failures. Use the procedures below. You can link to the ACA

traces in one of two ways: 1) You can link to the ACA traces from the test results window, 2) You can link to the

ACA traces by navigating from the Navigator view.

To access the ACA traces from the Test Results window:

1. Select the test results that you wish to view ACA traces from in the Navigator view.

Refer to the screen example below.

Page 57: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 57 March 24, 2017

2. Double click on the test transaction in the Test Results window to access the associated ACA logs.

Alternatively, click on the Open ACA Data button on the lower left of the Test Results window.

Refer to the screen example below.

Page 58: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 58 March 24, 2017

The ACA trace logged during that selected test is presented as shown below.

Page 59: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 59 March 24, 2017

Detailed procedures on how to use the ACA for DisplayPort can be found in the DisplayPort User Guide available

at the DisplayPort webpage.

To access the ACA traces from the Navigator view:

1. Double click on the ACA log you wish to open in the Navigator view as shown below.

Page 60: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 60 March 24, 2017

The ACA trace logged during that selected test is presented as shown below.

Page 61: User Guide 980 DisplayPort Link Layer Sink Compliance Tests · 980 User Guide – DP LLCT 2.2 Compliance Rev. A1 Page 4 March 24, 2017 980 DisplayPort Video Generator / Protocol Analyzer

980 User Guide – DP LLCT 2.2 Compliance Rev. A1

Page 61 March 24, 2017

Detailed procedures on how to use the ACA for DisplayPort can be found in the DisplayPort User Guide available

at the DisplayPort webpage.

END OF USER GUIDE